OversightArchive
Twin Falls, Idaho

City Council meeting

Monday, June 19, 2017

Listen, read the transcript, and link to any moment. Every timestamp is time into the recording.

The transcript is machine-made and not checked word for word. Names, numbers and quiet speakers are the most likely to be wrong. The one exception is the Pledge of Allegiance: a room reciting together is hard for the machine to hear, so the pledge is shown in its standard wording. The recording is the record: listen before you quote. Home addresses, phone numbers and email addresses that speakers give are muted in the audio and marked in the text. The audio is a smaller copy made by software from the video the agency posted, so it loads quickly; nothing is cut apart from the muted passages. The agency's own posting is the original, and each recording below links to it where we have its address.

No finding or timeline entry cites this meeting. It's here so the whole record can be searched and checked, including anything that could explain or change a finding.

Part 1 (from 0:00:00)

Part 2 (from 1:30:00)

Part 3 (from 3:00:00)

Transcript

1:32:47 Okay, we're going to get Nikki in and we'll be going at this time

1:32:55 We're going to reconvene the Twin Falls City Council meeting for tonight June 19th

1:33:00 We did meet at 3 30 and two words some of our new facilities that are under construction

1:33:05 so at this time I would like to

1:33:08 Go ahead and confirm that we do have a quorum of the council here

1:33:12 We have five of the seven members tonight and at this time we are going to say the Pledge of Allegiance

1:33:18 So if you'd like to join us, please stand

1:33:28 and to the republic for which it stands,

1:33:32 one nation under God, indivisible, with liberty and justice

1:33:36 for all.

1:33:40 Again, thank you for your patience.

1:33:42 We're still working through some new software

1:33:44 for the council members and city staff.

1:33:46 So we'll keep going and get all those buds worked out,

1:33:49 hopefully, in the next couple of weeks.

1:33:53 At this time, we're going to look to our city managers

1:33:56 and ask if there's any amendments to tonight's agenda.

1:34:00 Madam Vice Mayor, there are no material changes to tonight's agenda.

1:34:04 We would like to modify the order this evening just for sequencing of items.

1:34:11 We would like to have item G followed by item I and then item H.

1:34:18 And so I and H will just be interchanged.

1:34:22 And also on item G, John Caten, the city's Public Works Director is going to make some

1:34:28 interjectory comments before Aaron Steele, our engineer,

1:34:33 lead you through the presentation of that item.

1:34:35 That's item G in which Mr. Caten will be speaking.

1:34:38 Thank you very much.

1:34:41 We have no proclamations tonight.

1:34:44 So at this time, we'd like to open the floor

1:34:47 to anyone in the audience who would like

1:34:49 to address the council on any issue

1:34:52 that is not on tonight's agenda.

1:34:55 So if there's anybody who has anything

1:34:57 to share with us, now's your chance.

1:35:00 see no one, we will move on to the consent calendar.

1:35:05 Greg Lanthine.

1:35:06 Move approval of the consent calendar as published.

1:35:08 Second.

1:35:11 We have a motion on the floor by Greg Lanthine,

1:35:14 seconded by Ruth Pierce to approve the consent calendar.

1:35:17 And we have council comments first, Chris Talkington.

1:35:21 I'd like to make an amendment to the council meetings,

1:35:26 minutes of June 12th.

1:35:27 That was reported that the third annual Vietnam

1:35:32 that's welcome home is scheduled for June 17th at Harman Park at

1:35:37 should be July 15th. It's pretty important and we're trying to

1:35:41 build a lot of public knowledge about that. So thank you.

1:35:44 Thank you, Chris. Any other comments from the council?

1:35:51 Sharon roll call vote, please.

1:35:58 Nikki Boyd. Yes, Suzanne Hawkins. Yes, Greg Lanting. Yes,

1:36:04 Ruth Pierce. Yes, and Chris talking to yes, motion passes five

1:36:09 to zero. Next on our agenda is items for, oh, are we going to do advisory board here? Is

1:36:17 that put in the right place on our agenda? It is not. You can skip that. Thank you. Okay.

1:36:26 So onto items of consideration then. The first item we have tonight is a request from our

1:36:33 chief of police, Craig Kingsbury, to recognize Lieutenant Craig Stott's for his completion

1:36:40 of the 268th session of the FBI National Academy, and first, the swearing in of our newest police

1:36:48 officer, Tracy Thompson, and we'll turn it over to our chief.

1:36:52 Thank you, Madam Vice Mayor, members of Council and our esteemed community this evening.

1:36:57 We have two exciting things that are happening within the police department here within the

1:37:02 City of Twin Falls that we're going to accomplish tonight.

1:37:05 We are going to start out by swearing in Officer Tracy Thompson.

1:37:10 So if I could have Officer Thompson come forward and stand in front of me, we'll make him kind

1:37:14 of stand there so we can all look at him for a little bit while I talk.

1:37:23 Tracy was hired by the Twin Falls Police Department on March 20th as a full-time police officer.

1:37:28 He was born and raised here in the Magic Valley right in Jerome.

1:37:31 He graduated from Jerome High School in 1994.

1:37:34 While still in high school, he enlisted in the Army Reserves as a combat engineer.

1:37:39 Once he graduated, he went to Fort Leonard Wood in Missouri for basic training.

1:37:43 Upon completion of basic training, he returned to Idaho and attended the College of Southern

1:37:47 Idaho as a music major until he left on a two-year LDS mission to Finland.

1:37:53 When he returned from Finland, he switched over to the 25th Army National Guard Army Band

1:37:58 out of Galenfield.

1:37:59 He went on to continue his education at Boise State University and worked at the BSU Book

1:38:03 Store as a textbook manager.

1:38:06 He attained his bachelor's degree in criminal justice in 2008.

1:38:10 Now, Tracy is not new to law enforcement.

1:38:15 He started his career with the Twin Falls County Sheriff's

1:38:17 Office, where he worked for the last four years as a detention

1:38:20 deputy.

1:38:21 Tracy just graduated on Friday from the Idaho Peace

1:38:25 Officer Standards and Training Academy with session 189.

1:38:30 And I will say, I don't always get a lot of feedback

1:38:34 from the instructors and the facilitators.

1:38:37 But one of the facilitators said something to me

1:38:40 in regards to Officer Thompson that I thought really,

1:38:43 really struck to what we're looking for when we,

1:38:47 when we as a city, looked at higher police officers.

1:38:50 And this coordinator, Mr. Festake, told me, said,

1:38:54 Tracy has a good heart.

1:38:56 And I think that that's very important.

1:38:58 And I want to thank you, Officer Thompson, for that.

1:39:01 because I think in this profession, that is very, very important.

1:39:06 Now, Officer Thompson has his full career ahead of him.

1:39:10 But as many of you have heard me say before,

1:39:13 there's a lot that goes into tonight

1:39:15 when he's about to get sworn in and take that oath of office.

1:39:19 At the graduation on Friday from the Peace Officers Standards

1:39:23 and Training Academy, the five officers from that class

1:39:29 got up and recited the Code of Ethics, the International Association Chiefs of Police Code

1:39:35 of Ethics, as well as the police officers and standards and trains Code of Ethics.

1:39:41 And when we look at police officers and what we, I think what you as a council, what our

1:39:46 community wants from the men and women to wear the badge and have the authority of the peace

1:39:52 officer, we want men and women that are going to abide by that Code of Ethics and live that

1:39:58 every day and I think that's one thing that we have here with Officer Thompson.

1:40:02 Officer Thompson, I would remind you that currently on your uniform you have two of the three very

1:40:09 important symbols that we have as peace officers.

1:40:14 The first is the patch that you wear on your shoulders that talks about our community, shows

1:40:20 where we're from, the organization that we represent, the community that we represent.

1:40:25 Also, you have your nameplate, that nameplate speaks to who you are, that nameplate probably

1:40:34 speaks more importantly than any of the other three items that are on our uniforms as to

1:40:40 who we are.

1:40:41 Now, Tracey, I know you have some family members here in the audience, so would you like to introduce

1:40:46 some of your family because family is so important to a successful career of a law enforcement

1:40:51 officer?

1:40:56 You'll never live that down the office forever.

1:41:46 No, you're right, Councilman. He's buying dinner tonight.

1:41:51 Well, I would like to welcome all of you to the Twin Falls Police Department family as they also welcome Officer Tracy Thompson.

1:42:00 In just a minute, Tracy, I'm going to pin your badge on your chest.

1:42:05 And that badge, that shield, represents our profession.

1:42:08 And the shield that we are, as law enforcement officers,

1:42:12 to protect society from those who may want to do them harm.

1:42:17 As peace officers, we know that we will be there for our community,

1:42:24 and for the people that maybe just are traveling through

1:42:27 so that we can protect them and serve them the best that we can.

1:42:30 Our model here in the city of people serving people is so very true in all aspects of city government

1:42:37 But especially in the police department. You've heard Tracy's bio. He's just a regular guy from Jerome Idaho

1:42:43 Who is who has grown up and done a lot of neat things in his life already?

1:42:48 But now has become a twin-false police officer

1:42:51 So what I would ask vice mayor if you want to come down and I think so Captain Hicks and I were speaking

1:42:57 It might be better if we pin the badge on him before the oath, that way it's on what he's,

1:43:02 you've been with that?

1:43:03 Perfect.

1:43:04 All right.

1:44:33 Which I have been appointed according to law.

1:45:02 And as Officer Thompson is signing that, just remind the community that as peace officers,

1:45:08 we take our oath of office very seriously.

1:45:11 In fact, we take it so seriously that, again, at Officer Thompson's one year anniversary,

1:45:16 will get presented that office in a frame so he can keep that with him. I was a few

1:45:22 months ago presented mine and it is something that I treasure. So, welcome to

1:45:45 the department, Officer Thompson. Now, next on the list, we recently had Lieutenant Craig

1:45:52 starts, a long time member of TFPD, attend some very high level and prominent training

1:46:02 from the Federal Bureau of Investigation.

1:46:05 I have asked Captain Matt Hicks to come up and speak about this training, as Captain Hicks

1:46:11 was the only current TFPD employee that had attended this training program before Lieutenant

1:46:18 and stocks recently graduated.

1:46:20 So for the next section, I'm going to turn it over to Captain Hicks.

1:46:28 Good evening, Mayor, members of council.

1:46:29 Thank you for giving us some time to recognize a career

1:46:32 achievement from one of our department's finest officers

1:46:34 and leaders.

1:46:35 On June 7th of this past year, Lieutenant Craig

1:46:37 Stott's graduated from the FBI National Academy.

1:46:41 And I would be remiss if he thought for one second,

1:46:43 I was going to let him sit on the back.

1:46:46 We have Lieutenant Craig Stott's please come forward.

1:46:55 The FBI National Academy's professional course of study for the United States and international

1:46:59 law enforcement managers nominated by their agency heads because of demonstrated leadership

1:47:04 qualities.

1:47:05 Craig is only the 12th graduate of the FBI National Academy and Art Department's 110-year history.

1:47:10 The 10-week program which provides coursework and intelligence theory, terrorism, management,

1:47:15 law, behavioral science, communication, forensic science, serves to improve administration,

1:47:20 of justice and police departments at agency at home and abroad and to raise law enforcement

1:47:24 standards knowledge and cooperation worldwide. The academy began in 1935. It was a

1:47:29 creative response to a 1930 study that recommended standardization and

1:47:33 professionalization of law enforcement departments across the US. Leaders and

1:47:38 managers of state, local, county, tribal, military, federal and international law

1:47:42 enforcement agencies all attend the FBI National Academy. Participation is by

1:47:46 invitation only through a nomination process. Participants are drawn from

1:47:51 every U.S. state and territory and from international partners worldwide. Sessions of approximately

1:47:57 220 officers take undergraduate or in Craig's case graduate courses at the FBI campus in

1:48:04 Quantico, Virginia. Classes are offered in the following areas law, behavioral science, forensic

1:48:10 science, terrorism, leadership, communication and health and fitness. Officers participate

1:48:15 in a wide range of leadership and specialized training where they share ideas, techniques,

1:48:20 experiences with each other, creating lifelong partnerships that transcend state and national

1:48:25 borders. The final test of the fitness challenge, the yellow brick road, is a grueling 6.1 mile

1:48:30 run through a hilly wooden trail built by the Marine Corps. A long way, participants must climb

1:48:35 over walls, run through creaks, jump through simulated windows, scale rock faces, a crawl under bob

1:48:41 wire, etc. If and when a student successfully completes this test, they receive an actual yellow brick

1:48:46 to memorialize their achievement.

1:48:48 Despite receiving an injury in week four of his training

1:48:50 to his knee, Craig was able to work his way through that

1:48:53 and able to successfully complete the yellow brick road.

1:48:56 During his 19-year career with us, Craig

1:48:58 has been promoted several times to the rank of staff sergeant

1:49:01 and lieutenant.

1:49:02 He has served as a field training officer, a motorcycle

1:49:05 officer, and as a SWAT team member, team leader,

1:49:08 and field commander.

1:49:09 Craig has managed our city communications center

1:49:13 for nine years and is currently serving

1:49:15 as a criminal investigation division commander.

1:49:18 At this point, I would like to introduce the correct spots.

1:49:29 Thank you.

1:49:30 Madam Vice Mayor, members of the City Council,

1:49:32 thank you very much.

1:49:33 I just want to take just a few short minutes

1:49:36 to express my appreciation for everybody

1:49:40 that made this possible.

1:49:42 The city staff, obviously the council

1:49:44 that approved this training, and also to the members of my team

1:49:48 that I work with back at the Criminal Investigations

1:49:51 division, the supervisors, Staff Sergeant Garner, Sergeant Diamond, Sergeant Frick, and Sergeant

1:49:56 Allen. They took on the task of completing all the duties that I'm responsible for while

1:50:02 I was gone for 10 weeks. So I appreciate them. And also, I would be remiss if I didn't thank

1:50:08 my wife. She obviously had the toughest job. She stayed home for 10 weeks while I was studying

1:50:21 and made it possible for me to concentrate and complete the Academy while taking care

1:50:26 of two teenage kids and an eight-year-old, so she deserves a round of applause, obviously.

1:50:31 So thank you.

1:50:37 Thank you very much.

1:50:38 Any questions?

1:50:39 No?

1:50:40 I don't think so, but I think we'd all like to shake your hand, but I think we'd like

1:50:44 to shake Bao's hand too if she'll come up with you.

1:50:47 Serious.

1:50:48 Yeah, no, truly.

1:50:53 down the home front is not an easy task.

1:50:56 You got somebody looking over your shoulder.

1:51:22 Thank you.

1:51:38 Congratulations.

1:51:40 Chris talking to us.

1:51:41 I'd like to say how doggone proud as a cop kid, I am to see the continued

1:51:46 personalities, starting with the chief that we stole from Napa Farron Square.

1:51:53 He came because he knows city of Tund Falls uses, can use his expertise.

1:51:59 Certainly a new officer's Thompson and Lieutenant Craig's.

1:52:04 I've known for Craig's thoughts, I've known for a number of years and our professionalism

1:52:09 is getting known around the Northwest and dug on proud of the cop shop.

1:52:16 Before we move on real quick, I just want to say congratulations again.

1:52:19 It's not very often that I take my packet and read it to my family, but I read to them

1:52:25 the biography on what you've just been through because I was so proud of everything that was

1:52:29 listed in there.

1:52:30 And that was just, it was amazing to me.

1:52:32 So I educated my grandchildren and they had to go through it all too.

1:52:36 So, thank you.

1:52:37 Did you have something to have a secret?

1:52:42 Okay.

1:52:44 So I was advised that it now would be a good time to announce that if you were here for the

1:52:50 police portion of the agenda, you're not going to hurt our feelings if you need to see to

1:52:56 other things this evening.

1:52:57 So, thank you for attending.

1:53:04 And while they're leaving, we will go ahead and call up Michael Errington from Star Corporation

1:53:10 for an update on our City Hall and Public Safety presentation.

1:53:14 And it looks like we have Jason Darrickott.

1:53:17 I'll just switch it right over.

1:53:18 We keep switching on you, sorry.

1:53:20 Last month I wasn't able to attend my son had a birthday party,

1:53:23 so Michael covered for me, so I appreciated him covering that for me.

1:53:26 But I'm happy to be here with his mic.

1:53:28 We had the chance to walk both the projects together,

1:53:32 so my report would be somewhat brief,

1:53:33 but I do want to recap what we saw out there and where we're at.

1:53:36 First and foremost, I just want to announce that we are on budget,

1:53:40 and we are on skin.

1:53:41 Thank you.

1:53:43 So that we can focus on the other details.

1:53:45 At the police operations building, we are currently hanging

1:53:48 Jipboard, as you saw today, and working our way from the

1:53:52 parking lot side to the evidence storage.

1:53:54 So there's Jipboard hanging out by the parking lot, and we're

1:53:57 running the walls to get back towards the back of the building.

1:54:01 That project will complete at the end of September, ready for

1:54:04 the city to move in their furnishings.

1:54:06 And they'll occupy as soon as the furnishings are in, and then

1:54:09 we'll go over to the third floor of the admin building and

1:54:13 finish that floor that has the concrete right now.

1:54:18 We left that open if you recall for the police

1:54:21 stop rate out of so we didn't bring the new carpet.

1:54:23 So that's a brief summary of where

1:54:25 we're at on the administration and the operations program.

1:54:29 At the city hall, we're painting in the council chambers

1:54:33 of the unit we're able to see today.

1:54:35 We're hanging and finishing jib board on the first floor

1:54:38 and hanging jib, jib's on board on the second floor

1:54:40 and doing the in-wall rough-in on the third floor.

1:54:43 That project will complete ready for the furnishings

1:54:46 to move in October 10.

1:54:48 And with a couple of weeks of finishing install,

1:54:50 you'll be ready to occupy fully the end of October

1:54:55 before we functional in that building.

1:54:57 So that's a brief summary of where

1:54:59 are there any questions that I can address

1:55:01 or things you saw today that maybe you had questions

1:55:04 about that you wanted to ask?

1:55:05 You know there's always questions.

1:55:07 I would hope so.

1:55:08 Okay, Chris talking to them.

1:55:09 Well, the qualified labor question,

1:55:11 are you concerned about any shortages or gaps

1:55:14 or critical components of qualified labor

1:55:19 that you're not able to get to help you?

1:55:21 Sure, I appreciate the question.

1:55:22 Labor is a challenge right now, especially qualified labor.

1:55:25 What most of the subcontractors have been doing

1:55:27 is working overtime with the guys they have

1:55:30 that are qualified to make up the time and to keep the schedule.

1:55:34 They are supplementing where they can,

1:55:35 but with new guys they'll train them,

1:55:37 Having them work under something who is a seasoned,

1:55:41 skilled contractor doing the work

1:55:44 and training them as they go.

1:55:46 So I'm not concerned with the quality of work

1:55:48 that's being put into place.

1:55:49 We do have a shortage of qualified tradesmen

1:55:53 in the industry and we're constantly seeking

1:55:55 to find more and help develop more qualified people

1:55:59 in the industry as well.

1:56:01 Nothing critical that you don't think cannot be managed

1:56:05 toward the completion of the program.

1:56:07 Thank you for your cadence, I appreciate that.

1:56:10 Thank you.

1:56:11 I don't see any other lights.

1:56:12 So I guess during the tour, you just answered all the questions.

1:56:15 Right.

1:56:16 I'm going to turn it over to our city manager.

1:56:18 Yeah, so one of the things, and Jason,

1:56:20 I've had this conversation.

1:56:21 I told him that I would cover this piece.

1:56:24 Since we've started that construction phase,

1:56:27 and after some events, one of the things

1:56:30 that we spent time with members of our police department

1:56:33 to really look at security and processes

1:56:36 as we've started to re-examine the security of the buildings that are in place.

1:56:43 In looking at the security features that are probably needed in facilities, we are going

1:56:51 to be bringing forward a possible change order for you to review and to consider members

1:56:58 of our team sat down with members of our tactical team and police leadership.

1:57:04 And we identified some potential flaws in the building's safety that weren't necessarily

1:57:10 considered at the beginning of those construction pieces.

1:57:14 We have then went with Humble and asked them to design and incorporate some of the security

1:57:20 features that are recommended by the members of our team.

1:57:23 We then have forwarded that on to Star Corporation right now and they're looking at the different

1:57:28 pricing options for some of the different options that we have incorporated.

1:57:32 And we will be bringing that update to you in the future after staff has an opportunity

1:57:39 to review that and take a look at its total cost.

1:57:42 I just wanted to let you know that that is a project that we're going and that may cause

1:57:48 a slight change in the cost of the project.

1:57:51 But one of the other things that we've shared with Jason is there's a portion of the contingency

1:57:57 that we've included in the project that has not been used.

1:58:00 And if it's not used, it will be returned back to the city.

1:58:03 And so we're looking at those costs,

1:58:05 but it could be largely offset with those contingency dollars

1:58:09 that don't go spent.

1:58:11 Travis, maybe you can just clarify for those listening

1:58:13 at home an example of one or two of the safety items

1:58:16 you're considering just to kind of put it in perspective.

1:58:20 So I'm actually going to give that to Jason to talk about.

1:58:25 That'd be great.

1:58:26 We have a couple here too, so if there's other questions

1:58:27 We can bring them up, but for an example at the city council chambers downstairs, there will be a

1:58:34 fence, if you will, it's more of a gate placed in front of the dias to keep people from approaching.

1:58:40 It's not a secure gate, but it does provide a barrier between where you're sitting in the

1:58:48 public so that there's a physical barrier. So maybe you can just explain with the new layout how

1:58:55 how we're going to be lower than some of the audience.

1:58:58 Because I think right now people see how we're here

1:59:00 and they're going to, maybe, just a quick, yeah.

1:59:03 A raised floor as you slow it back,

1:59:05 so they will be sitting at your level or higher.

1:59:09 Is that what you're?

1:59:10 Yeah, just to understand why we're putting the railing in there.

1:59:14 Because here, you know, it'd be very different, yeah.

1:59:17 Yeah, so there is a elevation there

1:59:21 that will help create a barrier.

1:59:25 There's some other doors we're adding on the second floor to restrict access to workspaces,

1:59:31 and there's some security-controlled access doors that will be installed in a few various

1:59:37 locations as well to help restrict access to different areas of the building so that it's

1:59:44 not open to everybody.

1:59:45 And Brian from Hummel's here, Brian, do you want to plug and add it into that?

1:59:51 So one of the challenges that we're wrestling with is obviously we want to create an environment

1:59:55 that is safe and secure for the men and women who work in the organization, but it's also

2:00:01 important that as a local government one of our values that were open and were accessible.

2:00:07 And so we're really trying to build a good blend between ensuring that we are creating

2:00:13 a safe, positive working environment for not only our employees but for those who visit,

2:00:18 but also making sure that the public has that accessible opportunity that is a hallmark

2:00:23 of local government.

2:00:25 Thank you. I was just trying to clarify that a little bit.

2:00:28 Yeah, that's a good point. Reception areas are the more defined where people come and check

2:00:32 in and then they're showing where to go rather than just go find where they want to go with

2:00:38 that.

2:00:39 Great. Any other questions from the council? Looks like you get an early evening. Thank

2:00:44 you. Thank you. Appreciate the update tonight. Next on the agenda is a request to adopt an

2:00:54 ordinance and a ZDA for a zoning title amendment and zoning district change from R2 Pro PUD and

2:01:03 R1 variable PUD to R2 Pro ZDA for property located at the northwest corner of Chaney Drive and

2:01:12 Madrona Street and I believe we have Renee Caraway Johnson.

2:01:16 You do.

2:01:17 Hi Renee.

2:01:18 Good afternoon Vice Mayor Hopkins and members of the Council this evening or this afternoon.

2:01:23 If you've looked at the agenda, there's actually four ordinances on the agenda this evening.

2:01:30 The adoption of the ordinance is actually the final step in a zoning action upon adoption

2:01:35 and codification.

2:01:37 That allows a development to go forward.

2:01:40 So I will present each one individually and ask for action individually, but I just wanted

2:01:45 to let John be here for a few minutes.

2:01:49 The first item is ordinance and a zoning development agreement for property that is located on

2:01:58 Chaney and Madrona.

2:02:00 On February 28, the commission held a public hearing on this request.

2:02:05 There was no people that spoke at that public hearing and upon conclusion of the presentations,

2:02:11 the public hearing and deliberations, the commissioner Tatum made a motion to recommend approval

2:02:18 of the request as presented with staff recommendations.

2:02:22 Commissioner Higgly seconded the motion

2:02:24 and all members present voted in favor of the motion.

2:02:27 On April 3rd, the city council held a public hearing

2:02:30 on this request.

2:02:31 Presentations were given by the applicants representative

2:02:34 and by staff.

2:02:36 The public hearing was opened.

2:02:37 One person spoke and expressed a concern with the widening

2:02:41 of Cheney and Madrona.

2:02:43 The issue was answered by the developers engineered

2:02:46 to that person's satisfaction.

2:02:49 Upon conclusion of the public hearing

2:02:50 and council deliberations, council member talking

2:02:53 to move to approve the request as presented

2:02:56 with the following conditions.

2:02:58 Number one is subject to site plan amendments

2:03:00 as required by building engineering fire and zoning officials.

2:03:04 Number two is subject to the written zoning development

2:03:07 agreement being modified as follows.

2:03:12 The first modification was additional land uses

2:03:16 upon lots two, three, four, and five, as shown on the master development plan, shall

2:03:21 require special use permits. That's been codified in the zoning development

2:03:24 agreement. We move all reference to East Park. The reference to be removed is

2:03:32 commercial subdivision number three. Zoning development agreement is not a

2:03:38 subdivision. And so we ask that to be removed and that's been removed from all

2:03:44 action in this zoning request.

2:03:48 Number three is subject to a master landscape plan as approved by staff.

2:03:53 That has been satisfied.

2:03:55 Number four is subject to a master lighting plan as approved by staff.

2:03:59 That has been satisfied.

2:04:01 Number five is subject to a master sign plan to be approved by staff,

2:04:06 which has been satisfied.

2:04:08 And number six is subject to the master of development plan,

2:04:11 reference again to the commercial subdivision access.

2:04:17 Council Member Reed seconded the motion and roll call vote

2:04:20 should all members present in favor of the motion.

2:04:22 It was approved seven to zero.

2:04:25 So as directed by Council that evening, staff has prepared an

2:04:28 ordinance and the zoning title or a zoning development agreement

2:04:32 in the packet for your review.

2:04:34 Staff asked for the Council to adopt this ordinance by the

2:04:38 third and final action, and we can proceed with development.

2:04:42 Thank you very much.

2:04:43 Sharon, do you have the ordinance number?

2:04:45 Ordinance number 2017-15.

2:04:51 Are there any questions from the council?

2:04:54 Chris Tockington.

2:04:55 We could place ordinance 2017-15 on third and final

2:04:58 by title only under suspension of the rules.

2:05:01 Second.

2:05:07 We have a motion by Chris Tockington,

2:05:09 seconded by Nikki Boyd to approve the request

2:05:14 Is there any questions?

2:05:16 We'll call vote please, Sharon.

2:05:21 Suzanne Hawkins.

2:05:22 Yes.

2:05:24 Greg Lanting.

2:05:25 Yes.

2:05:25 Ruth Pierce.

2:05:26 Yes.

2:05:27 Chris Tockington.

2:05:28 Yes.

2:05:29 Nikki Boyd.

2:05:29 Yes.

2:05:30 Motion passes five to zero.

2:05:33 Sharon, would you read the title of the ordinance, please?

2:05:37 Oh, wait.

2:05:38 We need a motion first, don't we?

2:05:39 Do we need a motion?

2:05:40 OK.

2:05:41 No.

2:05:41 Go ahead.

2:05:42 I'm sorry.

2:05:45 ordinance number 2017-15 and ordinance of the City Council of the City of Twin Falls, Idaho

2:05:53 rezoning real property below described providing the zoning classification therefore and ordering

2:06:01 the necessary amendments to the area of impact and zoning districts map and the revised area

2:06:07 of impact. Thank you, Sharon. Great, Lantine. I'd like to move approval of

2:06:15 Ordinance 2017-15.

2:06:17 Second.

2:06:19 We have a motion from Greg Lanting,

2:06:21 seconded by Ruth Pierce to approve the ordinance.

2:06:25 Is there any discussion?

2:06:28 Sharon Roll call vote please.

2:06:35 Greg Lanting.

2:06:36 Yes.

2:06:37 Ruth Pierce.

2:06:37 Yes.

2:06:38 Chris Hockington.

2:06:39 Yes.

2:06:40 Nicky Boyd.

2:06:41 Yes.

2:06:42 And Suzanne Hawkins.

2:06:43 Yes.

2:06:44 Motion passes five to zero.

2:06:46 One down, three to go.

2:06:48 Event.

2:06:55 Do you want me to read the request?

2:06:59 I can do that.

2:07:00 Yeah, maybe if you want to paraphrase,

2:07:01 since we've all read through it,

2:07:02 you don't have to.

2:07:04 This second item is a request for the Council's

2:07:07 consideration to adopt an ordinance for annexation

2:07:10 with the ZDA for property located at 403 Grandview Drive.

2:07:15 On February 28th, the commission did hold

2:07:18 a public hearing on this request.

2:07:20 There were two people who spoke with some concerns

2:07:23 about this property being rezoned to an industrial status.

2:07:28 and also with the property already being utilized prior to approval.

2:07:33 The applicant spoke and addressed the neighbors.

2:07:37 They appeared to be satisfied upon the conclusion of that public hearing.

2:07:42 At the conclusion of the public hearing and deliberations, Commissioner Tatum made a motion

2:07:47 to recommend the zoning district change and zoning map amendment as presented

2:07:51 with staff recommendations. Commissioner Higley seconded the motion

2:07:55 and all members present voted in favor.

2:07:58 On March 27th, the Council held a public hearing

2:08:00 on the request.

2:08:02 Presentations were given by the applicants,

2:08:04 representative and by city staff.

2:08:06 The public hearing was opened and closed with no comment.

2:08:09 Upon conclusion of the public hearing and deliberations,

2:08:12 Council member talking to move to approve the request

2:08:14 for annexation with a zoning district change

2:08:17 and zoning amendment from R4 Pro Area of Impact

2:08:21 to M1 CRO ZDA as presented, subject to eight conditions.

2:08:29 I can read them, but I think you're familiar

2:08:32 they're in your packet.

2:08:34 I think we're fine.

2:08:35 Commissioner, Council Member Pierce seconded the motion

2:08:39 and roll call vote showed all members present

2:08:41 in favor of the motion.

2:08:42 The motion was approved five to zero with one extension.

2:08:47 As directed by staff, ordinance and ZDA's in the packet

2:08:50 and I ask for your approval this evening.

2:08:52 And I'm gonna go on a hunch and say,

2:08:54 this is 2017-16.

2:08:57 Yes.

2:08:58 There you go.

2:09:01 Nicki Boyd.

2:09:02 I'll move to place ordinance number 2017-16

2:09:07 on third and final reading by title only.

2:09:10 Second.

2:09:11 I guess you have to say suspend the rule.

2:09:14 Oh, I forgot to suspend the rules apart.

2:09:16 I bet you suspend them though, don't you?

2:09:18 I do.

2:09:19 And I second this.

2:09:21 Thank you.

2:09:22 OK, we have a motion from Nikki Boyd, seconded by Ruth Pierce,

2:09:26 to approve the request to adopt the ordinance by suspending

2:09:30 the rules and putting it on third and final bike title only.

2:09:34 And I see no lights on.

2:09:35 So Sharon, roll call vote, please.

2:09:42 Ruth Pierce?

2:09:42 Yes.

2:09:44 Chris Tockington?

2:09:45 Yes.

2:09:48 Nikki Boyd?

2:09:48 Yes.

2:09:50 Suzanne Hawkins?

2:09:51 Yes.

2:09:52 Greg Lanting?

2:09:53 Yes.

2:09:54 motion passes five to zero. Sharon, would you read the title, please?

2:10:00 Ordinance number twenty seventeen dash sixteen and ordinance of the City Council of the City

2:10:05 of Twin Falls, Idaho, annexing certain rail property below describe providing the zoning

2:10:12 classification therefore and ordering the zoning or an ordering the necessary area of impact

2:10:20 and zoning district map amendment.

2:10:23 Thank you.

2:10:24 Ruth Pierce.

2:10:25 I would move that we adopt the ordinance number 2017-16.

2:10:32 This time we have a motion from Ruth Pierce

2:10:37 seconded by Nikki Boyd to approve ordinance 2017-16.

2:10:44 And again there are no lights.

2:10:46 So Sharon roll call vote please.

2:10:50 Chris Hockington.

2:10:51 Yes.

2:10:51 Nikki Boyd.

2:10:52 Yes.

2:10:55 Suzanne Hawkins.

2:10:56 Yes.

2:10:57 Greg Lanting.

2:10:57 Yes.

2:10:58 Ruth Pierce.

2:10:59 Yes.

2:11:01 Motion passes 5-0.

2:11:06 Number three.

2:11:06 We're ready.

2:11:07 OK.

2:11:09 This is a request to adopt an ordinance

2:11:11 with a zoning development agreement for a zoning district

2:11:14 change and zoning map amendment from R4 and R4 PUD to R6 ZDA.

2:11:21 Property is consisting of four acres

2:11:24 and is located on the south side of the 1800 block

2:11:27 of Elizabeth Boulevard.

2:11:29 On April 11th, Commission held a public hearing on this request.

2:11:33 During the public hearing with the commission,

2:11:35 one of the adjacent neighbors expressed concerns

2:11:38 regarding noise, light, and compromising the integrity

2:11:42 of the existing trees.

2:11:43 Again, the applicant did address those concerns,

2:11:47 seemed to satisfy his questions that he had.

2:11:51 Upon conclusion of the public hearings and deliberations,

2:11:54 Commissioner Gray made a motion to recommend approval

2:11:57 to the city council of the request as presented

2:12:00 with staff recommendations, Commissioner Darrin Hall,

2:12:04 seconded the motion and all members

2:12:05 present voted in support of the motion.

2:12:09 On May 8th, the council held a public hearing

2:12:11 on this request, presentations were given

2:12:13 to the by the applicant's representative

2:12:16 and by staff, the public hearing is opening

2:12:19 close with no comment.

2:12:21 Upon conclusion of the public hearings

2:12:23 and deliberation, council member Tockington

2:12:25 moved to approve the request as presented,

2:12:27 subject to six conditions again they're in your packet they sat they've been

2:12:32 satisfied by staff's review council member Pierce seconded the motion and

2:12:37 roll call vote showed all members present voted in favor of the motion the

2:12:41 motion passed by a vote of six four and zero against so again that's asking for

2:12:48 you to adopt this one thank you Renee yep turn it over to council great

2:12:55 I move that we suspend the rules in place ordinance 2017-17 on third and final by

2:13:03 title only plug in that we have a motion from Greg

2:13:10 Lanting seconded by Chris Tockington to suspend the rules and place ordinance

2:13:15 2017-17 on third and final by title only and seeing no lights share and we'll

2:13:22 call vote. Nikki Boyd. Yes. Suzanne Hawkins. Yes. Greg Lanting. Yes. Ruth Pierce. Yes. Chris

2:13:31 Tocquenten. Yes. Motion passes five to zero. Sharon if you could read the title please. Ordinance

2:13:38 number twenty seventeen dash seventeen and ordinance of the City Council of the City

2:13:43 of Twin Falls Idaho rezoning real property below describe providing the zoning classification

2:13:50 therefore and ordering the necessary amendments to the area of impact and zoning district maps

2:13:57 and the revised area of impact.

2:14:00 Thank you.

2:14:02 Council wishes.

2:14:03 Move the approval of ordinance 2017-17.

2:14:09 Second.

2:14:10 We have a motion from Greg Lanting, seconded by Ruth Pierce, to adopt ordinance 2017-17.

2:14:20 Sharing, can we have a roll call vote please?

2:14:27 Suzanne Hawkins.

2:14:28 Yes, Greg Lanting.

2:14:30 Yes.

2:14:31 Pairs.

2:14:33 Yes.

2:14:34 Chris Knockington.

2:14:35 Yes.

2:14:36 Nicki Boyd.

2:14:37 Yes.

2:14:38 Motion passes five to zero.

2:14:40 While you're on a roll, Renee, why don't you try again?

2:14:45 This is a request to adopt an ordinance for annexation or property, zoned R4 consisting

2:14:51 of 30 acres plus or minus located at 248,000th row.

2:14:57 On April 11th, the Commission held a public hearing on this request.

2:15:01 No one spoke at the public hearing.

2:15:03 Upon conclusion of the presentations, public hearing and deliberations, the Planning and

2:15:07 Zoning Commission forwarded a positive recommendation for a zoning designation of R4 on the above-mentioned

2:15:13 property.

2:15:14 All members present voted in favor of the positive recommendation.

2:15:19 On May 8th, the City Council held a public hearing on this request.

2:15:23 Presentations were given by the applicants representative and by staff.

2:15:26 the hearing was open and again no one spoke at the public hearing and the public hearing

2:15:32 was closed.

2:15:33 On conclusion of the public hearing and council deliberations, council member Boyd moved to approve

2:15:38 the request as presented.

2:15:41 Council member Reed seconded the motion and roll call vote show all members present in

2:15:45 favor of the motion approved six to zero.

2:15:48 Again as directed by staff.

2:15:56 Turn it to the council.

2:15:58 Nikki Boyd.

2:15:59 Your turn.

2:16:01 I second them all the time.

2:16:04 All right.

2:16:04 I move that we suspend the rules in place.

2:16:07 Ordinance number 20, 17-18 on third and final reading

2:16:13 by title only.

2:16:16 I'll second that.

2:16:18 We have a motion by Nikki Boyd, seconded by Ruth Pierce

2:16:21 to suspend the rules and put ordinance number 2017-18

2:16:26 on third and final by title only.

2:16:30 Sharon Roll call vote please.

2:16:32 Greg Lanting.

2:16:33 Yes.

2:16:34 Ruth Pierce.

2:16:35 Yes.

2:16:36 Chris Tockington.

2:16:37 Yes.

2:16:38 Nikki Boyd.

2:16:39 Yes.

2:16:40 Suzanne Hawkins.

2:16:41 Yes.

2:16:42 Motion passes five to zero.

2:16:45 Sharon, can you read the title please?

2:16:47 Ordinance number 2017-18.

2:16:50 An ordinance of the city council of the city of Twin Falls,

2:16:54 Idaho, annexing certain rail property below described.

2:16:58 providing the zoning classification, therefore, and ordering the necessary area of impact

2:17:04 and zoning districts map amendment.

2:17:08 Thank you.

2:17:09 Ruth Pierce?

2:17:10 So I move we approve.

2:17:12 I know it's my turn.

2:17:14 Ordinance 2017-18 as read by Sharon.

2:17:19 Second.

2:17:21 We have a motion by Ruth Pierce, seconded by Nikki Boyd to adopt Ordinance 2017-18.

2:17:30 and roll call vote please.

2:17:34 Ruth Pears?

2:17:35 Yes.

2:17:36 Chris Talkington?

2:17:37 Yes.

2:17:38 Nikki Boyd?

2:17:39 Yes.

2:17:40 Suzanne Hawkins?

2:17:41 Yes.

2:17:42 Greg Lanting?

2:17:43 Yes.

2:17:44 Motion passes 5-0.

2:17:45 Thank you very much.

2:17:46 Thank you.

2:17:47 Thank you.

2:17:48 I'm just to get started.

2:17:49 So we're on our way.

2:17:50 Here we go.

2:17:51 Thank you Renee.

2:17:53 I appreciate all your hard work.

2:17:54 Next on our agenda is a request to award the 2017-48A ramp project to JS Custom Crete

2:18:02 in the amount of $226,100, and we're going to hear from Aaron Steele in just a moment,

2:18:09 but first John Caten.

2:18:10 Thank you, Vice Mayor and Council.

2:18:58 Before we jump into the projects that we're going to talk about to be awarded, I thought

2:19:03 I would give a Council a quick update and just a quick refresher basically, where we left

2:19:09 off last time when we were talking about the road damage and Council authorized the use

2:19:14 of street reserves in the amount of $4.4 million

2:19:18 to address recommended street projects.

2:19:21 So the slide that I presented that night

2:19:23 on April 10th is right here.

2:19:25 And you'll see, just to remind you,

2:19:30 there were these first several projects

2:19:34 for complete reconstructs.

2:19:36 Then these are millen in lanes.

2:19:38 And then this is backlog.

2:19:42 We know we have problems.

2:19:43 We know that all this money right here

2:19:45 doesn't take care of all of our problems roadwise in the city.

2:19:49 But what we, but I wanted to identify that there is a backlog.

2:19:54 And what we want to do address this year were these top 10 projects here.

2:19:58 And they came out to be about $4.375 million.

2:20:02 And there was about $4.4 available in street reserves.

2:20:07 And that was in April, like a city for 10th.

2:20:10 And since that time, engineering has been furiously at work,

2:20:15 really a bulk of the work is in that department as they have rapidly moved through concept to

2:20:23 design.

2:20:24 And so I wanted to talk about these projects and tonight you're going to see some formerly

2:20:31 bed projects being and requesting your award.

2:20:42 Okay, so what I did is I just want to talk to you about the projects that we gave to the

2:20:47 engineering group.

2:20:48 So, they understand the priorities, the top ten rows, they understand the budget, and as

2:20:53 far as a construction sequence goes, they've broken up the projects, and I'm going to walk

2:20:58 you through this in a minute, but they've broken up the projects so that they can ask

2:21:05 quickly and appropriately construct this as quickly as possible.

2:21:11 We have a short construction season, a lot of work to do this is more than I would say

2:21:15 we've done in a long time if not ever.

2:21:18 So the way I broke this up is, these projects are the exact projects that we talked about

2:21:25 before with a couple of additions.

2:21:28 We added crests from Eastland to View.

2:21:31 It's a small piece of road that's near rim view that we did last year.

2:21:40 And Bridgeview, we decided to do a portion from Blue Lakes to the curb by Sportsman's

2:21:46 warehouse.

2:21:47 So those are two additions.

2:21:49 And really, the way to look at this spreadsheet is the red here is all EDA projects.

2:21:58 The white is all complete reconstruct.

2:22:01 The blue is millin and length.

2:22:03 And so engineering not only wanted to get a certain sequence, they wanted to put construction

2:22:11 packages together of like work.

2:22:16 The first packages are all concrete packages and the ideas that we go out prior to the construction

2:22:22 of a roadway or a millen in lane.

2:22:25 If she's not reconstructing strictly millen in lane, we like to go out and get the ADA

2:22:30 rafts and valley gutters and all the concrete in place and then follow that with a roadway

2:22:35 improvement.

2:22:37 On the far left here you can see black numbers and red numbers.

2:22:43 The black numbers are the construction package number and they have been awarded.

2:22:48 So project construction package one are these two projects and these are ADA ramps and they

2:22:55 are 42,900.

2:22:56 I'm using the term ADA ramp but really I mean all the concrete works, there's other things

2:23:03 in there as well.

2:23:05 All the ADA ramps in the falls and also Eastland have been awarded in these amounts here.

2:23:13 Tonight, that's the next project and that Aaron Steele will bring forward is Project 4,

2:23:20 and right after Aaron is Josh Baird, which is Project 5, and currently Project 6 is going

2:23:28 to be bid advertising this week on Wednesday.

2:23:31 It is also a formal project.

2:23:34 And on our list and being worked in parallel, but we haven't finished putting it, obviously,

2:23:41 The engineering is not done on Eastland, which is a high priority.

2:23:45 So again, these construction packages are just packaged.

2:23:49 It's not a priority.

2:23:52 These aren't the exact orders of priorities,

2:23:54 but because Eastland has a very high priority,

2:23:57 we just need to get a lot of work ahead of the roadway work done.

2:24:02 I want to point out that the first three projects that are awarded

2:24:06 We're informally bid, the Eastman one, as well, yes, okay.

2:24:13 So the first three projects were informally bid that allowed the engineers to engineer it

2:24:16 rapidly and get the work out quickly.

2:24:19 Keep in mind anytime we formally bid something, it takes at least a month just to advertise.

2:24:23 And then that doesn't include engineering.

2:24:25 So from April till now to be awarding two formally bid projects is very fast.

2:24:32 So with that, before I turn it over to Aaron,

2:24:36 he'll talk specifically about Project 4.

2:24:40 Are there any questions?

2:24:42 Nicky Boyd.

2:24:43 John, when you say the ADA ramp, it's everything.

2:24:46 So just like what we just saw at Locust and Falls,

2:24:49 that's the everything?

2:24:51 Yes, and I'm actually glad you brought that up,

2:24:54 because I wanted to maybe dive into that for a minute.

2:25:00 Falls from Washington to Blue Lakes.

2:25:02 You remember I've been talking about how expensive that is.

2:25:05 In engineering, we took a step back and we looked at what Josh Baird here knows the rules

2:25:12 about ABA a little better than I do, but we looked at the regulations of what's the minimum

2:25:17 requirement as far as when you go in and you do a roadway improvement.

2:25:22 What we're doing here is we're meeting the minimum standard.

2:25:27 What I'm saying is there's private ramps along falls that we're not going to replace.

2:25:33 we're going to do the minimum.

2:25:35 Now, when we have situations where there's a special request

2:25:39 where a person needs assistance in getting from A to Z,

2:25:43 we'll address every single ramp from A to Z.

2:25:47 That's part of our transition plan.

2:25:49 So we'll do that on special requests.

2:25:51 When we don't have a special request,

2:25:52 we're going to meet the better amount

2:25:53 because we can't afford to do more.

2:25:55 We need to get as much money in the roadway

2:25:59 as we possibly can't because that's where the failure happened.

2:26:03 Did I answer your question?

2:26:04 Yeah, and then some.

2:26:05 That's great.

2:26:05 Thank you.

2:26:09 Thank you, John.

2:26:10 I don't see any other lights.

2:26:14 Welcome, Aaron.

2:26:15 Thank you.

2:26:16 So to add with John, so if you remember,

2:26:18 there's three styles of roadway reconstruction that we do.

2:26:22 The first one is patching.

2:26:23 It's just kind of a, here's the basketball.

2:26:25 Let's fix it.

2:26:25 The second one is the mill and inlay,

2:26:28 which triggers all the ADA ramp adjustments

2:26:31 to bring them up to compliance.

2:26:33 And then the third one is the full roadway reconstruction.

2:26:35 So they go in, dig out all the base, all the material, and they put the new stuff in.

2:26:41 So this area that I'm going to talk about now is triggered because of the Mailman Inlay

2:26:45 portion of it.

2:26:46 And so the two areas that we have are falls from, let's see, falls from between Washington

2:27:02 and Blue Lakes, and then filer between Locust and Sunrise Boulevard.

2:27:07 We'll do all the public ADA ramps in those two stretches.

2:27:11 Now, this project went out to bed on May 18th and May 25th to be opened on June 1st.

2:27:18 We didn't receive any bids.

2:27:21 So after a short conversation with the Brits, he just said you can go open market negotiations

2:27:26 and talk to the first.

2:27:28 One of the two contractors, we had two contractors pick up plans, one of which could not do the

2:27:34 because his public works license only covered up to $200,000 threshold and the

2:27:39 engineer's estimate was $225,000. So we went with the other contractor

2:27:46 who was Jerry Smith and so he supplied us with an estimate. His estimate was for

2:27:51 $226,000, $226,100. The engineer's estimate was $225,250. So very close. So

2:28:01 So we were very excited when we received his open market negotiation price on that.

2:28:06 So I'm here tonight to ask to award that contract to J.S. custom created Jerry Smith in the amount

2:28:13 of $226,100.

2:28:14 Thank you, Erin.

2:28:17 Any questions from the council?

2:28:20 Chris talking to you.

2:28:21 Even though it was an open bed and it came very close, he still has to provide bonding

2:28:25 project.

2:28:26 Performance bombing, yes.

2:28:30 And has done that.

2:28:31 Or will.

2:28:32 We'll do that.

2:28:33 Turn it over to the council.

2:28:37 Greg Lanting.

2:28:38 Move approval of granting the bid of $226,100 to...

2:28:45 I thought the name was on here. Where is it?

2:28:48 J.S.?

2:28:49 Great.

2:28:51 Custom Creek, yeah.

2:28:53 Second.

2:28:54 We have a motion from Greg Lanting, seconded by Nikki Boyd,

2:29:01 to approve the request for the ADA RAMP project to J.S.

2:29:06 custom creep in the amount of $226,100.

2:29:11 And I see no lights on, so Sharon, roll call vote please.

2:29:19 Yes.

2:29:21 Nicky boy.

2:29:21 Yes.

2:29:23 Suzanne Hawkins.

2:29:24 Yes.

2:29:25 Greg Lanting.

2:29:25 Yes.

2:29:26 Right there.

2:29:27 Yes.

2:29:28 Motion passes five to zero.

2:29:29 Thank you, Erin.

2:29:30 Thank you.

2:29:31 Appreciate all your hard work.

2:29:35 Okay.

2:29:36 Next on the agenda, we are going to skip down to item I,

2:29:39 which is the request to award the 2017-05

2:29:44 roadway construction project to Kleppfer Incorporated

2:29:47 of Paul, Idaho, in the amount of $749,471.

2:29:54 And I believe we have Josh Baird.

2:30:02 The roadway reconstruct projects,

2:30:03 this is taking the roads at following locations,

2:30:07 bit of root, crest, butte, sophomore walnut,

2:30:11 portion near the C3 building and fully

2:30:13 reconstructing the road from the soil all the way up.

2:30:16 So gravel and then the plan is pavement layer on top.

2:30:21 So we decided it'd be easiest to go ahead

2:30:24 and bundle those all again in a single package

2:30:26 and that is the package.

2:30:28 We formally bid it because it was over the $100,000 threshold.

2:30:33 The engineers estimate for the project was $874,000.

2:30:38 And we got two bids from Add-O materials and construction

2:30:42 and Clupper Inc. and Clupper was a little bit at 7.49, 471, so the request is to reward them.

2:30:50 Clupper Inc. that project will be about 7.49, 471, and I can entertain any questions.

2:30:57 Thank you. Greg Lanting?

2:30:59 Yeah, Josh, the one that I think maybe the public would like to understand is that it talks about the C3 parking lot,

2:31:06 but it's not actually the C3 parking lot, so it's a roadway on the east side of that that's actually a city street.

2:31:12 correct so it's gone right away it is really a bad shape thanks so all right

2:31:17 thank you thank you for clarifying that great any other questions from the

2:31:23 council Chris talking to I would move to approve the other 749,471

2:31:32 to come free for the describe project we have a motion from Chris talking to

2:31:42 seconded by Greg Lanting to approve the request to award the roadway reconstruction program.

2:31:49 Is there any questions from Council? Sharon will call vote please.

2:31:56 Chris Stockington? Yes. Nikki Boyd? Yes.

2:31:59 Suzanne Hawkins? Yes. Greg Lanting? Yes.

2:32:04 Ruth Pears? Yes. Motion passes five to zero.

2:32:08 Greg Lanting? John, well that's actually for John.

2:32:12 The 150,000 were saving that possibly would be the last 200 feet of Elm Street.

2:32:18 No, I'm taking that as a note.

2:32:26 The printed pause, okay.

2:32:28 Well, let me say I know we have to do something there.

2:32:33 But I do want to give you an update on budget and I'm not sure I explained it very clearly,

2:32:38 But you know, as a result of doing a little bit less of the ADA ramps, because like I said,

2:32:43 we're going to hit the minimum, it does free up some money plus, the engineers estimate

2:32:48 that I use was robust, the bids are generally coming in a little bit.

2:32:54 Well, the first few bids were coming in lower, and they're going up as the construction

2:32:59 season heats up.

2:33:00 But right now, I don't see us having a budget issue.

2:33:04 One thing I'd like to point out is that we had projects one, two, three, four, five now

2:33:13 after tonight are awarded, and that is about 27% of the 4.4 million, it's like 1.2 million,

2:33:21 is awarded and will be in construction if not already in construction.

2:33:26 Project six, like I said, advertises this week, seven and eight, seven is Eastland, and eight

2:33:32 is frontier.

2:33:33 Right now, I'd like to just talk briefly about Eastland.

2:33:36 We had like 750,000 estimated right around 800,000 in frontier because there's some storm

2:33:42 water.

2:33:43 There's some engineering issues there.

2:33:46 So right now, because of the short construction season, we're not probably not going to get

2:33:51 time to do everything on our list.

2:33:53 Right now, I'm sure it listed it to not include frontier.

2:33:57 I would like to talk to engineering more about this, but right now we're talking about potentially

2:34:02 engineering a solution for frontier over the winter because we need some time to

2:34:06 think about it and design it and then divert that money that we have been

2:34:10 tended to use on frontier to Eastland. It'll give us a little bit increase the

2:34:16 scope of work for Eastland. We haven't finished scoping yet. We haven't really

2:34:20 gotten through the design yet but right now that's that's what I'm thinking.

2:34:24 Thank you. So now we're gonna go back up and hit item H on our agenda which is a

2:34:32 A request to award the 2017 Grand View Sewer and Corrosion Resistant Manhole Project to

2:34:39 Knife River Corporation in the amount of $935,115.

2:34:45 It's Josh again.

2:34:51 This project is being funded by the $6 million portion of the sewer bonus allocated towards

2:34:59 These types of projects, the specific project as well as in the sewer master collection facilities plan.

2:35:07 So it's item number, capital improvement plan number three.

2:35:12 So we'll be completing that portion of the plan.

2:35:17 We are doing a few interesting things on this project.

2:35:20 And there's a reason that we've titled it the 2017 Grandview Sewer and Corrosion Risk and Manuals project.

2:35:26 That's because we have serious corrosion issues along the entire Grandview trunk line, and

2:35:31 so we're trying three separate manhole types on this specific project, and for the reason

2:35:37 we're doing that for this project, because there's no other inflow areas, there's no

2:35:40 other ties from influence in the line, so it should be the same flow in all three of

2:35:46 those adjacent manholes, and we're hoping to get a good test to figure out which manhole

2:35:51 type is going to be best beneficial for the city and potentially use that in the future.

2:35:59 Could I just follow up then, is using like different materials that have different interactive

2:36:05 reactive scenarios with the hydrogen sulfide.

2:36:11 So I think one of the spray on material in concrete, one is a polymer tech concrete.

2:36:15 So yes, there's different materials in different types of ways that we're utilizing modern

2:36:21 technologies to allow, hopefully, the corrosion to be resisted, so.

2:36:26 I'm glad to hear that, but I'm surprised that we have to invent the wheels.

2:36:30 It seems like that would be something that would be in the industrial knowledge base.

2:36:34 And it is.

2:36:35 And that's why there's multiple options out there, though, so what works best for us may

2:36:39 not work best for other people, because our stream, our affluent may be a little bit different

2:36:45 than other people, so.

2:36:47 Before you continue on, Greg Lanting has a question.

2:36:50 I'm going to assume as I think of the city, Grandview is going to be mostly from many of

2:36:55 our western industrial partners is what flows down to Grandview.

2:37:00 I believe we have, yes, some of the major industrial partners, we have also a good portion of downtown,

2:37:04 I believe, Kixil O'Ran goes westward and ties in with that as well as all the residents.

2:37:09 Probably why they did a little bit different flow because every industry has a different

2:37:15 different effluent but usually that's the issue with the corrosion be the

2:37:18 different type of flow of industries yes thank you so this project specifically

2:37:25 runs from approximately a manhole just north of where the the county offices are

2:37:32 where the old hospital was near the heliport there helipad there's a manhole

2:37:36 that runs virtually due north and ties with the manhole in Father Avenue it's

2:37:42 about 1300 feet of pipe it's going to be very large diameter it's potentially the

2:37:46 large standard pipe we'll have in the sitting out at 40 inch standard pipe.

2:37:50 They'll be fully required to buy a pass pump, that amount of flow for the duration of the

2:37:57 project.

2:37:58 And we've been working with the major adjacent property owner, the Helen Paulson Co-op-Trest

2:38:05 and were able to acquire a temporary construction easement from them to build a project, an additional

2:38:10 30 feet on top of the existing 15 footies in it, so that's the kind of the background of the project

2:38:20 we've been at recently, and we're able to get three bidders on the project. Their bids range from

2:38:26 $935,000 up to almost $1.3 million. The engineer's estimate was at $903,555, so the little bid was

2:38:38 the NYFRA Corporation, just a few percentage of points

2:38:42 over the industry assessment, so we're coming to request

2:38:46 each award, the grant to be co-returned to the 2017 grant

2:38:49 to be co-entering this is a manuals project to NYFRA

2:38:51 Corporation Northwest, the amount of $935,115.

2:38:56 Thank you, Josh.

2:38:56 Great, 19.

2:38:57 I have a question, Josh.

2:38:59 NYFRA is one who has been considerable work in swim

2:39:02 faucet, like they did one of the major portions of the arsenic

2:39:06 water line, as I recall.

2:39:08 So we have a lot of experience with them.

2:39:10 Thank you.

2:39:11 I go ahead and make a motion to accept

2:39:13 the Niagara Corporation Northwest bid of $935,115

2:39:19 for the Grandview Sewer and Corrosan Resistance Manhole Project.

2:39:26 Chris Talkington.

2:39:27 Second, and clarification,

2:39:29 this is all part of the sewer bonding.

2:39:33 We have a motion on the floor from Greg Lenting,

2:39:36 seconded by Chris Talkington to approve the award

2:39:39 of the Grandview Sewer and Corrosion Resistant Project.

2:39:43 Is there any other questions for the council?

2:39:46 Sharon will call vote please.

2:39:49 Nikki Boyd?

2:39:50 Yes.

2:39:51 Suzanne Hawkins?

2:39:52 Yes.

2:39:53 Greg Lanting?

2:39:54 Yes.

2:39:54 Ruth Parris?

2:39:55 Yes.

2:39:56 Chris Hawkins?

2:39:57 Yes.

2:39:58 Motion passes five to zero.

2:40:00 Thank you very much for all that information tonight, Josh.

2:40:04 Next, we have Jackie Fields, our city engineer

2:40:07 with the request to reject all bids submitted

2:40:10 for the 2017 Slurry Seal project.

2:40:16 Welcome, Jackie.

2:40:49 The Slurry Seal item or the seal code item in our budget

2:40:53 comprises several different aspects of sealing the roadway.

2:40:57 So it addresses fox seal, a slurry seal, and a chip seal

2:41:03 as well as crack sealing.

2:41:07 The current zone of the line is number five,

2:41:12 And it turns out that number five is a little bit larger

2:41:16 for square yards of pavement.

2:41:17 And we tried to size the zones.

2:41:19 They were pretty evenly distributed.

2:41:21 And that zone has a more square yard of pavement

2:41:27 than some of the others.

2:41:29 That becomes relevant in that as we approach the job,

2:41:34 we believed that even though this area has more square yards

2:41:38 in it, we thought with the prices

2:41:40 that we had seen last year on our estimate

2:41:42 what we thought would receive this year that we could afford to address the whole zone as it stands.

2:41:47 We have already done informabidding for the fox seal material

2:41:56 and or purchased the fox seal material that's applied by the streets department

2:42:02 and done an informabid for a crack ceiling contract.

2:42:06 Last year the streets superintendent intended to address fox seal in the fall

2:42:12 using temporary help that didn't work very well.

2:42:17 There was some challenges getting enough manpower at the time to be able to get the work done.

2:42:22 So the fog seal in zone four didn't happen, and the crack sealing and the materials were lumped into this year's budget.

2:42:31 That is a very inexpensive treatment, and so based on what we had we believed we could afford the entire amount of work.

2:42:42 higher amount of work. We also bid CHIPSEAL, which we came to you a few weeks ago, to award

2:42:50 that award at Emory. Their price, their unit price was $2.07 a square yard for CHIPSEAL.

2:43:00 Some of you may remember, and others probably don't, that staff approached the Council several

2:43:05 years ago and suggested that Slurry Seal could be an opportunity for us, not only because

2:43:14 It has a smoothness to it, but because it was substantially less expensive per square yard

2:43:19 than applying a chip seal, and it was an appropriate use on a lower volume road, such as a residential

2:43:28 street.

2:43:29 We still wanted to be able to use chip seal on roads that had more damage and on higher

2:43:34 volume roads.

2:43:39 On June 1st, we opened bids for the 2017 Swayro Seal project, and two bids were received.

2:43:45 both of those bids exceeded the engineer's estimate.

2:43:47 The apparent hospital bidder was 104% of the estimate,

2:43:50 which isn't too bad usually.

2:43:53 You know, when we're, we know we're never going to be exact,

2:43:56 right?

2:43:58 And the reality of the situation is that this bidder

2:44:04 could not make the residency requirements required

2:44:07 by Idaho statute section 44-101.

2:44:10 the next qualified bidder is Boswell asphalt paving solutions out of Meridian. Boswell does

2:44:22 meet the residency requirement and this is pretty exciting news for us because this is

2:44:26 not been our reality in the time that we've been doing slurry projects. That bid however

2:44:31 was 140% of our estimate and the total bid package including the craft ceiling that goes

2:44:39 with the slurry coat was 175% of the engineer's estimate.

2:44:44 This absolutely would overrun our seal coat budget.

2:44:52 It's important to note that the unit price

2:44:55 for the slurry seal component of this bid item,

2:45:00 or this contract was $2.12 a square yard,

2:45:04 which is a nickel higher per square yard than ship seal.

2:45:07 and approximately 62 cents higher than the uni-press that we used to estimate what we were expecting

2:45:15 to see for Slurry. Staff believes that the bid should be rejected and that we should work

2:45:30 on other ways to try to maximize the amount of zone 5 that we can get treated with surface

2:45:37 treatment in this year. And we believe that that solution is a combination of applying

2:45:45 fox seal to some of our knuckles and cul-de-sacs. For those of you that are familiar with the terms,

2:45:50 they're these little guys right here. Just a little tiny little about kind of thing. It's

2:46:01 not really cul-de-sacs. So, a couple of knuckles. Applied fox seal to the knuckles, and it applied

2:46:10 chip seal to the western side and north college portion of seal and fire. We believe that we could

2:46:22 to accomplish this by additional work for street superintendents,

2:46:27 folks would check in with them near the ones

2:46:29 that actually apply to Foxy.

2:46:31 And we would like to engage Emery in a change order

2:46:36 if they're in medical at the request.

2:46:38 So this evening's staff is recommending the council

2:46:41 to reject all the bits on the 2017 Slurry Seal project.

2:46:46 Any questions for Jackie?

2:46:48 Great, Linting.

2:46:49 What do you attribute the dramatic change in the slurry seal because I remember you vividly

2:46:56 remember what we're talking about as a way to force to save some money because it's cheaper

2:46:59 than chip seals.

2:47:00 Now, suddenly it's more than chip seals, the products they're using are suddenly more

2:47:04 expensive.

2:47:05 Well, asphalt prices do go up and they are not linearly correlated to the cost of a barrel

2:47:14 of crude.

2:47:15 It's sometimes it's difficult to have that type of evaluation.

2:47:20 We believe that we'd see about somewhere between $25 and $1.50 per square yard for Slurry

2:47:28 Seal.

2:47:29 The out-of-state bidder was kind of close.

2:47:33 They were, I believe, at $156 a square yard.

2:47:36 This is the first year we've had an in-state bidder.

2:47:39 We contacted that bidder and said, hey, we don't think we can recommend awarding this.

2:47:50 She believed that she was giving us the best price she could at this given time.

2:47:56 The labor costs is possibly up as well as the potential.

2:48:00 Is there any more labor intensives and chipper?

2:48:02 It's a slightly different type of work.

2:48:07 So I guess what I'm saying is that it's a little bit different than the labor costs

2:48:12 I'll try to be more succinct, Greg.

2:48:15 I'm sorry.

2:48:16 So one of the bidders was very close to engineer's estimate, and the other was not.

2:48:21 The bidder that made the residency requirement was substantially higher.

2:48:27 It may be that that's the price that can be achieved in Boise or the Boise Treasure Valley area.

2:48:35 The other bidder is out of Utah and that apparently is a competitive price for them.

2:48:42 They've been on our projects for several years.

2:48:44 Thanks, it's okay.

2:48:45 Thank you.

2:48:46 Thank you.

2:48:47 Thank you.

2:48:48 Thank you, Chris.

2:48:49 Yeah, I'm really surprised like Greg that he went against us that much.

2:48:51 I guess when I'm asking maybe friends with your guideline, could we get a lock on a bed

2:48:57 a certain period of time in the future?

2:48:59 Did they go out a year and say, if your bed is good, we'll say that we'll do this next

2:49:08 construction season.

2:49:10 We can figure out how to handle it and find out.

2:49:14 We would have to spec it out that way but I think Jackie would tell you that these contractors

2:49:17 won't commit themselves out that way.

2:49:20 Yeah, they're a risk then.

2:49:22 Okay.

2:49:23 Well, it's a nice try and I'll regretfully say that I would ask for the rejection of all the

2:49:29 slurry seal bids for 2017.

2:49:34 I'll second that.

2:49:37 We have a motion from Chris Talkington, seconded by Ruth Pierce, to reject all of the bids submitted

2:49:43 for the 2017 slurry sill project and I see no lights on so Sharon will call

2:49:49 vote.

2:49:50 Ruth Pears yes Chris Hockington yes Nikki Boyd yes

2:49:56 Suzanne Hawkins yes Greg Lanting yes motion passes five to zero thank you Jackie

2:50:03 so at this time we are going to turn it over first of all to our city manager

2:50:15 any information you have to share tonight?

2:50:18 Nothing there.

2:50:19 Any advisory reports from the council?

2:50:23 Ruth Pierce.

2:50:24 I just want to mention that the Historical Preservation

2:50:26 Commission is looking forward to members.

2:50:32 Debbie Latin was going to retire.

2:50:35 Now she's thinking about re-appen.

2:50:37 And then we have one other vacancy.

2:50:39 So at least one.

2:50:41 If you want to send your information to Telly Weeks.

2:50:46 Thank you, Ruth.

2:50:46 I'll feed you back on that. We always have several aspiring city council members here in the audience and serving on some of these commissions and boards is a good way to get your wheat feet wet.

2:50:56 I think many of us up here have served. I know Nick and I were both on planning zoning previously and that's a good way to get started and get involved in the city government.

2:51:07 The Sport Preservation Commission is one of the fun ones. I've been here and did that. That's a good one.

2:51:13 Thank you.

2:51:14 I'd just like to remind everybody that this summer our public library has an incredible

2:51:20 lineup of things happening every day for all ages, but one of the new things they have

2:51:26 now too is you can check out for like disc golf if you want to go out and try it before

2:51:31 you buy the equipment or bocce ball or some different small type activities, but that

2:51:38 way you can try out some of these sports maybe that you haven't played before before

2:51:42 you buy equipment and invest in it, but check out their schedule if they do have it online

2:51:47 and there are lots of fun things happening at the library.

2:51:52 I'd like to also go back and thank the Twin Falls Reform Church.

2:51:55 They came last week and invited us to their first responders event this past Saturday and

2:52:00 I know Ruth and I were able to attend that and it was fantastic.

2:52:05 Our firemen did repelling out in the parking lot and we had our police officers out there

2:52:11 with a bike rodeo and our robot and police dogs doing their job in front of us showing

2:52:20 us how they're trained. There was just a lot of good activities happening out there so thank

2:52:24 you to anybody from the Reformed Church who helped make that event come together. It was

2:52:30 good. Alright, so at this time we'll once again turn it over to the public if there's

2:52:36 anybody in the audience who has anything they would like to address the council on. We will

2:52:42 Open it up, seeing no one, we will move on to our public hearings.

2:52:48 Nikki Boyd.

2:52:49 I'm going to re-keys myself.

2:52:51 I understand.

2:52:53 They're both, yep.

2:52:55 I don't think we have five people here.

2:52:58 That's true.

2:53:01 So the first public hearing we have tonight

2:53:03 is a request for a special use permit

2:53:06 to construct a professional office on lot five

2:53:10 of the East Park Professional Subdivision Number 2 PUD, located on the northeast corner of

2:53:17 Locust Street North and Chaney Drive. And is Jim Boyd going to present first or is Jonathan

2:53:23 Spinlow?

2:53:24 I'm going to just interlude real quick.

2:53:26 These projects are right next to each other at Lot 5 and Lot 6, we're going to combine

2:53:30 kind of discussion about from Dave Tebow, who's representing, and then you want to do a combined

2:53:36 two separate motions for Lot 5 and Lot 6.

2:53:38 We went to separate public hearing portions also been probably wonderful.

2:53:47 Thank you for it.

2:53:48 Okay.

2:53:49 Dave Tebow, welcome.

2:53:50 Thank you Madam Vice Mayor, members of the City Council, my name is Dave Tebow at 621

2:53:56 North College Road here in Twin Falls.

2:53:58 I'm representing Mr. Chip Boyd who's in the audience this evening and could answer some

2:54:03 of your questions if you have some specific questions for him.

2:54:06 This property is located on Shaney Drive, east of Blue Lakes, right behind the existing

2:54:11 Home Depot shopping center and facility.

2:54:14 We recently completed construction of the surgery center here on the corner of Locust

2:54:19 and Shaney, the first American title in escrow.

2:54:24 We're under construction with an orthodontist office right here.

2:54:28 Now we'd like to build on both Lot 5 and Lot 6 here, and we're looking at approximately

2:54:33 6,000 square feet of professional office that would be constructed on each of those

2:54:39 lots associated parking, stormwater drainage, and utilities. The project is

2:54:44 plotted, so it's a plotted subdivision that you saw not too long ago, but it's

2:54:48 building out nicely and progressing and starting to come alive as we get

2:54:51 landscaping established this year. And this season, and we're here because the

2:54:56 PUD, the East Park PUD, which was prepared in the early 1990s, required that a

2:55:01 special use permit be issued for all professional offices or medical office

2:55:06 uses that may be associated in and we anticipate both of those uses in these

2:55:11 buildings potentially so therefore we're coming before you we've submitted some

2:55:16 building elevations and plans that we think are representative these plans are

2:55:21 into the city for building permit and it'll give you an idea that we have added

2:55:27 to the residential neighbors to our south, all the parking will be located north of these

2:55:34 buildings and landscaping buffer on the south edge of the front's changing drive.

2:55:38 So with that I'd stand to answer any questions that you might have.

2:55:42 Chris, talking to me.

2:55:43 And lighting will be shielded and away from the residential.

2:55:47 That is correct.

2:55:48 Yeah.

2:55:49 I do not see any other questions at this time.

2:55:52 Thank you.

2:55:53 And at this time we will hear from John with the Spin Love on the City's report.

2:55:57 Thank you Madam Vice Mayor. So a little bit of a glare there. Both of the projects, they've explained it perfectly everything that we have.

2:56:09 About 5-0-6 stand next to each other as there's been multiple developments around them. The eastern portion of this project,

2:56:17 I think it just approved the ZDA for that eastern portion tonight. So there will be multiple different types of offices in this eastern portion.

2:56:24 of a look similar and feel similar as this one.

2:56:28 So they're really trying to just blend all of this

2:56:30 into one, and they're meeting the PUD requirement,

2:56:34 which requires buildings to be maximum 10,000 square feet

2:56:39 if they're within 350 feet of locust,

2:56:41 and then otherwise there's 6,000 square feet,

2:56:43 single story office buildings with residential feel.

2:56:46 All of this is located within that PUD,

2:56:50 this is a PUD document that we require them to follow

2:56:53 when they come in for building permit.

2:56:55 We also go through all parking and all the required improvements such as landscaping,

2:57:00 screening, storm drainage and other requirements we deal with those at the time of the permit,

2:57:05 approval or building permit review process, kind of going to what's in staff report.

2:57:11 This is in compliance with the comprehensive plan which was approved in 2016.

2:57:16 It's areas located on the border between a mixed use and town neighborhood.

2:57:21 that designation of mixed use is described as being appropriate for retail offices, civic

2:57:25 and other uses serving local and regional activities, how neighborhoods reserved for the traditional

2:57:30 residential development pattern.

2:57:32 This position, the position of this development between existing intensive commercial retail

2:57:38 like Home Depot and traditional residential uses has led staff to determine this request

2:57:44 and applies with that comprehensive plan and its intent to have a transition zone between

2:57:48 commercial and residential centers of development.

2:57:50 We feel it flows from the residences to the south.

2:57:53 Home Depot, Imperial, have a neighborhood or a residential type field to some office buildings

2:57:59 which kind of separates those uses from each other, trying to be better neighbors.

2:58:04 So in conclusion to the Council of Grants request, as presented staff recommends the

2:58:10 following conditions, one subject to the site plan amendments has required by building engineering

2:58:14 fire and zoning officials to ensure compliance with applicable city code requirements and

2:58:19 and compliance with the East Park PUD agreement number two one three and

2:58:23 number two subject all lighting being downward-pacing and the light source being

2:58:26 shielded from nearby residential properties same conditions are on both

2:58:30 special thank you we have a question from Chris talking to the standard

2:58:34 condition would require our curb gutter sidewalk that's great thank you any

2:58:42 other questions from the council for John can Greg Lan team actually might have

2:58:46 one for Dave as well. Can we put the sitemap back up? Actually the other one, the one you

2:59:01 had first I think probably looked better. Now it's a clear at the bottom I think. That

2:59:07 one. There we go. We're simple. Do we either of you heard, since we're starting, I was

2:59:14 thinking about traffic of course, and do we have anything in the pipeline for you guys

2:59:20 or anything? Maybe you've heard about the possible extension of Cheney to connect with

2:59:24 that area that has already stepped out down by the temple.

2:59:31 So in other words, it would complete it all the way

2:59:32 to Eastland.

2:59:33 Right.

2:59:34 So there's a portion of property located east of Madrona

2:59:39 that you're referring to, that extension of Chaney Drive

2:59:42 East.

2:59:43 Right.

2:59:43 So my knowledge, there's no proposal or designs in the pine.

2:59:47 I was just hopeful, I guess.

2:59:48 So we could have a space out the traffic a little bit.

2:59:52 We're working our way that way.

2:59:53 We're working our way that way.

2:59:57 Thanks, Dave.

2:59:58 Thank you.

2:59:59 Just one thing to Councilman Talkington,

3:00:02 we do have Kirk Gutter and sidewalk on Cheney.

3:00:04 It's installed now on the south side,

3:00:06 so we'll be doing that as part of the site

3:00:08 and for this interior.

3:00:10 Thank you.

3:00:12 Any other comments from Council?

3:00:14 We'll go ahead and open up the public hearing then.

3:00:17 At this time, if there's anybody in the public who

3:00:19 would like to address either of these parcels,

3:00:21 now is your opportunity. See no one we will close the public hearing and turn it back over to council.

3:00:31 And just a reminder we do need two separate motions. Greg Lanting.

3:00:37 Mayor, I move approval of the special use permit to contract professional office on lot five of

3:00:44 East Park professional subdivision number two part of the PUD and with the staff recommendations.

3:00:50 second that we have a motion from Greg Lanting seconded by Chris

3:00:56 talking to approve the special use permit and I see no lights again

3:01:02 Sharon so roll call vote please.

3:01:04 Ruth Pierce Chris talking to yes Nicky boy abstaining

3:01:17 Suzanne Hawkins yes and Greg Lanting yes motion passes for to zero with one

3:01:26 abstention and we can move on to this special use permit for a lot six at this

3:01:32 time Ruth Pierce. I would move that we approve a special use permit to construct

3:01:38 a professional office on lot six of the East Park professional subdivision

3:01:43 number two. PUD located at the northeast corner of Lorca Street and Chaney

3:01:49 drive. Thank you period. With staff recommendations. Would anyone like to

3:01:59 second that motion? We have a motion from Ruth here seconded by Greg

3:02:07 Lanting to approve the special use permit for the lot number six in the

3:02:12 East Park professional subdivision and again there are no lights so share and

3:02:17 roll call vote. Chris talking 10 yes. Yes. Yes. Motion passes 40 0 with one

3:02:32 and with that, the meeting is adjourned.

3:02:35 I'm sorry, I kept forgetting to check over.

3:02:49 I'll talk to you a second if you could.

3:02:52 How's Eric?

3:02:57 Okay.

3:02:58 Okay.

3:02:59 Alright.

3:03:00 Alright.

3:03:01 Alright.

3:03:02 Alright.

3:03:03 Alright.

3:03:04 Alright.

3:03:05 Alright.

3:03:06 Alright.

3:03:07 Alright.

3:03:08 Alright.

3:03:09 Alright.

3:03:10 Alright.

3:03:11 Alright.

3:03:12 Alright.

3:03:13 Alright.

3:03:14 Alright.

3:03:15 Alright.

3:03:16 Alright.

3:03:17 Alright.

3:03:18 Alright.

3:03:19 Alright.

3:03:20 Alright.

3:03:21 Alright.

3:03:22 Alright.

3:03:23 Alright.

3:03:24 Alright.

3:03:25 Alright.

3:03:26 Alright.

Chain of custody

  1. Recorded. At the open meeting of the City Council on Monday, June 19, 2017. The recording started at 14:28 by the recorder's clock and runs 03:03:11.
  2. Obtained. Posted publicly by the City of Twin Falls. The copy here has the same SHA-256 fingerprint as the City's posted file. Request filed 2026-09; the City's response: Denied (response not in folder) (request log).
  3. As received. SHA-256 of the video file exactly as received:
    not recorded
  4. Audio track. Taken from that video and kept unaltered. SHA-256:
    3205f4624de9a3d1fa1201ad0d7367465b9c78e60a3c66ce1d70eab7abaa83e4
  5. Listening copy. Made from the audio track for playing on the web: aac 32k mono 22050Hz, levelled, parts of 90 min. SHA-256 of each file:
    part01.m4a f78665562f7b0d8a14483d458e83bb8ea4ec63ccf40e2e5ae39f9d1e41a27816
    part02.m4a 186ed6c85adfac49e721f7adc9a0f0aa591f83830232187ab3947f1731ce0706
    part03.m4a 0a45cf0867fa85baf14e23f38b71aa061e95915fdf663ebdb6a7613b73926f00
  6. Transcript. Machine transcript of the audio track, made with faster-whisper base.en on 2026-11-10. Not edited, except that 0 passages with private details are marked instead of shown. SHA-256 of the posted text:
    dc590aa9b1148ecace2575947cc9c1dc4e6ca0f3b71193c9e60c8ab26695304d

The original video and audio track are kept unaltered. Anyone holding the City's copy can check it against the "as received" fingerprint. Chain of custody for every meeting (CSV) · How to verify a file