City Council meeting
Monday, July 29, 2013
Listen, read the transcript, and link to any moment. Every timestamp is time into the recording.
The transcript is machine-made and not checked word for word. Names, numbers and quiet speakers are the most likely to be wrong. The one exception is the Pledge of Allegiance: a room reciting together is hard for the machine to hear, so the pledge is shown in its standard wording. The recording is the record: listen before you quote. Home addresses, phone numbers and email addresses that speakers give are muted in the audio and marked in the text. The audio is a smaller copy made by software from the video the agency posted, so it loads quickly; nothing is cut apart from the muted passages. The agency's own posting is the original, and each recording below links to it where we have its address.
No finding or timeline entry cites this meeting. It's here so the whole record can be searched and checked, including anything that could explain or change a finding.
Part 1 (from 0:00:00)
Part 2 (from 1:30:00)
Transcript
0:00:03 I'm going to have a drink pretty well.
0:00:05 I'm going to have a drink pretty well.
0:00:08 I'm going to have a drink pretty well.
0:00:14 I'm going to have a drink pretty well.
0:00:17 I'm going to have a drink pretty well.
0:00:19 I'm going to have a drink pretty well.
0:00:21 I'm going to have a drink pretty well.
0:00:26 I'm going to have a drink pretty well.
0:00:28 I'm going to have a drink pretty well.
0:00:30 I'm going to have a drink pretty well.
0:00:32 I'm going to have a drink pretty well.
0:00:34 I'm going to have a drink pretty well.
0:00:36 I'm going to have a drink pretty well.
0:00:38 I'm going to have a drink pretty well.
0:00:40 We rented two beach houses in Seaside Oregon and we're taking our whole family in September
0:00:51 31 of us, just a little vacation
0:00:56 At least in our trying to find a place where you can be sure of your own
0:01:02 Did you do it to verbal and be a hero?
0:01:05 I saw that woman though, that's not who I used, I found a different one and I'd have to look to tell you
0:01:09 I had limited options because I needed houses with six veterans and so forth.
0:01:14 We got some other good deals, I think.
0:01:17 Oh yeah, absolutely.
0:01:19 What are you going, September?
0:01:21 It's September.
0:01:24 Get into late September.
0:01:25 I've told you I see some storm.
0:01:27 Actually, September is their highest, hottest month on average for the year.
0:01:32 Yeah, it isn't San Francisco too.
0:01:34 Let's follow.
0:01:35 It's the hottest and the darkest.
0:01:37 So we have a good chance of doing this with the issue.
0:01:45 I think I have a general schedule here.
0:01:48 The two handles.
0:01:50 It was hard for me to learn.
0:01:52 What should we learn how to do it?
0:01:56 I'd like to call the Monday, July 29, 2013 meeting
0:02:01 of Twin Falls City Council to order.
0:02:03 Our first item of business is the pledge.
0:02:05 All those like to join, we please rise.
0:02:07 I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.
0:02:21 for all.
0:02:25 I would like to confirm we do have a quorum.
0:02:26 Sean Berger is out of town this evening.
0:02:29 This is kind of a, what's normally the meeting that we skip,
0:02:33 but we're having because of the budget things
0:02:35 and the possibility of not having to be in the 12th we've
0:02:37 chose to meet tonight.
0:02:38 I think he'd already made plans.
0:02:41 Introduction of staff.
0:02:43 See manager trash while while our city attorney French winner look deputy city clerk recording secretary the odd Sanchez
0:02:49 We have a lot of department heads for the city here as well
0:02:54 It's a rush to be a minute to the agenda. We do not
0:03:08 I did have a question on the bill I
0:03:10 I appreciate asking that before we move on that.
0:03:13 Certainly, that's the only item on here.
0:03:15 Let's just talk about the demo.
0:03:17 On page four of the payables,
0:03:20 there were two engineering payments,
0:03:22 one for whitening a US30 and the other one for as chip seal,
0:03:28 where those both competitive beds do you recall?
0:03:34 I think the chip seal was,
0:03:36 but I don't know about the whitening a US30 ZHM engineers.
0:03:41 I was looking for this from Jackie now, but let's tell her we've been waiting on her for a question.
0:04:13 Jackie, Jackie, Chris, Jackie has a question for you.
0:04:35 I thought we acted on the Emory State.
0:04:37 I was thinking U.S. Highway 30 and the whole different project.
0:04:44 This is directly related to the Chibani project.
0:04:49 And so what we did was in that project, we selected an engineering firm.
0:04:55 Those are the engineering costs associated with that.
0:04:58 We went through a request for qualifications proposal, and that's what we do.
0:05:03 Remember, we cannot select professional engineering firms by price.
0:05:08 We select them by qualification of work, and then this is associated
0:05:13 with the Jibani signalization project that is being funded by the Urban Renewal Agency.
0:05:20 So the contract is actually the responsibility of the Urban Renewal Agency, and we pass those
0:05:26 funds, we pass through those funds and they pay for that with the bond proceeds so we get
0:05:31 reimbursed 100% of those costs.
0:05:34 Well, you mentioned that we can't pick the firm on the basis of cost.
0:05:38 can if it's a competitive bid, but because you have the allow ability to seek the services
0:05:44 of an engineer, that's the way that that is, I won't say circumvented, but as long as I
0:05:52 meet the initial criterion, then you don't discuss price.
0:05:56 So we can negotiate a scope and a contract for work after the engineering firm has been
0:06:02 selected.
0:06:04 We do not do it as a part beforehand.
0:06:09 I mentioned this only as a point of reference.
0:06:13 I realize a local engineering firm
0:06:15 has an advantage of credibility, but it seems
0:06:18 that this particular engineering company
0:06:21 is getting a lion's share of all business or projects
0:06:25 with or without urban renewal's involvement.
0:06:28 And were there any other engineering firms
0:06:32 were aware of that showed an interest, or had the credentials, I guess, the best way to put it.
0:06:39 So, for professional services, our process is to identify in our own minds the nature of the work,
0:06:52 to look at our list of engineers and say, you know, we think that these two or three firms are
0:06:59 competent, potentially competent, maybe they're available and then we call one and if our proceedings
0:07:11 with that entity proceed nicely then we're done and if they don't then we move on to number
0:07:18 two so if we can't get them to agree on the scope or we can't get ourselves to a place
0:07:23 where we can handle the price then we can move on and negotiate with someone else.
0:07:27 The other firms that come to mind, Jackie, would be Rita Seil on JUB, would they be
0:07:32 tentual, uh, considerates for this?
0:07:36 Um, they are competent to do road work, so, um, we could have called them, uh, we also could
0:07:44 have called civil science.
0:07:45 We have 15 entities that are, uh, not necessarily, uh, local but able to do road work that are
0:07:53 on our list.
0:07:54 And one more question on this then, who actually was in the driver's seat then for initiating,
0:08:01 no, not initiating, making the decision to eat, was it urban renewal, or the city?
0:08:06 Or was urban renewal utilizing the city's engineering services expertise to make that decision for a professional service?
0:08:17 My question is, who was the initiator or would it?
0:08:22 I would say the latter, the latter of that is how I would say that went, where the urban
0:08:27 and the new agency is relying upon us to assist them in that recommendation and that process.
0:08:35 In this particular case, I'm the contracting administrator, so it was me.
0:08:41 But if it had been a staff engineer or someone else on our team, then it more likely would
0:08:48 have been them.
0:08:49 Thank you very much.
0:08:50 Thank you.
0:08:51 Thank you.
0:08:52 Thank you.
0:08:53 Thank you.
0:08:54 Thank you.
0:08:55 Thank you.
0:08:56 Thank you.
0:08:57 Thank you.
0:08:58 Thank you.
0:08:59 Thank you.
0:09:00 Thank you.
0:09:01 Thank you.
0:09:02 Thank you.
0:09:03 Thank you.
0:09:04 Thank you.
0:09:05 Thank you.
0:09:06 Thank you.
0:09:07 Thank you.
0:09:08 Thank you.
0:09:09 Thank you.
0:09:10 Thank you.
0:09:11 Thank you.
0:09:12 Thank you.
0:09:13 Thank you.
0:09:14 Thank you.
0:09:15 Thank you.
0:09:16 Thank you.
0:09:17 Thank you.
0:09:18 the process that the state requires us to follow.
0:09:21 Understand.
0:09:22 For engineering services.
0:09:23 Thank you.
0:09:26 Don Hall, if you're ready for a motion.
0:09:28 Sure.
0:09:28 A move approval of the consent calendar.
0:09:32 Second.
0:09:33 Moved by Don Hall, seconded by Jim Munn,
0:09:36 to prove the consent calendar.
0:09:38 See no additional lights, we have a roll hold vote.
0:09:41 Jim Munn.
0:09:42 Yes.
0:09:43 Rebecca Milsweka.
0:09:44 Yes.
0:09:45 Chris Talkington.
0:09:46 Yes.
0:09:47 Don Hall.
0:09:48 Yes.
0:09:49 Suzanne Hawkins.
0:09:50 Yes, Greg Lansing.
0:09:52 Yes, motion passes six to zero.
0:09:55 Moving under items for consideration,
0:09:58 consideration of a request to award the renovation
0:10:00 of the Public Works Building to Stanley and Associates.
0:10:04 As she would just Stanley Associates, there's no end.
0:10:06 Incorporated in the amount of $152,605
0:10:11 in addition to approve the installation of a locker room
0:10:13 for approximately $25,000.
0:10:16 Rob Bolling, welcome.
0:10:19 Thank you, Council, Mayor.
0:10:22 Tonight, not coming before you guys.
0:10:24 We'd like to request the Stanley Associates.
0:10:30 We have four bits, and Stanley Associates
0:10:33 was a little bit at 152.605.
0:10:37 So we'd like to request the consideration of that,
0:10:40 that they be awarded that.
0:10:42 And then on top of that, when we went out to bid on this,
0:10:48 it came in quite a bit lower. We always planned on having a locker room and area where the
0:10:56 guys could come in and keep it clean, change of clothes. Not so much on the water side,
0:11:01 but the guys on the wastewater side when they're out and they have a line break. They can get
0:11:07 in some messy stuff. I would say, not everybody lives just around the corner. We thought, it'd
0:11:16 nice to have a place where the guys could come in and not have to run home, you know,
0:11:21 crawl into the city vehicles and their own vehicles in a mess and have a place where
0:11:27 they could just come in and get clean, change of clothes and go back to work and not have
0:11:33 to take time off to run home.
0:11:35 And so when we got the bits, we were thinking that it was going to be quite a bit more than
0:11:41 a low bid.
0:11:42 We thought, well, maybe since we've got the contractors there,
0:11:47 they're gonna be doing the work.
0:11:49 Why don't we see if we can just go ahead
0:11:50 and finish it out to be done with it.
0:11:53 So that's what we're requesting is the other monies John
0:11:59 who's wanting to take out of the savings
0:12:03 in the wastewater fund this year.
0:12:05 And for the total, then it would be 177.605.
0:12:09 and we get up a locker rooms and the showers and that finished.
0:12:13 It's not what we're requesting for.
0:12:16 I think Rob, we do have some questions.
0:12:18 Don't call.
0:12:19 Rob, I was just curious.
0:12:20 The shower that you're contemplating here
0:12:22 is it going to be unisex?
0:12:24 I'm assuming most of your staff are male right now,
0:12:27 but that's not always going to be.
0:12:30 Yeah, and we probably need to look into that, definitely,
0:12:35 because, yeah, there's never, who's to say
0:12:38 that we won't hire a woman someday and need,
0:12:41 we have new sex bathrooms in there,
0:12:44 so that could certainly be a consideration
0:12:47 and we could look in the future or maybe.
0:12:50 Even if we didn't designate it right off the bat,
0:12:53 have a couple of them.
0:12:56 You might talk to your construction people
0:12:58 about an easy expansion that would be able
0:13:01 to add a smaller female locker room or something,
0:13:05 with a single private shower or something.
0:13:08 Well, just plumb it, rough plumb it, you know,
0:13:11 and then in the future if we need to finish it off.
0:13:13 Yeah, as we know in our world today
0:13:16 that dominant male or dominant female traditional
0:13:20 employment is changing.
0:13:22 So we need to be prepared for that one,
0:13:24 and when it comes about.
0:13:25 Just a suggestion.
0:13:26 We're perfectly playing with that.
0:13:28 Thank you, Tom.
0:13:28 Good idea.
0:13:29 I'm not sure if it was first, so this is Emily, Chris.
0:13:32 OK.
0:13:33 Who came up with the $25,000 estimate and how tight is that?
0:13:38 I think John just got a rough estimate from Stanley on what they thought it would cost to go ahead and finish that out
0:13:46 If we go over by
0:13:48 $10,000 where would we take that money do we have I mean from looking at the numbers here? We do not have that much
0:13:55 extra in our savings division for it, so I know I think
0:14:04 Coming into the year
0:14:08 put in a budget for coming here.
0:14:11 So you just wait on the locker room all together this year
0:14:14 and start the whole project over if it's
0:14:16 going to go that much over?
0:14:17 Is that what you're saying?
0:14:20 Or do what you can do for 25?
0:14:22 We're going to try this together.
0:14:23 So my suggestion would be that you approve the initial bid
0:14:30 and scope on the contract.
0:14:34 And then give us an opportunity to get a formalized change
0:14:38 order and we can bring that back next week or the week after. John Kate is on vacation this
0:14:46 week. So we can bring that back for your review and consideration and so we'll have a good cost.
0:14:53 You can determine if that's something that you want to add to the project in addition to
0:14:57 the project that's already gone through that competitive bit process.
0:15:01 Thank you.
0:15:02 and it's just make me nervous.
0:15:04 So we can figure out how to work that to approve the contract for the 150,000 and then ask
0:15:10 the approval of a seeking a change order for the walker.
0:15:13 Just haven't bring it back.
0:15:15 Yeah.
0:15:16 Or just leave out the walker entirely and just bring it back,
0:15:18 which just leave it out entirely.
0:15:20 I get the nozzle for it.
0:15:21 Moving on.
0:15:22 Chris, talk.
0:15:23 Well, I was going to make a contingent upon the 25,000 contingent upon future approval
0:15:30 by the council based upon the plans presented.
0:15:33 That way we don't have to send a state on set as fine.
0:15:35 And Mayor to name it all, I'll move for approval of a little bit
0:15:41 of standing associates and the amount of 152, 605 for the renovation
0:15:49 of the public works building.
0:15:51 Second.
0:15:53 We'll move by Chris Dyeongy then and seconded by Don Hall
0:15:57 to approve the $150,605 to Stanley Associates
0:16:01 for the renovation of the Public Works Building.
0:16:06 See no additional lights for that, or I'll call vote.
0:16:09 Rebecca Milsoka, yes.
0:16:10 He's talking to?
0:16:11 Yes.
0:16:12 Don Hall.
0:16:13 Yes.
0:16:14 Suzanne Hawkins.
0:16:15 Yes.
0:16:15 Great land team.
0:16:16 Yes.
0:16:17 Jim Munn.
0:16:18 Yes.
0:16:19 What's your best?
0:16:20 Six feet of a Don Hall.
0:16:21 Rob, I would just reemphasize when you do visit with them
0:16:24 about the locker room, if you could talk to them.
0:16:27 How would we expand if we need to in the future?
0:16:29 Is there a possibility of making that work?
0:16:32 If there's a room for it.
0:16:34 Well, yeah, that's a good point.
0:16:36 Or even if you do it now.
0:16:38 But personally, I am very supportive of that
0:16:41 because the guys and gals someday
0:16:43 will need a place to clean up before they go home.
0:16:45 I get that.
0:16:46 Okay, all right.
0:16:47 All right, we'll get those in the close to that
0:16:49 and get it back to you.
0:16:51 Appreciate it.
0:16:51 Thank you, Rob.
0:16:56 So Rob, just a quick question.
0:16:57 Since we've had an extra hot summer,
0:16:59 what has been our peak day this summer on water?
0:17:03 Just right at 25 million gallons
0:17:08 for about four days straight last week.
0:17:11 And then what was our all time record in the past?
0:17:14 31, or 33 million.
0:17:18 OK.
0:17:18 So we're still under the build time records.
0:17:22 The I and every other day watering and those things helping.
0:17:26 It makes it definite help having the I.
0:17:31 All right, because I recall that was in 2003, wasn't it, that record?
0:17:36 And we're definitely a larger city with a lot more customers than we were in 2003.
0:17:41 Yeah, we're looking at getting a couple more big set divisions, but on P.I.
0:17:46 And utilized our new out shares that we have.
0:17:49 All right.
0:17:50 I think we'll be good for a long time.
0:17:52 All right, thank you, Rob.
0:17:53 Appreciate it.
0:17:54 Thanks for the additional information.
0:17:55 Item number two, presentation of a summary of the Police Department's
0:17:59 request to purchase six sports interceptor police vehicles in the
0:18:03 visit of the year 2014 budget year, including a comparison of efficiencies of
0:18:08 different models that different models provide. But that
0:18:12 exists as the Captain Hicks.
0:18:14 I'll phrase that differently.
0:18:15 Mr. Mayor, Council, I appreciate the opportunity to present a summary of our
0:18:21 budget request. As you know, Captain Barnhart spoke in front of you last
0:18:25 February with the initial concept of transitioning our police vehicles from the
0:18:29 Dodge Chargers to the police interceptor utility vehicle. With the Council's general
0:18:36 authorization, we purchased three of those. They're just now starting to come online
0:18:40 and I think the most of you saw that we have one of those on display out front of the
0:18:43 Council chambers. We've continued our research and as you'll see in the budget
0:18:48 we requested to purchase up to six more of these vehicles. Most of you saw your
0:18:54 emails today where I sent you a couple different messages, one regarding the cost, comparison
0:18:58 breakdowns with the fuel economy, comparisons, and then the second email with some more justification
0:19:04 as to the actions that we find most appealing about these cars.
0:19:10 In general, I can answer any particular questions that you have about them, but I also want to
0:19:14 use this opportunity to talk to you about our general philosophy towards fleet management
0:19:17 in the police department.
0:19:18 We've actually prepared a fleet management plan, and I have copies of it here, a circuit
0:19:22 I'm sorry, I wasn't able to get those out too early today.
0:19:25 But within that plan, we try to work cooperatively
0:19:27 within several people within the police department,
0:19:30 the command structure, Joan Lang,
0:19:32 who is our internal fleet manager,
0:19:35 and the vehicle fleet shop with Norm Hatke.
0:19:37 Norm wanted to be here tonight.
0:19:39 He had a family issue that came up
0:19:40 and prevented him from being here.
0:19:42 We've tried to work cooperatively over the last year
0:19:45 to not only anticipate our future needs,
0:19:47 but to develop realistic solutions
0:19:49 within the budgets that were set.
0:19:52 So while you want to provide the best possible equipment we can for folks, we also understand
0:19:56 that we need to do this with very conservative budgeting strategies in mind.
0:20:02 In general, let me just cover our proposal.
0:20:05 We're asking for five vehicles to be purchased out of the general fund capital for $238,000.
0:20:09 And for a sixth vehicle, we purchased what the restitution or asset forfeiture fund vehicles.
0:20:14 These are all replaced existing Dodge Charger vehicles, all of which would have been identified
0:20:19 by Norman and his staff as problematic and they need to be replaced as soon as possible.
0:20:27 This is not for an expansion except for one vehicle is conditional upon the Cough's grant
0:20:32 that we've approved for it.
0:20:34 We generally assign a patrol car to two officers that work on alternating days off.
0:20:40 Those officers typically place about 12,000 miles per officer on the car or 24,000 miles
0:20:47 total.
0:20:49 So after four years on the road, we're approaching 100,000 mile barrier.
0:20:53 And while that's not an absolute set criteria to recycle a car, we found typically as the
0:20:59 folks in the city shop that are usually indicative of when major maintenance problems start on
0:21:03 vehicles.
0:21:04 So we've tried to establish a soft four-year rotational plan on the vehicles.
0:21:10 Depending on the assignments, those mileage estimates can be lower, but typically they're
0:21:15 placing 24,000 miles a year on the patrol cars that we have.
0:21:19 We have 23 patrol cars in the patrol division.
0:21:22 That's for the 42 members of the division.
0:21:24 So typically each car is assigned to two different people
0:21:27 and typically driven every day for a number of hours of every day.
0:21:31 Those types of demands stop and go driving the weather conditions
0:21:34 that they have to negotiate.
0:21:36 Those conditions are very hard on vehicles.
0:21:37 So we tend to look for vehicles that are very sturdy,
0:21:40 that are built specifically for our purposes.
0:21:42 When we were trying to research the best vehicles
0:21:45 the future. In the past several years, there's really been a very limited choice, the Dodge
0:21:49 Charger. For years, we purchased Crown Ford Crown
0:21:53 Victoria's, but when they stopped making those in 2007, our options were somewhat limited.
0:21:57 When we learned last year that they were going to start making vehicles again, Norm, who is
0:22:02 very familiar with the Ford line, was very encouraged by this, and we spent several weeks
0:22:06 researching the alternatives. But two primary objectives in mind. Norm is sure with us that
0:22:13 He is typically spending over $1,100 a year in repair costs, just in parts, and approximately
0:22:20 another $550 in soft personnel labor costs, repairing each Dodge each year.
0:22:26 He compared that to $550 that he was typically spending on a Ford Crown Victoria.
0:22:31 We have $30,000 budgeted in Captain Barnham's line item for repairs and maintenance, and
0:22:37 we have spent 82% of that money so far, and we're projected to spend all of that money
0:22:40 repairing the Dodge chargers.
0:22:42 Obviously, we're looking for something a little bit more efficient than what we've had in the
0:22:46 past.
0:22:47 The second issue, and I'll refer back to the two officers in the back, the remoster, Gates
0:22:52 and Officer Schmerko.
0:22:53 They have a little bit different job than I did or Councilman Hall or Councilman Munn had
0:23:00 back in the 90s.
0:23:01 We typically had a bag that carried our report forms and maybe some gear.
0:23:05 If you saw the car outside, you see now the required gear that they have to carry every
0:23:09 every day, stop sticks, a tackle bag, a battle bag full of ammunition, an automatic defibrillator,
0:23:18 traffic cones, two rifles, first aid kit, traffic investigation equipment, and then finally
0:23:25 the computer that occupies most of that front seat.
0:23:28 Those demands require a large amount of storage and when that was finally a fact of decision
0:23:34 making, that's how we ultimately ended up with the Ford utility vehicle.
0:23:39 If you see from the spreadsheet that we sent out earlier, your overall cost, the forward
0:23:48 utility is more expensive of the three options.
0:23:51 But we were able to mitigate this a little bit.
0:23:53 In years past, we outsourced the outfitting, the purchase of the equipment and the outfitting
0:23:58 to a company in Utah.
0:23:59 And while they did a good job for us, it was very expensive.
0:24:02 Norm agreed to take that on in-house, and he was able to not only purchase that equipment
0:24:07 directly at a reduced price, but he was actually able to purchase better equipment.
0:24:12 And this year in particular, able to purchase several items of equipment that we just couldn't afford.
0:24:16 And previous years it's going to enhance the officers' ability to do their jobs.
0:24:21 The fuel economy, if you analyze what the manufacturers tell you that you're going to get on the mileage,
0:24:28 versus what we're actually doing, you know, I think that you'll see that we're typically averaging about 13 miles a gallon on the cars.
0:24:34 The first Ford utility van, excuse me, car has been online for only three weeks,
0:24:39 and we're averaging around 13 miles a gallon.
0:24:41 miles a gallon. When you factor in the long idle times that these officers have to
0:24:46 endure, that's usually pretty typical. That's what we've been averaging with any
0:24:51 car in the patrol division. So when it came down to it, the final decision-making
0:24:58 factor for us was if we could afford this model vehicle that we needed the
0:25:04 storage room and the passenger room to help these officers do their jobs better.
0:25:08 So, summary, that's really the crux of our argument, we want to try to get these officers
0:25:15 the best possible equipment that they have to do their jobs, and we're hopeful that you'll
0:25:19 approve the request.
0:25:20 So, Mr. Mayor and members of the Council, one of the things that we've done today is we've
0:25:25 positioned two of the vehicles that are outside, and what we think that would be really beneficial
0:25:29 is just to take a quick tour of those vehicles after you have some questions so that you
0:25:33 You can see them, you can sit in them, you can understand maybe the level of equipment in
0:25:38 the gear that the officers are beginning to carry with them as Captain Hicks head shared
0:25:44 and talked about.
0:25:45 So those are ready, they're available.
0:25:47 We also have a couple of officers with us this evening as Captain Hicks shared and we would
0:25:52 invite you obviously to get their opinions, talk to them, see what their thoughts and perspectives
0:25:58 are about these vehicles by comparison to the Dodge Chargers.
0:26:02 One of the questions that we did have is, well, how does that work in comparison to the sedan?
0:26:08 And the only thing that we have in relationship to that is the information that we have here.
0:26:14 We don't have one of those that we could bring on display for you to take a look at.
0:26:19 But if you look at the headroom, you look at the shoulder room, you look at the basic
0:26:25 dimensions of that of the Ford Interceptor sedan and the Dodge Charger.
0:26:30 start seeing there's some consistencies there at least in the terms of the sedan
0:26:35 charger and the sedan interceptor.
0:26:38 Great, Doug Holland and Rebecca Milsuy.
0:26:43 Thank you, Captain Hicks. I think this was informative and the information that you've
0:26:48 sent us very informative. A couple of us had the opportunity to preview the
0:26:52 vehicles at National Night Out by the way. Congratulations to the department
0:26:57 for that and I think it was a very good success and the hot dog was good. So
0:27:02 Thank you for that.
0:27:04 You know, I just go back to my past and driving
0:27:08 different vehicles while I was a police officer.
0:27:10 And where we're training now at CSI
0:27:12 with the new cadets going through.
0:27:14 I have a Dodge Charger I have.
0:27:16 I've had some Capris.
0:27:17 I've had some Ford Crown Vicks as well.
0:27:21 And there is no comparison to the vehicles of yesterday
0:27:25 to a vehicle like this.
0:27:27 the passenger space officer Smirchko.
0:27:33 How'd I do?
0:27:33 Do I do okay?
0:27:34 I specifically asked him how tall he was
0:27:37 because seeing him get in and out of the vehicles,
0:27:39 he's six, three, and not a small guy.
0:27:42 And it seemed like he could get in and out easier.
0:27:45 I know it's a challenge with officers getting in
0:27:48 and out of these vehicles with all the gear,
0:27:50 not only the gear they have to carry,
0:27:51 but the gear they have on their bodies.
0:27:53 They look like Batman, sometimes with all this stuff.
0:27:56 And it looks like it's a much more comfortable, user-friendly place for our officers to be,
0:28:04 which translates to me to a better work environment for our employees.
0:28:11 When they have passengers with them and they're having their FDO's with them or whatever
0:28:15 the situation is, there's more room.
0:28:17 I tell you, with those dogs' chargers and the computers inside those, it's miserable for
0:28:21 two officers to be in there, I've seen that.
0:28:24 So I think that's better.
0:28:25 But also the individuals that might have to have a right in the back from time to time.
0:28:32 It's actually a safer environment for those folks.
0:28:34 That's part of our call is to keep them safe and confined until we can get them to a facility.
0:28:41 And the gear that they can carry.
0:28:44 Frankly, I'm very sensitive about gas mileage and all that stuff too.
0:28:47 But I'm more sensitive about the safety of our citizens and safety of our officers.
0:28:52 And to me, this looks like a good compromise.
0:28:56 Now for my first question, or really I think my only question.
0:29:00 That was more of a statement, wasn't it?
0:29:03 You're coming to us, talking to us about purchase of five,
0:29:06 possibly six with this other grant.
0:29:09 Because we need to rotate some of these vehicles out.
0:29:12 Is that typical that we would want to do six in a year,
0:29:17 or is it more like three or four, are you coming to us
0:29:20 with more now because they're wearing out,
0:29:24 they're becoming problems,
0:29:25 and then what will that do for the rotation in the future?
0:29:28 Over the last two years, we've asked for three cars each.
0:29:30 And with a 23 car pool to choose from,
0:29:35 typically we asked for three to four replacement cars
0:29:37 per year, and we've been able to manage that.
0:29:39 According to Norm, and I wish that he was here
0:29:41 to verify this, this is being exacerbated
0:29:43 by the Dodge problems.
0:29:46 Typically, when we start asking about
0:29:48 what problems he's seeing.
0:29:49 They're systematic through each car.
0:29:53 They're isolated to several key areas
0:29:55 that he was here to speak about,
0:29:56 but he's noticing this on a continual basis.
0:30:00 The other thing that this does is it's a compounding effect.
0:30:02 If you have one or two cars down,
0:30:04 those two to four officers are now misplaced
0:30:07 in other cars, placing additional mileage on those cars.
0:30:10 And I think your point is well taken.
0:30:12 It's said before, but if they're saying again,
0:30:15 these are these employees' offices.
0:30:18 their job is tough enough as it is.
0:30:20 It doesn't need to be that uncomfortable for them,
0:30:22 and they shouldn't have to struggle to put the equipment
0:30:24 that we require them to carry in there.
0:30:27 So we're very hopeful.
0:30:28 We rely heavily on Norm's opinion.
0:30:30 He's earned our trust, and when he tells us
0:30:32 that he believes that the Ford product in this arena
0:30:36 is going to be more reliable, we support that request,
0:30:39 and we believe in it.
0:30:42 So will it skew us in the future?
0:30:44 We're doing six this year, and then how does that happen?
0:30:46 And you'll see in the fleet by hand, we're trying to project rotational plans several
0:30:53 years out.
0:30:54 We don't want to do that solely based on the mileage.
0:30:56 We're able to do that to some degree about three years out from now, but some of these
0:31:01 issues with these particular cars need to take off line have only come to light in the last
0:31:04 six or seven months.
0:31:06 So we're hopeful as these products, if they are, as they're being advertised to us, that
0:31:11 this you'll see requests start to be dialed back down to a more reasonable number of three
0:31:15 or four.
0:31:16 Thank you.
0:31:17 Thank you.
0:31:18 Thank you Mayor.
0:31:21 Thank you for your report.
0:31:22 I think this is important information for us to have for the future because I definitely
0:31:26 understand the size of the vehicle, the comfort of the vehicle, and you might need a few for
0:31:31 extra gear or larger people, but as you know every year at the budget hearing, what we
0:31:38 get asked to do is to spend less than not more, and so I think these are important numbers
0:31:43 to just keep in mind when we're talking about transitioning our entire fleet of 23 cars.
0:31:50 And I've never seen, you know, I grew up here and live in town and I've never seen an incident
0:31:57 that has fewer than two patrol cars reporting.
0:32:00 And so I think that there is, on a practical level, a way to maybe intermix the vehicles
0:32:06 because even if you're able to save $3,000 per vehicle and then over the life of that
0:32:12 vehicle doing the math on the mileage if it's anywhere close to the estimate, you'd actually
0:32:20 save around $2800 per the life of the vehicle.
0:32:24 When you times that by the 23 vehicles, I think that's what's important to consider.
0:32:30 I appreciate all of the work that it took to give us this information and I just hope
0:32:34 that we would consider it as we move along and as we rotate cars out because that's just
0:32:40 is something that the citizens ask of us,
0:32:42 if we can achieve the same objective transportation
0:32:46 from point A to point B, while saving money
0:32:49 and using less taxpayer dollars,
0:32:52 I think it's something to consider.
0:32:54 So I appreciate the information.
0:32:56 Appreciate you saying that.
0:32:57 We share the same responsibility.
0:32:59 And I'll hand the fleet plan out at the end of the questioning.
0:33:03 But hopefully, you'll see stream throughout that level
0:33:06 of responsibility.
0:33:07 We're dedicated to analyzing these issues
0:33:09 on an annual basis.
0:33:10 Hopefully everything that we're being told
0:33:12 and we expect right now will come to fruition,
0:33:14 but we'll make sure that that is analyzed on a yearly basis
0:33:16 and will make the best possible decision you can.
0:33:19 Thank you.
0:33:19 Suzanne Hoggins.
0:33:21 I'm just curious, how do we rotate out the old vehicles?
0:33:24 What happens to them?
0:33:25 Typically, the older vehicles that are not,
0:33:29 they're still drivable.
0:33:31 We rotate a few of those out to the school resource
0:33:33 officer positions.
0:33:34 They typically place far less mileage
0:33:36 on them than a patrol car.
0:33:38 But in the last several years,
0:33:39 Once a car has reached the point that norm, it's become counterproductive to keep it online
0:33:42 for those purposes, we take it to auction.
0:33:46 Some of you may remember for years that we would offer them to other city departments, and
0:33:50 they would continue to drive those cars.
0:33:51 Some of them are probably still being driven, but that is just simply compounding the problem.
0:33:56 So I think that the general philosophy is now, once a car has been deemed by the shop to
0:34:00 be unfit for the road that is taken off line completely and sold an auction.
0:34:04 Do you have any rep estimate on what we get for them at auction?
0:34:07 I don't, but I know that I think the norm made reference to this last February.
0:34:11 He is analyzing local options versus options throughout Southern Idaho, trying to get the
0:34:17 best possible dollars back for those vehicles.
0:34:20 And then do we put that back into the budget for purchasing vehicles or does it just go to
0:34:23 the general fund or where does it go?
0:34:25 Yeah, it just goes.
0:34:26 So all cash received, it goes back into the general fund.
0:34:29 Okay.
0:34:30 Thank you.
0:34:32 Jim.
0:34:33 Oh, thank you, Mayor.
0:34:34 Thank you, Captain.
0:34:35 I think that was very well presented.
0:34:36 Here's my take on this.
0:34:39 Whereas I'm concerned about fuel efficiency
0:34:42 and so forth in the general motoring public.
0:34:45 I've had several incidents in my career as a police officer
0:34:50 that have convinced me that having big cars
0:34:53 is a good thing.
0:34:55 In 1986, I was involved in a shooting situation
0:34:58 in which I couldn't get a bigger car to get behind.
0:35:01 And I think it's very, very important for us
0:35:02 to think about that when you're involved
0:35:05 in a shooting situation where you have incoming rounds,
0:35:10 you have to have as much covered concealment as possible
0:35:13 and a Toyota Prius ain't gonna cut it.
0:35:16 Number two, I remember a use of force,
0:35:19 a deadly force transaction in 1993
0:35:21 where an officer was assaulted with an AK-47,
0:35:24 a rifle next to a canyon, you remember this also,
0:35:27 a canyon view mental hospital in which his car
0:35:30 was taking numerous rounds.
0:35:33 He was able to employ his shotgun
0:35:35 that was sitting next to him in the front carrier.
0:35:39 And these smaller cars, I remember
0:35:41 we were like putting them in the back seat
0:35:42 or putting them under the seat or putting them in the trunk.
0:35:45 When this happens, you need to have those available to you
0:35:48 immediately.
0:35:50 And the argument that, well, we can have a few little cars
0:35:53 and a few big cars, it's a roulette, real-est.
0:35:59 We'll ask, who's going to arrive on that radio call first
0:36:03 and be the poor person who is going to have to engage that active shooter right then.
0:36:08 And here she better have those tools available to her right up in the front seat.
0:36:12 And if you don't, it could cost you a life.
0:36:13 So I think that the community is going to understand that we're going to have to use bigger cars and more efficient cars.
0:36:20 Because nobody out there who's working the street for
0:36:25 us putting their life on the line every day should have to compromise their safety to have fuel efficient cars.
0:36:34 That's my two cents worth. Thank you.
0:36:37 Thank you.
0:36:39 One of the things that I want to say, I will take a quick recess here for probably five to ten minutes for us to go out and look at the cars.
0:36:46 I want everyone to take a look at the space for the citizens that we may have to take into custody.
0:36:54 They don't necessarily have a right to.
0:36:57 to the amount of room, the difference between the sedan and the utility vehicle as far as
0:37:06 the amount of room for the citizen need to be taken into contest. I'm not sure how you
0:37:13 get like somebody my size in cuffs. I mean you might just lay me in their sideways I guess
0:37:20 It's all good, because it's not going to work any other way.
0:37:25 And I will, you made a quick mention of the we have passed some cars on down to other departments.
0:37:35 And I remember riding in Mitch Humboldt's car one time up to look at some property out on the canyon rim.
0:37:42 And got the front seats are just terrible.
0:37:44 I mean, they're just gone.
0:37:46 They're completely worn out, but the back seats are pristine.
0:37:49 Because they've been out set somewhere on a rack,
0:37:51 and then they come back in and do a cell of oxygen.
0:37:53 So it's kind of like you get the tail of two cars.
0:37:56 The front back seats way better than the one's
0:38:00 those are a police car.
0:38:00 They have the plastic.
0:38:01 The whole thing.
0:38:02 So it's going to be fun.
0:38:03 Let's take a 10-minute break.
0:38:04 Let's go take a little of the cars, and we'll come right back.
0:38:08 You think by looking out on this,
0:38:09 I'm going to change that much, bro.
0:38:13 I see that.
0:38:14 I do it really.
0:38:15 complex Harmon Park in the Twin Falls Gulf Club and Dennis Boyer who is the
0:38:23 they're resting him out there and putting him in Dennis you're it
0:38:31 we're in your we're in your item Dennis okay thank you mayor and council
0:38:40 pleasure to be here tonight tonight we're gonna be talking my item is parking
0:38:44 lots you know there has been some discussion I guess the last few weeks at
0:38:48 City Council meetings about City-owned parking lots that aren't paid. So City
0:38:52 staff has kind of been reviewing those. These are the parking lots we have we
0:38:55 looked at, okay. Of course the Oregon Trail Youth Complex, South of town, the
0:39:01 Harman Park parking lot on the south side of town, if some of you remember the
0:39:05 Old Sherman Pool area, and also we have looked at the Overflow Parking at the Twin
0:39:09 Falls Golf Club. Some of the other parking lots we did look at was one down at
0:39:13 The Niagara Falls, at very end,
0:39:15 we can't access it right now,
0:39:16 but we have a parking lot down there that's not paved.
0:39:19 Over by the Parks and Recreation Office,
0:39:21 we kind of have a trailhead parking lot of people park there
0:39:24 before they go down into Rock Creek Canyon over there
0:39:26 by the old singing bridge, what does that call now?
0:39:30 I still call it the Old Town Bridge.
0:39:31 Old Town Bridge, sorry, the singing bridge is still on there.
0:39:34 And also we looked at down at Durkeys Lake
0:39:36 on the west side of the parking lot,
0:39:38 there's kind of an overflow parking over there too
0:39:40 when the crowds are a big people park over there.
0:39:42 So we looked at those parking lots
0:39:44 that we could possible pay.
0:39:46 And we kind of prioritized the parking lots
0:39:48 and the three highest priorities of the parking lots
0:39:50 where we figure the most use is the organ trail
0:39:54 youth complex, the Harmon Park parking lot on the south side
0:39:57 and the overflow parking at the Twin Falls golf club.
0:40:01 And there's really two options to make these improvements
0:40:03 to these parking lots.
0:40:05 One is just a asphalt paving two inch compact
0:40:08 hot mix process.
0:40:10 And the other one is a double chip seal similar to what we did at Sunway Soccer Complex, that's a double chip seal.
0:40:16 I had a small mistake in my staff report here, I said the same process or chip-silling for the streets.
0:40:23 The streets were just receiving a single chip seal.
0:40:26 Okay, so we're looking at for the parking lots a double chip seal.
0:40:30 So Dean Lillard got an estimate on painting these three parking lots.
0:40:37 And you look at the kind of how many square yards you have,
0:40:40 and you kind of see the three prices of the paving
0:40:43 of those three parking lots, Harmon Park was
0:40:45 a little bit over $33,000.
0:40:47 The Oregon Trail Youth Complex was over $125,000 to pave,
0:40:51 and the Twin Falls Golf Club was about $45,000,
0:40:54 a little bit over $45,000 to pave those
0:40:56 with the two-inch asphalt compacted hot mix.
0:41:01 The option two was really the double chip seal,
0:41:03 similar to, like I said, to what we've done
0:41:05 at Sunway Soccer Complex.
0:41:07 And you can see Harmon Park was a little bit over almost $12,000.
0:41:10 Oregon Trail was almost $45,000.
0:41:13 And the Twin Falls Golf Club was a little bit over $15,000.
0:41:16 And talking Dean Littler, our street superintendent,
0:41:18 he said he needs some additional about $10,000
0:41:21 for some additional green grind and some other materials
0:41:24 if we do that double chip seal.
0:41:27 So right now, we do not have any funds budgeted
0:41:29 for these specific items, paving.
0:41:33 But we do have some looks like leftover funds
0:41:35 from this year's capital improvements,
0:41:39 and it looks like we have about $83,000 available for this.
0:41:43 The agri-fals development of trails,
0:41:45 we have $110,000 in this year's budget.
0:41:48 Over the work that's being done down there,
0:41:51 we won't be able to use all that money.
0:41:53 We're hoping to maybe still use some of that money,
0:41:55 maybe for development of some signs,
0:41:57 interpretive signs for agri-fals,
0:41:59 but we can set aside at least $70,000 out of that.
0:42:02 We had $10,000 for a slurry on our trail down in Rock Creek Canyon, Canyon Parkway.
0:42:09 But I was informed that in probably about two years, that whole trail will be torn up in
0:42:14 a new sewer line.
0:42:15 Is it in large?
0:42:16 Is it in large?
0:42:17 In large sewer line.
0:42:19 So that trail will be redone in two years.
0:42:21 So we decided we don't need to spend $10,000 and two years later, we're going to be tearing
0:42:25 it up.
0:42:26 And also when we purchased our large area, a long more of this year, we had a savings
0:42:29 of $3,000.
0:42:30 So there's where our savings of $87, $83,000.
0:42:34 So staff is just really kind of seeking direction
0:42:37 from the council.
0:42:38 Do we want to move forward with this and what option?
0:42:40 We do have the funds for option number two.
0:42:42 If we had to do option number one, we'll have,
0:42:44 I don't know where we would get the money from right now.
0:42:47 So I'm available for any questions.
0:42:48 So I've got a couple of dentists.
0:42:50 So the option two, it's the regrined.
0:42:53 So old asphalt that's been regrined and laid out
0:42:57 and then chips sealed twice on top of it.
0:42:59 Is that what I heard?
0:43:01 Yes.
0:43:04 Yes.
0:43:05 Okay.
0:43:06 And we did that at Sunway.
0:43:07 Yes.
0:43:08 How long?
0:43:12 So there has to be a small amount of regrating that occurs and there are some, I guess you
0:43:18 should call them soft spots in there.
0:43:21 And so the, in some locations.
0:43:23 So the goal was to use regrying to get your surface so that you could deal with it and
0:43:28 then put a double chip on there.
0:43:30 Okay.
0:43:31 And double chip is what happened out at Sunway.
0:43:33 But they had base work and that type of thing done beforehand.
0:43:39 Okay.
0:43:40 And maybe for you, Jackie, how is it holding up out at Sunway?
0:43:47 We have not, it's doing great for us out there.
0:43:51 Yeah, how old is it?
0:43:55 Four or five years.
0:43:57 High flies.
0:43:58 Okay.
0:43:59 So it's a good option, in your opinion, city engineer field.
0:44:04 Thank you.
0:44:05 That's a pretty quick question, too.
0:44:08 You know, we've offered this as an option to other entities.
0:44:14 Yes.
0:44:15 You know, for their areas that have that type of traffic load.
0:44:19 Right. It kind of makes sense to me.
0:44:22 Last question I have for you, you outlined a couple other potential projects in the future that we need, maybe need to do.
0:44:28 So these are the priorities this year, and then we'll talk about the others in the future.
0:44:33 I guess my other question is do we have any obligation because this is all about
0:44:39 reducing the amount of dirt and grime getting on the roadway so that we can be in compliance that
0:44:45 Whatever might happen in the future. Do we have obligation for some of these alleyways and things like that that are not paved
0:44:52 In that same respect because that's going to be an issue as well, right?
0:44:58 At some point in time everyone will have an obligation and that will include us in every
0:45:04 government partner that we have, and they'll be partners whether they want to be partners
0:45:10 or not.
0:45:11 Right.
0:45:12 Right.
0:45:13 So, and we will have to show from a point in beginning, which is in the future, improvement.
0:45:20 So I guess my philosophy is if we can be chipping away at this every year to the ultimate goal
0:45:27 of being prepared for that, that's probably the wise thing to do.
0:45:32 Yes, Jackie, to follow up on the question of the it's a good thing more precisely.
0:45:40 We're spending about 40% of the on the double chip sale versus the hot mix.
0:45:47 What's the difference in longevity under normal wearing tear?
0:45:51 I mean, if it's two and a half times, what I'm saying is that if we're going to be replacing
0:45:59 it in half the time we would the hot mix that is not necessarily such a good deal.
0:46:05 I have an actual life spam on a double chip. Single chip is anticipated to last for about
0:46:18 seven years and it depends on how people drive it and what the underlying surface is like.
0:46:24 These aren't highly traffic areas that we're intending to begin with.
0:46:28 The traffic tends to be, will tend to be like Sunway Soccer Field in that there is volume
0:46:35 but it's generally slow.
0:46:37 You know, I guess people do rip through
0:46:39 Sunway Soccer Field now and then,
0:46:40 but it's rather hard to do when we have the large numbers
0:46:43 of people in there.
0:46:44 I wouldn't anticipate that Oregon Trail would be different
0:46:48 in that it's kind of a crowded little parking lot.
0:46:51 You know, it's well used and people are going fairly slowly.
0:46:55 There aren't loads on it, you know, except for the garbage truck.
0:47:00 Okay, well, at the risk of the council hurrying up and doing projects that we've been negligent
0:47:07 on accomplishing, I don't want us to throw this money away as a bad investment.
0:47:12 Do you think it's okay to, would you recommend that we can approve, proceed with the double
0:47:18 chip as opposed to the hot next?
0:47:21 I think that we can proceed with the double chip.
0:47:26 And the other question back on Augur Falls, that's kind of my pet project.
0:47:32 I'd hate to see it deferred or delayed or moved down.
0:47:36 But if we do the double chip seal, that would not impact that.
0:47:41 Is that what you're saying, Dennis or Jackie?
0:47:44 I'm just going to answer because Dennis really wanted to put those paths in.
0:47:49 And we really felt that the pipeline job with the blasting and the work that's going
0:47:54 on and how consumptive it is of the roadway, made that whole area an area that we really
0:48:00 wanted to close for just so we can get the pipeline in.
0:48:03 So, and there's somewhat of a discussion, I guess, on safety and I think that we'll need
0:48:10 to have delineated paths and signs later if we want to address that resource properly.
0:48:18 And so I'm sure he's going to be back with that.
0:48:23 Thank you, Susan, correct me if I'm wrong, but I believe that we came up with an agreement
0:48:32 with the county on their property where they are housing their search and rescue boats to
0:48:37 help them with the double chip seal there since the pavement was so expensive.
0:48:43 But I was under the impression we had a large supply of the recycled product so that the city
0:48:49 was covering some of that and all they were paying for was oil.
0:48:54 And if that's the case, do we not have access to that for ourselves to bring these costs down
0:48:59 even further?
0:49:01 So that event was a, I guess, a perfect timing of opportunity.
0:49:07 We were using the zipper, and we were out there, and we were making a road improvement.
0:49:12 And when we were making that road improvement, we had the material that we were able to apply
0:49:19 by adding the oil and putting it into that setting.
0:49:22 We only have the material when we go forward and we use the zipper or we do overlay or re-grind
0:49:28 is how you get that because it's that you recondition the asphalt so you got to refine
0:49:33 the asphalt to begin with.
0:49:35 Right now I'm not aware unless Jackie can correct me if I'm wrong of any significant
0:49:40 zipper-like projects like we had last year that we're going to be able to absorb or eat
0:49:46 into some of these costs.
0:49:52 Sorry, Jackie, just down and up with the mic.
0:49:57 So Dean looked and ran an estimate based on the quantities
0:50:02 that were here for what we actually have in the pile
0:50:04 and what he thinks he's going to have ready in a timely manner.
0:50:08 So if he knows a hedgehog, then he will create a bigger pile.
0:50:14 But this is not, you know, this is an imminent short-term window.
0:50:19 And so that was not as much of an opportunity this time around.
0:50:24 So would we be better off to wait on this a little bit
0:50:26 until we refill our stockpile and do that?
0:50:30 I mean, what kind of money are we talking?
0:50:33 And how long, you know, how far in advance do you need to know?
0:50:37 Don't we have a pile out by the golf course?
0:50:39 Isn't that what we're talking about, pile of asphalt?
0:50:42 Is that what we're talking about to use?
0:50:45 Don't have enough.
0:50:47 But would we be better to put this on hold
0:50:49 until we have enough and do it?
0:50:51 Or is it better just to go forward
0:50:53 because of the timing with the weather
0:50:54 and everything else that has to mix in?
0:51:05 Yeah, so Jackie just said it's probably not going to save
0:51:09 that much money at the end.
0:51:12 So again, just kind of a quick reminder,
0:51:14 this is another discussion that came up
0:51:18 during the budgeting process as a result
0:51:20 of looking at the park's capital fund budget
0:51:22 seeing if we should insert parking projects or something should we consider those at those
0:51:30 time.
0:51:31 And so one of the things that we've done is we've gone back to look at the current year
0:51:34 allocation to try to include those to remove the political sensitivity of the issue.
0:51:43 You know, obviously every time we go forward with having that public conversation, we have
0:51:50 have to stand up and say, well, you too, city, or at least hear it, even though there might
0:51:55 be some different circumstances in those areas.
0:51:59 We felt that it would be a good use of our resources right now.
0:52:04 What's going to happen to those funds is if we do not spend them or use them in this fiscal
0:52:09 year, they will revert back into the capital improvement fund cash reserve line item.
0:52:16 And it's one of those things that as we go forward, as you're aware, every year we take
0:52:20 a look at where that we think that fund is going to end up for the year and then we often
0:52:25 propose things that might be of interest to the council to move forward.
0:52:32 These are projects that would probably appear on that list now because of the importance
0:52:38 of what they mean to moving forward in the political sensitivity.
0:52:42 Thank you.
0:52:43 We recommend a second.
0:52:44 Thank you, Mayor.
0:52:45 I don't know if this is a question for Mitch or for Jackie, but I just want to clarify.
0:52:52 I think you touched on that.
0:52:54 One of these options is the same that we've offered the private sector in covering their
0:52:59 requirement to pave.
0:53:00 Is the double chip seal something that we would also accept?
0:53:05 Yes.
0:53:06 Okay.
0:53:07 We wanted to make sure that the options that we were using for us were options that we would
0:53:14 be willing to allow others to also do in the completion of the work.
0:53:20 We didn't want to fix the problem that caused another problem.
0:53:23 Right.
0:53:24 That's great.
0:53:25 So when we do make changes to the code, if that's what the council wishes, then that would become
0:53:31 an option.
0:53:32 Or is it something that doesn't need to be written into the code, it just is an option?
0:53:36 I think it should remain an option with some discretion.
0:53:44 some places where it is very inappropriate to just ship on the
0:53:48 dirt and say, oh, it's good enough.
0:53:52 And that's at least somewhat based on what we want to look
0:53:55 like as a community as well as how we want to manage that and
0:53:59 whether or not we can manage it.
0:54:01 Particularly behind the property line, we lose all jurisdiction
0:54:04 in that.
0:54:06 That's a great idea.
0:54:07 So will there be some sort of requirements or some sort of
0:54:11 objective standards that we can look to in making this
0:54:15 decision, because I think that's kind of where the conversation started from is, well, when
0:54:19 do you decide to enforce the code and when do you not?
0:54:22 I think it's very difficult, but it would be nice if certain maneuvering areas, certain
0:54:27 amounts of traffic, I think that would be helpful.
0:54:30 I thought life I have.
0:54:36 Oh, Chris Targeting.
0:54:37 Right, Mac Emotion.
0:54:38 Is this a motion item for Travis?
0:54:43 So really that we would ask that this be one of those items, because actually what we're
0:54:49 doing is we're not only answering the question for next fiscal year, but we're asking for
0:54:55 the reallocation of funds that were appropriated this year, and it's appropriate for the council
0:54:59 to make a motion to reallocate those funds for a purpose than what other slides described.
0:55:05 Okay.
0:55:06 Just asking your lights on.
0:55:07 I move to pre to reallocate prior designated funds
0:55:12 for the use of double chip ceiling.
0:55:16 The three mentioned city owned facilities,
0:55:19 including Oregon Trail, Harman Park and the golf club
0:55:22 and the amount not to exceed,
0:55:24 including additional costs of 10,000 for a total of 81,856.
0:55:31 Suzanne, were you seconded or did you have a question?
0:55:33 Seconded.
0:55:34 All right.
0:55:35 Okay, but my first time seconded by Suzanne Hawkins,
0:55:39 and we do have one line up, Suzanne.
0:55:42 Dennis, I don't remember seeing anything in the budget
0:55:45 for next year to address some of the other properties
0:55:48 that are still out there.
0:55:49 Is that?
0:55:50 That is correct.
0:55:51 Okay.
0:55:52 So are we going to, I know we're...
0:55:58 Yes, we will look at that, you know,
0:55:59 Auger Falls, I would say between those other three parking
0:56:01 lots, you know, Auger Falls is the highest need,
0:56:03 you know, Durkeys Lake.
0:56:06 If you're familiar with Durkeys Lake,
0:56:08 I became an overflow parking just because people could,
0:56:10 if they'd start driving through the sagebrush,
0:56:12 it came overflow parking and it really only takes effects
0:56:16 for about five weekends out of the whole year
0:56:18 that people park over there when the parking lot is full.
0:56:22 So I think there's still some internal discussion about
0:56:25 is that really a parking lot or not?
0:56:26 I just don't want tonight to end up being a feel good
0:56:29 because it's been in the forefront and let it slide
0:56:32 and not keep working on it.
0:56:35 So, I think it's best to wait for the Auger Falls project simply because we have a lot
0:56:43 of activities still going on down there.
0:56:48 In all reality, it really becomes like Dennis said, a question of whether or not you want
0:56:53 to cause a requirement to have overflow parking to be paid.
0:56:58 And if that is the case, remember that Durkys, and Shoshone Falls is a fund that collects
0:57:06 a vehicle entrance pass, and part of that vehicle entrance pass is dedicated towards future improvements.
0:57:13 And Lori just shared with me that there is considerable funds in there.
0:57:18 She actually used the word plenty.
0:57:20 Oh, I get too excited.
0:57:25 Considerable plenty, but funds that are dedicated and can only be used down in that area.
0:57:30 So that's something that we could investigate and move also very quickly on, if that was
0:57:34 the Council's correct.
0:57:35 Okay.
0:57:39 So move seconded.
0:57:40 I've seen no additional license on the other row cover.
0:57:43 Chris Talkington.
0:57:44 Yes.
0:57:45 Don Hall.
0:57:46 Yes.
0:57:47 Suzanne Hawkins.
0:57:48 Yes.
0:57:49 Greg Lansing.
0:57:50 Yes.
0:57:51 Jim Mun.
0:57:52 motion passes 6 to 0 thank you
0:57:56 Dennis moving on to item number
0:58:01 four versus presentation of the
0:58:02 nine month financial update of the
0:58:05 tax-supported funds and water
0:58:06 wastewater and sanitation for
0:58:09 physical year 2012 13 or a CFO of the
0:58:14 city of football
0:58:54 We're getting piggy tonight, so we're going to give this a try and if we have a little problem, we're going to back up and try again, okay?
0:59:04 It's Windows.
0:59:09 Let's be positive, come on.
0:59:13 All right.
0:59:23 Well, good evening mayor and city council.
0:59:26 With all of the 2014 budget discussions we've been having, it seems the perfect time to drag you back to the current fiscal year.
0:59:33 So, it's time for our third financial report for 2013.
0:59:37 We're going to take a look at the tax important funds for the nine months of this fiscal year,
0:59:43 along with the three major enterprise funds.
0:59:45 And tonight, we're also going to spend some time discussing investment income.
0:59:55 So, I'm going to do a little repeat here.
0:59:57 I do this every time, but it's for the folks in the audience who might not understand.
1:00:02 So, the tax-supported funds are the general fund, the street and street light fund, library,
1:00:09 airport, capital improvement special projects, and pool insurance and fireworks.
1:00:18 The total budget for these funds is $30.1 million.
1:00:22 The largest contributing revenue sources are property taxes, franchise fees, state shared
1:00:29 revenues, highway monies, and inter-fund transfers. The total of these five revenue
1:00:36 sources is about $25.3 million and they make up 84% of the total revenues in these funds.
1:00:45 So let's take a closer look at the revenue sources and how the actual dollars come in,
1:00:50 nine months of 2013. We'll also have a little comparison of the prior three years. So through
1:00:58 Through June, we've received a little over $11 million in current property taxes, delinquent
1:01:05 property taxes, and penalty and interest, where it's 66 percent of the budget, which is ahead
1:01:11 of our prior three-year average of 62 percent.
1:01:15 So in January, the news from the county was that current collections were up.
1:01:20 And if you look at our total collections, strip out delinquents, strip out penalties and interests,
1:01:27 the numbers support that statement.
1:01:30 Franchise fees collected through-
1:01:32 We have a quick question for you.
1:01:34 Although we are ahead of the previous three years
1:01:37 on property tax collection,
1:01:40 we are still substantially below the 75%.
1:01:43 So that's not an even monthly incremental accrual.
1:01:46 That's right.
1:01:47 That's a great point.
1:01:48 So we receive, we get drips and drabs throughout the year,
1:01:52 but we get our two largest pieces in January and in July.
1:01:57 So this shows a big piece in January,
1:02:00 and those little pieces throughout.
1:02:02 And one day short of the July.
1:02:03 Yep, in fact we just received that today.
1:02:09 So the franchise fees collected through June
1:02:12 are $1.3 million and are at almost 85% of budget.
1:02:17 And that's with the prior three year average at 78.
1:02:22 Now you remember from our last update
1:02:24 that the gas franchise fee was off
1:02:27 because there was a warmer than normal winter.
1:02:31 It's the fees from electricity
1:02:33 that are actually driving this increase
1:02:35 and the portion of the franchise fee revenue.
1:02:38 So I'd hope power franchise fees is about 87% of budget
1:02:44 and I'm now projecting that we'll receive about $120,000
1:02:48 more from this revenue source than what we had budgeted.
1:02:55 State shared revenues are at 81% of budget
1:02:59 or $2.3 million.
1:03:01 The average of the prior three years was about 77%.
1:03:06 I'm sure you remember from our last update
1:03:09 that we're receiving a bigger share of the state shared revenue
1:03:12 because our values decreased less than other entities
1:03:16 in the state.
1:03:19 When we talked for the six month update,
1:03:22 I had projected an additional $115,000 of revenue
1:03:26 in this category.
1:03:28 And I've adjusted that estimate by another $35,000.
1:03:32 It's looking more like unanticipated revenues
1:03:34 of about $150,000.
1:03:37 And I did adjust our current year revenues prior
1:03:42 to projecting those increases for the 13-14 budget.
1:03:47 Highway user and road and bridge taxes are about 76%
1:03:51 of budget with the prior three years at 73%.
1:03:55 We're running ahead of projections in highway M&O
1:03:59 And that's very similar to the way we receive our property tax dollars.
1:04:03 And it transfers look out of line in all the years displayed, but there's always an explanation.
1:04:12 For the current year, it's at $2.9 million repayment from the sewer fund to the general fund.
1:04:19 If you remove that, we're at 75% of budget.
1:04:23 And the prior three years, it's an un-budgeted transfer from the capital improvement fund to the library fund.
1:04:30 In all cases, it was to purchase approved capital projects for the library fund.
1:04:35 So, that's a look at the major revenue sources and the tax-supported funds, but before we
1:04:39 move to expenditures, we're going to discuss investment income.
1:04:48 During our last financial update, I shared with you a 10-year history of our investment
1:04:53 income.
1:04:54 I showed how that revenue source had declined, but was picking up.
1:04:58 I shared that there's a cost to not being proactive with our idle cash and a benefit
1:05:04 to search out better investment opportunities, always keeping in mind the three objectives
1:05:09 of our investment policy.
1:05:11 Safety, first, liquidity, second, and at the very least, yield.
1:05:17 That's the secondary importance to the other two.
1:05:21 So as you were reviewing this agenda item, I'm certain that you noticed the negative investment
1:05:25 income. And I'm guessing you wanted to know what happened and who, if anyone, is actually
1:05:30 monitoring our investments. Well, nothing has happened to our investment income. And I assure
1:05:37 you, I am monitoring it. So let me explain. As of June 30th, the city's trust account had
1:05:45 a cost value of $35.9 million. The estimated annual income from these investments is $926,000.
1:05:55 are current yield 2.62 percent, however, at that particular point in time, the market value
1:06:05 of that same portfolio was valued over a half a million dollars less at 35.3 million dollars.
1:06:15 Does this mean we lost to half a million dollars?
1:06:17 No, it does not.
1:06:20 It's what's referred to as an unrealized loss.
1:06:24 I would have had to have liquidated our entire portfolio on June 30th to recognize that loss.
1:06:33 Market value is a reflection of market conditions as a point in time and rates jump for a very
1:06:41 short time in May and at the end of June.
1:06:44 So why does our general ledger show we have negative interest income?
1:06:49 to GASB 31 and that's governmental accounting standards board. All investment
1:06:55 income including changes in the fair market value of investments should be
1:07:00 reported as revenue in the operating statement. It's meant to provide information
1:07:05 that is more representative of what's creating the market. So in our general
1:07:12 ledger we have two lines. We have one for actual income and we have one for market
1:07:18 adjustments. The info gets netted for the reports I prepare for you. So let me
1:07:24 illustrate actual investment income for the nine months of the fiscal year along
1:07:29 with market adjustment. Our investment income is the darker line and it shows
1:07:35 steady while market evaluations in the lighter color are all over. Again, if we
1:07:42 were to liquidate the entire portfolio on the particular reporting day of the
1:07:46 month than those unrealized gains and losses would be real. I assure you it's our intent
1:07:53 to hold our investments until maturity and continue to steadily bring in that income.
1:08:00 Our portfolio is diversified. We are limited on the percent of any one name or issuer of
1:08:07 corporate bonds. Our investments must be single, A minus or higher by at least two rating agencies.
1:08:16 We have investments that are very liquid for operations, and we have longer term investments
1:08:20 for funds that aren't immediately needed.
1:08:22 One second, please.
1:08:25 Mr. Stagt.
1:08:26 As a former stock broker, I'd probably spend about two or three hours a day on the market,
1:08:32 and I don't have to tell you this is a disastrous time to purchase bonds.
1:08:38 Please assure me the city is not going to be making a dive into bonds that as yields go
1:08:45 up the principal decreases.
1:08:48 We will not die against the increase.
1:08:50 I understand the portfolio we have that we hold to maturity while we really return a
1:08:56 principal, but that will be years off, but for new purchases, please don't do that.
1:09:03 So we are very diversified.
1:09:07 We are single, AIM minus rated by at least two rating agencies at time of purchase.
1:09:15 We kind of have a latter effect for the bonds at for maturity dates
1:09:22 So what I really wanted to get at is our actual income through June is about
1:09:29 $419,000 and we budgeted
1:09:32 469,000 our income comes in steady
1:09:36 The markets the one that goes up and down
1:09:38 So what we have actually received is 89% of budget, 75% through the year.
1:09:46 We're going to continue to comply with GASB 31, but I will also ensure that you know what our actual investment income is.
1:09:55 Here's my key question, NASA.
1:09:59 Hey, Chris, I want to know what we were doing considering bonds and buying bonds at this time.
1:10:03 So we have bonds, we buy debt, we have U.S. securities, and I can come up with a better
1:10:11 report when in these days if that's what you would like to see, Chris.
1:10:14 Maybe I should just drop in your office and have a formal discussion, but I mean ten-year
1:10:22 or paper is at two and a half percent, now and some people are talking about it going
1:10:26 as high as four, four and a half, five percent within the next couple of years.
1:10:30 that happens, your principal commensurately decreases.
1:10:36 And if you buy a 20 or a 30-year bond note,
1:10:42 it's just going to be year after year of unrealized losses.
1:10:46 So Chris, we don't have anything that far out.
1:10:51 I'm just saying this is not a desirable time
1:10:54 for purchase of new bonds, corporate, any type.
1:10:59 And I don't know what that means.
1:11:01 or just have to go cash.
1:11:03 But I guess I would also say do not rely
1:11:05 upon any one investment advisor,
1:11:08 especially one who works for commissions.
1:11:12 Thank you.
1:11:12 Stop by any time, Chris, and we can go over the portfolio.
1:11:20 So now it's time to review the expenditures
1:11:22 and the tax-supported funds.
1:11:24 We have four major expenditure categories,
1:11:26 and they are personnel, M&O, capital, and transfers.
1:11:33 The personal budget constitutes 58% of the total budget in the tax-supported funds, and
1:11:42 we're 69% spent through the third quarter of this fiscal year.
1:11:47 It's one category that's pretty consistent from pay period to pay period, and our current
1:11:53 percentage of expenditures is pretty much right in mind with the prior three years.
1:11:59 Patty Lehman has very carefully gone through our labor distribution, looking at salaries,
1:12:04 looking at positions, looking at benefits, and really trying to zero in on, does our budget
1:12:11 reflect the correct number of positions and the correct salaries? Are the benefits accurate?
1:12:18 Have we budgeted family coverage and maybe we're only paying single coverage or vice versa?
1:12:24 Do we have the correct percentage if we have an employee that a portion of their wages goes
1:12:29 to the water fund or a portion goes to the general fund? Is it allocated correctly? And
1:12:34 Our unspent dollars the result of over budgeting or unfilled positions.
1:12:40 So we have made some adjustments for fiscal year 2014 and we believe the amount spent next
1:12:46 year should be more in mind with budget.
1:12:52 The M&O budget makes up 20% of the total tax supported funds and we're currently at 65%.
1:12:59 The pool and the insurance funds are the only two that are over the 75% mark and that's
1:13:05 because the city pays the why at the beginning of the month.
1:13:10 So the pool's M&O expenditures include 10 months of payments
1:13:14 instead of nine.
1:13:15 And in the insurance fund, the city's
1:13:17 paid 100% of insurance premiums.
1:13:20 So otherwise, M&O expenses and all the other tax-supported funds
1:13:24 is below our 75% mark.
1:13:30 The capital improvement budget makes up 19% of the total,
1:13:34 and we're 56% spent.
1:13:37 Our three-year average is about 57%.
1:13:40 Capital projects have been picking up in the street fund,
1:13:43 and they will continue to do so throughout the remainder
1:13:45 of the year.
1:13:47 And transfers make up 3% of the tax-supported fund
1:13:50 expenditures budgets.
1:13:51 These expenditures are the ones made by adjusting journal
1:13:54 entry, and they're pretty consistent throughout the year.
1:13:58 So in the tax-supported funds, we've reviewed major revenues
1:14:02 and how they've come in year to date.
1:14:04 We've received 80% of our total tax-supported fund
1:14:08 revenues, if you include the $2.9 million repayment from the
1:14:11 wastewater fund, 71% without property text collections have
1:14:17 been strong and ahead of where the county expected them to be.
1:14:21 Power franchise fees and state shared revenues have come in
1:14:24 higher than anticipated. On the revenue side, we're in very
1:14:28 good shape. We've reviewed year to date expenditures and
1:14:35 personnel, M&O, and transfers are all at or below the 75% target level.
1:14:42 Capital expenditures are 56% of budget. They picked up in the street fund and
1:14:47 will continue to do so. On the expenditure side, we're at 66% spent year
1:14:53 to date. The graph shows the actual revenues and actual expenditures nine
1:14:58 months into each of the fiscal years beginning with 2010 through current. You
1:15:04 You see that revenues are higher than normal in 2013, but if you take out that $2.9 million
1:15:11 or more in line with prior years.
1:15:14 We continue to have adequate cash flow to support our activity until revenues are received.
1:15:20 We conservatively invest our idle cash.
1:15:23 We're on track and in strong financial condition in the tax-supported funds.
1:15:31 Now we'll take a look at the enterprise funds in the three largest water, wastewater, and sanitation.
1:15:42 We begin in the water fund and take a look at the revenue picture.
1:15:47 Now this graph shows water user revenue by month for fiscal year 2011, 12, and current.
1:15:55 Water user revenue accounts for 99% of the total budgeted revenue.
1:16:01 The first nine months of fiscal year 2012 showed we had received a little over 24% from 2011,
1:16:09 but if you remember 2011 was kind of a cool wet spring.
1:16:16 That was after a 5% rate adjustment.
1:16:19 For 2013, these revenues are up almost 2% from 2012 after 3% rate adjustment.
1:16:27 We know that pre-sip and temps play a big role in the spring and summer months.
1:16:32 So I look at lots of historical numbers and beginning in 2005, we've had on average a
1:16:39 little over 61% of our actual revenues by this time.
1:16:44 That eight-year time span takes into account fluctuations in temperature and precipitation.
1:16:52 And if that holds true, we should collect an additional $2.5 million in the next three
1:16:58 months, putting us over our budgeted figure by about $450,000. The extended hot temperatures
1:17:06 have certainly contributed to this. If we end up realizing this additional revenue over
1:17:12 and above what was budgeted, we can look at using those dollars for capital projects in
1:17:17 future years and thereby reducing a potential rate increase to our citizens. On the expenditure
1:17:27 underside and water. Personnel costs are 19% of the total. We're currently at 63%. This
1:17:34 was also part of the labor distribution review Patty did during the budget process. There
1:17:39 were adjustments made in this fund and in 2014 we expect to see the budget and actual
1:17:44 falling more in line.
1:17:47 Immunocosts make up 24% of the water fund and we're at 60%. Our year to date power expenditures
1:17:55 are a month behind, so June hasn't been included,
1:18:01 and I anticipate July's pumping costs
1:18:04 will be pretty high.
1:18:06 Capital costs make up only 14% of this budget,
1:18:10 and currently show we've only spent 30% year to date.
1:18:14 Speaking with Jackie, there are capital projects
1:18:17 such as the facilities plan that we're moving forward with,
1:18:20 we haven't been built yet, and there are several projects
1:18:23 that the water department's planning on moving forward
1:18:25 with that just isn't, they're not under contract yet.
1:18:30 The plan is to move ahead with the project, so expenditures will pick up in the last two
1:18:34 months of the fiscal year.
1:18:37 Debt makes up a third of this budget at $3 million.
1:18:40 We're showing 145% spent year to date, but that's the refinancing of that DEQ debt.
1:18:46 While it appears our budget is way out of line, the refinancing of this 4% debt saved the city
1:18:52 and the rate payers hundreds of thousands of dollars in interest.
1:18:56 If you adjust the early payoff from the budget, the true comparison is that we're 15% of budget
1:19:01 through June and we'll have other interest and principal payments coming due in August.
1:19:07 Transfers make up 10% of the total budget and are at 75%.
1:19:12 In total, the water fund is 86% spent, 75% through the fiscal year.
1:19:19 If you remove the DEQ debt payoff from expenditures, the fund is about 40% spent to date.
1:19:30 In the Wastewater Fund, there are three major revenue sources,
1:19:33 Royal Review, Residential, Industrial, and Municipal User Fees.
1:19:37 And together, they make up 95% of the total revenue in that fund.
1:19:43 We're going to take a look at residential user fees from 2011 through current.
1:19:49 For 2013, this revenue is coming in about 3.7% higher than 2012 after a 2% rate adjustment.
1:19:57 And that's right where we were at our six month update.
1:20:00 Industrial user revenues are a little more difficult to predict.
1:20:04 We find out about changes in usage after the fact.
1:20:08 And this revenue is up from 2012 because of a new user, but not to the levels we've anticipated.
1:20:15 Municipal user fees were showing a slight increase over 2012 of about 1.2%.
1:20:21 Overall, we're up about 16% from the same time last year.
1:20:26 The majority of this is due to the new industrial user.
1:20:33 When expenditures personnel costs make up 7% of the total and we're 77 and a half percent
1:20:40 spent through June.
1:20:42 M&O costs make up 50% of the total and we're showing 72% spent.
1:20:48 Capital costs make up roughly 18% of this budget and according to reports we've expended 79%.
1:20:55 This includes the major projects that began last year and they're the projects that the
1:21:00 general fund helped cash flow prior to bonds being issued.
1:21:04 We'll include those in a budget amendment.
1:21:08 So if you strip those items out that we're
1:21:10 going to include in the budget amendment,
1:21:11 your date costs for 2013 are about 35% of budget,
1:21:15 or $466,000.
1:21:20 Debt is 17% of this budget at $1.2 million.
1:21:24 We paid 462%.
1:21:27 But just like in the Water Fund, that's
1:21:28 the payoff of the high interest of DEQ.
1:21:32 Bond proceeds cover this expense, and it'll
1:21:34 included in the Budget Amendment. We also paid off our outstanding certificates of participation,
1:21:39 which resulted in $10,000 of savings to the city and rate payers. If you strip out the
1:21:44 un-budgeted retirement of debt, we've spent 13%. Again, we have scheduled interest and
1:21:51 principal payments due in August. Transfers make up 8% of the total at $576,000, and they
1:21:59 currently show 579% spent, just the expenditure side of the $2.9 million repayment to the general
1:22:06 fund. So in total, the wastewater fund appears to be 178% spent nine months into the year. But
1:22:14 if you subtract out the expenditures that we will include in the budget amendment, we're at 56%
1:22:20 of budget. We're going to finish up our discussion with a look at sanitation. The graph illustrates
1:22:28 Garbage collection fees and landfill fees collected nine months into the year compared to budget and
1:22:35 We have collected 75% of our garbage fees and 73% of landfill fees. I usually like to include some historical data
1:22:45 However, as I shared last time we're really doing some changing and how we account for things in this in this fund
1:22:52 In the past, admin fees were included in garbage collection fees, and I'd like to keep those separated.
1:22:59 So having historical information just isn't very useful at this point.
1:23:06 My goal has been to ensure we're collecting adequate revenue to cover expenditures,
1:23:11 and the 2013 and 2014 budget should be more reflective of what's actually happening.
1:23:17 on the expenditure side, personnel costs make up 7% of the sanitation budget, and we're
1:23:26 76% spent. M&O costs are the majority of this budget, and they're 87%. They include PSI and
1:23:36 Twin Falls Solid Waste, and we're showing we've only expended 60% to date, but we don't
1:23:43 have all the months of PSI and the landfill charges in there. So once you
1:23:48 include those June payments, then we're at 68% spent. There's no capital or debt in
1:23:55 this fund. It's just operations. Transfers make up 6% of the total budget and
1:24:01 they're right on track. So the sanitation fund overall is showing 62%
1:24:07 spent here today. If you add in the June payments for PSI in solid waste, the fund
1:24:13 is closer to 69% spend. So that is look at revenues and expenditures for the three major
1:24:22 enterprise funds in addition to the tax supportive funds. That concludes what I prepared for you
1:24:27 for the nine month financial update and is the summary of revenues and expenditures for
1:24:32 the enterprise funds displays. I'm happy to answer any questions you have.
1:24:36 Just a great overview Laurie. Thank you.
1:24:39 Back on the sanitation fund and recycling revenue. We're only collecting 5% of our
1:24:45 budget for this coming year or we likewise budgeting have we reduced way down like
1:24:52 only a few thousand bucks as opposed to 20 so we won't be out of variance too much
1:24:57 that's good that's good to do it lights Lori thank you very much you always
1:25:03 bring it down to a level that we can understand we appreciate that and thanks
1:25:07 and even me yeah we do have former cops on here like
1:25:17 We'll put you back in that car again
1:25:26 Next item
1:25:28 consideration which is a continued discussion of the
1:25:32 City managers ready recommended budget for the upcoming year 2013 14
1:25:37 Travis Rothwether
1:25:43 Mr. Mayor members of the council recognizing the time did you guys want to take a quick break?
1:25:47 We're going to go ahead and go forth and if somebody passes me a note, we'll take one
1:25:57 thing.
1:25:58 How's that?
1:26:00 I was really looking forward to a break.
1:26:02 If you want to, what's the quick break while you're setting up, how's that sound?
1:26:07 Five-minute break.
1:26:08 We're going to time them.
1:26:15 How many cars does it take to balance a checkbook?
1:26:21 We have another members of our staff.
1:26:24 We have a few department homes.
1:26:26 See, we pour all the department heads here.
1:26:28 We do everyone have any, Jim, on.
1:26:33 Yes, I'm going to say.
1:26:35 I was just going to give you what the next steps look like,
1:26:37 but if you have a question with the answer.
1:26:39 I'll wait.
1:26:40 She's going to wait.
1:26:41 Go ahead.
1:26:42 So next week is on August 5th is the evening in which we will
1:26:46 hold the public hearings associated with the rate adjustments.
1:26:50 We are not going to ask you to adopt the rate resolution on the 5th,
1:26:54 just have a public hearing that evening on the enterprise rates.
1:26:59 The only rate that we will be having a public hearing on is the sewer rate
1:27:04 because that is the only one that is over 5%, and that is the one that is required by law.
1:27:11 Also on the 5th, you will adopt the tentative budget.
1:27:15 that tentative budget is, and it does set that maximum spending threshold that you cannot cross.
1:27:21 We have not had any conversation about use of any foregone dollars in this budget.
1:27:28 And so be thinking if you would like to do that or not remember in the past what the council has done
1:27:36 as they've added some foregone to maintain some flexibility, not saying you have to do that,
1:27:42 but just priming that thought as you move forward
1:27:45 into the August 5th meeting.
1:27:48 And then on the 19th, we will ask you to come in
1:27:52 and at 6 o'clock, the first thing you'll do is adopt
1:27:55 the utility rate resolution, which drives the revenue
1:27:58 in the budget and then the following is the adoption
1:28:01 of the ordinance for the upcoming fiscal year.
1:28:04 And we will be done with the setting of the budget
1:28:08 for the fiscal year 2014 and then we'll continue
1:28:11 to move forward and track the final months of 13 as we prepare for fiscal year 14, so inclusion
1:28:20 into our operations.
1:28:22 Okay.
1:28:23 Chris, talk.
1:28:24 Well, just an observation.
1:28:25 We spent approximately three months of fourth of a full year on this budget and all the budgets
1:28:31 I've gone through.
1:28:32 I have to tell you, I have a more comfortable feel of the community's mediocre input to
1:28:41 but that's probably not to be expected ever to be anything more than just a few people to take active interest.
1:28:48 Department heads participation just seems to have been and is superior.
1:28:54 The explanation of the inner workings of enterprise funds and the general fund and everything is helpful because of our new streaming.
1:29:03 I think that this has really been a net sum game for the community this year.
1:29:08 and as to get Travis and all your staff.
1:29:10 Thank you.
1:29:10 It's been the best one I've seen in my 150 years on the campus.
1:29:15 Thank you.
1:29:16 Jim, I'm on.
1:29:17 Thank you, Mayor.
1:29:18 If we're off the budget, I just wanted
1:29:19 to take a moment to commend Sue Harris, Gretchen Scott,
1:29:23 and Katie Touche for the fantastic employees picnic.
1:29:26 We had the other day.
1:29:28 Not only was it just a great picnic,
1:29:29 but everything that they did was homemade stuff.
1:29:31 And so it was really, really cool.
1:29:33 On behalf of the council, I just want to say thanks.
1:29:36 Good job.
1:29:38 I would echo that those both thoughts, both Chris's and Jim's.
1:29:41 I would echo what they did to both.
1:29:44 I appreciate the process we went through and the comfortable feeling we have, understanding
1:29:51 the budget as well as the boy picnic was definitely a success, Susanne Hargins.
1:29:59 I'm going to follow with Jim there.
1:30:01 I wanted to thank Officer Poland for the National Night Out last week too.
1:30:06 I know my grandkids enjoyed it thoroughly and I could not believe some of the questions they
1:30:11 came up with.
1:30:12 I thought it was really great to see them interacting.
1:30:15 Also, this morning I had the chance to be the guest reader at Rime Time at the library and
1:30:21 I just want to say we have an incredible library staff.
1:30:25 Those employees are so good with those kids and the way they bring them in and interact
1:30:29 with them and teach them about the library and the books and it was just really awesome
1:30:33 to be a part of that and see how it all flows.
1:30:37 So we've kind of melded right into the input by city manager and city council and things.
1:30:43 So we're just going to continue with that.
1:30:45 Saturday was the friends of Muni.
1:30:48 I know we've changed the name of the tournament.
1:30:50 Didn't change it with the name of the golf course.
1:30:54 I believe 20 teams, 22 teams there.
1:30:58 We don't have a final tally of the money that's raised.
1:31:01 All the money that's raised is turned right around back into capital projects at the golf
1:31:06 Of course, they've done a lot of T boxes and other things
1:31:11 around the course over the years.
1:31:12 And so it's just to make it more playable
1:31:18 and more attractive to the general public
1:31:20 is usually the purpose there with that.
1:31:24 Don and I played on a team sponsored by CH2M Hill,
1:31:28 and we were lucky enough to bring along
1:31:30 one of our fine police officers, Lieutenant Craig Stottz,
1:31:34 who led us to a third place meeting in the event,
1:31:37 which is the last place that got a prize,
1:31:40 that we got a small prize from the,
1:31:43 thank, from the, ours came from the pocket,
1:31:45 but there were a lot of sponsors,
1:31:47 a lot of community sponsors, Orange Leaf,
1:31:48 had a huge commitment there,
1:31:51 as well as a lot of others around Guild Mortgage,
1:31:54 as well as the banks,
1:31:56 and a very successful event,
1:31:59 and we will keep,
1:32:01 we will have Suzanne report back to us
1:32:03 What the Golf Advisory Board decides to spend this year's
1:32:08 funds on to help improve the golf course,
1:32:13 the improvement playability of the golf course.
1:32:14 And I just had a great time, but wasn't all that hot.
1:32:17 Stots hit some incredible shots.
1:32:20 And then we're just fun to play from and don
1:32:24 to do anything to add to your.
1:32:25 I just want to say I participated.
1:32:28 That's all I did.
1:32:31 We had a good time.
1:32:33 John Moffitt from CHM in played with this as well.
1:32:38 CHM in.
1:32:39 And so any other council or city manager have any additional thoughts for tonight, Travis?
1:32:47 Mr. Mayor, members of the council, as you'll recall, we had some members of the Women's
1:32:53 Association at the golf course come in and have a conversation about tables and chairs.
1:33:00 We have been able to work with Mr. Meyerhofer, and one of the conversations we had early
1:33:06 on with Mr. Meyerhofer was taking those funds, any profits that the city would see and applying
1:33:16 those back into capital investments into the golf course.
1:33:21 Because the golf fund is really an enterprise fund, and the funds that we collect there really
1:33:25 should be used for that purpose.
1:33:28 We believe that there are enough funds to solve the table and chair issue, and-
1:33:34 Right.
1:33:35 And I'm asked at the tournament that it would have been solved, but I sure hope so.
1:33:39 And so Mr. Meyerhopper right now is going forward in pricing out some tables and chairs.
1:33:45 We will present those options to you for your consideration.
1:33:51 But again, I think it really illustrates how well he's running that show.
1:33:56 is the first profit that we've realized at the golf course
1:34:00 in a really long time.
1:34:04 So compliments to Steve in the ways managing it,
1:34:07 but also in case there are people still listening out there
1:34:10 who participated in that, that we are also working
1:34:13 and getting that fixed insult as well.
1:34:16 OK, thank you, Travis.
1:34:17 Anybody else?
1:34:18 Council or anything?
1:34:22 Anybody from the public that would like to talk to us tonight over in the section for public input?
1:34:29 Seeing no one sprinting through the mic, I believe that takes care of it. We're adjourned.
Download
- Transcript (text) 93 KB
- Captions (WebVTT) 126 KB
- Transcript (JSON) 173 KB
- Audio, part 1 of 2 (M4A) 21.2 MB
- Audio, part 2 of 2 (M4A) 1.1 MB
Chain of custody
- Recorded. At the open meeting of the City Council on Monday, July 29, 2013. The recording started at 17:00 by the recorder's clock and runs 01:34:40.
- Obtained. Posted publicly by the City of Twin Falls. The copy here has the same SHA-256 fingerprint as the City's posted file. Request filed 2026-09; the City's response: Denied (response not in folder) (request log).
- As received. SHA-256 of the video file exactly as received:
not recorded - Audio track. Taken from that video and kept unaltered. SHA-256:
08b1c21fb787766978c073709770f80125649863126268d3d3dc1a9a8e63cfbb - Listening copy. Made from the audio track for playing on the web: aac 32k mono 22050Hz, levelled, parts of 90 min. SHA-256 of each file:
part01.m4a c99790986e9b19c251eb06e24d12e973e2b0d03f108ded6c75a955c03dba1c5c
part02.m4a 2109920287bce6974967ca54b4fe55f634c5b4ff3aca25d801473cf4d95f3794 - Transcript. Machine transcript of the audio track, made with faster-whisper base.en on 2026-11-10. Not edited, except that 0 passages with private details are marked instead of shown. The Pledge of Allegiance is shown in its standard wording. SHA-256 of the posted text:
011563672cc31610c361c596bd73a472e57a60a88b620e5e89f67c62120a2fa6
The original video and audio track are kept unaltered. Anyone holding the City's copy can check it against the "as received" fingerprint. Chain of custody for every meeting (CSV) · How to verify a file