 "meeting_date": "2025-03-19",
 "recording": 1,
 "started": "08:59",
 "engine": "faster-whisper base.en",
 "made": "2026-11-09",
 "note": "Machine transcript, not checked word for word; the Pledge of Allegiance is shown in its standard wording. Times are seconds into the recording.",
 "segments": [
  {
   "start": 62.42,
   "end": 69.68,
   "text": "Good morning ladies and gentlemen and welcome to the March 19th 2025 Special City Council"
  },
  {
   "start": 69.68,
   "end": 70.68,
   "text": "meeting."
  },
  {
   "start": 70.68,
   "end": 72.38,
   "text": "I want to confirm we have a quorum."
  },
  {
   "start": 72.38,
   "end": 77.74,
   "text": "We have six members present in chambers and Jason Brown is on the phone."
  },
  {
   "start": 77.74,
   "end": 80.14,
   "text": "First item on the agenda is the Pledge of Allegiance."
  },
  {
   "start": 80.14,
   "end": 100.14,
   "text": "If you wish to join me please rise."
  },
  {
   "start": 100.14,
   "end": 101.14,
   "text": "Thank you."
  },
  {
   "start": 101.14,
   "end": 106.14,
   "text": "We have one action item under items of consideration today."
  },
  {
   "start": 106.98,
   "end": 110.5,
   "text": "Consider a request to approve a development agreement"
  },
  {
   "start": 110.5,
   "end": 112.18,
   "text": "for an industrial expansion,"
  },
  {
   "start": 112.18,
   "end": 115.82,
   "text": "and we have our URA Executive Director, Sean Berriger."
  },
  {
   "start": 115.82,
   "end": 117.5,
   "text": "Welcome, Sean."
  },
  {
   "start": 117.5,
   "end": 118.54,
   "text": "Thank you, Mayor and Council."
  },
  {
   "start": 118.54,
   "end": 119.9,
   "text": "Good morning."
  },
  {
   "start": 119.9,
   "end": 123.1,
   "text": "So exciting day today for us."
  },
  {
   "start": 123.1,
   "end": 126.5,
   "text": "This morning, I'm here to provide an overview"
  },
  {
   "start": 126.5,
   "end": 129.5,
   "text": "of an expansion project development agreement"
  },
  {
   "start": 129.5,
   "end": 135.1,
   "text": "is a three-way agreement between the City of Twin Falls, the Urban Renewal Agency, and Chobani,"
  },
  {
   "start": 135.1,
   "end": 142.7,
   "text": "LLC. The agreement outlines responsibilities, financial commitments, and infrastructure improvements"
  },
  {
   "start": 142.7,
   "end": 150.3,
   "text": "necessary to support Chobani's planned $500 million expansion in creation of 150 new jobs"
  },
  {
   "start": 150.3,
   "end": 155.42,
   "text": "at their Twin Falls facility. The proposed infrastructure improvements will support broad"
  },
  {
   "start": 155.42,
   "end": 159.14,
   "text": "economic growth and job creation throughout the region."
  },
  {
   "start": 159.14,
   "end": 164.32,
   "text": "This expansion builds upon the original 2011 development agreement, which established revenue"
  },
  {
   "start": 164.32,
   "end": 173.22,
   "text": "allocation area, 4-3, to fund eligible components, Perchovani's initial project, as well as contemplated"
  },
  {
   "start": 173.22,
   "end": 178.32,
   "text": "future expansion opportunities within the life of that revenue allocation area, which runs"
  },
  {
   "start": 178.32,
   "end": 182.0,
   "text": "through September of 2032."
  },
  {
   "start": 182.0,
   "end": 188.56,
   "text": "The Urban Renewal Agency issued bonds to finance some of those initial infrastructure improvements."
  },
  {
   "start": 188.56,
   "end": 194.12,
   "text": "Bond payments are made from revenue allocation revenues from Area 4-3."
  },
  {
   "start": 194.12,
   "end": 200.64,
   "text": "Additional initial investments in 2011 were also made by the City of Twin Falls."
  },
  {
   "start": 200.64,
   "end": 204.4,
   "text": "Community development block grants for the State of Idaho, community contributions and"
  },
  {
   "start": 204.4,
   "end": 207.12,
   "text": "Chobani itself."
  },
  {
   "start": 207.12,
   "end": 211.32,
   "text": "Further expansions of Chobani's facilities and associated water and wastewater improvements"
  },
  {
   "start": 211.32,
   "end": 216.32,
   "text": "were made through amended agreements in 2016 and 2019."
  },
  {
   "start": 216.32,
   "end": 218.88,
   "text": "Those agreements were between the agency and Chobani"
  },
  {
   "start": 218.88,
   "end": 222.12,
   "text": "for construction and reimbursement agreements."
  },
  {
   "start": 222.12,
   "end": 224.32,
   "text": "These improvements were funded by Chobani."
  },
  {
   "start": 224.32,
   "end": 226.16,
   "text": "They are eligible for reimbursement"
  },
  {
   "start": 226.16,
   "end": 229.7,
   "text": "from available revenue allocation revenues"
  },
  {
   "start": 229.7,
   "end": 233.52,
   "text": "after meeting the bond obligations."
  },
  {
   "start": 233.52,
   "end": 235.52,
   "text": "This current expansion project that we're talking"
  },
  {
   "start": 235.52,
   "end": 238.28,
   "text": "about today requires additional upgrades"
  },
  {
   "start": 238.28,
   "end": 240.28,
   "text": "to the city's water and wastewater systems"
  },
  {
   "start": 240.28,
   "end": 243.52,
   "text": "to accommodate an additional 1 million gallons per day"
  },
  {
   "start": 243.52,
   "end": 246.32,
   "text": "of hot water and 1 million gallons per day"
  },
  {
   "start": 246.32,
   "end": 248.36,
   "text": "of additional wastewater flow,"
  },
  {
   "start": 248.36,
   "end": 252.57,
   "text": "as well as improvements to the electric power system."
  },
  {
   "start": 252.57,
   "end": 255.11,
   "text": "As a continuation of these previous commitments,"
  },
  {
   "start": 255.11,
   "end": 257.89,
   "text": "these additional public improvements are eligible"
  },
  {
   "start": 257.89,
   "end": 262.01,
   "text": "for funding from anticipated new revenue allocation"
  },
  {
   "start": 262.01,
   "end": 264.45,
   "text": "based upon the increased access value"
  },
  {
   "start": 264.45,
   "end": 266.61,
   "text": "of these new facilities through the term"
  },
  {
   "start": 266.61,
   "end": 268.93,
   "text": "of revenue allocation area 4-3."
  },
  {
   "start": 268.93,
   "end": 277.01,
   "text": "So, to summarize the responsibilities of the three parties in this, first, the City of Twin"
  },
  {
   "start": 277.01,
   "end": 283.97,
   "text": "Falls, there are water system upgrades which include the construction of Southwell No. 5."
  },
  {
   "start": 283.97,
   "end": 290.29,
   "text": "As you are aware, this is a long planned project by the City of Twin Falls, and it is ready"
  },
  {
   "start": 290.29,
   "end": 292.33,
   "text": "to move forward."
  },
  {
   "start": 292.33,
   "end": 298.57,
   "text": "In addition, there are sewer system upgrades to install a new wastewater gravity mainline"
  },
  {
   "start": 298.57,
   "end": 303.57,
   "text": "along Pull Line Road from about Eastland and Pull Line, kind of through the mall property,"
  },
  {
   "start": 303.57,
   "end": 309.57,
   "text": "that is estimated to be 7 to 9 million dollars."
  },
  {
   "start": 309.57,
   "end": 317.57,
   "text": "This agreement has 50% of that being funded by the city, as well as 50% by Chobani."
  },
  {
   "start": 317.57,
   "end": 326.57,
   "text": "In addition, the agreement contemplates that the city would cover up to $1.5 million in additional funds for that."
  },
  {
   "start": 326.57,
   "end": 332.43,
   "text": "that should there be cost overruns, since that project has not been designed yet, the"
  },
  {
   "start": 332.43,
   "end": 338.65,
   "text": "seven to nine million dollars is a best estimate that we have currently."
  },
  {
   "start": 338.65,
   "end": 343.55,
   "text": "Chobani's responsibilities would be the power system upgrades, so that's the installation"
  },
  {
   "start": 343.55,
   "end": 348.49,
   "text": "of new transmission lines from the Pillar Falls ad-ho power substation that's estimated"
  },
  {
   "start": 348.49,
   "end": 355.45,
   "text": "at a $3.5 million cost that would be fully funded by Chobani and then eligible for reimbursement"
  },
  {
   "start": 355.45,
   "end": 359.6,
   "text": "from the urban renewal agency tax increment funds."
  },
  {
   "start": 359.6,
   "end": 363.42,
   "text": "Sewer system upgrades, as I mentioned, again 50% funded"
  },
  {
   "start": 363.42,
   "end": 367.26,
   "text": "by the city and then 50% up to $4.5 million funded"
  },
  {
   "start": 367.26,
   "end": 372.34,
   "text": "by Chobani, eligible for reimbursement."
  },
  {
   "start": 372.34,
   "end": 377.06,
   "text": "In addition, Chobani would pay approximately $3.7 million,"
  },
  {
   "start": 377.06,
   "end": 380.66,
   "text": "which is the current industrial wastewater discharge fee."
  },
  {
   "start": 380.66,
   "end": 382.74,
   "text": "That would be for the expanded use"
  },
  {
   "start": 382.74,
   "end": 385.78,
   "text": "at the wastewater treatment plant capacity."
  },
  {
   "start": 385.78,
   "end": 389.62,
   "text": "There are pre-treatment facility upgrades required as part"
  },
  {
   "start": 389.62,
   "end": 393.86,
   "text": "of this expansion, estimated to cost $25 million."
  },
  {
   "start": 393.86,
   "end": 396.9,
   "text": "That would be funded by Chobani, and again,"
  },
  {
   "start": 396.9,
   "end": 400.18,
   "text": "potentially eligible for reimbursement,"
  },
  {
   "start": 400.18,
   "end": 403.54,
   "text": "though there is some discussion about whether that would be a"
  },
  {
   "start": 403.54,
   "end": 407.98,
   "text": "project that would be included in a revised reimbursement"
  },
  {
   "start": 407.98,
   "end": 411.02,
   "text": "agreement, but again, fully funded by Chobani and potentially"
  },
  {
   "start": 411.02,
   "end": 413.16,
   "text": "eligible for reimbursement."
  },
  {
   "start": 413.16,
   "end": 418.34,
   "text": "And then permit and impact fees, Chobani would pay their building permit fees, they would advance"
  },
  {
   "start": 418.34,
   "end": 423.28,
   "text": "fund impact fees, which again would be eligible for reimbursement."
  },
  {
   "start": 423.28,
   "end": 429.7,
   "text": "The urban renewal agency responsibilities, the agency will reimburse Chobani from available"
  },
  {
   "start": 429.7,
   "end": 437.18,
   "text": "additional revenue allocation revenues for the sewer system upgrades of 4.5 million."
  },
  {
   "start": 437.18,
   "end": 445.84,
   "text": "impact fees of approximately 700,000 power system upgrades of $3.5 million and then potentially"
  },
  {
   "start": 445.84,
   "end": 450.31,
   "text": "pre-treatment facility upgrades of 25 million."
  },
  {
   "start": 450.31,
   "end": 461.39,
   "text": "Overall the total estimated cost for the improvements is $45.75 million with $8 million coming from"
  },
  {
   "start": 461.39,
   "end": 466.07,
   "text": "the City of Twin Falls, potentially an additional $1.5, should there be overruns on the sewer"
  },
  {
   "start": 466.07,
   "end": 473.73,
   "text": "There are a criminal agency through tax increment financing, up to $33.7 million, and Chobani,"
  },
  {
   "start": 473.73,
   "end": 482.29,
   "text": "up to $29 million if there is no reimbursement requested from the pre-treatment facility upgrades."
  },
  {
   "start": 482.29,
   "end": 488.17,
   "text": "So the reimbursement from the revenue allocation revenues will be subject to the bond obligations"
  },
  {
   "start": 488.17,
   "end": 489.77,
   "text": "that the agency has."
  },
  {
   "start": 489.77,
   "end": 495.71,
   "text": "Those will be a priority first, and then additional funds would be available for reimbursements."
  },
  {
   "start": 495.71,
   "end": 502.31,
   "text": "In addition, the three parties agree in this agreement to seek working good faith and to"
  },
  {
   "start": 502.31,
   "end": 508.67,
   "text": "explore additional funding opportunities for these improvements through potential grants"
  },
  {
   "start": 508.67,
   "end": 513.07,
   "text": "from the state or federal allocations or other opportunities."
  },
  {
   "start": 513.07,
   "end": 518.39,
   "text": "The next steps in this, the Urban Renewal Agency Board, met just prior to this meeting."
  },
  {
   "start": 518.39,
   "end": 522.75,
   "text": "They did approve of the agreement and have signed."
  },
  {
   "start": 522.75,
   "end": 529.75,
   "text": "Council will consider the agreement now. We will develop any amendments to the"
  },
  {
   "start": 529.75,
   "end": 533.07,
   "text": "current construction or reimbursement agreements that are in place between"
  },
  {
   "start": 533.07,
   "end": 540.03,
   "text": "the agency and Chobani as needed for these additional utility service agreements"
  },
  {
   "start": 540.03,
   "end": 544.35,
   "text": "and coordinate the construction schedules between the city Chobani and"
  },
  {
   "start": 544.35,
   "end": 549.39,
   "text": "the utility providers. With that I would stand for any questions you may have we"
  },
  {
   "start": 549.39,
   "end": 554.27,
   "text": "also have the city manager here who has been involved in these discussions as"
  },
  {
   "start": 554.27,
   "end": 558.75,
   "text": "well and certainly can answer any questions. Thank you Sean and thank you"
  },
  {
   "start": 558.75,
   "end": 563.95,
   "text": "for all your hard work on this and Travis as well and city staff I know"
  },
  {
   "start": 563.95,
   "end": 569.55,
   "text": "you've been working on this for a while so we appreciate that any questions for"
  },
  {
   "start": 569.55,
   "end": 576.98,
   "text": "Sean or Travis this morning Chris Reed. Could you give us a time frame on these"
  },
  {
   "start": 576.98,
   "end": 582.78,
   "text": "types of the time in which this would take to fully fulfill."
  },
  {
   "start": 582.78,
   "end": 588.06,
   "text": "So currently, Chavani's intent is to begin immediately on construction of their facilities"
  },
  {
   "start": 588.06,
   "end": 594.38,
   "text": "with anticipation of being operational toward the end of the year or the first of 2026."
  },
  {
   "start": 594.38,
   "end": 601.06,
   "text": "Currently, our systems are able to accommodate the flows that they will need for their ramp"
  },
  {
   "start": 601.06,
   "end": 608.72,
   "text": "up by committing, by utilizing previously committed capacity that is not yet being used."
  },
  {
   "start": 608.72,
   "end": 614.24,
   "text": "In anticipation that these improvements would be made to offset those commitments, there"
  },
  {
   "start": 614.24,
   "end": 621.75,
   "text": "will be varying timelines for those and Travis may be able to speak those."
  },
  {
   "start": 621.75,
   "end": 630.31,
   "text": "So in terms of the water and the sewer improvements, as Sean had shared and as the council knows,"
  },
  {
   "start": 630.31,
   "end": 637.75,
   "text": "12th, number five has been our proverbial can that we have kicked down the road the last"
  },
  {
   "start": 637.75,
   "end": 643.67,
   "text": "three fiscal years where we've taken the funding and we've had to replace it with another project"
  },
  {
   "start": 643.67,
   "end": 649.35,
   "text": "that became more pressing at that time."
  },
  {
   "start": 649.35,
   "end": 654.43,
   "text": "We have that project budgeted for fiscal year 26th, it was already slated."
  },
  {
   "start": 654.43,
   "end": 660.47,
   "text": "By advanced funding it, our intent would be to bring a proposal to the council on March"
  },
  {
   "start": 660.47,
   "end": 669.53,
   "text": "31st at your next regular meeting to move funds from cash reserves and the water fund to fund"
  },
  {
   "start": 669.53,
   "end": 676.41,
   "text": "that project and then we would essentially bank the savings in fiscal year 26 by not forwarding"
  },
  {
   "start": 676.41,
   "end": 681.69,
   "text": "that project and having those funds then fall back into cash reserves would be a temporary"
  },
  {
   "start": 681.69,
   "end": 683.85,
   "text": "allocation there."
  },
  {
   "start": 683.85,
   "end": 688.73,
   "text": "In the sewer fund I plan on doing the same on the 31st coming in asked to have our engineering"
  },
  {
   "start": 688.73,
   "end": 696.89,
   "text": "team begin that project and moving forward. Both timelines are estimated to take, so the"
  },
  {
   "start": 696.89,
   "end": 701.53,
   "text": "South One Number Five is already designed. And so that is a construction project and we"
  },
  {
   "start": 701.53,
   "end": 709.43,
   "text": "believe that that is under a year. We will have to go through the design of the North"
  },
  {
   "start": 709.43,
   "end": 714.65,
   "text": "East Shore Line segment along Pole Line. We estimate that will take about a year to fully"
  },
  {
   "start": 714.65,
   "end": 719.93,
   "text": "design and to bid to work through all the appropriate negotiations, then probably a"
  },
  {
   "start": 719.93,
   "end": 724.49,
   "text": "like time to construct. Right now, we're contemplating a 48-inch"
  },
  {
   "start": 724.49,
   "end": 730.17,
   "text": "sewer line, and so we'll probably do some advanced acquisition of the pipeline material like we"
  },
  {
   "start": 730.17,
   "end": 735.29,
   "text": "did on the original Chibani project. So, like Sean said, we'll be able to use the available"
  },
  {
   "start": 735.29,
   "end": 740.93,
   "text": "capacity with target anticipation of having both infrastructure completed within the"
  },
  {
   "start": 740.93,
   "end": 746.86,
   "text": "the next 18 to 24 months and then just on a quick side note so the pre-treatment"
  },
  {
   "start": 746.86,
   "end": 751.06,
   "text": "facility improvements I believe those will advance along with Shobani's"
  },
  {
   "start": 751.06,
   "end": 757.5,
   "text": "construction. Idaho Power improvements will be over the course of the next couple"
  },
  {
   "start": 757.5,
   "end": 763.85,
   "text": "two or three years. Okay understanding that the the citizens of Twin Falls"
  },
  {
   "start": 763.85,
   "end": 769.08,
   "text": "are going to be the city itself is going to be putting in a substantial"
  },
  {
   "start": 769.08,
   "end": 772.36,
   "text": "amount. Could you speak to the improvements and how it doesn't just"
  },
  {
   "start": 772.36,
   "end": 780.26,
   "text": "benefit this one user but all citizens in the community itself. Certainly so I"
  },
  {
   "start": 780.26,
   "end": 787.22,
   "text": "think when you go back even to the original 2011 agreement the private"
  },
  {
   "start": 787.22,
   "end": 794.06,
   "text": "investment by Chobani allowed for improvements to the public system more"
  },
  {
   "start": 794.06,
   "end": 799.78,
   "text": "broadly than just running the waterline and the sewer line to a single user. So the"
  },
  {
   "start": 799.78,
   "end": 804.34,
   "text": "improvements that have been made since that time really have benefited the"
  },
  {
   "start": 804.34,
   "end": 810.16,
   "text": "broader wastewater and water systems. Same is true for power upgrades and those"
  },
  {
   "start": 810.16,
   "end": 815.56,
   "text": "types of things. So again it's really the opportunity that we have through the"
  },
  {
   "start": 815.56,
   "end": 819.86,
   "text": "city's use of funds as well as the tax increment financing that's available"
  },
  {
   "start": 819.86,
   "end": 824.5,
   "text": "through the urban renewal agency. We take those dollars invested in public"
  },
  {
   "start": 824.5,
   "end": 829.5,
   "text": "systems that more broadly support the city."
  },
  {
   "start": 829.5,
   "end": 835.5,
   "text": "As an example, when you look at the anticipated wastewater sewer line improvements,"
  },
  {
   "start": 835.5,
   "end": 845.36,
   "text": "those are to serve not only this increased flow, but address that entire flow from that whole side of town."
  },
  {
   "start": 845.36,
   "end": 846.36,
   "text": "Thank you."
  },
  {
   "start": 846.36,
   "end": 847.91,
   "text": "Thank you."
  },
  {
   "start": 847.91,
   "end": 853.69,
   "text": "Any other questions for Sean or Travis?"
  },
  {
   "start": 853.69,
   "end": 854.69,
   "text": "Okay."
  },
  {
   "start": 854.69,
   "end": 857.69,
   "text": "I would entertain a motion then."
  },
  {
   "start": 857.69,
   "end": 870.69,
   "text": "And if you would like, I can give you a recommendation, so the staff recommends approval of the expansion project development agreement among the urban renewal agency of Twin Falls and Shobani."
  },
  {
   "start": 870.69,
   "end": 871.69,
   "text": "Thank you."
  },
  {
   "start": 871.69,
   "end": 881.02,
   "text": "We'll try to do it on one shot."
  },
  {
   "start": 881.02,
   "end": 883.56,
   "text": "Yes."
  },
  {
   "start": 883.56,
   "end": 892.56,
   "text": "Here, I move that we approve the expansion project development agreement among the urban renewal agency, the city of Twin Falls and Shobani as presented."
  },
  {
   "start": 892.56,
   "end": 894.56,
   "text": "Thank you, Grayson Stone."
  },
  {
   "start": 894.56,
   "end": 895.56,
   "text": "Thank you, Madam Mayor."
  },
  {
   "start": 895.56,
   "end": 901.79,
   "text": "motion to approve the development agreement among the City of Twin Falls,"
  },
  {
   "start": 901.79,
   "end": 908.48,
   "text": "urban renewal agency and Chibani, in motion by Chris Reed, seconded by Grace"
  },
  {
   "start": 908.48,
   "end": 915.58,
   "text": "and Stone. Any further discussion? Glory, Rokalvo please."
  },
  {
   "start": 915.58,
   "end": 927.03,
   "text": "Chris Reed, Ruth Pierce, Jason Brown, Spencer Cutler,"
  },
  {
   "start": 927.03,
   "end": 928.03,
   "text": "Yes."
  },
  {
   "start": 928.03,
   "end": 929.03,
   "text": "Very Volmer."
  },
  {
   "start": 929.03,
   "end": 930.03,
   "text": "Yes."
  },
  {
   "start": 930.03,
   "end": 931.03,
   "text": "And Grayson Stone."
  },
  {
   "start": 931.03,
   "end": 932.03,
   "text": "Yes."
  },
  {
   "start": 932.03,
   "end": 933.03,
   "text": "Thank you."
  },
  {
   "start": 933.03,
   "end": 934.38,
   "text": "Motion passes seven to zero."
  },
  {
   "start": 934.38,
   "end": 935.99,
   "text": "Thank you, Sean."
  },
  {
   "start": 935.99,
   "end": 939.99,
   "text": "That is all the items on today's agenda."
  },
  {
   "start": 939.99,
   "end": 940.99,
   "text": "So we are adjourned."
  },
  {
   "start": 940.99,
   "end": 941.99,
   "text": "Thank you, everyone."
  },
  {
   "start": 941.99,
   "end": 947.0,
   "text": "And thank you, team."
  },
  {
   "start": 947.0,
   "end": 949.08,
   "text": "Thank you."
  },
  {
   "start": 949.08,
   "end": 950.08,
   "text": "Thanks, Jason."
  }
 ]
}