WEBVTT

00:01:09.390 --> 00:01:16.310
Good evening, ladies and gentlemen, and welcome to the October 14, 2024 City Council meeting.

00:01:16.310 --> 00:01:19.150
I want to confirm we have a quorum, barely.

00:01:19.150 --> 00:01:23.790
We have four members, President Chambers today.

00:01:23.790 --> 00:01:27.390
The other three council members are excused.

00:01:27.390 --> 00:01:29.750
First item on the agenda is the Pledge of Allegiance.

00:01:29.750 --> 00:01:50.880
If you wish to join me, please rise.

00:01:50.880 --> 00:01:51.880
Thank you.

00:01:51.880 --> 00:01:56.360
We have no proclamations tonight, so next we move on to the consent calendar.

00:01:56.360 --> 00:01:57.360
Excuse me.

00:01:57.360 --> 00:02:03.600
Thank you. Thank you. Motion from Chris Reed seconded by Jason Brown to approve

00:02:03.600 --> 00:02:10.740
the consent calendar as written. Amy Roll call vote please. Ruth Piers. Yes.

00:02:10.740 --> 00:02:17.220
Chris Reed. Yes. Craig Hawkins. Yes. Jason Brown. Yes. Thank you. Motion passes 4 to 0.

00:02:18.420 --> 00:02:24.260
Next under items of consideration we have actually three items but we are going to postpone

00:02:24.260 --> 00:02:31.660
item C's discussion until we have more council members here. That's something

00:02:31.660 --> 00:02:36.220
that we're not in a hurry for and it would be best if everybody was here. So

00:02:36.220 --> 00:02:41.860
first under items of consideration is an action item a request to discontinue

00:02:41.860 --> 00:02:47.460
the DEQ land application permit at Aug. Falls and we have our assistant city

00:02:47.460 --> 00:02:49.820
engineer Lee Glesman. Welcome Lee.

00:02:49.820 --> 00:02:56.820
This is a request to discontinue the DEQ land application permitted auger falls.

00:02:56.820 --> 00:03:01.820
In an effort to improve stake with water quality and to help meet the department of environmental

00:03:01.820 --> 00:03:07.820
quality discharge requirements, the city developed a treated wastewater land application site

00:03:07.820 --> 00:03:09.820
at Auger Falls in 2013.

00:03:09.820 --> 00:03:14.420
The city used EPA grant funding to improve the road doger falls and solve pipeline and construct

00:03:14.420 --> 00:03:17.020
ponds for the land application.

00:03:17.020 --> 00:03:20.340
This then city's been pumping a portion of its treated wastewater about two miles from

00:03:20.340 --> 00:03:24.920
the city's wastewater treatment plant, dog refalls.

00:03:24.920 --> 00:03:30.120
This land application process is basically we pump water down dog refalls, put it in

00:03:30.120 --> 00:03:35.440
ponds, and the water just filters through the soil to remove phosphorus and other.

00:03:35.440 --> 00:03:41.420
However, the last 10 years, testing results have shown that the soil's capacity to remove

00:03:41.420 --> 00:03:45.460
phosphorus is more limited than expected and an unknown amount of phosphorus is passing

00:03:45.460 --> 00:03:47.420
through the soil filter.

00:03:47.420 --> 00:03:50.700
If the amount of hospitals removal cannot be measured, the city cannot use the agafals

00:03:50.700 --> 00:03:56.260
site to help with the city's discharge permit requirements.

00:03:56.260 --> 00:04:00.580
And if we can't get a discharge permit, it's difficult to justify the cost of continuing

00:04:00.580 --> 00:04:03.300
with the land application.

00:04:03.300 --> 00:04:09.420
Also the land application permit, it's through DEQ, has a whole bunch of things that we have

00:04:09.420 --> 00:04:10.420
to do there.

00:04:10.420 --> 00:04:14.540
One of them is public access is restricted, we can't let the public anywhere near it.

00:04:14.540 --> 00:04:20.220
we were to expand this to 70-80 acres and we'd have to fence out the public from that area.

00:04:20.220 --> 00:04:25.820
So I mean when we first started this project we didn't have public access. This project

00:04:25.820 --> 00:04:30.740
actually developed the access for the public to get two agar falls. We widened the road

00:04:30.740 --> 00:04:36.860
and now it's a well used park. And part of the monitoring we have to monitor the water

00:04:36.860 --> 00:04:40.460
that goes down there. We have to monitor. We have to do soil monitoring. We have to do groundwater

00:04:40.460 --> 00:04:47.770
monitoring and and we also have to control animals like musk rats and and

00:04:47.770 --> 00:04:52.090
rock chucks they dig through the berms if the berms were to fail and the water

00:04:52.090 --> 00:04:54.930
were to leave the site we'd have a violation of our permit that we would

00:04:54.930 --> 00:05:00.810
have to report and so since we can't really use it for removing phosphorus the

00:05:00.810 --> 00:05:07.250
way it's configured now I'm recommending that we discontinue thank you any

00:05:07.250 --> 00:05:12.770
questions questions for Lee go ahead great Lee what's plan B then

00:05:12.770 --> 00:05:15.920
And if we lose that ability there, what?

00:05:15.920 --> 00:05:17.120
Well, it's not.

00:05:17.120 --> 00:05:18.960
So right now, we don't get any credit for it.

00:05:18.960 --> 00:05:21.280
As it is, it's kind of a pilot project.

00:05:21.280 --> 00:05:24.480
And when we take the water, we put it down there.

00:05:24.480 --> 00:05:27.960
It's shown up in the phosphorous shown up in the ground

00:05:27.960 --> 00:05:29.480
water, which goes back to the river anyway.

00:05:29.480 --> 00:05:31.400
So we can't get any credit for it.

00:05:31.400 --> 00:05:33.160
But we are working on some other projects,

00:05:33.160 --> 00:05:35.800
kind of like our TSS ponds out at the gun range

00:05:35.800 --> 00:05:37.240
at the ender point.

00:05:37.240 --> 00:05:39.280
We've got this rock-crick restoration project

00:05:39.280 --> 00:05:40.880
that we're starting to work on.

00:05:40.880 --> 00:05:42.800
We're looking at cleaning up the water quality

00:05:42.800 --> 00:05:48.640
in Rock Creek, that's about six million bucks that we have a grant for, and we're just starting

00:05:48.640 --> 00:05:52.120
that right now. We've done a lot of testing on Rock Creek and I think we can probably,

00:05:52.120 --> 00:05:57.200
as far as water quality in the Snake River, we could probably do far more with water quality

00:05:57.200 --> 00:06:01.320
in the Snake River by putting our forces and our time into those types of projects.

00:06:01.320 --> 00:06:02.320
Thank you.

00:06:02.320 --> 00:06:05.080
And it's non-regulated water, so we don't have to do all the recording.

00:06:05.080 --> 00:06:06.080
No hoops.

00:06:06.080 --> 00:06:07.080
No hoops.

00:06:07.080 --> 00:06:08.080
Chris Street.

00:06:08.080 --> 00:06:10.960
Lee, what is the process to discontinue this?

00:06:10.960 --> 00:06:15.400
What happens to the land over there, those pools that we currently have in?

00:06:15.400 --> 00:06:17.960
Well, we'll shut off the water.

00:06:17.960 --> 00:06:22.520
You know, eventually remove fences so the public can get in there where it was at.

00:06:22.520 --> 00:06:24.640
I need to talk to DEQ, see what they need.

00:06:24.640 --> 00:06:27.460
I probably have to do some additional reporting.

00:06:27.460 --> 00:06:29.980
But as it is right now, I've got to do an annual report anyway.

00:06:29.980 --> 00:06:32.760
This is what an annual report looks like.

00:06:32.760 --> 00:06:39.180
I don't know if there's going to be any additional things they'll want us to do other than just close it out.

00:06:39.180 --> 00:06:40.500
Jason?

00:06:40.500 --> 00:06:43.800
Yeah, I follow up on Chris just a little bit.

00:06:43.800 --> 00:06:47.620
So if we ever had to, you know, we discontinue that now

00:06:47.620 --> 00:06:50.420
and if forever some reason we'd want to redo that again

00:06:50.420 --> 00:06:52.540
in the future, that's still an option, correct?

00:06:52.540 --> 00:06:54.980
Yeah, the infrastructure is still there.

00:06:54.980 --> 00:06:59.260
If we wanted to, whatever we do, you know, one of the initial

00:06:59.260 --> 00:07:01.580
ideas we had was to go pop through trees and things like that.

00:07:01.580 --> 00:07:03.680
It's much easier to demonstrate phosphorus removal

00:07:03.680 --> 00:07:05.300
if you're growing plants and you're moving

00:07:05.300 --> 00:07:07.260
to soil tissue analysis.

00:07:07.260 --> 00:07:09.540
So the infrastructure is there so we can still send the water

00:07:09.540 --> 00:07:13.140
down there and do something, but the way we're doing it right now is just soaking it into

00:07:13.140 --> 00:07:15.660
the ground. That doesn't really work for the phosphorus removal.

00:07:15.660 --> 00:07:26.560
Any other questions? I'll make a motion if that's what we're looking for. I've moved to

00:07:26.560 --> 00:07:31.960
discontinue the land application permit for agar falls through the Idaho Department of

00:07:31.960 --> 00:07:38.660
Environmental Quality. I'll second that. Thank you. I'm motioned by Jason Brown, second by

00:07:38.660 --> 00:07:42.260
Chris Reed to approve discontinuing the DEQ land

00:07:42.260 --> 00:07:45.820
application permit at Arger Falls.

00:07:45.820 --> 00:07:48.060
Any further discussion?

00:07:48.060 --> 00:07:50.660
Amy Rokavo please.

00:07:50.660 --> 00:07:51.460
Chris Reed.

00:07:51.460 --> 00:07:52.060
Yes.

00:07:52.060 --> 00:07:52.740
Ray Cawkins.

00:07:52.740 --> 00:07:53.240
Yes.

00:07:53.240 --> 00:07:54.140
Jason Brown.

00:07:54.140 --> 00:07:54.700
Yes.

00:07:54.700 --> 00:07:55.980
And Reese Pierce.

00:07:55.980 --> 00:07:57.140
Yes.

00:07:57.140 --> 00:07:58.500
Motion passes 4-0.

00:07:58.500 --> 00:07:59.380
Thank you, Lee.

00:07:59.380 --> 00:08:01.350
Thank you.

00:08:01.350 --> 00:08:01.850
OK.

00:08:01.830 --> 00:08:04.990
Next item on the agenda is also an action item.

00:08:04.990 --> 00:08:09.190
It's consideration to use water reserves toward the base

00:08:09.190 --> 00:08:17.490
bid and bid alternate for the 2024 Lateral 38 Improvement Project to PMF Inc. in the

00:08:17.490 --> 00:08:26.010
amount of 369,477 and 30 cents and authorize the contingency in the amount of 35,000 for

00:08:26.010 --> 00:08:32.050
potential change orders and we have our Water and Superintendent Rob Bulling.

00:08:32.050 --> 00:09:03.090
Good evening Madam Mayor and Council. I appreciate your time to bring this forward to you this evening and as the Mayor stated we're requesting the bid award to PMF in the amount of $369.477.30 and authorizing project contingency, the amount of $35,000 for a total of $404,000.

00:09:03.090 --> 00:09:15.030
of 404, 477-30. There's also a grant that we applied for through the flood management

00:09:15.030 --> 00:09:21.670
grant through Department of Water Resources, and Canal Company helped us acquire that grant.

00:09:21.670 --> 00:09:32.870
And that grant was for $5,914 that will be taken off of that. So just kind of give you a background

00:09:32.870 --> 00:09:39.870
on it we had a project that we were looking out on lateral 38, which is downstream of our

00:09:39.870 --> 00:09:47.050
Brian Cooley pump station, pressurized irrigation station, and the city is looking at expanding

00:09:47.050 --> 00:09:54.200
that station and using more of our shares there for us to be able to do that and to have the

00:09:54.200 --> 00:09:59.640
ability to deliver those shares to that station there was some downstream improvements that

00:09:59.640 --> 00:10:04.220
needed to be made it there for us to be able to deliver all of our shares there and when

00:10:04.220 --> 00:10:12.140
we were not using the shares not to flood out other people downstream because currently

00:10:12.140 --> 00:10:19.140
the ditch was designed to take X amount of shares and when we build the station and move

00:10:19.140 --> 00:10:23.860
shares and send a bunch more shares over to a station that didn't originally have those

00:10:23.860 --> 00:10:28.880
shares in it then that can cause problems when we're not using them all downstream.

00:10:28.880 --> 00:10:31.240
So that's kind of what this project is.

00:10:31.240 --> 00:10:35.600
There was two projects actually that we were looking at doing.

00:10:35.600 --> 00:10:39.720
And we also had some improvements

00:10:39.720 --> 00:10:42.000
that we needed to do with the piping underneath the road

00:10:42.000 --> 00:10:47.240
and some existing structures on that lateral also.

00:10:47.240 --> 00:10:51.760
So since we looked at doing the one project in 22

00:10:51.760 --> 00:10:55.720
and didn't get it fulfilled, that money went back into reserves.

00:10:55.720 --> 00:11:00.080
And when we looked at doing this project and the piping

00:11:00.080 --> 00:11:01.960
and other structure improvements,

00:11:01.960 --> 00:11:04.760
we decided to package those together.

00:11:04.760 --> 00:11:08.200
And that's why there's a bit of alternate there,

00:11:08.200 --> 00:11:11.080
because we figured we could probably get a better pricing

00:11:11.080 --> 00:11:16.760
if we had a contractor coming in and doing concrete structures.

00:11:16.760 --> 00:11:20.240
And rather than having them come in twice,

00:11:20.240 --> 00:11:21.920
you get a mope fee and all that on that.

00:11:21.920 --> 00:11:25.200
So we figured we could probably get a better price doing

00:11:25.200 --> 00:11:42.640
that way. You have a better, so there you can see the base bid,

00:11:42.640 --> 00:11:48.460
original language, 279, 763, 40, and then the bid alternate was

00:11:48.460 --> 00:11:55.840
this 89730, and then plus the contingency, and just make note,

00:11:55.840 --> 00:12:02.720
contingencies to cover what ifs that we run into, we may use none of that, or $10

00:12:02.720 --> 00:12:08.400
of it or a thousand. Hopefully where this is kind of out in a rural area if we won't run

00:12:08.400 --> 00:12:14.160
into a whole bunch of stuff that we have to use that contingency for. But nowadays you need

00:12:14.160 --> 00:12:19.920
to have something that otherwise I'll be back here asking. I hate doing that. So with all

00:12:19.920 --> 00:12:29.040
that that came to 404 or 7730 and previously budgeted money for this project was in 2083.

00:12:29.040 --> 00:12:34.180
We had $107,000 that we didn't use in this last budget, 24.

00:12:34.180 --> 00:12:41.300
We had $280,000 for the project, but we didn't get a bid out in the contract.

00:12:41.300 --> 00:12:47.040
Everything done in time, so now we have money also rolled back into reserves, and then we

00:12:47.040 --> 00:12:55.400
have the $5,914 that we'll receive through the grant.

00:12:55.400 --> 00:13:06.600
equals the 392 914 and so if you have the 392 914 we're asking for is

00:13:06.600 --> 00:13:18.740
404,000 or 7730 that leaves us still with 11,563 30 wasn't any money allocated to

00:13:18.740 --> 00:13:23.240
either one of the previous projects so hopefully that's kind of breaks that

00:13:23.240 --> 00:13:28.200
down and explains the numbers there for you so we do use on budgeted for this

00:13:28.200 --> 00:13:42.260
project that amount what is the timing on this project so we are just waiting for

00:13:42.260 --> 00:13:48.180
council approval already got the did out received the bid back from PMF has a

00:13:48.180 --> 00:13:54.360
little bit or some we're here to ask for moving forward right now yes any

00:13:54.360 --> 00:14:05.490
questions for Rob. You did a very good job. Want to tackle that Jason? No I don't

00:14:05.490 --> 00:14:12.310
need to add anything but if Chris and so you know just looking at this project

00:14:12.310 --> 00:14:20.640
and and part of it, I think ultimately it helps prove the system downstream so

00:14:20.640 --> 00:14:27.320
I'll go ahead and make a motion for the use of water reserves to award the bid

00:14:27.320 --> 00:14:39.320
and bid alternate for the 2024 lateral 38 improvement project to PMF Inc. in the amount of 404,477 and 30 cents.

00:14:39.320 --> 00:14:41.320
Thank you. Do I have a second?

00:14:41.320 --> 00:14:42.320
Second.

00:14:42.320 --> 00:14:56.320
Thank you. Motion by Jason Brown, seconded by Craig Hawkins to approve the use of water reserves to award the base bid and bid alternate for the 2020 for lateral 38 improvement project to PMF Inc.

00:14:56.320 --> 00:15:06.640
a math ink for the total of 404 you took it down for 77 30 thank you any further

00:15:06.640 --> 00:15:16.530
discussion Amy Rokal vote please great Hawkins yes Jason Brown yes Ruth

00:15:16.530 --> 00:15:25.400
Pierce yes and Chris Reed yes thank you motion passes 40 0 thank you Rob

00:15:25.400 --> 00:15:29.770
We'll get started on that tonight, right?

00:15:29.770 --> 00:15:31.170
Oh, okay, okay, yeah.

00:15:34.590 --> 00:15:37.750
Okay, so that is all for items of consideration.

00:15:37.750 --> 00:15:41.390
Next on the agenda is a time for public input.

00:15:41.390 --> 00:15:44.230
If there's anybody in the public that wishes

00:15:44.230 --> 00:15:49.150
to address City Council on an issue not on today's agenda,

00:15:49.150 --> 00:15:53.290
please come down.

00:15:53.290 --> 00:15:55.890
See no one advisory board reports.

00:15:55.890 --> 00:15:57.500
Craig.

00:15:57.500 --> 00:16:06.070
I just wanted to mention that the Friday Cliff Bar sent, I guess, their entire outfit,

00:16:06.070 --> 00:16:10.910
and all the employees came down to Rock Creek, and I think it was, what, 230-some?

00:16:10.910 --> 00:16:12.910
It's close to 300 people.

00:16:12.910 --> 00:16:13.910
Close to 300 people.

00:16:13.910 --> 00:16:14.910
Close to 300 people.

00:16:14.910 --> 00:16:15.910
Yep.

00:16:15.910 --> 00:16:19.230
And they started, I think, about eight or nine o'clock and worked till four o'clock.

00:16:19.230 --> 00:16:21.230
Got a lot done.

00:16:21.230 --> 00:16:25.390
It closed down the factory for the day and sent everybody to Rock Creek.

00:16:25.390 --> 00:16:26.390
Wow.

00:16:26.390 --> 00:16:27.390
Yeah.

00:16:27.390 --> 00:16:28.390
It was pretty cool.

00:16:28.390 --> 00:16:33.910
think and they were tired it was one day but they got a lot done and I'm sure

00:16:33.910 --> 00:16:37.510
they saved the city a whole lot of money when you add up all the manpower and

00:16:37.510 --> 00:16:42.600
stuff so anyway I just wanted to mention that that's great any other advisory

00:16:42.600 --> 00:16:50.680
board reports anything from a manager okay so we'll move on to the public

00:16:50.680 --> 00:16:55.440
hearings we have two public hearings tonight and before we start I'm just

00:16:55.440 --> 00:17:02.000
going to read the rules so we have them in everybody's mind so we will follow this process

00:17:02.000 --> 00:17:08.720
for the public hearing portion of the agenda. City staff will first present the request

00:17:08.720 --> 00:17:15.160
and analysis. The applicant will then present their request. The council will then ask questions

00:17:15.160 --> 00:17:20.280
of the applicant or staff. After questions have been asked the public hearing will be

00:17:20.280 --> 00:17:24.400
opened during that time anyone in attendance is given the opportunity to

00:17:24.400 --> 00:17:29.280
comment or ask questions about the requests being considered. When giving

00:17:29.280 --> 00:17:33.280
testimony please step up to the podium to state your name and address and present

00:17:33.280 --> 00:17:39.000
your comments or concerns. You will be given two minutes after you give testimony

00:17:39.000 --> 00:17:45.000
please sign the public sign-in sheet which is located upstairs with your name

00:17:45.000 --> 00:17:50.080
and address for the record. After public comments are concluded the applicant

00:17:50.080 --> 00:17:55.120
will be invited to answer any questions and make a closing statement. Staff will then

00:17:55.120 --> 00:18:01.220
answer, clarify any comments as needed. After the closing statement, public hearing will

00:18:01.220 --> 00:18:07.420
be closed and then the council will have open discussion and take action. So our first public

00:18:07.420 --> 00:18:13.540
hearing is a request for City Council to amend the Federation Point Zoning Development

00:18:13.540 --> 00:18:20.340
agreement and conceptual plan to specify lot sizes for each building on property located

00:18:20.340 --> 00:18:27.100
at 2035 Washington Street North, here of EHM engineers on behalf of Federation Point

00:18:27.100 --> 00:18:36.300
property LLC, PZ24-0081 and we have William Clayver, our senior city planner.

00:18:36.300 --> 00:18:37.300
Welcome William.

00:18:37.300 --> 00:18:43.750
Thank you Madam Mayor and grateful to be in front of you today.

00:18:43.750 --> 00:18:45.990
Today we have an application for ZDA,

00:18:45.990 --> 00:18:48.390
a zoning development agreement amendment.

00:18:48.390 --> 00:18:53.030
This amendment is for Federation Point.

00:18:53.030 --> 00:18:58.030
It is located on Washington Street North,

00:18:58.750 --> 00:19:04.740
right where Federation Road they're going together.

00:19:08.020 --> 00:19:11.860
This is for the entirety of the Federation Point,

00:19:11.860 --> 00:19:15.380
but really focuses on the residential portion,

00:19:15.380 --> 00:19:19.660
on the south portion of the ZDA.

00:19:19.660 --> 00:19:21.940
For your reference, the ZDA goes all the way up

00:19:21.940 --> 00:19:24.100
to the Federation Road and down,

00:19:24.100 --> 00:19:30.220
and this is your south border.

00:19:30.220 --> 00:19:34.180
The, this Federation Point ZDA was created originally

00:19:34.180 --> 00:19:35.940
in 2021.

00:19:35.940 --> 00:19:40.940
In 2022, the ZDA was amended to accommodate

00:19:41.020 --> 00:19:43.980
the Chem Prep Charter School,

00:19:43.980 --> 00:19:45.220
which is permitted by right.

00:19:45.220 --> 00:19:48.900
And then now before you today is again,

00:19:48.900 --> 00:19:53.920
just to accommodate the residential aspect of it.

00:19:53.920 --> 00:19:55.840
Essentially, everything stays the same,

00:19:55.840 --> 00:19:59.680
besides one comment before I get to that.

00:19:59.680 --> 00:20:04.240
Let me go through some zoning and future land usage.

00:20:04.240 --> 00:20:09.660
But again, it's the ZDA zoning map,

00:20:11.260 --> 00:20:12.780
the Federation Point ZDA.

00:20:14.020 --> 00:20:18.080
It's currently used as residential and institutional.

00:20:18.080 --> 00:20:26.080
to the east is E1, and then also to the west and south,

00:20:26.080 --> 00:20:30.200
and then is residential primary single families.

00:20:30.200 --> 00:20:35.160
And to the north is residential with a gun range

00:20:35.160 --> 00:20:39.120
and the Canyon Rim Trail.

00:20:39.120 --> 00:20:41.000
As far as the future land use map goes,

00:20:41.000 --> 00:20:44.150
this is a town neighborhood.

00:20:44.150 --> 00:20:46.710
I'm sitting on the other side of Washington.

00:20:46.710 --> 00:20:56.990
is easy, but really it's a town neighborhood feel, which is primarily residential.

00:20:56.990 --> 00:21:09.720
Though the current verbiage simply states that the lot or parcel area shall be a minimum

00:21:09.720 --> 00:21:15.940
of six and one-tenth acre and shall contain nineteen-four plexes and seven duplex buildings

00:21:15.940 --> 00:21:23.240
with a total of ninety residential one acres as depicted in the master plan.

00:21:23.240 --> 00:21:28.760
The proposed verbiage keeps that verbiage, but then adds that the four plex and duplex

00:21:28.760 --> 00:21:36.390
buildings may be on any individual water parcel of not less than 8,000 square feet.

00:21:36.390 --> 00:21:38.670
So what does this mean?

00:21:38.670 --> 00:21:43.110
It means that the develop is now eligible to split up the property or would be eligible

00:21:43.110 --> 00:21:50.230
to split up the property into different lots where it was tied to the 6.1 acre lot.

00:21:50.230 --> 00:21:55.110
would not allow for smaller lots to be in existence.

00:21:55.110 --> 00:21:57.710
So this would allow for them to split it up,

00:21:57.710 --> 00:22:00.350
potentially sell off the individual parcels

00:22:00.350 --> 00:22:02.270
that that's how they wanted to do it,

00:22:02.270 --> 00:22:06.170
or it also gives them the ability

00:22:06.170 --> 00:22:11.000
to utilize creative financing and make it a phase development

00:22:11.000 --> 00:22:14.360
rather than all that once.

00:22:14.360 --> 00:22:17.880
Then the last part is it means that all previous entitlements

00:22:17.880 --> 00:22:19.320
stay on the same, such as density,

00:22:19.320 --> 00:22:22.200
the high proposed uses, the previous conditions

00:22:22.200 --> 00:22:29.930
approval with the fence being built, that would all stay the same. This is the

00:22:29.930 --> 00:22:38.720
criteria, I know this is criteria I apologize for that. Criteria for review has

00:22:38.720 --> 00:22:45.760
outlined in our city code. This is really what we need to address today. I

00:22:45.760 --> 00:22:53.100
wanted to conclude my portion with the last portion of the applicant's

00:22:53.100 --> 00:22:56.900
narrative. So the change will not add any effect to the surrounding area other

00:22:56.900 --> 00:23:02.260
them to allow the development to proceed with construction and stages as the market determines

00:23:02.260 --> 00:23:06.700
intent in terms of the original originally approved CDA remaining attacked with the minor

00:23:06.700 --> 00:23:12.780
change throughout individual individual plots for each building. Staff concurs with that

00:23:12.780 --> 00:23:22.360
agrees with that statement and with that I will stand for any any questions you may have.

00:23:22.360 --> 00:23:28.480
So Will, could you flip back a couple of three slides real quick, right there.

00:23:28.480 --> 00:23:35.160
So what you're saying is the 19, four plexus and seven duplexus for a total of 90 will not

00:23:35.160 --> 00:23:36.160
change.

00:23:36.160 --> 00:23:38.680
It's just the lot size, basically.

00:23:38.680 --> 00:23:39.680
Correct.

00:23:39.680 --> 00:23:40.680
Okay.

00:23:40.680 --> 00:23:41.680
Thank you.

00:23:41.680 --> 00:23:42.680
The density and everything stays.

00:23:42.680 --> 00:23:43.680
Thank you.

00:23:43.680 --> 00:23:44.680
Any other questions?

00:23:44.680 --> 00:23:46.870
Great.

00:23:46.870 --> 00:23:54.130
I guess my understanding is that basically they want to start some income and sell some

00:23:54.130 --> 00:23:55.130
property.

00:23:55.130 --> 00:23:58.910
They can go ahead and start that, but the parameters are still the same, right?

00:23:58.910 --> 00:23:59.910
Yes, that's correct.

00:23:59.910 --> 00:24:03.530
Okay.

00:24:03.530 --> 00:24:07.320
Any other questions for Will?

00:24:07.320 --> 00:24:08.320
Hey, the applicant?

00:24:08.320 --> 00:24:20.640
Good evening, member, mayor and members of the council, Tim Vosser with the HM engineers

00:24:20.640 --> 00:24:24.120
representing the applicant.

00:24:24.120 --> 00:24:33.420
So I love the Councilman Hawkins question at the end there because that's exactly the case.

00:24:33.420 --> 00:24:40.820
What we have is a lot of paperwork to basically do something relatively simple.

00:24:40.820 --> 00:24:47.660
The owners of the property when they first went to pull a building permit and that was

00:24:47.660 --> 00:24:52.780
applied for earlier this year.

00:24:52.780 --> 00:24:59.220
They realized that they had to move forward with the whole development in order to get

00:24:59.220 --> 00:25:00.720
that done.

00:25:00.720 --> 00:25:09.360
As you might know, lending is somewhat difficult and procuring money to get all of those units

00:25:09.360 --> 00:25:15.680
built in order to releasing a certificate of occupancy so they can start renting out units

00:25:15.680 --> 00:25:17.320
that are already complete.

00:25:17.320 --> 00:25:25.600
It gets tied up pretty quickly when you get into financial institutions and your guarantees.

00:25:25.600 --> 00:25:32.840
So by doing nothing more than applying law lines to each individual unit, that enables

00:25:32.840 --> 00:25:40.080
the owners to come in and do a group of two to six units at a time, get those in compliance

00:25:40.080 --> 00:25:46.320
with all the city standards, and then get those released for certificate of occupancy

00:25:46.320 --> 00:25:49.320
and just roll right into the next phase.

00:25:49.320 --> 00:25:53.320
It's really basically orderly development

00:25:53.320 --> 00:25:57.320
that allows them to move forward more easily.

00:25:57.320 --> 00:26:00.320
The base ZDA does not change and we're not asking

00:26:00.320 --> 00:26:05.320
for any specific use of those applications

00:26:05.320 --> 00:26:09.340
of individual lots for the unit.

00:26:09.340 --> 00:26:13.340
If you have any questions, I'd be happy to answer any.

00:26:13.340 --> 00:26:15.340
Any questions for Tim?

00:26:15.340 --> 00:26:20.690
Doesn't look like it. Thank you. Thank you very much. Okay

00:26:22.210 --> 00:26:25.170
Time to open up the public hearing

00:26:25.810 --> 00:26:33.010
So I'll open that up officially is there anybody in the audience that wishes to give testimony on this particular item

00:26:33.010 --> 00:26:40.980
You know when I will close the public hearing

00:26:41.760 --> 00:26:49.540
Is there probably aren't any questions or any additional comments before I close the public hearing well

00:26:49.540 --> 00:26:58.010
Just for the record, there has been one letter sent out that was included in your packet, otherwise it's not.

00:26:58.010 --> 00:27:01.910
Yes, thank you for saying that. Thank you.

00:27:01.910 --> 00:27:05.360
Okay, so I will close the public hearing.

00:27:05.360 --> 00:27:13.350
No further testimony will be allowed. Council time for discussion, right?

00:27:13.350 --> 00:27:21.310
It just makes sense. The conditions we're facing today and cost the money, at least they can get started.

00:27:21.310 --> 00:27:36.240
Thank you. Anybody else? Good? Yeah, I'll add, you know, the environment of borrowing money right now has changed since 2001 and this was originally presented, so understanding the desire and the need to be able to do that is perfectly fine.

00:27:36.240 --> 00:27:55.620
I do hope that whatever happens with this does move forward quickly so we don't have a piece of dirt and really eye traffic beautiful area that's just not sitting there for years and years and years to come that they're going to do something they move quickly on it.

00:27:55.620 --> 00:27:58.200
Hey, make a motion?

00:27:58.200 --> 00:27:59.200
Yes.

00:27:59.200 --> 00:28:00.200
Yeah.

00:28:00.200 --> 00:28:04.400
I move to approve the request to the City Council to amend the Federation Point Zoning

00:28:04.400 --> 00:28:11.040
Development Agreement and Conceptual Plan to specify lot sizes in each building on property

00:28:11.040 --> 00:28:17.140
located at 2035 Washington Street, North, care of the HM and engineers on behalf of

00:28:17.140 --> 00:28:20.040
Federation Point property LLC.

00:28:20.040 --> 00:28:21.040
Thank you.

00:28:21.040 --> 00:28:22.040
Do I have a second?

00:28:22.040 --> 00:28:23.040
Second.

00:28:23.040 --> 00:28:24.040
Thank you.

00:28:24.040 --> 00:28:25.040
Motion by Chris Reed.

00:28:25.040 --> 00:28:30.320
Craig Hawkins to approve the amendment to the Federation Point Zoning Development Agreement

00:28:30.320 --> 00:28:38.080
and Conceptual Plan to specify a lot of sizes for each building on property located at 203.5

00:28:38.080 --> 00:28:46.640
Washington Street North, Car of EHM Engineers. On behalf of Federation Point property, LLC.

00:28:46.640 --> 00:28:50.640
Any further discussion? Amy Rolkow, please?

00:28:50.640 --> 00:29:18.580
Case in Brown. Yes, Bruce Pierce. Yes, Chris Reed. Yes, and Craig Hawkins. Yes. Thank you. Motion passes four to zero. Thank you gentlemen. Hey, next public hearing are requests for City Council to approve the annexation of approximately two acres located on the southwest corner of Park Avenue and Washington Street, South.

00:29:18.580 --> 00:29:21.400
Here of Jim State dairy products LLC

00:29:22.100 --> 00:29:47.920
easy 24-082 we have our city planner Lisa Strickland welcome Lisa good evening mayor council

00:29:48.280 --> 00:29:55.760
This is a request for an annexation with the zoning designation of M2 for property located at the southwest corner of Park Avenue

00:29:55.760 --> 00:29:57.760
Washington Street, South

00:29:57.880 --> 00:30:05.000
The subject property is located within the counties area of impact and although we do not have jurisdiction over its land use

00:30:05.000 --> 00:30:12.260
designation, we do know it was entitled in the county as M1. In 2019, Jim State,

00:30:12.260 --> 00:30:18.980
Derry rezoned the undeveloped agricultural property to the Northwest from R4 and M1

00:30:18.980 --> 00:30:24.080
to M2 for future development. They have since purchased this project or this

00:30:24.080 --> 00:30:28.880
property and are requesting it to be zoned to M2 if annexed. Although the

00:30:28.880 --> 00:30:32.920
declaration of land use is not required with the zone request, the Commission took

00:30:32.920 --> 00:30:38.600
into consideration the differences between the zones and the land uses allowed when making

00:30:38.600 --> 00:30:44.760
the recommendation to approve the request from M1 to M2.

00:30:44.760 --> 00:30:50.160
A review of the M1 and M2 zoning designation districts revealed that the land uses within

00:30:50.160 --> 00:30:55.720
each zone are very similar except for the uses are categorized and permitted in special

00:30:55.720 --> 00:30:56.720
uses.

00:30:56.720 --> 00:31:01.720
The M2 zoning district also has uses that are not listed in the M1 zoning district but these

00:31:01.720 --> 00:31:07.720
additional uses do require a special use permit within the M2 zone.

00:31:07.720 --> 00:31:12.240
As a part of the consideration, the commission also reviewed the comprehensive plan to determine

00:31:12.240 --> 00:31:16.480
if the change would be appropriate and compatible with the future land use map.

00:31:16.480 --> 00:31:22.760
Keeping in mind that the comprehensive plan is a guide to what the city's proposed uses

00:31:22.760 --> 00:31:27.640
for the area and that the designations are not attached to the property boundaries, rather

00:31:27.640 --> 00:31:31.840
represent what would generally be compatible in the surrounding area.

00:31:31.840 --> 00:31:36.480
The property therefore has two designations, neighborhood commercial on the east and industrial

00:31:36.480 --> 00:31:49.640
flex on the west.

00:31:49.640 --> 00:31:54.960
The neighborhood commercial is characterized by small-scale commercial development designed

00:31:54.960 --> 00:31:57.800
to complement the neighborhood's character.

00:31:57.800 --> 00:32:03.120
Examples of neighborhood commercial land uses are offices, small-scale retail, civic and

00:32:03.120 --> 00:32:05.800
community facilities and apartments.

00:32:05.800 --> 00:32:08.520
The industrial flex is characterized by businesses

00:32:08.520 --> 00:32:12.280
for bride non-retail employment and support local industries

00:32:12.280 --> 00:32:14.600
within the community such as hotels, restaurants,

00:32:14.600 --> 00:32:18.240
and other retail uses and are located near regional roads

00:32:18.240 --> 00:32:19.520
and railways.

00:32:19.520 --> 00:32:23.480
Staff has determined that the current entitlement of M1

00:32:23.480 --> 00:32:26.760
and the requested zone of M2 are very similar in nature

00:32:26.760 --> 00:32:29.800
and are compatible with the Future Laney's plan.

00:32:29.800 --> 00:32:31.920
The proposed zone change, if approved,

00:32:31.920 --> 00:32:34.680
would support the goals of the comprehensive plan,

00:32:34.680 --> 00:32:38.320
which is to allow for future industrial growth in this area.

00:32:38.320 --> 00:32:40.520
Prior to hearing and annexation requests,

00:32:40.520 --> 00:32:42.960
the council shall receive a recommendation

00:32:42.960 --> 00:32:45.640
on the zoning designation for the subject property

00:32:45.640 --> 00:32:48.720
and the commission on September 10th of 2024

00:32:48.720 --> 00:32:51.280
held a public hearing to make a recommendation

00:32:51.280 --> 00:32:53.480
on the zoning designation for this property

00:32:53.480 --> 00:32:55.280
and has recommended M2.

00:32:56.530 --> 00:32:58.490
Upon conclusion, the council is tasked

00:32:58.490 --> 00:33:01.490
with making a final decision on the annexation

00:33:01.490 --> 00:33:04.370
and the zoning designation of this property.

00:33:04.370 --> 00:33:06.650
The council may approve the request as presented,

00:33:06.650 --> 00:33:09.290
approve with conditions, table the request

00:33:09.290 --> 00:33:12.650
for additional information or deny the request.

00:33:12.650 --> 00:33:14.450
Should the council approve the request,

00:33:14.450 --> 00:33:16.730
staff recommends that it be subject

00:33:16.730 --> 00:33:18.410
to the following conditions,

00:33:18.410 --> 00:33:21.450
subject to applicant dedicating right-of-way

00:33:21.450 --> 00:33:24.010
for Park Avenue with of the dedication

00:33:24.010 --> 00:33:26.290
to be determined by the city engineer

00:33:26.290 --> 00:33:28.610
and subject to Park Avenue right-of-way improvements

00:33:28.610 --> 00:33:31.250
to be installed by owner of the property

00:33:31.250 --> 00:33:32.770
at the time of development,

00:33:32.770 --> 00:33:36.510
design of improvements to be determined by the City Engineer.

00:33:36.510 --> 00:33:39.330
So if we're looking at the conditions,

00:33:39.330 --> 00:33:43.410
this is Park Avenue, this is the property in question.

00:33:43.410 --> 00:33:45.730
When they decide to develop this property,

00:33:45.730 --> 00:33:49.490
they will need to extend Park Avenue,

00:33:49.490 --> 00:33:51.610
and therefore that's where the condition comes in,

00:33:51.610 --> 00:33:54.830
where they dedicate right away.

00:33:54.830 --> 00:33:57.350
And I'll stand for any questions.

00:33:57.350 --> 00:34:05.130
Questions for Lisa?

00:34:05.130 --> 00:34:08.860
We can now hear from the applicant.

00:34:08.860 --> 00:34:13.800
Welcome.

00:34:13.800 --> 00:34:16.080
Good afternoon, Mayor, Council members.

00:34:16.080 --> 00:34:19.520
This is just a simple request for annexation and changes.

00:34:19.520 --> 00:34:20.360
Your name, please.

00:34:20.360 --> 00:34:21.200
Oh, I'm sorry, Mayor.

00:34:21.200 --> 00:34:23.120
All right, I'm at a couple of your comments.

00:34:23.120 --> 00:34:26.120
Manager of Jim State.

00:34:26.120 --> 00:34:26.960
Thank you.

00:34:26.960 --> 00:34:28.370
Great products.

00:34:28.370 --> 00:34:32.250
Just a simple request stated by the City Planner.

00:34:32.250 --> 00:34:37.200
Hey, any questions for Hank?

00:34:37.200 --> 00:34:39.670
OK.

00:34:39.670 --> 00:34:42.630
So I will open up the public hearing.

00:34:42.630 --> 00:34:44.350
Again, if you're giving testimony,

00:34:44.350 --> 00:34:46.350
please step up to the podium, state your name,

00:34:46.350 --> 00:34:51.150
address and present your comments. Is there anybody in the audience that wishes to address

00:34:52.030 --> 00:35:04.970
City Council on this item? Hey, see no one, any additional information, Lisa? Okay, then I will

00:35:04.970 --> 00:35:20.960
close the public hearing. Um, doesn't make sense to me. Somebody want to make some motion? Hey,

00:35:21.520 --> 00:35:26.970
you're looking at you. Okay, I'll give it a try here and move there that we approve the

00:35:26.970 --> 00:35:31.710
the request for City Council to approve the annexation of approximately two acres located

00:35:31.710 --> 00:35:36.250
on the southwest corner of Park Avenue in Washington Street, South, Fair of Gem State

00:35:36.250 --> 00:35:44.770
Dairy Products, LLC, EZ24-0082 with the conditions stated.

00:35:44.770 --> 00:35:46.490
I'll second that.

00:35:46.490 --> 00:35:47.490
Thank you.

00:35:47.490 --> 00:35:48.490
Motion by Craig Hawkins.

00:35:48.490 --> 00:35:55.890
Second by Chris Reed to approve the annexation of approximately two acres located on the southwest

00:35:55.890 --> 00:35:59.130
Corner of Park Avenue in Washington Street, South,

00:35:59.130 --> 00:36:03.070
Carav Gym State, Dairy Products, LLC, PC, 24,

00:36:03.070 --> 00:36:07.050
Dust 0082, Subject to the Conditions

00:36:07.050 --> 00:36:09.770
Recommended by Staff.

00:36:09.770 --> 00:36:11.570
Any further discussion?

00:36:11.570 --> 00:36:13.690
Amy Rokow, please.

00:36:13.690 --> 00:36:14.570
Ruth Pierce?

00:36:14.570 --> 00:36:15.370
Yes.

00:36:15.370 --> 00:36:15.970
Russ Reed?

00:36:15.970 --> 00:36:16.570
Yes.

00:36:16.570 --> 00:36:17.330
Greg Hawkins?

00:36:17.330 --> 00:36:17.830
Yes.

00:36:17.770 --> 00:36:18.730
And Jason Brown?

00:36:18.730 --> 00:36:20.090
Yes.

00:36:20.090 --> 00:36:23.010
Thank you, Motion passes forward to zero.

00:36:23.010 --> 00:36:27.250
So that is it on our items on the agenda tonight.

00:36:27.250 --> 00:36:28.090
So we're adjourned.

00:36:28.090 --> 00:36:29.090
Thank you.

00:36:29.090 --> 00:36:31.130
Do you want to do general public input?

00:36:31.130 --> 00:36:32.570
We skipped that one real quick.

00:36:32.570 --> 00:36:33.570
No.

00:36:33.570 --> 00:36:34.570
I did.

00:36:34.570 --> 00:36:35.570
Oh, OK.

00:36:35.570 --> 00:36:36.570
I didn't.

00:36:36.570 --> 00:36:37.570
Sorry.

00:36:37.570 --> 00:36:40.810
I wasn't paying attention, and apparently I did that.

00:36:40.810 --> 00:36:41.810
OK.

00:36:41.810 --> 00:36:42.810
So we're adjourned.

00:36:42.810 --> 00:36:43.810
Thank you, everyone.
