WEBVTT

00:01:17.140 --> 00:01:18.780
Good afternoon, ladies and gentlemen.

00:01:18.780 --> 00:01:22.590
I'd like to call the February 27th,

00:01:22.590 --> 00:01:25.830
2023 meeting to order.

00:01:25.830 --> 00:01:27.630
I want to confirm we have a quorum.

00:01:27.630 --> 00:01:31.470
We have six members present in chambers.

00:01:31.470 --> 00:01:36.910
First item on the agenda is an action item

00:01:36.910 --> 00:01:41.190
to move into executive session to communicate

00:01:41.190 --> 00:01:44.430
with legal counsel for the public agency

00:01:44.430 --> 00:01:51.430
to discuss the legal ramifications of and legal options for pending litigation or controversies

00:01:51.430 --> 00:01:57.130
not yet being litigated, but imminently likely to be litigated, the mere presence of legal

00:01:57.130 --> 00:02:01.790
counsel at an executive session does not satisfy this requirement.

00:02:01.790 --> 00:02:11.380
And that doesn't say what section we're moving into executive session under.

00:02:11.380 --> 00:02:16.580
Section now.

00:02:16.580 --> 00:02:18.310
Can you have a second?

00:02:18.310 --> 00:02:19.310
Second.

00:02:19.310 --> 00:02:20.310
Motion by Christopher Reed.

00:02:20.310 --> 00:02:21.310
Second by Craig Hawkins.

00:02:21.310 --> 00:02:25.550
to move into executive session, under section F.

00:02:25.550 --> 00:02:29.460
Amy Rokavo, please.

00:02:29.460 --> 00:02:35.810
Yes.

00:02:35.810 --> 00:02:36.810
Yes.

00:02:36.810 --> 00:02:39.020
And Alex Kavol.

00:02:39.020 --> 00:02:40.260
New motion passes six to zero.

00:02:40.260 --> 00:02:44.860
So to let everybody know, we'll be leaving chambers,

00:02:44.860 --> 00:02:47.260
but we'll be back here a little bit before five,

00:02:47.260 --> 00:02:49.660
and we'll start a regular meeting at five.

00:02:49.660 --> 00:04:45.580
Evening, ladies and gentlemen, and welcome

00:04:45.580 --> 00:04:51.500
to our Monday, February 27th, 2020, three city council meeting.

00:04:51.500 --> 00:04:53.420
I want to call the meeting back to order.

00:04:53.420 --> 00:04:56.820
We met at 4.30 this morning, this morning.

00:04:56.820 --> 00:04:58.700
I was at work at 4.30 this morning,

00:04:58.700 --> 00:05:03.700
but we met for executive session at 4.30 PM, and we're back.

00:05:04.340 --> 00:05:08.060
So we'll just move on to, I'll call the meeting back to order.

00:05:08.060 --> 00:05:10.620
Her side among the agenda is the Pledge of Allegiance.

00:05:10.620 --> 00:05:32.140
If you wish to join me, please rise.

00:05:32.140 --> 00:05:35.140
So before we get started, I just wanna take a minute

00:05:35.140 --> 00:05:41.800
to publicly think that in the women of our police department

00:05:41.800 --> 00:05:45.040
and our city staff and all the law enforcement

00:05:45.040 --> 00:05:49.580
and public safety individuals that helped us

00:05:49.580 --> 00:05:54.580
through our crisis last week was a very scary day

00:05:55.120 --> 00:05:59.320
and the teams worked together phenomenally.

00:06:00.240 --> 00:06:02.880
It was kind of like practice makes perfect

00:06:02.880 --> 00:06:05.080
and it was definitely perfect

00:06:06.820 --> 00:06:08.980
for being as scary as it was.

00:06:08.980 --> 00:06:12.100
Dr. Dickinson said the Canyon Ridge staff

00:06:12.100 --> 00:06:18.100
and in parents and students also did exactly what they were supposed to do.

00:06:18.100 --> 00:06:24.100
In addition, I wanted to publicly thank the many members of our city staff

00:06:24.100 --> 00:06:28.100
who stepped up to the plate and handled things well.

00:06:28.100 --> 00:06:33.100
The executive team was gone and just made us like we didn't miss a beat.

00:06:33.100 --> 00:06:39.100
So thank you everyone and especially thanks to men and women of the Twin Falls PD.

00:06:39.100 --> 00:06:47.270
Okay so next on the agenda we don't have any proclamations so we to the consent

00:06:47.270 --> 00:06:56.450
calendar we have several items on the consent calendar council wishes thank

00:06:56.450 --> 00:07:02.390
you Jason Brown thank you motion by allys kavals seconder by Jason Brown to

00:07:02.390 --> 00:07:20.350
approve the consent calendar as written Amy Roekalvo please yes yes thank you

00:07:20.350 --> 00:07:24.790
motion passes seven to zero. One thing I didn't do that I normally do is confirm we

00:07:24.790 --> 00:07:30.190
have a quorum. We have all seven seven members present. So if you were here for

00:07:30.190 --> 00:07:37.710
the Cedar Parks subdivision PUD, final clap for a Paris condominiums, special

00:07:37.710 --> 00:07:44.230
event permits for Cinco de Mayo Mother's Day, Chochel Falls after dark, Twin

00:07:44.230 --> 00:07:52.230
Fall School District, Canyon Properties, Airport Hanger Leases for five different leases.

00:07:52.230 --> 00:07:54.510
Your items have been approved.

00:07:54.510 --> 00:07:58.270
So next, we'll move to items of consideration.

00:07:58.270 --> 00:08:03.990
The first item is a presentation by people for paths regarding a proposed expansion to

00:08:03.990 --> 00:08:09.750
the Twin Falls Animal Shelter and we have Sean Stanley, our Code Enforcement Coordinator.

00:08:09.750 --> 00:08:13.700
Welcome.

00:08:13.700 --> 00:08:18.960
I'm excited to be here tonight to present to you the Shilter Expansion Project.

00:08:18.960 --> 00:08:24.460
The city's relationship with people's pets is as strong as it's ever been.

00:08:24.460 --> 00:08:38.060
Percidicence and the animals of the Magic Expansion Project has been a long journey that began in 2017.

00:08:38.060 --> 00:08:58.450
We're excited for that. We have Jackie Fry. She is the President of people.

00:08:58.450 --> 00:09:03.700
Welcome, Jackie.

00:09:03.700 --> 00:09:05.960
Travis, our Mayor and our Commimmers.

00:09:05.960 --> 00:09:14.300
And I'm going to be brief because first I wanted to address the

00:09:14.300 --> 00:09:17.580
analog architecture drawings that each of you saw.

00:09:17.580 --> 00:09:21.580
And this is a project that Debbie has been very proactive in the board

00:09:21.580 --> 00:09:25.580
to pursue to look at the expansion of the shelter.

00:09:25.580 --> 00:09:31.280
Currently we have endowments and trusts to be able to pay for

00:09:31.280 --> 00:09:34.280
the expansion, so we're very excited about that.

00:09:34.280 --> 00:09:40.720
So at this time we have no plans to do, we continue to do the furball

00:09:40.720 --> 00:09:45.560
which is coming up. We encourage anyone to come please. And also the pooch

00:09:45.560 --> 00:09:49.640
flash. So those are our two main events each year that we put on to continue to

00:09:49.640 --> 00:10:02.800
maintain the care of the animals at the shelter. And how much we appreciate the

00:10:02.800 --> 00:10:08.880
city. How much you support us. The fencing, the new parking lot. So many things that

00:10:08.880 --> 00:10:14.160
you do with the building and it has been such an incredible resource and such a

00:10:14.160 --> 00:10:19.200
blessing to our community as we continue to see the population grow we continue

00:10:19.200 --> 00:10:22.920
to see the needs of the community for the animals this is one of the reasons

00:10:22.920 --> 00:10:29.400
that the expansion is so critical and so we hope that at this time the reason

00:10:29.400 --> 00:10:35.590
we're here is to just present where we're at currently any questions whatsoever

00:10:35.590 --> 00:10:43.310
with the drawings that we're done so Jackie I do have a question if you were

00:10:43.310 --> 00:10:48.660
We're talking about square footage without getting into the weeds on this.

00:10:48.660 --> 00:10:53.660
How does Dave's Mansion compare to what the facility size is now?

00:10:53.660 --> 00:10:59.590
So what we're looking at right now and we also is the need for our cats

00:10:59.590 --> 00:11:02.590
and actually being able to have a holding room.

00:11:02.590 --> 00:11:10.060
We're looking hopefully to have a place for surgery and more treatment of the cats.

00:11:10.060 --> 00:11:13.060
Cats seem to be a large population base.

00:11:13.060 --> 00:11:17.860
dogs are bigger we have a lot of cats we really are proactively looking at also

00:11:17.860 --> 00:11:22.740
that that support but we need to have a larger area and so this is what the

00:11:22.740 --> 00:11:28.740
critical part is expanding so that we can bring more resources and more of

00:11:28.740 --> 00:11:32.820
those services to the animals and then of course in place educate the

00:11:32.820 --> 00:11:38.890
citizens about adoption and having them go into a home where they're well

00:11:38.890 --> 00:11:42.970
so would you say you're doubling the size or not quite

00:11:42.970 --> 00:12:11.660
I think we were looking to speak into the mic as it is right now is 6400. Thank you. Anybody have any

00:12:11.660 --> 00:12:52.550
USB? Appreciate it. Thank you Jackie. Yes, Sean. Yeah, one other thing I like to point out is a little

00:12:52.550 --> 00:12:58.870
spooky out there when it's crazy busy with people and animals hacking out there. So I did want to point

00:12:58.870 --> 00:13:18.890
out the rounds to be very nice. Very responsible with our funding of course. One of the biggest

00:13:18.890 --> 00:13:23.570
concerns is the cost of building so we're really reviewing and looking this was a

00:13:23.570 --> 00:13:28.330
plan that we hope to have as part of the five-year plan in 17 and of course

00:13:28.330 --> 00:13:32.970
economic play with the increase on the cost of building so that's one of the

00:13:32.970 --> 00:13:39.090
reasons why we have the funds we do those are very specifically placed so we can

00:13:39.090 --> 00:13:43.410
do this but I would pray really within the next two years we're hoping to see

00:13:43.410 --> 00:13:48.490
this this isn't a 10 or 20 year plan this is pretty immediate because of the

00:13:48.490 --> 00:13:49.490
needs of the animals.

00:13:49.490 --> 00:13:50.490
Wonderful.

00:13:50.490 --> 00:13:53.310
Thank you.

00:13:53.310 --> 00:13:56.650
Thank you.

00:13:56.650 --> 00:13:59.250
A next item on the agenda is also an action item.

00:13:59.250 --> 00:14:07.410
A request to use $33,312 dollars of library reserve funds to replace an air handling unit

00:14:07.410 --> 00:14:13.130
at the Twin Falls Public Library and we have Tara Bartley, our Twin Falls Public Library

00:14:13.130 --> 00:14:14.130
Director.

00:14:14.130 --> 00:14:15.540
Welcome.

00:14:15.540 --> 00:14:17.540
Thank you, Mary Pierce, Council members.

00:14:17.540 --> 00:14:22.180
I come to you today on behalf of the Twin Falls Public Library Board of Trustees in requesting

00:14:22.180 --> 00:14:28.620
that we used an additional $33,312 of our librarians serve funds.

00:14:28.620 --> 00:14:41.850
We put out a bid, let me unit it, a rate for two years now.

00:14:41.850 --> 00:14:45.010
So we had it currently on the 2122 budget.

00:14:45.010 --> 00:14:47.210
Because of personnel issues, we were unable

00:14:47.210 --> 00:14:48.810
to get that project completed.

00:14:48.810 --> 00:14:52.170
And so then we put it again on the 2223 budget.

00:14:52.170 --> 00:14:54.650
We put bids out early January.

00:14:54.650 --> 00:14:57.490
We sent bids out to five different companies.

00:14:57.490 --> 00:14:59.330
We received two bids back.

00:14:59.330 --> 00:15:16.700
and our lowest bid came in at the 163,322 today to see if we eject.

00:15:16.700 --> 00:15:19.940
Any questions for Tara and Nicky Boyd?

00:15:19.940 --> 00:15:29.310
I want to say Tara has reserved funds. This is why we plan it.

00:15:29.310 --> 00:15:48.940
Jason Brown.

00:15:48.940 --> 00:15:49.940
I'll second that.

00:15:49.940 --> 00:15:55.940
Thank you. Motion by Nicky Boyd. Seconded by Jason Brown to approve the request of using

00:15:55.940 --> 00:16:02.940
$33,312 of library reserved funds to replace an error handling unit at the library.

00:16:02.940 --> 00:16:04.900
Thank you.

00:16:04.900 --> 00:16:05.900
Okay.

00:16:05.900 --> 00:16:10.870
Next item on the agenda is an action item.

00:16:10.870 --> 00:16:32.520
It's the Twin Falls Recreation Center Committee report on progress of the feasibility study and

00:16:32.520 --> 00:16:37.320
a request for council support to continue work on this feasibility study.

00:16:37.320 --> 00:16:40.820
We have Wendy David, I look like three people,

00:16:40.820 --> 00:16:41.860
I don't know who's starting.

00:16:41.860 --> 00:16:44.460
Wendy Davis, Parks and Rec.

00:16:44.460 --> 00:16:46.700
Chris Golds, a committee member and Brian Wright,

00:16:46.700 --> 00:16:54.750
a committee member, so welcome Wendy.

00:16:54.750 --> 00:16:58.940
Hi Council, it's my pleasure to be here this evening

00:16:58.940 --> 00:17:02.120
with members of the committee,

00:17:02.120 --> 00:17:06.280
which I'd like to introduce when we get to that point,

00:17:06.280 --> 00:17:21.520
but when we get to that place,

00:17:21.520 --> 00:17:23.240
and then I'm going to ask Chris and Brian

00:17:23.240 --> 00:17:26.760
to join me at the microphone to finish the presentation.

00:17:26.760 --> 00:17:29.100
Thank you.

00:17:29.100 --> 00:17:35.340
So we're here this evening to give you some background to help prepare you to make the

00:17:35.340 --> 00:17:39.400
decision that we're asking you to make this evening.

00:17:39.400 --> 00:17:46.200
Several of the members of this council are new since this process was started and I think

00:17:46.200 --> 00:17:50.400
it's to everybody's benefit that we kind of start back up, talk about what we've done

00:17:50.400 --> 00:17:53.600
and how we've gotten to where we are right now.

00:17:53.600 --> 00:18:01.110
So, eventually we're getting to the place to show, to demonstrate the need for a site,

00:18:01.110 --> 00:18:06.160
in order to be able to finish the study and move forward with this process.

00:18:06.160 --> 00:18:14.330
In the City Strategic Plan, in the Healthy Community Area, we have to be an effective partner in

00:18:14.330 --> 00:18:18.770
a rock-based focus on community health, with the initiative to explore options for creating

00:18:18.770 --> 00:18:23.970
a community recreation center, and the objective to work with an advisory committee to develop

00:18:23.970 --> 00:18:30.210
recreation center feasibility study that identifies community needs and support potential locations

00:18:30.210 --> 00:18:34.670
and potential partners for funding options. That was kind of the overarching piece that

00:18:34.670 --> 00:18:44.210
started this whole process. In 2017, the council formed the committee. At that time, there was

00:18:44.210 --> 00:18:49.910
15 members. We've had a few move out of town at this point, but the remaining members are

00:18:49.910 --> 00:18:57.580
listed up here. And I would like, I know there's a lot of it in the audience today, so I'm

00:18:57.580 --> 00:19:17.820
rec center committee member stand up for just a moment in the years and worked really

00:19:17.820 --> 00:19:27.240
are not in this process. So the first house of the committee was to select the experts

00:19:27.240 --> 00:19:32.160
to guide our process, which was essentially defining our expectations in the feasibility

00:19:32.160 --> 00:19:39.080
study, putting out a request for qualifications, interviewing candidates and selecting a firm

00:19:39.080 --> 00:19:47.000
to work with. And we selected Pivot North in Kinsha and then they brought in BRS architecture

00:19:47.000 --> 00:19:53.160
as the experts in recreation centers and community centers to help with this process.

00:19:54.360 --> 00:20:00.520
At that point we identified what our goals were which was really a four-step process that

00:20:00.520 --> 00:20:05.400
emphasized community input and support and provided opportunity for regular council

00:20:05.400 --> 00:20:12.420
check-ins. That gave Council the option all the way through the study to stop if we didn't

00:20:12.420 --> 00:20:17.560
like the direction things were going or if we learned that things weren't going to work.

00:20:17.560 --> 00:20:22.240
The four steps essentially are defined up here. I don't want to spend a lot of time going

00:20:22.240 --> 00:20:30.320
into all of them. But the first step we identified program spaces and we need a lot of community

00:20:30.320 --> 00:20:36.380
input and then we're in the middle of step two. The end is to put a draft of the final

00:20:36.380 --> 00:20:45.250
program together as well as the site plans and diagrams of the facility. I don't want

00:20:45.250 --> 00:20:49.530
to go into a whole lot more of that because at this point I'm going to invite Chris and

00:20:49.530 --> 00:20:53.850
Brian to come up and they're going to help with the rest of the presentation.

00:20:53.850 --> 00:21:11.350
I'm giving us a time extensively for this rec center. It was not just to be a recreational

00:21:11.350 --> 00:21:16.350
It was meant to be an educational center as well as a social center.

00:21:16.350 --> 00:21:23.340
The mix of needs that this facility needed to represent

00:21:23.340 --> 00:21:28.340
led us to taking serious steps in order to get multiple viewpoints on what,

00:21:28.340 --> 00:21:35.060
not just what the committee wanted, even though the committee was composed of a lot of different viewpoints.

00:21:35.060 --> 00:21:40.580
It wasn't enough, and so with that we wanted to unify our communities.

00:21:40.580 --> 00:21:48.340
to make sure that there were opportunities for individuals to become the wellness and that

00:21:48.340 --> 00:21:54.820
we supported economic running areas. As far as that goes, the operational cost recovery

00:21:54.820 --> 00:21:59.980
was a big goal. We weren't going to set us up for failure by just putting things in place

00:21:59.980 --> 00:22:05.140
that we were the city wanted or members of the city wanted. We wanted to make sure that

00:22:05.140 --> 00:22:10.660
that operational cost recovery was a big part of this. And so we went through a few processes

00:22:10.660 --> 00:22:25.110
to get there. We give Chris a moment just to talk about some of the... Thanks very much for allowing us to come and present.

00:22:25.110 --> 00:22:34.110
It was very important from the start of this, for us to get, not just the B-wise of the committee, but also to get input from community members into that end.

00:22:34.110 --> 00:22:41.110
The public has been invited to committee workshops, which tried to bring in stakeholders from all of the relevant organizations.

00:22:41.110 --> 00:22:44.270
And we've had an open house with comment cards.

00:22:44.270 --> 00:22:46.950
What's called a dotocracy that we'll go into in a minute.

00:22:46.950 --> 00:22:49.070
And we sent out a community survey.

00:22:49.070 --> 00:22:53.430
So we wanted to have hard data as opposed to just kind of a,

00:22:53.430 --> 00:22:54.870
yeah, that'd be nice.

00:22:54.870 --> 00:22:57.070
So let's talk a little bit about that survey.

00:22:57.070 --> 00:22:58.350
There were two parts of it.

00:22:58.350 --> 00:23:00.150
The first was a random mailed survey.

00:23:00.150 --> 00:23:02.310
We're 3,500 copies of the survey.

00:23:02.310 --> 00:23:04.350
We sent out two randomly-dead members

00:23:04.350 --> 00:23:05.910
of the Twin Falls community.

00:23:05.910 --> 00:23:08.830
And then it was an open online part of the survey

00:23:08.830 --> 00:23:10.710
that anyone was able to take part in.

00:23:10.710 --> 00:23:15.430
most of the responses from the Open Online survey did come from the Twin Falls area,

00:23:15.430 --> 00:23:19.030
but we do understand that that is a little bit more self-selected as opposed to the random

00:23:19.030 --> 00:23:24.310
survey at the beginning. The results of this, I think, are very important and very impressive.

00:23:27.690 --> 00:23:34.490
If you look at the random respondents, between quarters of them, and almost 90% of those in the

00:23:34.490 --> 00:23:39.610
Open Survey identified a community center, a community recreation center as an important

00:23:39.610 --> 00:23:46.000
priority for the city. And more importantly than that, when asked a question about an increase

00:23:46.000 --> 00:23:52.000
in taxes as a potential method to pay for this, two-thirds of the random respondents and three

00:23:52.000 --> 00:23:58.960
quarters of those in the open survey responded that they would be willing to entertain a tax

00:23:58.960 --> 00:24:04.800
increase as a mechanism to pay for this. Now let's parse what that means. Not only is this

00:24:04.800 --> 00:24:09.880
It's a good idea, you know, as somebody who's responding to the survey, but these are people

00:24:09.880 --> 00:24:12.520
who are voting with their wallet.

00:24:12.520 --> 00:24:17.880
They have said that this is something that they are willing to pursue, and that's an

00:24:17.880 --> 00:24:22.960
extra step beyond, hey, you know, madam, on the street, would you like to do this, well,

00:24:22.960 --> 00:24:24.800
of course I would.

00:24:24.800 --> 00:24:27.040
This is kind of where the rubber meets the road.

00:24:27.040 --> 00:24:30.680
There was another part of the survey that I think is important, that was looking at particular

00:24:30.680 --> 00:24:33.600
amenities that might be included in it.

00:24:33.600 --> 00:24:36.670
and that to Brian to discuss.

00:24:36.670 --> 00:24:37.270
Thank you again.

00:24:37.270 --> 00:24:43.270
So this is obviously informative as well as one

00:24:43.270 --> 00:24:44.570
of the other angles that was taken

00:24:44.570 --> 00:24:49.350
to get more of the information we needed to take one space

00:24:49.350 --> 00:24:52.110
as we felt needed to be in the Rep Center.

00:24:52.110 --> 00:24:56.680
You can see, not off-receive, some of these amenities

00:24:56.680 --> 00:24:57.980
that people wanted out.

00:24:57.980 --> 00:24:59.980
Keep in mind the goal that I talked about earlier

00:24:59.980 --> 00:25:02.280
was for full-cost recovery.

00:25:02.280 --> 00:25:05.180
So it wasn't enough just to say this is what everybody wanted.

00:25:05.180 --> 00:25:09.600
we wanted to pair that with expert consultants that have done this before

00:25:09.600 --> 00:25:15.560
and determine how are these amenities that our community wants to see in the

00:25:15.560 --> 00:25:21.300
rec center, going to match up with cost recovery. And so you can see on here an

00:25:21.300 --> 00:25:26.660
indoor lab pool was the top choice and that most of these on the dotocracy aligned

00:25:26.660 --> 00:25:33.020
with some of the other results that we saw. So here we have a survey identified

00:25:33.020 --> 00:25:37.900
priorities for these amenities and as we can see here on the screen it's

00:25:37.900 --> 00:25:42.420
really blurred hard to see this graphic but this is what we're looking at in order

00:25:42.420 --> 00:25:47.060
to figure out what these amenities are and then we consulted with experts that

00:25:47.060 --> 00:25:51.440
have done rec centers and and determined like how are these a cost

00:25:51.440 --> 00:25:58.060
recovery so the next the next slide really just gives a visual for the

00:25:58.060 --> 00:26:01.980
different slivers and angles that we took to make sure that we're representing our

00:26:01.980 --> 00:26:07.860
community, make sure that we're representing the experts, all that we can to get our final

00:26:07.860 --> 00:26:10.500
recommendations for the Rec Center.

00:26:10.500 --> 00:26:16.480
Our division statement is a big one we want more than just for athletics.

00:26:16.480 --> 00:26:21.200
The cost-recover efficacy, the comment cards that Chris had mentioned briefly in the survey

00:26:21.200 --> 00:26:26.000
results, the dot-op or C, and then, as we've mentioned many times in the committee and the

00:26:26.000 --> 00:26:27.920
consult expertise.

00:26:27.920 --> 00:26:33.160
So ultimately, we came up with this list of recommended spaces that included all the

00:26:33.160 --> 00:26:39.220
those factors and again I could read through each of these but you can see this list

00:26:39.220 --> 00:26:47.330
breaks together our goal and the vision for those recommended spaces. I'll let

00:26:47.330 --> 00:26:56.900
Chris speak a little bit more to this from this slide is some of these are no

00:26:56.900 --> 00:27:00.180
brainers you have a rexner you have to have a lobby if you have a gym you have to

00:27:00.180 --> 00:27:05.000
have a locker room but look at the rest of them this is not a barn with a hardwood

00:27:05.000 --> 00:27:09.820
floor this is a community center there's a couple of different studio spaces

00:27:09.820 --> 00:27:13.540
studio spaces can be for aerobics, they can be for fitness for seniors, they can be for

00:27:13.540 --> 00:27:16.620
spinning classes, they can be for acting classes.

00:27:16.620 --> 00:27:21.780
This is not limited to 12 year olds bouncing some sort of a ball.

00:27:21.780 --> 00:27:26.780
We're very specifically looking at putting parts of this together.

00:27:26.780 --> 00:27:31.860
That might not have been my vision, but are things that when working with our experts have

00:27:31.860 --> 00:27:39.820
been shown in their experience to increase revenue to make this a self-supporting adventure.

00:27:39.820 --> 00:27:44.520
Now, let's talk a little bit about the cost, and I'm going to tell you that there are 10,000

00:27:44.520 --> 00:27:47.900
asterisks on this slide.

00:27:47.900 --> 00:27:53.620
In 2019, when we got to essentially a bubble diagram that had everything that was mentioned

00:27:53.620 --> 00:27:57.380
on the last slide, we looked at a rough estimation of cost.

00:27:57.380 --> 00:28:00.380
The rough estimation of cost is $41 million.

00:28:00.380 --> 00:28:01.380
What does that include?

00:28:01.380 --> 00:28:04.230
It includes everything but ground.

00:28:04.230 --> 00:28:09.670
That is, their ideas start to finish, plus a fairly healthy fudge factor to make certain

00:28:09.670 --> 00:28:11.270
there aren't cost overruns.

00:28:11.270 --> 00:28:13.950
but that does not include land acquisition.

00:28:13.950 --> 00:28:16.550
Now, the reason they're asked to risk on this,

00:28:16.550 --> 00:28:18.070
a couple of big things, number one,

00:28:18.070 --> 00:28:21.350
who's done in 2019, some things are a little more expensive,

00:28:21.350 --> 00:28:23.150
some are a lot more expensive, some are cheaper,

00:28:23.150 --> 00:28:24.430
but it's all different.

00:28:24.430 --> 00:28:27.610
So I would use that as kind of a,

00:28:27.610 --> 00:28:32.480
or in the wind rather than a specific number.

00:28:32.480 --> 00:28:34.720
What we're talking about tonight,

00:28:34.720 --> 00:28:38.680
we understand as a committee that the specific details

00:28:38.680 --> 00:28:42.400
of the Rec Center are not going to be made

00:28:42.400 --> 00:28:45.030
until we have a location.

00:28:45.030 --> 00:28:48.030
If there is a spot that is conducive,

00:28:48.030 --> 00:28:51.270
has a wonderful view, we want to take advantage of that.

00:28:51.270 --> 00:28:52.830
That may change how many classrooms

00:28:52.830 --> 00:28:54.990
we got by many committee rooms we have.

00:28:54.990 --> 00:28:56.750
If there's not, that may change things.

00:28:56.750 --> 00:28:59.510
So that's really the biggest asterisk on us.

00:28:59.510 --> 00:29:02.470
But this at least gives an idea.

00:29:02.470 --> 00:29:04.710
So let's talk about our committee progress.

00:29:04.710 --> 00:29:07.390
Wendy showed that four step process

00:29:07.390 --> 00:29:10.190
that we presented to the city council earlier.

00:29:10.190 --> 00:29:11.510
There's step one done.

00:29:11.510 --> 00:29:13.910
We came back and said we're done with step one.

00:29:13.910 --> 00:29:15.310
Do we have permission to go to step two?

00:29:15.310 --> 00:29:16.210
We do.

00:29:16.210 --> 00:29:18.110
So we've gone through our space list.

00:29:18.110 --> 00:29:19.710
We've gone through a business plan.

00:29:19.710 --> 00:29:21.610
We went through criteria for selecting a site,

00:29:21.610 --> 00:29:23.510
which I'll address here in just a second.

00:29:23.510 --> 00:29:27.810
And importantly, we took the next step to try to look at

00:29:27.810 --> 00:29:31.210
specific property acquisition, came to council,

00:29:31.210 --> 00:29:37.000
and did receive permission in 2019 to negotiate with a landowner.

00:29:37.000 --> 00:29:38.200
Now it didn't work out.

00:29:38.200 --> 00:29:41.440
Landowner didn't want to sell, but that's okay.

00:29:41.440 --> 00:29:52.130
But what I want to make, what we're trying to do is because there was that little two-year

00:29:52.130 --> 00:30:02.670
hiccup that everybody survived and a reset and get a chance to do this again.

00:30:02.670 --> 00:30:06.710
It was never the case that committee members were driving around to involves seeing empty

00:30:06.710 --> 00:30:09.710
fields and saying, I want that or I want this.

00:30:09.710 --> 00:30:16.070
We set up a process to try to identify in screen various sites and this is the list and

00:30:16.070 --> 00:30:17.710
this is ranked in order.

00:30:17.710 --> 00:30:20.710
I'm not going to go through each and every one.

00:30:20.710 --> 00:30:28.710
If you take a look at those top two or three, this is designed with an eye towards being able to make the self-supporting.

00:30:28.710 --> 00:30:34.410
It's also designed with the understanding that not only is this facility going to change to

00:30:34.410 --> 00:30:38.710
and falls red large, but it is going to make an impact on wherever it goes.

00:30:38.710 --> 00:30:43.210
It would be that downtown, old town, the north end, just wherever it may be.

00:30:43.210 --> 00:30:46.710
It is going to impact the neighborhood as well and the people who live there.

00:30:46.710 --> 00:30:57.880
So this is every hypothetically we screened with this and we probably at least discussed

00:30:57.880 --> 00:31:05.950
to something like that potential sites and evaluated all of them with us.

00:31:05.950 --> 00:31:08.950
So step two is partially completed.

00:31:08.950 --> 00:31:14.950
We've got the business plan, we've got space verification and now we're stuck.

00:31:14.950 --> 00:31:18.950
And the reason we're stuck is to be able to actually sell a finished product.

00:31:18.950 --> 00:31:21.950
I need to be able to give you details.

00:31:21.950 --> 00:31:29.110
I can't give you details until we've got a spot where we can put this because the place

00:31:29.110 --> 00:31:33.870
where we put the Rec Center is going to change the facility itself.

00:31:33.870 --> 00:31:48.420
So a circle going, we get a site located and get sort of funding options more fleshed out.

00:31:48.420 --> 00:31:53.860
We can get more public input when we can give them a specific project to say thumbs up or

00:31:53.860 --> 00:31:59.990
them down. And importantly, first step two is done. Our next responsibility is to come back

00:31:59.990 --> 00:32:09.210
to you and say, okay, we have step two done. Now we're here and then we can. So, and this

00:32:09.210 --> 00:32:12.730
is step three and we're a little ways away from this. I just wanted to make sure it's

00:32:12.730 --> 00:32:16.730
there. The conclusion is important. That's the step that I'm looking forward to where

00:32:16.730 --> 00:32:24.850
we can come and say, and council, we've done it. Here's the feasibility study, but we've

00:32:24.850 --> 00:32:32.580
got some work to do to get. So, out of the findings from everything that we've got, from

00:32:32.580 --> 00:32:41.570
all the work that the committee that shows me that does support this, and has indicated

00:32:41.570 --> 00:32:47.840
a willingness to help to pay for it. Working with our professional partners, we do believe

00:32:47.840 --> 00:32:55.040
that this can be self-supporting, but we understand that without a site, this is still vapor.

00:32:55.040 --> 00:33:00.440
It won't be able to give you specifics until we have a site to work with. So, in order to

00:33:00.440 --> 00:33:04.040
We get to the end of our feasibility statement really to get to step 3.

00:33:04.040 --> 00:33:07.730
We need a location.

00:33:07.730 --> 00:33:09.810
Here's what I'm asking, and here's what I'm not.

00:33:09.810 --> 00:33:15.420
I'm not asking for a check, I'm not asking for a number to say it will allocate, you know,

00:33:15.420 --> 00:33:18.300
so many bazillion dollars to anything.

00:33:18.300 --> 00:33:24.760
I'm asking for help, I'm asking for support, and be that and that the city already owns

00:33:24.760 --> 00:33:30.300
or a land swap are working with urban renewal or buying property or whatever.

00:33:30.300 --> 00:33:44.030
That's the support I'm with, well option, take a lot of the work that we've remains incomplete.

00:33:44.030 --> 00:33:54.700
Project I support to keep it cool. Is there anything that we can answer any questions for Chris or Ryan or

00:33:55.200 --> 00:34:10.640
That matter I'm excited

00:34:18.710 --> 00:34:31.640
The slides step to progress how much time do you think it'll be between a site designation?

00:34:32.300 --> 00:34:34.300
To finish out

00:34:35.740 --> 00:34:44.010
That's actually that's a very good question because as soon as you could hand me the keys to the castle right now

00:34:44.690 --> 00:34:51.690
The next step is to get to the North and PRS back here to walk it, say, here are the dimensions,

00:34:51.690 --> 00:34:58.690
and then start the discussions on how to make specific changes that we would need to.

00:34:58.690 --> 00:35:01.690
We have a bubble diagram right now, but that's a bubble diagram.

00:35:01.690 --> 00:35:05.260
So I can't give you a very specific answer, sorry.

00:35:05.260 --> 00:35:12.410
So in that meeting steps, you would go through another public input comment,

00:35:12.410 --> 00:35:33.590
Another, this question was asked, obviously being new on the kid council, taxing districts, guys.

00:35:33.590 --> 00:35:34.090
Yes.

00:35:34.090 --> 00:35:34.590
Okay.

00:35:34.590 --> 00:36:05.820
I would say that you guys thought it would look like, does this have the things you were hoping?

00:36:05.820 --> 00:36:07.320
No, that's fair.

00:36:07.320 --> 00:36:09.320
And one more question, sorry.

00:36:09.320 --> 00:36:13.320
So, and this might go back to the feasibility study as well, Wendy.

00:36:13.320 --> 00:36:21.610
Looking at, is that self-sufficient day one, or is there going to be a grace period that somebody is going to be on the hook?

00:36:21.610 --> 00:36:32.220
Sometimes they pre-sell,

00:36:32.220 --> 00:36:35.600
memberships and things to start building that,

00:36:35.600 --> 00:36:38.750
base to start with,

00:36:38.750 --> 00:36:41.750
but several facilities that have been self-supporting within less than a year.

00:36:41.750 --> 00:36:45.840
I think there's to be a three or five year process,

00:36:45.840 --> 00:36:49.840
and I think they hit self-supporting status within their first year.

00:36:49.840 --> 00:37:01.860
Nice to see you guys again. I miss you.

00:37:01.860 --> 00:37:37.540
The council members and surveys mentioned.

00:37:37.540 --> 00:37:47.270
So I...

00:37:47.270 --> 00:38:35.890
Alex, come on.

00:38:35.890 --> 00:39:15.800
Such as, for example.

00:39:15.800 --> 00:40:21.800
I'm finishing some sort of a site to be deterred programs, spaces that are dependent on location.

00:40:21.800 --> 00:40:29.430
So if we selected a hypothetical location, which was a conversation we had with BRS at one point.

00:40:29.430 --> 00:40:57.700
If we say, gosh, someday if we ever get a space to do this, it's ready to go.

00:40:57.700 --> 00:40:59.700
And this is what it's going to look like.

00:40:59.700 --> 00:41:01.700
So we haven't...

00:41:01.700 --> 00:41:05.140
So my thought on what you're asking is either...

00:41:05.140 --> 00:41:08.140
Is it burnt to be hypothetical? I would say probably not.

00:41:08.140 --> 00:41:13.660
does it work to maybe go take a look at some of our spaces to see if any of them we want to

00:41:14.540 --> 00:41:21.730
educate to a recreation center? I don't know if we really ever seriously consider that. There is

00:41:21.730 --> 00:42:26.770
one space that the city mostly owns up 13 if you understand correct. Oh this package is going to be

00:42:26.770 --> 00:42:33.970
put together. They're asking us to either support them moving form on the rest of step two

00:42:33.970 --> 00:42:38.970
or just to say, you're done, okay, thank you for your work.

00:42:38.970 --> 00:42:44.970
So we're not going deep into costs or what piece of land we've got or how much we're spending.

00:42:44.970 --> 00:42:52.970
I just want to make that clear, we're just here to say, yes please go forward, pursue it, or you're done.

00:42:52.970 --> 00:43:01.970
And if I might, at that time we will be back in front of council for those very questions to be debated and answered.

00:43:01.970 --> 00:43:04.480
So that's where this is not a...

00:43:04.480 --> 00:43:08.910
We're not asking us for any money.

00:43:08.910 --> 00:43:12.670
It's just permission to move forward.

00:43:12.670 --> 00:43:15.670
And we asked, just so you know, back in 17,

00:43:15.670 --> 00:43:18.670
we asked for periodic check-ins

00:43:18.670 --> 00:43:27.590
to where we make sure that they agreed to do

00:43:27.590 --> 00:43:35.410
your hiatus.

00:43:35.410 --> 00:43:37.890
They were right on track for what they said they were gonna do.

00:43:37.890 --> 00:43:47.930
Yes, we support you. It's probably going to set the committee up.

00:43:47.930 --> 00:44:02.700
So we'll support probably two locations,

00:44:02.700 --> 00:44:08.160
whether we find our options,

00:44:08.160 --> 00:44:14.230
a conversation right now in the near future.

00:44:14.230 --> 00:44:30.860
So I think you can't just be simply a gosh we think this is right but you're not asking

00:44:30.860 --> 00:44:40.120
Council to go find the land. No, no, okay. That's kind of right. Yeah. I just wanted to reinforce if I'm asked you what when you were saying an ad

00:44:40.120 --> 00:44:46.560
that of those criteria that we used to select the space we did have a lot of

00:44:46.560 --> 00:44:51.380
different land pieces that we were looking at some included city own and

00:44:51.380 --> 00:45:17.920
Some did not interested to it. If we were to get council support to purchase a piece of land that would represent what we wanted the rec center to be built upon, basically a contingency if you will of how that land could potentially be used as well as we understand that there's other steps to be done past that point.

00:45:17.920 --> 00:45:29.710
And so that's one of the steps that we feel really responsible for as well, making sure that it's not just a land that now used for the city as well. If the steps don't proceed past there.

00:45:29.710 --> 00:47:04.580
initial was approved as far as we know now there is no additional cost so we

00:47:04.580 --> 00:47:08.300
haven't spent the entire we haven't spent all of it but I think it's what I was

00:47:08.300 --> 00:47:13.580
starting to get to they think we may have spent more than half already although

00:47:13.580 --> 00:47:17.580
Part of the work of Phase 2 still hasn't been built for.

00:47:17.580 --> 00:47:38.980
Is it self-supported? Can you define self-supported?

00:47:38.980 --> 00:48:01.210
So, it's for operations. Simple expectation is on paying that back.

00:48:01.210 --> 00:48:07.510
While, since I've talked to Gary over in Jerome, but I believe,

00:48:07.510 --> 00:48:15.700
do you remember, it seems like some of those that we went looked at in Denver,

00:48:15.700 --> 00:48:23.460
they were able to pay their on-back and anticipated with me.

00:48:23.460 --> 00:48:27.900
And so it tends to snowball and work well.

00:48:27.900 --> 00:48:34.190
You know, you set expectations and goals,

00:48:34.190 --> 00:48:38.520
and I've heard many stories about facilities

00:48:38.520 --> 00:48:40.640
that exceeded those expectations,

00:48:40.640 --> 00:48:43.320
and it happened in a much faster time.

00:48:43.320 --> 00:48:46.640
So not only paying back what it cost to build it,

00:48:46.640 --> 00:48:50.360
but also being able to start self-supporting,

00:48:50.360 --> 00:48:54.000
and then setting aside cash reserves for upgrades

00:48:54.000 --> 00:49:07.240
and things that need to happen moving from the secret sauce.

00:49:07.240 --> 00:49:16.570
that your citizens want.

00:49:16.570 --> 00:49:39.530
What we're discussing tonight is the feasibility study.

00:49:39.530 --> 00:49:56.750
Comments that I've text and things like the ability study that still has two more steps.

00:49:56.750 --> 00:50:08.740
Mechanism would be discussed as well, so we're still concerned.

00:50:08.740 --> 00:50:54.670
Negative sessions where we come in and say, that's what we'd like to do.

00:50:54.670 --> 00:50:58.870
So that we have what we need behind us to go into that negotiation.

00:50:58.870 --> 00:51:02.570
And I appreciate that I don't want to set up the council to say,

00:51:02.570 --> 00:51:17.530
the importance of our, what we're seeking at this support is more than just a battle.

00:51:17.530 --> 00:51:34.200
Because I have a concern with that, what we're saying yes to, we're saying yes going look, but we're actually saying yes to money at some point in touch.

00:51:34.200 --> 00:51:35.200
Travis, would you like to?

00:51:35.200 --> 00:51:38.200
Yeah, so I don't know if that's a fair statement.

00:51:38.200 --> 00:52:07.610
I'd be sure that because while there may be a property acquisition piece, there's also maybe the possibility that we can just existing property in the city.

00:52:07.610 --> 00:52:29.390
has, but the committee is saying is if they do not also support, they're saying, because

00:52:29.390 --> 00:52:36.340
if the next step is to acquire the land, the council needs to be able to support that

00:52:36.340 --> 00:52:37.340
step.

00:52:37.340 --> 00:52:41.740
Now remember, there are conversations of land acquisition that occur, there's negotiations

00:52:41.740 --> 00:53:37.780
that occur.

00:53:37.780 --> 00:53:47.100
You approach us with land, and it turned out it didn't give us really a sweetheart deal

00:53:47.100 --> 00:53:51.740
because they were interested in the project succeeding.

00:53:51.740 --> 00:53:55.740
So there is the possibility of land donation, there is the possibility of working with somebody

00:53:55.740 --> 00:54:03.380
for naming rights.

00:54:03.380 --> 00:54:07.680
There is a real possibility that at the end of this when we have found what we think is

00:54:07.680 --> 00:54:14.060
the right spot and promise that that is absolutely a possibility.

00:54:14.060 --> 00:54:41.860
In order to build it, revisited what some alternative funding options could be.

00:54:41.860 --> 00:55:01.810
If the city can't provide the land anymore by the land and the resources of the discussion,

00:55:01.810 --> 00:55:03.810
that conversation hasn't shifted.

00:55:03.810 --> 00:58:14.930
possibly successful. Thank you board. There are a lot of sentiment about the desire for a

00:58:14.930 --> 00:58:18.970
rec district but I always wonder if people start thinking realistically about cost,

00:58:18.970 --> 00:58:26.970
you know where does that balance in the community? They see the need for the

00:58:26.970 --> 00:58:49.870
community center versus cost that could come with it says a lot because we don't

00:58:49.870 --> 00:59:03.910
know why for example if we have city on property land swap, buyers and if they

00:59:03.910 --> 00:59:08.710
counsel supports this in concept, you know they may be willing to sell to talk

00:59:08.710 --> 00:59:15.250
seriously about selling the price if they know that they're and that's just one

00:59:15.250 --> 01:00:51.670
example when I say spending money I achieved skate but I forget that's okay

01:00:51.670 --> 01:02:15.610
more expensive Spencer said we don't know what impossible to my concern

01:02:15.610 --> 01:02:33.830
the city to a big financial decisions until we have also citizens of the city

01:02:33.830 --> 01:02:47.330
of Twinfall so I am in favor of moving the feasibility study knowing that there

01:02:47.330 --> 01:02:52.330
There are some caveats from my side of it, but I think it's important to collect the data.

01:02:52.330 --> 01:03:06.970
And I'm just going to add, if we go back to the strategic plan, which Wendy started off with,

01:03:06.970 --> 01:03:12.970
that we've been, this has been in the strategic plan for a long time, and I was involved back,

01:03:12.970 --> 01:03:18.970
I'm going to guess it was 18 years ago in this, and so it's been talked about for a long time.

01:03:18.970 --> 01:03:22.970
I personally support it moving to the next step.

01:03:22.970 --> 01:03:29.970
You're not asking us to write a check. I know there's lots of nonprofits out there, foundations.

01:03:29.970 --> 01:03:40.970
There's a lot of potential for partnerships, so I don't think we're looking at the city physically writing a bit of a check.

01:03:40.970 --> 01:04:11.920
There's too many people that want to see this happen that would be willing to be involved, so I personally...

01:04:11.920 --> 01:04:30.530
to have a second by Gockon second by Nicky Boyd to authorize moving forward on this feasibility

01:04:30.530 --> 01:04:36.770
study and requesting the council support for continued work on the feasibility study.

01:04:36.770 --> 01:04:42.970
Is there any further discussion? Anybody?

01:04:42.970 --> 01:04:57.480
Yes. Yes. Yes.

01:04:57.480 --> 01:05:04.190
Here's Reid. Thank you. Motion passes six to one.

01:05:04.190 --> 01:05:13.600
Thank you, everyone. So we've got a couple other items on the agenda

01:05:13.600 --> 01:05:17.920
I don't know that you all want to sit through that if we could take a two-minute break

01:05:18.360 --> 01:06:44.190
Let you get out of here, and then we'll finish the rest margin. It's not big enough. Okay, so everybody's almost gone

01:06:44.190 --> 01:06:49.350
So if somebody up there could shut the doors we'll move on to our next item

01:06:50.350 --> 01:06:54.490
another action item the request to approve these of

01:06:54.490 --> 01:07:02.830
$7,960 from contingent CFUNS to replace the distribution unit in the first floor HVAC

01:07:02.830 --> 01:07:10.440
system and we have Mitch, our W.D. City Manager here to make a presentation. Welcome, Mitch.

01:07:10.440 --> 01:07:15.280
Thank you. Prettion was going to be here to talk about this tonight but she couldn't make

01:07:15.280 --> 01:07:20.180
it in today so I'm going to cover this for her. So don't ask me anything really hard.

01:07:20.180 --> 01:07:22.180
So I was ready for this.

01:07:22.180 --> 01:07:36.360
No, the request tonight is to use $7,960 of contingency money to replace an HVA distribution unit on the first floor, so make the ground for it.

01:07:36.360 --> 01:07:40.360
There's $150,000 in the budget in contingency in this year's budget.

01:07:40.360 --> 01:07:52.760
And we haven't, so this is the kind of thing that for several months this unit's been kind of high-pitched squeaking noise and it's failing.

01:07:52.760 --> 01:07:57.760
We've had some people come out and look at it and they're like, yeah, that needs to be replaced.

01:07:57.760 --> 01:08:02.440
So if we start today, because of the delivery of parts,

01:08:02.440 --> 01:08:05.160
we're looking at probably early August before we can

01:08:05.160 --> 01:08:07.680
actually get it done, and so the request is,

01:08:07.680 --> 01:08:11.760
why don't we go ahead and get going on this,

01:08:11.760 --> 01:08:14.600
use contingency money for it, we'll sign the contract,

01:08:14.600 --> 01:08:16.680
and then we'll deal with our squeaky unit

01:08:16.680 --> 01:08:18.760
for the next six or so months.

01:08:18.760 --> 01:08:21.180
And so hopefully that answers

01:08:21.180 --> 01:08:24.530
a lot of your questions if you have any more.

01:08:24.530 --> 01:08:37.470
Chris, we did.

01:08:37.470 --> 01:08:51.130
Five and a quarter issues, yeah.

01:08:51.130 --> 01:08:53.690
Please, Chris, all right, I was, there was some feedback.

01:08:53.690 --> 01:09:01.170
I know that we approve the use of $7,960 for contingency funds to replace a distribution

01:09:01.170 --> 01:09:04.810
unit in the first floor HVAC system.

01:09:04.810 --> 01:09:05.810
Thank you, Alex.

01:09:05.810 --> 01:09:06.810
Come on.

01:09:06.810 --> 01:09:07.810
I second that motion.

01:09:07.810 --> 01:09:08.810
Thank you.

01:09:08.810 --> 01:09:09.810
Motion by Christopher Reed.

01:09:09.810 --> 01:09:10.810
Second by Alex.

01:09:10.810 --> 01:09:17.810
Come on to approve the use of $7,960 from contingency funds to replace the distribution

01:09:17.810 --> 01:09:19.810
unit on the first floor HVAC.

01:09:19.810 --> 01:09:21.810
Amy Rokavo, please.

01:09:21.810 --> 01:09:28.920
Yes.

01:09:28.920 --> 01:09:35.640
Thank you motion passes seven to zero.

01:09:35.640 --> 01:09:36.640
Thank you Mitch.

01:09:36.640 --> 01:09:43.390
Next on the agenda is another action item.

01:09:43.390 --> 01:09:53.930
A request to approve resolution number 2023-001 authorizing the destruction of records period.

01:09:53.930 --> 01:09:58.920
Amy Luna, our administrative assistant.

01:09:58.920 --> 01:09:59.920
Thank you Amy.

01:09:59.920 --> 01:10:04.510
Good evening.

01:10:04.510 --> 01:10:42.110
We can be for the council to destroy records that are no longer needed by the state code 50-907-B destroyed only by resolution of the city council and it applies to the city attorney which looks like everybody has a question. I'm just teasing. Not really.

01:10:43.310 --> 01:10:46.110
Couldn't help it. You're looking so nervous.

01:10:47.310 --> 01:10:51.430
I would welcome a motion for this unless anybody has any questions for me.

01:10:51.430 --> 01:11:09.730
Craig Hawkins resolution cue Alex Kaval

01:11:09.730 --> 01:11:18.440
I second the cue motion by Craig Hawkins second by Alex Kaval to approve resolution 2023-001

01:11:18.440 --> 01:11:24.400
authorizing the destruction of records. Hi, roll call vote please.

01:11:24.400 --> 01:11:34.840
Cruz Pierce? Yes. Cruz Reed? Yes. Nikki Boyd? Yes. Craig Hawkins? Yes. Jason Brown? Yes. Spencer Cutler? Yes. Alex Kaval? Yes.

01:11:34.840 --> 01:12:01.200
Thank you motion passes seven to zero. Thank you, Amy. So that is all the items on the regular items on the agenda. We do have public hearings that are scheduled to start after this. But now is the time for general public input. If there's anybody in the community on the audience that wishes to come down and address City Council. Now is your time.

01:12:01.200 --> 01:12:32.150
I've seen no one advisory board reports, a celebration coming up.

01:12:32.150 --> 01:12:38.360
Flags are in half mass, yeah we got it. Anybody else down there?

01:12:38.360 --> 01:12:43.450
I'm surprised that didn't garner any conversation.

01:12:43.450 --> 01:12:50.600
So we had the Greater Twin Falls Transportation meeting last week,

01:12:50.600 --> 01:12:57.600
week before, in disguise there were different traffic conversations.

01:12:57.600 --> 01:13:04.480
branch is still part of the conversation. There's really nothing conclusive to add to that.

01:13:05.200 --> 01:13:09.760
They're still looking at some funding opportunities and some different things and working through

01:13:09.760 --> 01:13:17.140
the study. That's really all I have at this point. No confirmation on when they might be back to

01:13:17.140 --> 01:13:24.580
talk to us? No, not right now. It appears that the funding source that they thought they might

01:13:24.580 --> 01:13:29.140
be able to secure may not necessarily be there still and so they're still working through some

01:13:29.140 --> 01:13:35.830
the state processes to interesting. Thank you. Chief.

01:13:35.830 --> 01:13:48.660
Mayor, thank you. First of all, thank you. That's Travis.

01:13:48.660 --> 01:13:59.160
So I just want to stand before you. Thank you to everyone of you.

01:13:59.160 --> 01:14:32.630
On Wednesday, we had a call for service with the Sheriff's Office

01:14:32.630 --> 01:14:38.060
at a state place. Responded post-hays to

01:14:38.060 --> 01:14:41.300
the Canyon Ridge High School to take immediate action

01:14:41.300 --> 01:14:50.040
and stop any, we also had our many partners from

01:14:50.040 --> 01:14:58.950
of St. Luke's, obviously, the school district, specifically.

01:14:58.950 --> 01:15:20.270
Lots of people try to determine,

01:15:20.270 --> 01:15:22.310
committed this crime against our community.

01:15:22.310 --> 01:15:26.260
Make no mistake, this was a crime against our community,

01:15:26.260 --> 01:15:28.100
whether or not something of the best.

01:15:28.100 --> 01:15:30.140
When he said this is actually terrorism,

01:15:30.140 --> 01:15:40.420
and I stand by this act,

01:15:40.420 --> 01:15:42.540
communities throughout this nation.

01:15:42.540 --> 01:15:45.540
So, it was an act of international terrorism.

01:15:45.540 --> 01:15:47.620
We will be working with our federal partners,

01:15:47.620 --> 01:15:52.040
specifically the Federal Bureau of Investigations.

01:15:52.040 --> 01:15:59.150
resolution and bring the people responsible to justice. We'll continue to learn from this event

01:15:59.150 --> 01:16:21.390
and work with our partners to continue to have discussions. See age if and ready to especially

01:16:21.390 --> 01:17:25.980
each of the most vulnerable citizens, those being our children.

01:17:25.980 --> 01:17:44.040
I was the one who left the school, told Brizzy in responding, that no one thought about calling

01:17:44.040 --> 01:18:10.480
school and she had no idea that it had been an incentive to lock somebody's sort of

01:18:10.480 --> 01:18:37.030
It's an interesting, I would say that...

01:18:37.030 --> 01:19:29.100
Chief, I actually want to give a shout out to Jonathan because he had a lee URA meeting, and he was like 8th in line, so did a good job on Wednesday.

01:19:29.100 --> 01:19:36.660
Okay, so anything from the city manager's office, Mitch.

01:19:36.660 --> 01:19:55.020
But Shane's going to talk 0-0-3 in our first one of the year.

01:19:55.020 --> 01:20:03.860
I believe it's...

01:20:03.860 --> 01:20:13.560
...a motion...

01:20:13.560 --> 01:20:15.460
...a solution number...

01:20:15.460 --> 01:20:19.950
...a new second in Alex.

01:20:19.950 --> 01:20:24.620
It's like a key motion by Craig Hawkins second in bi.

01:20:24.620 --> 01:20:31.280
I'll ask of all to amend the motion to read resolution number 2023 dash zero zero three

01:20:31.840 --> 01:20:33.840
authorizing the destruction of records

01:20:34.400 --> 01:20:38.890
Amy roll call vote

01:20:38.890 --> 01:20:44.680
Yes

01:20:44.680 --> 01:20:51.930
Thank you motion passes seven to zero. Thank you Shane

01:20:52.450 --> 01:20:58.880
So that is all the items next are probably two public hearings

01:20:59.680 --> 01:21:01.680
Before we move on to the

01:21:02.120 --> 01:21:07.190
Take a five minute break you good. Okay, so we'll move on

01:21:07.390 --> 01:21:17.750
public hearing is an action item.

01:21:17.750 --> 01:21:21.750
Request for annexation with the zoning designation of C1

01:21:21.750 --> 01:21:23.750
for property located at 1881.

01:21:23.750 --> 01:21:28.750
The line wrote east care of EHM engineers on

01:21:28.750 --> 01:21:33.750
engineers on behalf of J Foundation LLC.

01:21:33.750 --> 01:21:39.750
Before we get started, I'm going to go ahead and read the rules.

01:21:39.750 --> 01:22:07.310
were to follow these steps under the public hearing portion of the agenda. City staff will present the request and analysis. The applicant will then present their request. The council will then ask questions of the applicant or staff. After questions have been asked, the public hearing will be opened during that time. Anyone in attendance is given the opportunity to comment or ask questions about the request being considered.

01:22:07.310 --> 01:22:15.310
If you are giving testimony, please step up to the podium, state your name and address and present your comments or concerns.

01:22:15.310 --> 01:22:23.310
After giving testimony, please sign the public, sign in sheet which is up in the lobby with your name and address for the record.

01:22:23.310 --> 01:22:30.310
Once public comments are concluded, the applicant will be invited to answer any questions and make a closing statement.

01:22:30.310 --> 01:22:36.110
the statement, staff will then answer, clarify any comments as needed after those statements,

01:22:36.110 --> 01:22:42.430
the public hearing will be closed, and then the council will have an open discussion and

01:22:42.430 --> 01:22:43.430
take action.

01:22:43.430 --> 01:22:50.940
So, Jonathan Spennlev, Penny and Zoning Director, welcome.

01:22:50.940 --> 01:23:08.390
This item, request for annexation of the properties outlined recently hold real things, including

01:23:08.390 --> 01:23:18.960
A and some other properties, he said to look this rectangular shape for quite a while,

01:23:18.960 --> 01:23:24.390
Is outside city limits the property immediate east is also outside the limits.

01:23:24.390 --> 01:23:31.830
I'm going to rest for around it is inside city limits.

01:23:31.830 --> 01:23:53.520
Requested annexation various reasons one of which is potential expansion size.

01:23:53.520 --> 01:24:42.960
This item did go.

01:24:42.960 --> 01:24:54.680
Any questions for John is a zone.

01:24:54.680 --> 01:25:06.340
It is only there's outside city limits that are typically for one acre larger residential.

01:25:06.340 --> 01:25:08.500
but it is a residential designation.

01:25:08.500 --> 01:25:20.580
At was zoned, S-U-I to blast round elements

01:25:20.580 --> 01:25:26.200
that Jason too, as well as usually reserved

01:25:26.200 --> 01:25:29.800
for one acre or larger, with well-acceptance.

01:25:29.800 --> 01:25:34.840
Any other questions for Jonathan before we call up the outcome?

01:25:34.840 --> 01:25:48.120
Welcome, Terrell.

01:25:48.120 --> 01:25:52.130
My name is Terrell Barnes, representing the J Foundation

01:25:52.130 --> 01:25:54.800
on the J Foundation.

01:25:54.800 --> 01:26:12.790
The J Foundation was in the county requesting

01:26:12.790 --> 01:26:17.560
to deny a sample annexation as a C-1 property.

01:26:17.560 --> 01:27:13.080
First of all, counseling for the C-1 of the facility through the city.

01:27:13.080 --> 01:27:35.620
Years ago we had been at the county, glad to be working with the city.

01:27:35.620 --> 01:27:39.220
Staffs have been very cooperative on working with us on this.

01:27:39.220 --> 01:27:59.600
So we simply ask for your approval and annexation.

01:27:59.600 --> 01:28:46.430
But almost totally sure on our city, the neighbors asked for the zoning in this area.

01:28:46.430 --> 01:28:48.230
Anybody have any questions for Gerald?

01:28:48.230 --> 01:28:52.440
Before he sits down, Alex?

01:28:52.440 --> 01:28:56.280
How does the C-1 designation fit in out there?

01:28:56.280 --> 01:29:07.980
The C-1, North, one step to the C-1's and it's a comprehensive plan.

01:29:07.980 --> 01:29:18.880
The C-1 activity primarily with the real deals and the office facility, the only difference now.

01:29:19.680 --> 01:29:38.800
We will incorporate into counseling and some physical therapy and other care all fit.

01:29:38.800 --> 01:29:57.310
Okay, so next we'll be, we'll open up the public hearing and again, if you wish to comment, please step up to the podium, state your name and address, present your comments and you will have two minutes.

01:29:57.310 --> 01:30:01.720
So I officially open the public hearing.

01:30:01.720 --> 01:30:15.680
Is there anybody in the public that wishes to come down and address City Council? Oh, close the public hearing.

01:30:15.680 --> 01:30:19.700
I don't know that we need a closing statement.

01:30:19.700 --> 01:30:24.180
Gerald, any other comments from you, Jonathan?

01:30:24.180 --> 01:30:27.440
Okay, so, Council discussion.

01:30:27.440 --> 01:30:31.270
Anybody wish to ask any questions?

01:30:31.270 --> 01:30:32.270
Make a motion.

01:30:32.270 --> 01:30:34.260
Go ahead, Jason.

01:30:34.260 --> 01:30:44.610
Move to approve the annexation with a zoning designation of C1.

01:30:44.610 --> 01:30:45.610
Thank you, Alex Gavall.

01:30:45.610 --> 01:30:46.610
I second that.

01:30:46.610 --> 01:30:47.900
Thank you.

01:30:47.900 --> 01:30:51.900
Motion by Jason Brown, seconded by Alex Gavall to approve.

01:30:51.900 --> 01:31:03.990
The request for annexation of property located at 1881 Poline Road East with a zoning designation of C1. Any further discussion?

01:31:03.990 --> 01:31:05.990
Amy Rokoffo, please.

01:31:05.990 --> 01:31:11.080
Yes.

01:31:11.080 --> 01:31:12.080
Yes.

01:31:12.080 --> 01:31:21.840
Thank you. Motion passes 7-0. Thank you, Gerald.

01:31:21.840 --> 01:31:33.510
Okay. So the next action item is public hearing or a request for zoning district change in zoning map amendment from C1.

01:31:33.510 --> 01:31:41.830
PUD to R6-PRO for approximately 4 acres on property located at the 1900 block of Washington

01:31:41.830 --> 01:31:51.120
Street North. EHM engineers, Inc. on behalf of Gerald Martin's. Jonathan Smith, welcome.

01:31:51.120 --> 01:31:57.200
The Council of this property has a little bit more of a story to pass than the last one.

01:31:57.200 --> 01:32:15.400
It is part of the North Ocean, but it's gone through many conditions that original PUD were

01:32:15.400 --> 01:32:42.980
We're in Harrison, all the way down to UC out there today.

01:32:42.980 --> 01:32:47.190
It's actually in the Duffer process that we're going through right now,

01:32:47.190 --> 01:32:57.530
which is they rezoned the property where they went through a new process.

01:32:57.530 --> 01:33:06.930
This is the original sub-uses that we're talking about is kind of the area.

01:33:06.930 --> 01:33:22.460
In the region of what's here, this is rezoning the property out of this PUD.

01:33:22.460 --> 01:33:58.880
Basically to just our base zoning code or six with the professional VISTA, PUD.

01:33:58.880 --> 01:34:04.200
What they're talking about are these two properties, rezoning it from a C1 PUD designation to R6.

01:34:04.200 --> 01:34:11.040
The R6 is a residential zone. It's written in city code. It allows for single-family

01:34:11.040 --> 01:34:42.930
up there. It still does not have cloth as overlay, ask for through a special use permit process

01:34:42.930 --> 01:34:51.760
to have a professional office like a dentist's office, medical office. In essence, what it

01:34:51.760 --> 01:35:06.770
is doing is allowing the similar, there is some duplexes and trifort plexes over here

01:35:06.770 --> 01:35:12.540
out the east. If you go further to the east, that's where river crest apartments are. This

01:35:12.540 --> 01:35:17.690
This property is a little bit more restricted than that one is it's smaller, minimum sizes.

01:35:17.690 --> 01:35:24.270
We'll kick into discussions with these.

01:35:24.270 --> 01:35:56.970
There were some items in the original for not specific, but in general.

01:35:56.970 --> 01:35:58.970
This area over here is a mixed use.

01:35:58.970 --> 01:36:34.960
Retail office, restaurants, economy, councils, taxes, making a final decision on to do so.

01:36:34.960 --> 01:36:35.960
R6.

01:36:35.960 --> 01:37:08.410
The R6 actually limits it back down to 30.

01:37:08.410 --> 01:37:10.410
It limits it to 35 as a maximum height.

01:37:10.410 --> 01:37:36.550
Thank you, Jonathan. So now we'll hear from the applicants. Welcome again, Gerald.

01:37:36.550 --> 01:38:53.050
Representing the Food Service. We, it is an essentially some professional offices, but

01:38:53.050 --> 01:39:38.310
they get that conducive to, I think the city manager is new, everybody is new, except me.

01:39:38.310 --> 01:39:42.960
Time to retire, Gerald?

01:39:42.960 --> 01:39:44.960
It's time to retire, right?

01:39:44.960 --> 01:39:48.960
So this is the last phase that you won't see me on this development again.

01:39:48.960 --> 01:39:53.960
Okay, so if that's a reason to vote in favor, please do so.

01:39:53.960 --> 01:39:56.410
Thank you.

01:39:56.410 --> 01:39:59.410
But I'll be glad to answer any questions.

01:39:59.410 --> 01:40:03.410
We do have no specific plans for the property.

01:40:03.410 --> 01:40:05.410
We had people that are interested.

01:40:05.410 --> 01:40:09.920
All of the interest is based upon residential.

01:40:09.920 --> 01:40:15.920
There's been some interest on professional offices, especially this smaller parcel to the south.

01:40:15.920 --> 01:40:59.250
Any questions for Gerald before he sits down?

01:40:59.250 --> 01:41:01.830
Looks like you're off the hook.

01:41:01.830 --> 01:41:02.830
Thank you.

01:41:02.830 --> 01:41:07.030
Thank you, Gerald.

01:41:07.030 --> 01:41:15.030
Next, we'll open up the public hearing if there's anybody out in the public that wishes to address City Council now is your time.

01:41:15.030 --> 01:41:23.220
The no one concludes the public hearing.

01:41:23.220 --> 01:41:26.220
Next, any other comments, Gerald?

01:41:26.220 --> 01:41:28.220
Probably said your piece.

01:41:28.220 --> 01:41:30.640
You good, Jonathan?

01:41:30.640 --> 01:41:34.990
Okay, council wishes. Any discussion?

01:41:34.990 --> 01:41:35.990
Emotion?

01:41:35.990 --> 01:41:41.180
Key void.

01:41:41.180 --> 01:42:01.390
For zoning is from C1.

01:42:01.390 --> 01:42:02.390
Jason Brown?

01:42:02.390 --> 01:42:03.680
I'll second that.

01:42:03.680 --> 01:42:08.680
Thank you. Motion by Nicky Boyd. Seconded by Jason Brown to approve the zoning district.

01:42:08.680 --> 01:42:16.680
Change in zoning map amendment from C1 PUD to R6PRO for four acres on property located in 1900.

01:42:16.680 --> 01:42:19.880
Chris Reed.

01:42:19.880 --> 01:42:27.040
Other questions or comments?

01:42:27.040 --> 01:42:30.990
Let me roll call vote please.

01:42:30.990 --> 01:42:31.990
Yes.

01:42:31.990 --> 01:42:36.920
Yes.

01:42:36.920 --> 01:42:39.140
Yes.

01:42:39.140 --> 01:42:40.140
Thank you.

01:42:40.140 --> 01:42:41.140
Motion passes 7-0.

01:42:41.140 --> 01:42:42.140
Yes, Chris.

01:42:42.140 --> 01:42:44.140
I just want to say that I'm excited.

01:42:44.140 --> 01:42:46.140
Something's happening here for sidewalks.

01:42:46.140 --> 01:42:49.390
I'm missing a huge junk there.

01:42:49.390 --> 01:42:52.640
So we've discussed sidewalks in this community.

01:42:52.640 --> 01:42:53.640
And always comes up.

01:42:53.640 --> 01:42:54.640
So I'm excited.

01:42:54.640 --> 01:42:55.640
Something's moving forward.

01:42:55.640 --> 01:42:57.640
Potentially to have a sidewalk there.

01:42:57.640 --> 01:43:06.530
Which if that means we have to have you come back?

01:43:06.530 --> 01:43:07.530
Come back.

01:43:07.530 --> 01:43:09.530
Thank you, Gerald.

01:43:09.530 --> 01:43:13.520
Anything else, Jonathan?

01:43:13.520 --> 01:43:22.150
Both of these items, um, councils, and anybody else, there will be a few more public hearings.

01:43:22.150 --> 01:43:41.830
You won't see the public hearings in your planning. Both of the actions tonight will come back.

01:43:41.830 --> 01:43:45.830
So, that's all on the agenda, so we are adjourned. Thank you all.