WEBVTT

00:01:31.660 --> 00:01:43.980
Good evening ladies and gentlemen and welcome to our December 12, 2022 City Council meeting. I want to confirm we have a quorum. We have all seven members here in chambers.

00:01:43.980 --> 00:01:49.660
First I'm on the agenda is the Pledge of Allegiance. If you wish to join me please rise.

00:01:49.660 --> 00:02:00.180
I have states of America, and she can be probably before we just stay.

00:02:00.180 --> 00:02:09.360
I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.

00:02:09.360 --> 00:02:10.360
Thank you.

00:02:10.360 --> 00:02:18.930
Next, we have no proclamations tonight, so next on the agenda is the consent calendar.

00:02:18.930 --> 00:02:19.930
Big Hawkins.

00:02:19.930 --> 00:02:23.370
Mayor would like to make a motion to approve the consent calendar as written.

00:02:23.370 --> 00:02:24.370
Thank you.

00:02:24.370 --> 00:02:25.370
Do I have a second?

00:02:25.370 --> 00:02:26.370
Second.

00:02:26.370 --> 00:02:27.370
Thank you, Nikki.

00:02:27.370 --> 00:02:28.370
Emotion by Craig Hawkins.

00:02:28.370 --> 00:02:29.370
Second.

00:02:29.370 --> 00:02:32.930
I would like to approve the consent calendar as written.

00:02:32.930 --> 00:02:36.030
Amy Roll call vote please.

00:02:36.030 --> 00:02:36.870
Ruth Pierce?

00:02:36.870 --> 00:02:37.470
Yes.

00:02:37.470 --> 00:02:38.130
Chris Reed?

00:02:38.130 --> 00:02:38.670
Yes.

00:02:38.670 --> 00:02:39.470
Nikki Boyd?

00:02:39.470 --> 00:02:39.970
Yes.

00:02:39.950 --> 00:02:40.790
Ray Cawkins?

00:02:40.790 --> 00:02:41.290
Yes.

00:02:41.270 --> 00:02:41.950
Mason Brown?

00:02:41.950 --> 00:02:42.550
Yes.

00:02:42.550 --> 00:02:43.550
Spencer Cutler?

00:02:43.550 --> 00:02:44.070
Yes.

00:02:44.070 --> 00:02:45.070
And Alex Cabot?

00:02:45.070 --> 00:02:46.230
Yes.

00:02:46.230 --> 00:02:46.730
Thank you.

00:02:46.630 --> 00:02:49.820
Motion passes 70-0.

00:02:49.820 --> 00:02:55.140
Next item under items of consideration is an action item.

00:02:55.140 --> 00:02:57.900
A request to confirm the mayoral appointment

00:02:57.900 --> 00:03:03.920
Sherry Vollmer to the historic preservation commission and we have Lisa Strickland our city plan. Hello

00:03:04.820 --> 00:03:09.600
That was an awful city planner. Good evening, Mayor Pierce Council

00:03:09.600 --> 00:03:14.600
This is a request to confirm an appointment of Sherry Vollmer to the historic preservation commission

00:03:15.160 --> 00:03:19.100
The commission has had three vacancies to fill over the past few months

00:03:19.460 --> 00:03:25.620
So the city published a request for volunteers during the month of September and we had three applicants which were

00:03:25.620 --> 00:03:28.700
were submitted for the open seats.

00:03:28.700 --> 00:03:32.420
The city council liaison, Cutler, Chairman Doug Baldwin,

00:03:32.420 --> 00:03:37.020
and City Planner, myself, we interviewed the applicants

00:03:37.020 --> 00:03:40.820
and the interview team found all three candidates

00:03:40.820 --> 00:03:44.780
to be very qualified and committed to furthering

00:03:44.780 --> 00:03:46.220
the goals of the end objectives

00:03:46.220 --> 00:03:48.500
of this sort of preservation commission.

00:03:48.500 --> 00:03:50.340
The interview team forwarded this information

00:03:50.340 --> 00:03:52.300
to the mayor and we would like to propose

00:03:52.300 --> 00:03:54.660
that Sherry Wilmer be confirmed as a new member

00:03:54.660 --> 00:03:56.980
on the historic preservation commission.

00:03:56.980 --> 00:03:58.580
And should she be appointed,

00:03:58.580 --> 00:04:01.300
she will be completing a partial term

00:04:01.300 --> 00:04:05.420
that will expire June 30th of 2024.

00:04:05.420 --> 00:04:08.340
So basically a simple majority of the city councils

00:04:08.340 --> 00:04:10.260
needed to approve the request

00:04:10.260 --> 00:04:13.100
and approval of this request will fill our third vacancy

00:04:13.100 --> 00:04:14.660
on the historic preservation.

00:04:15.540 --> 00:04:17.900
We recommend confirmation.

00:04:17.900 --> 00:04:18.940
Thank you.

00:04:18.940 --> 00:04:20.380
Jason Brown.

00:04:20.380 --> 00:04:24.030
If there's no discussion, I'll make a motion.

00:04:24.030 --> 00:04:25.310
Perfect.

00:04:25.310 --> 00:04:30.310
I move to approve Sherry Volmer to the Historical Preservation Commission.

00:04:30.310 --> 00:04:31.310
Thank you.

00:04:31.310 --> 00:04:32.310
Do I have a second?

00:04:32.310 --> 00:04:33.310
Second.

00:04:33.310 --> 00:04:34.310
Thank you.

00:04:34.310 --> 00:04:35.310
Motion by Jason Brown.

00:04:35.310 --> 00:04:42.310
Seconded by Spencer Cutler to confirm the mayoral appointment of Sherry Volmer to the Historic Preservation Commission.

00:04:42.310 --> 00:04:44.570
Amy Rokow, please.

00:04:44.570 --> 00:04:46.590
Chris Reed.

00:04:46.590 --> 00:04:47.590
Yes.

00:04:47.590 --> 00:04:48.590
Thank you.

00:04:48.590 --> 00:04:49.590
Boyd.

00:04:49.590 --> 00:04:50.590
Yes.

00:04:50.590 --> 00:04:51.590
Jason Brown.

00:04:51.590 --> 00:04:52.590
Yes.

00:04:52.590 --> 00:04:53.590
Alex Koval.

00:04:53.590 --> 00:04:54.590
Yes.

00:04:54.590 --> 00:04:55.590
Spencer Cutler.

00:04:55.590 --> 00:05:03.590
Thank you. Motion passes 7-0. So we have two options, Sherri. You can get up and speak if you'd like or you don't have to.

00:05:03.590 --> 00:05:12.060
It's about 50-50 on who doesn't, who doesn't. So push your little button, the green or...

00:05:12.060 --> 00:05:20.060
There we go. Okay. Thank you very much for this and I look forward to helping the city and helping the committee.

00:05:20.060 --> 00:05:24.100
Thank you, Sherri. Welcome.

00:05:24.100 --> 00:05:32.340
Okay, next item on the agenda is a presentation. It's the water facility plan and pressurized irrigation plan presentations

00:05:32.580 --> 00:05:36.380
And we have Lee Gleismann staff engineer. Welcome Lee

00:05:37.060 --> 00:05:45.140
Good evening mayor council. I've got two parts to this presentation tonight first part is gonna be the water facility plan

00:05:45.420 --> 00:05:52.080
Which I Gary Hatterley with JUB will will be presenting and then I'll follow that up with the master PI plan

00:05:52.080 --> 00:05:54.700
And then we'll talk about budget perfect. Thank you

00:05:56.020 --> 00:06:22.180
Perfect.

00:06:22.180 --> 00:06:23.180
All right.

00:06:23.180 --> 00:06:25.780
Good evening, Mayor.

00:06:25.780 --> 00:06:29.780
Councilwoman and Van, it's a pleasure to be here tonight.

00:06:29.780 --> 00:06:35.780
I'm Gary Hatterley with JUB and Mark Holson, who I'm sure many of you know, is in the audience

00:06:35.780 --> 00:06:41.340
with us as well, but we have many other staff including Timothy Kill and others listed there

00:06:41.340 --> 00:06:44.690
who have helped us with this.

00:06:44.690 --> 00:06:53.300
So we've prepared a water facilities plan based on many meetings and input from your dedicated

00:06:53.300 --> 00:06:57.740
staff primarily in your engineering and public works department but also with

00:06:57.740 --> 00:07:04.220
city administration with finance with legal utilities apartment we've had a

00:07:04.220 --> 00:07:10.160
lot of discussions across a broad swath of the city and based on all that input

00:07:10.160 --> 00:07:16.700
we've prepared updated a water model that analyzes the water system for the

00:07:16.700 --> 00:07:22.180
whole city we've put in inputs for every single parcel within the city that could

00:07:22.180 --> 00:07:28.300
build to have something on that. And so we're excited to be able to share some of that with

00:07:28.300 --> 00:07:39.110
you tonight. To start out, I wanted to talk a little bit about water planning and master

00:07:39.110 --> 00:07:46.040
planning, if you will. So what is master planning? What should this do for you? This is a high-level

00:07:46.040 --> 00:07:51.760
planning process for your water system that we're trying to align the goals of your strategic

00:07:51.760 --> 00:07:57.280
plan and your comprehensive plan and to make improvements and look at what needs

00:07:57.280 --> 00:08:02.720
to happen to stay in alignment with that focus that you have as a city. It allows

00:08:02.720 --> 00:08:08.680
you to understand and tackle big picture items as well as big risk items. It allows

00:08:08.680 --> 00:08:14.440
you to define how you want the city to grow and prosper and finally it helps

00:08:14.440 --> 00:08:19.280
us understand the capital improvement priorities the infrastructure needs that

00:08:19.280 --> 00:08:24.300
that will have an estimated cost to implement them.

00:08:24.300 --> 00:08:26.980
That will then help you as you come up this next year

00:08:26.980 --> 00:08:28.940
with your budgeting for your water system.

00:08:28.940 --> 00:08:31.820
So that's kind of the big picture items.

00:08:31.820 --> 00:08:34.220
And so what do we even talk about tonight then?

00:08:34.220 --> 00:08:37.180
First, we'll talk a little bit about the existing system.

00:08:37.180 --> 00:08:39.460
Make sure you have familiarity with that.

00:08:39.460 --> 00:08:42.260
And we'll talk about water supply and demand

00:08:42.260 --> 00:08:44.980
and the evaluation of the system.

00:08:44.980 --> 00:08:47.180
And then finally, we'll talk about some of the improvements

00:08:47.180 --> 00:08:50.220
that we've come up with.

00:08:50.220 --> 00:08:54.380
So, before we get going too much more though,

00:08:54.380 --> 00:08:57.620
what are some of the successes that the city has had

00:08:57.620 --> 00:08:59.980
over the last 10 years or so?

00:08:59.980 --> 00:09:01.580
I think it's important to point out some of this.

00:09:01.580 --> 00:09:04.300
Sometimes we forget all of the things that have happened.

00:09:04.300 --> 00:09:07.380
And so, prior to this master plan,

00:09:07.380 --> 00:09:09.940
we began previously some planning processes

00:09:09.940 --> 00:09:11.700
almost 10 years ago,

00:09:11.700 --> 00:09:13.740
and you can see quite a long list,

00:09:13.740 --> 00:09:15.220
it's not even a comprehensive list,

00:09:15.220 --> 00:09:17.020
but a long list of a number of things.

00:09:17.020 --> 00:09:20.140
I just wanted to go over just a couple of those things.

00:09:20.140 --> 00:09:24.800
First of all, as many of you are aware, the Harrison Storage Tank has been undersized

00:09:24.800 --> 00:09:25.800
for many years.

00:09:25.800 --> 00:09:28.800
In order to build that tank, we've had a choir land.

00:09:28.800 --> 00:09:31.400
The city was able to do that in 2017.

00:09:31.400 --> 00:09:33.400
It's such a big deal.

00:09:33.400 --> 00:09:39.520
As you may also know, for many, many years, the Will's Wooster Pump Station was not doing

00:09:39.520 --> 00:09:44.640
well, and that was able to be replaced here in the last few years.

00:09:44.640 --> 00:09:48.840
Many other successes here, but this kind of success comes out of master planning and

00:09:48.840 --> 00:09:54.280
thinking through your goals, and you can just see what, you know, pat yourselves in the back,

00:09:54.280 --> 00:09:56.580
a lot of good stuff has been done there.

00:09:56.580 --> 00:10:01.540
Alright, so kind of jumping back into more of the master planning process then.

00:10:01.540 --> 00:10:05.220
In case you're not familiar with the water system, we just wanted to review it briefly.

00:10:05.220 --> 00:10:10.340
Up on the very north end of the city, we have four wells, the blue lakes wells, as they're

00:10:10.340 --> 00:10:11.820
called.

00:10:11.820 --> 00:10:17.700
Those provide the majority of the water for the city, and those provide the, or that provides

00:10:17.700 --> 00:10:26.450
the water that meets all the water quality, constituent, their concerns, the EPA has, so

00:10:26.450 --> 00:10:29.470
that's our best water and our most water.

00:10:29.470 --> 00:10:33.950
Down in the south, we also have several south wells that provide the most efficient water

00:10:33.950 --> 00:10:38.870
for the city and that blends with the blue lakes of the well water.

00:10:38.870 --> 00:10:45.350
The yellow lines, let's see, is this mouse, it's not pointing, however you can see those

00:10:45.350 --> 00:10:49.230
Those yellow lines are some of the major pipelines that supply the water throughout

00:10:49.230 --> 00:10:51.670
the city to several pump stations.

00:10:51.670 --> 00:10:56.750
And on the right there, you can see just a few statistics about the water system over

00:10:56.750 --> 00:11:03.350
300 miles of pipe.

00:11:03.350 --> 00:11:07.430
As I continue on here, I'm anticipating that we may be able to take some questions at the

00:11:07.430 --> 00:11:08.430
end, if you will.

00:11:08.430 --> 00:11:12.830
But if you feel like there's a question as I'm going here, feel free to jump in, I don't

00:11:12.830 --> 00:11:15.460
mind.

00:11:15.460 --> 00:11:23.020
So next, let's talk a little bit about water supply.

00:11:23.020 --> 00:11:27.020
What kind of water supply does the city have and what's going to be needed?

00:11:27.020 --> 00:11:31.020
We asked Brockway engineers to help with the groundwater modeling

00:11:31.020 --> 00:11:35.340
to prepare some of these graphs that have done that for us for many years before the city.

00:11:35.340 --> 00:11:41.340
So typically for capital improvements, the things that you're going to need to build a budget for now,

00:11:41.340 --> 00:11:46.340
we want to look at the next around 10 to 20 years, and that's what we put in our plan.

00:11:46.340 --> 00:11:50.340
When we start talking about water supply and water rights,

00:11:50.340 --> 00:11:56.020
The state of Idaho allows us to look out to 50 years or longer because that's such a critical

00:11:56.020 --> 00:12:04.580
item that you acquire those water rights. The state's guidance isn't exacting, but again,

00:12:04.580 --> 00:12:12.180
it allows us cities to be able to prepare for that. So, as you can see on this graph here on the bottom

00:12:12.180 --> 00:12:17.700
graph is the Blue Lakes Wells. On the top graph is the South Wells. There's been some decline in both

00:12:17.700 --> 00:12:22.580
these for many years. If you see in the Blue Lakes Wells, you can see that the

00:12:22.580 --> 00:12:27.060
jagged up and down has gone up the last couple years. This is in part due to

00:12:27.060 --> 00:12:31.820
some recharge efforts and also outside of the last year or two where you know

00:12:31.820 --> 00:12:35.580
we've had a drought that wasn't quite the case prior to that and so the water

00:12:35.580 --> 00:12:41.120
had come up. Because of the time frame of the recharge versus somebody's

00:12:41.120 --> 00:12:46.690
other metrics is such a short time frame, Rockway didn't feel entirely confident

00:12:46.690 --> 00:12:51.170
that recharged was the entire reason it has come up and so they've tried to

00:12:51.170 --> 00:12:56.150
conservatively estimate for the city what that water supply trend will continue

00:12:56.150 --> 00:13:01.270
to be going forward and as you can see there's a forecast that it will continue

00:13:01.270 --> 00:13:04.950
to have some declines even though there's always been some ups and downs in that

00:13:04.950 --> 00:13:10.680
water period. Again our focus for immediate needs is the next 20 years but

00:13:10.680 --> 00:13:14.800
I think it's important to point out for the city that all of the water rights that

00:13:14.800 --> 00:13:22.120
you currently have will not be enough even in the future. And so when you consider acquiring

00:13:22.120 --> 00:13:27.240
additional water rights or making negotiations with that, just please bear that in mind.

00:13:27.240 --> 00:13:34.400
When the city continues to fill out to the comprehensive plan area, all of the water

00:13:34.400 --> 00:13:41.440
that you have is currently needed as some. Now on the current capital improvement plan,

00:13:41.440 --> 00:13:46.880
we don't have to tackle all of that right now. But water rights has been constantly an ongoing

00:13:46.880 --> 00:13:50.880
discussion that we've had with many entities in the city, and it's something that you should

00:13:50.880 --> 00:13:58.290
need to keep at the forefront of your mind. So, on this graph again, I just want to make

00:13:58.290 --> 00:14:02.930
sure that you're clear. The Blue Lakes graph you can see there is a combination of not

00:14:02.930 --> 00:14:09.170
only the city's water, but several other entities that procure water from Blue Lakes, and those

00:14:09.170 --> 00:14:16.330
combined water rights are represented on this graph. The city is a portion of those, and

00:14:16.330 --> 00:14:19.420
Again, you can see that that is going down.

00:14:19.420 --> 00:14:22.090
Talk a little more about that in a minute here.

00:14:22.090 --> 00:14:25.150
So what kind, going to the next slide here,

00:14:25.150 --> 00:14:29.830
what kind of demand for water does the city have

00:14:29.830 --> 00:14:32.070
and how has this changed?

00:14:32.070 --> 00:14:33.510
So first of all, we wanted to just look

00:14:33.510 --> 00:14:35.250
at how has this changed over time.

00:14:35.250 --> 00:14:39.230
Back in 2003, the city was using over 30 million gallons

00:14:39.230 --> 00:14:46.750
a day of water, that's that blue lined up top.

00:14:46.750 --> 00:14:49.830
And you can see that it's actually gone down

00:14:49.830 --> 00:14:56.830
any M.G.D. over the last 20 years. It was kind of a quandary in 2008-19 when we were doing

00:14:56.830 --> 00:15:01.570
the last Master Plan update. We weren't entirely sure why this was, but that's right when the

00:15:01.570 --> 00:15:06.670
recession had hit. So it was a little difficult to peace out with confidence that was an economic

00:15:06.670 --> 00:15:12.710
attrition or other reasons. But you can see that on this graph, the very biggest reason

00:15:12.710 --> 00:15:17.090
for the decline has been the pressure irrigation stations that have gone in. And that blue line

00:15:17.090 --> 00:15:23.350
represents peak demand in the summer time use. The red line down at the bottom is

00:15:23.350 --> 00:15:29.130
winter time demand and you can see it's going up a little bit or almost flat but

00:15:29.130 --> 00:15:33.990
as the city has continued to grow there has been some demand but due to back

00:15:33.990 --> 00:15:38.670
several decades ago an energy policy act that was enacted the amount of water used

00:15:38.670 --> 00:15:42.430
per house continues to go down so even though growth has gone up individual

00:15:42.430 --> 00:15:46.590
household water has gone down and the net effect of that has been in general as

00:15:46.590 --> 00:15:50.270
you can see kind of a declining of water over this time period.

00:15:50.270 --> 00:15:52.890
Now, the city has caught up on most of the pressure

00:15:52.890 --> 00:15:54.090
irrigation at this point.

00:15:54.090 --> 00:15:56.790
We don't expect that trend to continue.

00:15:56.790 --> 00:15:59.070
And so when we start looking at future,

00:15:59.070 --> 00:16:01.110
we have to analyze what kind of growth rate might

00:16:01.110 --> 00:16:02.030
you be looking at.

00:16:02.030 --> 00:16:04.230
We looked at several different growth rates.

00:16:04.230 --> 00:16:07.470
But in short, over the next 20 years,

00:16:07.470 --> 00:16:09.070
they're not substantially different.

00:16:09.070 --> 00:16:11.510
The longer time period they are, for this plan,

00:16:11.510 --> 00:16:13.710
we looked at 1.8% growth rate.

00:16:13.710 --> 00:16:21.010
That was what was selected, I should say, by city staff.

00:16:21.010 --> 00:16:25.290
Okay, so now we wanted to look at based on that 1.8%

00:16:25.290 --> 00:16:28.130
as well as some possibilities for industrial

00:16:28.130 --> 00:16:29.770
or level large growth.

00:16:29.770 --> 00:16:31.810
What would the demand be in the future?

00:16:31.810 --> 00:16:33.490
And you can see that we're expecting to go

00:16:33.490 --> 00:16:36.890
from this 23 or 24 million gallons a day back up

00:16:36.890 --> 00:16:40.090
to at least 28 and a half million gallons a day

00:16:40.090 --> 00:16:42.330
over the next 20 years.

00:16:42.330 --> 00:16:44.850
Interestingly, you can see that's a little bit less,

00:16:44.850 --> 00:16:48.660
has been used historically.

00:16:48.660 --> 00:16:51.740
But with better city meters and a better handle on all of this,

00:16:51.740 --> 00:16:55.140
we feel much more confident about where the city's headed.

00:16:55.140 --> 00:16:58.260
This projection of going up continues to account

00:16:58.260 --> 00:17:02.610
for some declining in household use with the Energy Act.

00:17:02.610 --> 00:17:04.650
Okay, on the top right of that graph,

00:17:04.650 --> 00:17:08.450
can you guys see that brown line going down?

00:17:08.450 --> 00:17:12.210
That represents the city's water supply

00:17:12.210 --> 00:17:15.170
during the low groundwater aquifer time of year,

00:17:15.170 --> 00:17:18.900
which is typically around May or June, April, May, June.

00:17:18.900 --> 00:17:31.900
So in May or June, the demand is coming up because of irrigation and also the supply is going down and so that biggest supply or biggest demand to low supply happens right in the major time period.

00:17:31.900 --> 00:17:36.900
And you can see over the next 20 years, those get right close to one another.

00:17:36.900 --> 00:17:42.900
And so we become very uncomfortable, if you will, from planning to hit up a line just like that.

00:17:42.900 --> 00:17:50.620
But in short, you can see with additional industrial use, as well as all the typical

00:17:50.620 --> 00:17:57.600
development we have, we expect things to go up in water supply or water demand, I should

00:17:57.600 --> 00:17:58.600
say.

00:17:58.600 --> 00:18:16.750
Alright, so continuing on.

00:18:16.750 --> 00:18:22.310
So based on that water demand, water supply numbers, we've evaluated all those many different

00:18:22.310 --> 00:18:23.550
infrastructure components.

00:18:23.550 --> 00:18:28.190
This is included the supply wells, the storage tank and booster pump stations.

00:18:28.190 --> 00:18:34.990
of the major items if you will and you can see we've noted several different colors here.

00:18:34.990 --> 00:18:38.390
The green in general means you're good.

00:18:38.390 --> 00:18:40.910
The yellow means there's a caution.

00:18:40.910 --> 00:18:46.510
We would recommend some changes there and the red are things that we think are things

00:18:46.510 --> 00:18:50.900
that more immediately need to be looked at either now or in the future.

00:18:50.900 --> 00:18:53.900
In the south you can see we've noted that as a red.

00:18:53.900 --> 00:18:59.380
Currently the south doesn't have any redundant pumps if you will for those wells down there

00:18:59.380 --> 00:19:02.900
And all the water we can pump out of the south is more cheap.

00:19:02.900 --> 00:19:08.260
We, you know, provide it to the city and this more resilient water source, if you will.

00:19:08.260 --> 00:19:14.100
You can see, as I mentioned earlier, the Harrison storage tank on the middle there has been undersized

00:19:14.100 --> 00:19:15.700
for many, many years.

00:19:15.700 --> 00:19:18.780
You might ask, well, how are we working in?

00:19:18.780 --> 00:19:21.060
How's the city running?

00:19:21.060 --> 00:19:27.140
What happens is the supply that we're supposed to be saving, if you will, for fire-flowed emergency,

00:19:27.140 --> 00:19:30.500
We're basically just, so it kind of puts the city

00:19:30.500 --> 00:19:32.980
in kind of a precarious situation, if you will.

00:19:32.980 --> 00:19:35.780
You know, when the city had less people,

00:19:35.780 --> 00:19:37.860
perhaps that was less, less, or concerned,

00:19:37.860 --> 00:19:40.380
but the more industries and the more people

00:19:40.380 --> 00:19:42.340
who really rely upon a water source,

00:19:42.340 --> 00:19:46.280
it becomes a bigger and bigger risk not to address that.

00:19:46.280 --> 00:19:49.560
Looking over at the booster pumps station,

00:19:49.560 --> 00:19:52.160
you can see that on the top station there,

00:19:52.160 --> 00:19:53.720
the canyon springs booster station,

00:19:53.720 --> 00:19:54.800
this is what pumps the water,

00:19:54.800 --> 00:19:57.200
the blue lakes water out of the canyon.

00:19:57.200 --> 00:20:04.200
this pump station was put in in the 60s and those pumps are just pumping but we

00:20:04.200 --> 00:20:08.600
don't typically expect pump stations to last that long so we are very concerned

00:20:08.600 --> 00:20:13.920
about that pump station and put that down as a yellow just we absolutely

00:20:13.920 --> 00:20:18.600
think we've got to keep track of that. The wheels visitor station we just put it

00:20:18.600 --> 00:20:22.600
in but with new development that will need another pump the Hankins pump station

00:20:22.600 --> 00:20:29.750
as well. There's a few generators that could be needed there we had some incidents

00:20:29.750 --> 00:20:31.890
on that this last summertime.

00:20:31.890 --> 00:20:33.490
Okay, we just wanted to give you one graph

00:20:33.490 --> 00:20:34.530
on some of the evaluation here.

00:20:34.530 --> 00:20:36.290
This is the Harrison Storage Tank.

00:20:36.290 --> 00:20:40.730
The blue bars there is the capacity of the tank

00:20:40.730 --> 00:20:42.930
and the green, red, and purple together

00:20:42.930 --> 00:20:47.290
represent how much volume is actually needed there each summer.

00:20:47.290 --> 00:20:50.970
So you can see we're actually well over the amount we,

00:20:50.970 --> 00:20:57.230
we are supposed to be there.

00:20:57.230 --> 00:20:59.830
This is a real detailed graph, so I apologize,

00:20:59.830 --> 00:21:06.590
it in short. This graph shows pressures throughout the system and where you see red pressure means

00:21:06.590 --> 00:21:12.740
that the city doesn't really have the right pressure there. It's either too low or too

00:21:12.740 --> 00:21:18.060
high. It's technically an orange color in the south there, but it's a little bit hard

00:21:18.060 --> 00:21:22.600
to see that. You guys are familiar with the Hankets pressures on projects we're doing

00:21:22.600 --> 00:21:26.840
right now. That's to address a great deal of those orange low pressures, but you can

00:21:26.840 --> 00:21:31.220
see up north there's also some on the west side some red high pressures that

00:21:31.220 --> 00:21:34.880
eventually will need to be addressed and there's also some additional pressure

00:21:34.880 --> 00:21:40.750
zones that we need to be made in the south eventually. If I can ask a question real

00:21:40.750 --> 00:21:44.350
quick I think it's probably go ahead go ahead and help clarify that. So just

00:21:44.350 --> 00:21:48.350
just so we everybody has a clarification what would be a good

00:21:48.350 --> 00:21:56.510
pressure rating that we would want? Thank you. So as you can see the green is

00:21:56.510 --> 00:22:02.380
is what's most of the city that's at 55 to 85 psi pressure that's what we're

00:22:02.380 --> 00:22:06.940
basically going for is a good pressure historically we've tried to be around 60

00:22:06.940 --> 00:22:12.110
psi if you get over 80 psi you can start up problems a little bit with your

00:22:12.110 --> 00:22:16.550
household PRVs and plumbing so that's kind of middle ground the state

00:22:16.550 --> 00:22:22.230
regulated pressures are 40 to 100 psi so even those pressures we are in

00:22:22.230 --> 00:22:28.710
violation of any, definitely try to tackle that. This shows what the low pressures are, or it's

00:22:28.710 --> 00:22:33.910
focused more on the low pressures. The high pressures are more evident under low demand,

00:22:33.910 --> 00:22:43.610
which is winter time. So you can see a lot more red up north in the winter time. The only way to

00:22:43.610 --> 00:22:48.730
address that is to make new pressure zone boundaries. And again, we're working on that down the southeast,

00:22:48.730 --> 00:22:59.020
we're not currently working on that up in the north, and in fact we're, this graph here just shows

00:22:59.020 --> 00:23:03.100
some fire flow requirements throughout the city and deficiencies and short where

00:23:03.100 --> 00:23:06.600
there's red or fire flow deficiencies so you can see those are scattered all

00:23:06.600 --> 00:23:14.140
throughout. Okay finally so based on all that evaluation what are some

00:23:14.140 --> 00:23:18.940
specific improvements that need to be done? We divided the improvements into

00:23:18.940 --> 00:23:23.220
existing capacity issues so not even a growth related items but things that are

00:23:23.220 --> 00:23:27.460
just problems right now and you can see at the very top of the list again is that

00:23:27.460 --> 00:23:30.940
Harrison storage tank we think it's probably about the most critical thing

00:23:30.940 --> 00:23:37.570
for the city to complete. Down in the distribution or the pipe systems within the city, you can

00:23:37.570 --> 00:23:44.780
see a number of projects that are listed there, including that Hinkins pressure zone split.

00:23:44.780 --> 00:23:51.050
Those other projects continue to dress primarily fire flow and just hold their pipe. You can

00:23:51.050 --> 00:23:55.550
see we divide this up in the time frame of zero to ten years and ten to twenty years.

00:23:55.550 --> 00:23:59.950
We realize that it's a process for you to budget and get through that. Just at a high

00:23:59.950 --> 00:24:05.230
level effort we wanted to show that timeframe. Now Lee in a minute is going to

00:24:05.230 --> 00:24:09.670
show some more specific budgeting and we looked at some of that and he'll show

00:24:09.670 --> 00:24:13.550
you that but looking at different percentages of rate increases or revenue

00:24:13.550 --> 00:24:21.350
bonds or private partnerships or just other revenue sources. This next slide goes

00:24:21.350 --> 00:24:26.310
into some kind of more redundancy resiliency items. You can see the big

00:24:26.310 --> 00:24:30.790
thing on there again is the Canyon Springs pump station. Probably our biggest

00:24:30.790 --> 00:24:38.070
concern for a state of condition, if you will, at just the age. But also on the

00:24:38.070 --> 00:24:43.430
same list, you can see that Southwell and even looking out into the future,

00:24:43.430 --> 00:24:48.150
we're going to need another South tank. The South tank can't be built, of course,

00:24:48.150 --> 00:25:00.880
unless we have land from the South tank, so we can put that down as well. I want to

00:25:00.880 --> 00:25:08.190
jump over this too fast. Any questions on this list? I think we're good. Okay. And I'm

00:25:08.190 --> 00:25:12.070
just going and looking into the future a little bit and with growth, we've

00:25:12.070 --> 00:25:23.840
We've identified a few different improvements that will be needed again, the wheels mister station, some upgrades there, the new Hankins pump station will be needed with all the growth on the east side of the city.

00:25:23.840 --> 00:25:33.790
Eventually we'll need new supply or additional supply of Hankins tank that could happen with this pipeline as long as we have water rights.

00:25:33.790 --> 00:25:43.580
So those are kind of again the main improvements that we've looked at, we spent, you know, so much effort and time with the city,

00:25:43.580 --> 00:25:50.100
Travis in particular asked us to make sure we're looking at the financing and budgeting, and going through that to look at options for the city.

00:25:50.100 --> 00:25:55.300
Again, Lee will talk about that a little bit more in a snapshot.

00:25:55.300 --> 00:26:01.030
And I know it's not so fast as I've talked here, but that is a lot of us.

00:26:01.030 --> 00:26:06.520
Any questions? Any questions for Gary?

00:26:06.520 --> 00:26:08.830
Yes, Alex.

00:26:08.830 --> 00:26:15.830
How short are we on the water rights in your opinion or growth in the next 20 years?

00:26:15.830 --> 00:26:18.830
In the next 20 years, you're okay.

00:26:18.830 --> 00:26:19.830
Okay.

00:26:19.830 --> 00:26:21.830
So you're projecting out 50 years?

00:26:21.830 --> 00:26:22.830
Is that what you were doing?

00:26:22.830 --> 00:26:26.830
Yeah, but when we look at water rights, we're looking out at, you know, with the boundary,

00:26:26.830 --> 00:26:32.830
the comprehensive plan, as we showed that earlier on the slides, in order to fill in those boundaries

00:26:32.830 --> 00:26:39.330
for water rights, we're going to need, no, I won't say too much about water rights here,

00:26:39.330 --> 00:26:44.030
water rights here, but all the water rights that you currently have access to or potentially

00:26:44.030 --> 00:26:52.240
have access to is not enough, includes all the south, as well as everything that's north

00:26:52.240 --> 00:27:01.900
of the Snake River that you currently should have or do have access to. In our opinion,

00:27:01.900 --> 00:27:08.260
that is something that discussions will continue to be had, the cities having those, but eventually

00:27:08.260 --> 00:27:11.360
we will need to look at even other sources of water rights.

00:27:11.360 --> 00:27:23.540
Go in terms of like, because I think we were at like what, 30, or current usages what, 30-something?

00:27:23.540 --> 00:27:28.000
Around 23,000 gallons of, it's 30 at one point.

00:27:28.000 --> 00:27:32.000
Yeah, in about 50 years, where do you estimate that to be?

00:27:32.000 --> 00:27:41.080
No, I don't have that exact number on me right now, but you can see that trend line that

00:27:41.080 --> 00:27:46.080
We just showed 20 years, if you will, we expect a similar trend to continue.

00:27:46.080 --> 00:27:52.080
So we're showing around about 5 million gallons a day, if you will, for the next 20 years.

00:27:52.080 --> 00:27:54.080
Don't come and give you a sense of that.

00:27:54.080 --> 00:27:56.330
Thank you.

00:27:56.330 --> 00:28:00.440
Any other questions for Gary?

00:28:00.440 --> 00:28:01.440
Thank you.

00:28:01.440 --> 00:28:24.900
Thank you.

00:28:24.900 --> 00:28:25.900
Thank you, Gary.

00:28:25.900 --> 00:28:30.900
I'd like to point out before I start that JEP has done an awful lot of work on these plans.

00:28:30.900 --> 00:28:37.900
On the Master PI plan, it's only about 200 pages, but there's about 450 pages of technical memorandums

00:28:37.900 --> 00:28:40.900
of all the evaluations they've done and everything that they've looked at.

00:28:40.900 --> 00:28:45.900
So, you know, try to cover 650 pages of information here in just a few minutes.

00:28:45.900 --> 00:28:48.900
It just really doesn't do it justice.

00:28:48.900 --> 00:28:53.900
And if there's any of you want to go a little deeper dive later on,

00:28:53.900 --> 00:28:56.900
we can meet with you one-on-one or something like that.

00:28:56.900 --> 00:29:05.900
So I'm sure we're going to miss a few of the things that are in the plan that we'll try to go over further quickly here.

00:29:05.900 --> 00:29:15.900
Back in 1999, due to diminishing potable water supplies and drought, the city passed more than restricting the use of potable water for irrigation and new developments.

00:29:15.900 --> 00:29:21.830
At the time, it looked like we were going to be running out of water, literally by now.

00:29:21.830 --> 00:29:28.830
So instead of using potable water, we started using canal company water in our subdivisions.

00:29:28.830 --> 00:29:35.830
Basically, when you have a field that is being developed, we have water rights that used to

00:29:35.830 --> 00:29:40.830
irrigate the field, irrigating the landscape in the new developments.

00:29:40.830 --> 00:29:45.830
And before I forget, pressurized irrigation, I'll use the term PI a lot.

00:29:45.830 --> 00:29:49.830
So that's what I'm saying when I say PI.

00:29:49.830 --> 00:30:04.200
This is the existing pressurized irrigation system along with pump stations and the areas

00:30:04.200 --> 00:30:05.200
that they serve.

00:30:05.200 --> 00:30:20.060
We have about 26 irrigation stations, 70 miles of pipe, and we serve about 2,000 acres.

00:30:20.060 --> 00:30:22.660
This is a heat map that we created.

00:30:22.660 --> 00:30:28.700
It uses about 500,000 water meter readings over the course of a couple of years.

00:30:28.700 --> 00:30:34.180
We compared the water usage in the middle of the winter compared to the middle of the summer,

00:30:34.180 --> 00:30:40.300
And so each dot represents the amount of potable water being used, or the additional amount of

00:30:40.300 --> 00:30:42.620
water being used in the summer compared to the winter.

00:30:42.620 --> 00:30:51.020
You can see in areas where we have pressurized irrigation, they're virtually black.

00:30:51.020 --> 00:30:56.320
They use basically the same amount of water during the summers they do in the winter.

00:30:56.320 --> 00:31:00.800
And you can see in various subdivisions, some of them use a little more water than others.

00:31:00.800 --> 00:31:06.600
are each one of these represents a water meter. Typically we see patterns where

00:31:06.600 --> 00:31:12.280
larger lots use more water, smaller lots use less water. You see a lot of

00:31:12.280 --> 00:31:18.840
these really super bright dots. A lot of those the top users that we when we're

00:31:18.840 --> 00:31:24.800
looking through the day of the top users are typically schools, churches, parks,

00:31:24.800 --> 00:31:29.800
sisters living facilities, apartment complexes, mobile home parks, landscape

00:31:29.800 --> 00:31:34.520
centers or nurseries, landscapes, drips, and office complexes.

00:31:34.520 --> 00:31:38.080
So a lot of these thoughts, if you look at them,

00:31:38.080 --> 00:31:55.660
you'll recognize that they may be one of those categories.

00:31:55.660 --> 00:31:57.560
So when we start out with plan, we also

00:31:57.560 --> 00:32:00.180
started looking at the difference in water consumption

00:32:00.180 --> 00:32:04.620
between PI areas and non-PI areas.

00:32:04.620 --> 00:32:06.940
We tried to pick out several neighborhoods around the city

00:32:06.940 --> 00:32:10.180
where they were built around at the same time,

00:32:10.180 --> 00:32:12.140
this location that I'm showing here.

00:32:12.140 --> 00:32:13.440
This is North Point Ranch.

00:32:13.440 --> 00:32:16.020
This is an earlier phase that was on potable water

00:32:16.020 --> 00:32:19.020
and in a laser phase that's on PI.

00:32:20.820 --> 00:32:23.180
What we found is that the PI areas use

00:32:23.180 --> 00:32:26.220
about 550 gallons per acre per day,

00:32:26.220 --> 00:32:30.980
and the non-PI areas use between 300 and 300, 900 gallons

00:32:30.980 --> 00:32:33.140
per day per acre.

00:32:33.140 --> 00:32:36.460
So in July and August when our water uses

00:32:36.460 --> 00:32:41.020
at the highest PI, neighborhoods use about 3000 gallons

00:32:41.020 --> 00:32:45.180
per day, less potable water than the PI neighborhoods.

00:32:45.180 --> 00:32:47.260
Well, when you, these are real rough numbers,

00:32:47.260 --> 00:32:50.460
but if you say you have 2,000 acres on PI,

00:32:50.460 --> 00:32:54.340
that's about 6 million gallons of potable water a day,

00:32:54.340 --> 00:32:57.300
that would have probably otherwise been used

00:32:57.300 --> 00:33:08.090
if we had not implemented the PI.

00:33:08.090 --> 00:33:10.530
It's a map of the Twin Falls Canal Company system,

00:33:10.530 --> 00:33:13.450
at least in the city of Twin Falls.

00:33:13.450 --> 00:33:18.490
Twin Falls Canal Company serves about 200,000 acres.

00:33:18.490 --> 00:33:25.010
And as over a hundred years old now, the original system, it was designed using gravity, the

00:33:25.010 --> 00:33:32.090
water flows, down canals, and bitches to get to all the various users, the canal company,

00:33:32.090 --> 00:33:40.250
has gates that deliver the water to the individual properties, and this is a 24-7 operation.

00:33:40.250 --> 00:33:44.090
Any water that enters the system, like in this case, it's the low line canal right

00:33:44.090 --> 00:33:49.890
here towards the bottom, water flowing down to the low line canal. They open

00:33:49.890 --> 00:33:54.950
gates over at Mertal Lake, and once they open those gates, that water has to either

00:33:54.950 --> 00:33:58.850
be used or it's going to go to Rock Creek or it's going to go to the Snake River Canyon.

00:33:58.850 --> 00:34:03.540
So the system, I say it's not something you can just turn on and turn off like

00:34:03.540 --> 00:34:14.860
we're used to with our potable water supply. It's a typical pressurized

00:34:14.860 --> 00:34:20.560
irrigation station. You have a supply ditch and then you have a gate. The gate

00:34:20.560 --> 00:34:25.280
supplies the water over to the usually their PI stations are composed of the

00:34:25.280 --> 00:34:30.000
pumps and storage so the water fills the storage and the pumps when they turn on

00:34:30.000 --> 00:34:42.150
they draw off that water any water that's not used has to waste down a ditch it's

00:34:42.150 --> 00:34:45.390
the same spot looking the other direction you can see the water just wasting

00:34:45.390 --> 00:34:54.260
downstream so this is just a little screen grab of the pressurized irrigation

00:34:54.260 --> 00:34:59.580
that the water department has online for any of any customers to look at you

00:34:59.580 --> 00:35:03.420
look at your individual pressurized irrigation stations, this one here is a morning sun.

00:35:03.420 --> 00:35:07.060
This was actually a couple years ago, but I took this shot because I thought it was kind

00:35:07.060 --> 00:35:08.620
of interesting.

00:35:08.620 --> 00:35:15.220
You can see that during the night, most people water, you see it really ramping at 8 p.m.

00:35:15.220 --> 00:35:18.260
and peeking over night and then it drops off at 9 a.m.

00:35:18.260 --> 00:35:24.240
In the middle of the day, we don't use nearly as much water.

00:35:24.240 --> 00:35:28.680
And this is a little bit of a problem because the canal company system is a constant flow

00:35:28.680 --> 00:35:36.180
system source supply is 24 hours a day. So when you see this dish shape right here, that's

00:35:36.180 --> 00:35:40.940
actually wasted water. That's water that's running down the ditch that we're not using.

00:35:40.940 --> 00:35:46.140
And in this case, if the water supply is up here around a thousand gallons per minute,

00:35:46.140 --> 00:35:51.460
go across here. If we don't have storage and we try to pump too much, you start seeing

00:35:51.460 --> 00:35:59.540
situations like this on the right, the wet wells for the pumps start to draw down and

00:35:59.540 --> 00:36:04.580
to prevent the pumps from damage, the pumps will actually shut off for about 15 minutes

00:36:04.580 --> 00:36:10.180
and then they will come back on and in this case it looks like three times that they

00:36:10.180 --> 00:36:16.340
kicked on, kicked off, kicked on, kicked off and with the water users if they weren't observing

00:36:16.340 --> 00:36:19.180
that their sprinklers weren't running they would just say oh my grass is just getting

00:36:19.180 --> 00:36:24.180
a little bit dry, and so just increase the amount of time that they're running their

00:36:24.180 --> 00:36:29.740
sprinklers, and that'll actually exacerbate snowball of the situation.

00:36:29.740 --> 00:36:34.940
We have tried to get users to use water in the middle of the day.

00:36:34.940 --> 00:36:36.340
We've put out advertisements.

00:36:36.340 --> 00:36:38.300
We haven't had much success.

00:36:38.300 --> 00:36:43.780
One time when we did an advertisement or public service announcement, a reporter talked

00:36:43.780 --> 00:36:47.020
to the University of Idaho about water and grass in the middle of the day and says,

00:36:47.020 --> 00:36:49.020
oh no, that's not a good idea.

00:36:49.020 --> 00:36:54.020
So it's very difficult to get people to water in the middle of the day when they're at PI

00:36:54.020 --> 00:36:57.220
and trying to convince them that it's actually a better way to use the water when you're

00:36:57.220 --> 00:37:00.720
on the irrigation system.

00:37:00.720 --> 00:37:05.240
So one of the ways that we can, well, there's a couple things, the other thing that's going

00:37:05.240 --> 00:37:10.360
on is this wasted water, it goes down ditches that it really wasn't intended to carry, you

00:37:10.360 --> 00:37:12.600
know, the system is 100 years old.

00:37:12.600 --> 00:37:16.840
And so it causes fluctuations in the delivery system, it causes problems for the Twin Falls

00:37:16.840 --> 00:37:23.560
canal company, because it's just a management issue, and there's also potential for needing

00:37:23.560 --> 00:37:32.120
to modify ditches or improve ditches to be able to handle these kinds of flows. Also, increasing

00:37:32.120 --> 00:37:36.760
storage will help this situation a little bit, too, so if we were able to instead delivering

00:37:36.760 --> 00:37:40.880
a thousand gallons per minute this example, we were delivering more like 800 gallons per

00:37:40.880 --> 00:37:47.600
minute but during this period right here if we were filling a pond and during this period

00:37:47.600 --> 00:37:51.760
right here we could be drawing off that pond and so that will help reduce the amount of

00:37:51.760 --> 00:38:00.240
water that's being wasted and then also reduce those fluctuations. So that's kind of the way

00:38:00.240 --> 00:38:13.720
the system is operating. So that gets us to capital improvements. So we have existing pump

00:38:13.720 --> 00:38:18.260
pump stations, right now the system works. What we have going on right now we have the pumping

00:38:18.260 --> 00:38:25.660
capacity for what our current situation. But as we grow some of these pump stations will

00:38:25.660 --> 00:38:31.600
need to have improvements to increase their capacity to be able to cover larger areas.

00:38:31.600 --> 00:38:36.600
Also we're looking into increasing pump station storage to reduce that waste until less of the

00:38:36.600 --> 00:38:42.100
impacts of the water fluctuation of the canal company system. We also need to evaluate and

00:38:42.100 --> 00:38:46.820
improve upstream downstream ditches to increase the supplies needed for growth and to better

00:38:46.820 --> 00:38:49.740
accommodate the water fluctuations.

00:38:49.740 --> 00:38:55.500
We also need to evaluate future development areas to determine future PI station locations.

00:38:55.500 --> 00:39:00.580
What we've been doing for years is when a development comes in and we don't have a capacity and

00:39:00.580 --> 00:39:05.980
existing pump station, that's when we have been putting in the pump stations.

00:39:05.980 --> 00:39:10.580
Usually we're getting the land from that current developer and it's not necessarily the absolute

00:39:10.580 --> 00:39:13.580
optimum location for those pump stations.

00:39:13.580 --> 00:39:18.380
So what we want to do is we want to start looking out into the future development areas,

00:39:18.380 --> 00:39:25.780
look at those to see where those better locations are for those pump stations and plan to put

00:39:25.780 --> 00:39:26.980
those stations to those places.

00:39:26.980 --> 00:39:30.780
And we would acquire land for those future PI stations.

00:39:30.780 --> 00:39:38.460
And we also need to expand some of the existing, say this is the purchase land for like storage.

00:39:38.460 --> 00:39:42.020
and also construct new PI stations as needed for growth.

00:39:42.020 --> 00:39:45.720
One of the things that we're contemplating bringing forward

00:39:45.720 --> 00:39:52.560
is we may be better for us to run new neighborhoods

00:39:52.560 --> 00:39:57.060
off of potable water for a while as the development goes out

00:39:57.060 --> 00:40:00.060
further to the country to where those pump stations are

00:40:00.060 --> 00:40:01.500
going to be.

00:40:01.500 --> 00:40:03.500
But we're going to put those pump stations right

00:40:03.500 --> 00:40:04.660
on the edge of Tamil.

00:40:04.660 --> 00:40:05.340
They'll be out of town.

00:40:05.340 --> 00:40:07.140
We won't wait until town gets to them

00:40:07.140 --> 00:40:09.060
before we bring them online.

00:40:09.060 --> 00:40:12.420
And so, like I said, there may be some time there

00:40:12.420 --> 00:40:13.780
that they'll have the PI piping,

00:40:13.780 --> 00:40:14.620
but they'll actually,

00:40:14.620 --> 00:40:17.940
that PI piping will actually carry hot water.

00:40:17.940 --> 00:40:20.340
Then also, we just have other general improvements.

00:40:20.340 --> 00:40:22.940
There's a lot of miscellaneous with the system.

00:40:22.940 --> 00:40:25.100
And finally, funding.

00:40:25.100 --> 00:40:26.780
We need to evaluate and establish fees

00:40:26.780 --> 00:40:27.780
for new developments.

00:40:27.780 --> 00:40:31.460
We typically expect development to pay for itself.

00:40:31.460 --> 00:40:33.820
So any land that we'd be purchasing

00:40:33.820 --> 00:40:35.580
or things like that,

00:40:35.580 --> 00:40:39.740
those future PI stations we would expect the funding for that to come from

00:40:39.740 --> 00:40:51.910
development. Questions? Honey, talk about budget here a little bit. This, I put

00:40:51.910 --> 00:40:57.590
together a spreadsheet, actually JUB, all the base work on this. We've got our

00:40:57.590 --> 00:41:05.390
revenue expenses and also our reserves. If you look at our revenue, we include a

00:41:05.390 --> 00:41:13.710
1.5% estimated growth every year and that's just as we get more and more people connected

00:41:13.710 --> 00:41:18.630
that will just and they pay their water bills will get a little bit of extra money every

00:41:18.630 --> 00:41:19.630
year from that.

00:41:19.630 --> 00:41:24.110
So there is a little bit of increased revenue over time just from new connections to the

00:41:24.110 --> 00:41:25.110
water system.

00:41:25.110 --> 00:41:32.030
And you can see 1.5% comes to about 189,000, maybe 200,000 in that area.

00:41:32.030 --> 00:41:33.030
We have our expenses.

00:41:33.030 --> 00:41:39.350
You have your basic expenses, your personnel, M&O, that transfers and that's this line right

00:41:39.350 --> 00:41:40.350
here.

00:41:40.350 --> 00:41:46.310
Got most of this information from finance and then we have our capital expenditures.

00:41:46.310 --> 00:41:51.910
That's the capital improvements for water supply, water distribution and PI and they're

00:41:51.910 --> 00:41:54.230
all summarized right here.

00:41:54.230 --> 00:41:59.270
One thing that's not or two things that are not included in here are the Canyon Springs

00:41:59.270 --> 00:42:01.630
pump station and the Harrison tank improvements.

00:42:01.630 --> 00:42:05.670
I'll bring those in later, but I just kind of want to show you that if we don't do those two things

00:42:06.470 --> 00:42:08.310
How things play out?

00:42:08.310 --> 00:42:15.750
So when you take your reserves we start out about this 12 million and then we start doing expenditures over time

00:42:15.750 --> 00:42:17.750
some of this stuff that's in here is like the

00:42:18.510 --> 00:42:28.930
Precious-owned improvements and things like that, but as you go out to the end or we don't have enough money. So

00:42:29.730 --> 00:42:34.790
This is a graphical representation of the previous spreadsheet

00:42:34.790 --> 00:42:43.790
You can see your revenue line right here is in black, and the red line are our expenditures.

00:42:43.790 --> 00:42:49.780
And this blue line is what's happening with our reserves.

00:42:49.780 --> 00:42:54.100
And you see the get out there that we don't quite make it.

00:42:54.100 --> 00:43:03.730
So I've included this slide just as an FYI because we don't actually know how much the PI fee is going to be.

00:43:03.730 --> 00:43:14.020
I took a swag at it. I assumed that we would have a $270,000 a year revenue from this PIV.

00:43:14.020 --> 00:43:22.020
I just took the last 20 years of residential building permits. They averaged it as $278

00:43:22.020 --> 00:43:30.020
a year through $1000 each and came up with $270,000. Right now JUB is working on trying to come up

00:43:30.020 --> 00:43:36.740
methodology for what that fee would be and eventually what the actual dollar

00:43:36.740 --> 00:43:43.760
amount would be. But using this number, you can see that the reserves over time

00:43:43.760 --> 00:43:50.660
are a little better instead of having nothing. We have about $300,000. I just

00:43:50.660 --> 00:43:53.500
wanted to show that in here. I'm going to pull that out in the future slides but

00:43:53.500 --> 00:43:56.940
just to keep that back in your mind that this is something that there is going

00:43:56.940 --> 00:44:04.460
be a little bit of revenue in there, we don't quite know what that is.

00:44:04.460 --> 00:44:09.820
So if we do a 2% rate increase every year, it works.

00:44:09.820 --> 00:44:19.200
We have, we maintain our reserves, we can cover all of our expenditures, you know, larger

00:44:19.200 --> 00:44:24.540
rate increases up front and maybe smaller increases later on, but you know some, there are going

00:44:24.540 --> 00:44:31.410
to need to be some rate increases to be able to do the capital improvements that we need

00:44:31.410 --> 00:44:43.080
to do. We do the Canyon Springs pump station in the Harrison tank in 25-26. We immediately

00:44:43.080 --> 00:44:50.930
run out of money and we're upside down. We're in the red pretty deep path. We were to do

00:44:50.930 --> 00:45:01.360
a $30 million bond. It works. Well, we don't want to try to do a $30 million bond. Maybe

00:45:01.360 --> 00:45:05.680
we want to split these up. You can either do the Harrison tank first or the Canyon Springs

00:45:05.680 --> 00:45:10.560
pump station. I've chosen to show the Harrison tank first and the Canyon Springs pump station.

00:45:10.560 --> 00:45:17.080
just the Hankins tank by itself, you can see that 2526 we still have a problem and of course

00:45:17.080 --> 00:45:24.730
it gets worse as we go out. Now if we were able to come up with a $10 million bond or maybe

00:45:24.730 --> 00:45:32.550
a grant or some other money, then that will give us some time. But once again, we get out

00:45:32.550 --> 00:45:35.490
to the Canyon Springs pump station,

00:45:35.490 --> 00:45:39.110
we need to do something.

00:45:39.110 --> 00:45:43.650
So, you know, this is an option,

00:45:43.650 --> 00:45:46.700
bond earlier and a bond later.

00:45:46.700 --> 00:45:49.260
You can see maybe do it one way or another.

00:45:49.260 --> 00:45:51.420
We're gonna probably have to do a bond

00:45:51.420 --> 00:45:53.300
to be able to pay for water.

00:45:53.300 --> 00:45:56.360
But you can see that we do need to have some rate increases.

00:45:57.420 --> 00:46:00.980
And that's, I'd say there's multiple scenarios.

00:46:00.980 --> 00:46:02.340
I think we can get through this,

00:46:02.340 --> 00:46:07.540
but we will be revisiting you annually, at least,

00:46:07.540 --> 00:46:10.820
to talk about what we think we can do over the next 10

00:46:10.820 --> 00:46:13.350
years.

00:46:13.350 --> 00:46:16.950
With that, questions?

00:46:16.950 --> 00:46:19.510
Lee is it possible that you could send us

00:46:19.510 --> 00:46:23.350
this PDF presentation in the email if you would do that?

00:46:23.350 --> 00:46:25.590
It's a pretty big file size.

00:46:25.590 --> 00:46:26.830
I can borrow it.

00:46:26.830 --> 00:46:28.470
We can upload it to our site.

00:46:28.470 --> 00:46:29.270
I can get it to you.

00:46:29.270 --> 00:46:29.950
Yeah.

00:46:29.950 --> 00:46:31.030
OK.

00:46:31.030 --> 00:46:32.990
Yeah, put it on teams.

00:46:32.990 --> 00:46:37.000
Any questions for Lee at this point?

00:46:37.000 --> 00:46:38.980
A lot of information, thank you.

00:46:38.980 --> 00:46:41.420
It is, I'd say it's still quite a bit

00:46:41.420 --> 00:46:46.310
that I'm sure I missed, but.

00:46:46.310 --> 00:46:47.150
Thank you very much.

00:46:47.150 --> 00:46:50.540
It doesn't look like there's any other questions.

00:46:50.540 --> 00:46:51.380
Thank you.

00:46:53.900 --> 00:46:57.900
So that is it under items of consideration.

00:46:57.900 --> 00:47:01.780
Next on the agenda is the time for general public input.

00:47:01.780 --> 00:47:03.820
There's anybody in the audience that wishes

00:47:03.820 --> 00:47:06.380
to come down and address council.

00:47:06.380 --> 00:47:08.060
Now is the time.

00:47:08.060 --> 00:47:11.140
I ask that when you come down, you state your name

00:47:11.140 --> 00:47:12.700
and whether you're a resident

00:47:12.700 --> 00:47:15.340
or a property owner of Twin Falls.

00:47:15.340 --> 00:47:20.920
And then tonight we'll limit input to three minutes.

00:47:22.120 --> 00:47:24.440
When you do, please state your name in full

00:47:24.440 --> 00:47:26.680
so we can get it for the record.

00:47:26.680 --> 00:47:33.410
So first, go ahead.

00:47:33.410 --> 00:47:36.290
Thank you, Mayor, Mayor Pierce and Council people.

00:47:36.290 --> 00:47:39.050
I appreciate the opportunity to speak to you.

00:47:39.050 --> 00:47:42.650
I am not a resident of Twin Falls.

00:47:42.650 --> 00:47:49.410
I live in the impact zone at 1467 Falls, Avenue West.

00:47:49.410 --> 00:47:58.890
My name is Sarah Harris and I am here for myself and I'm also representing five other

00:47:58.890 --> 00:47:59.890
neighbors.

00:47:59.890 --> 00:48:10.240
Earlier today, we sent you an email expressing our concerns about a decision made by the

00:48:10.240 --> 00:48:15.760
the Twin Falls Planning and Zoning Commission meeting on November 29th.

00:48:15.760 --> 00:48:24.000
On that night, the Commission considered and approved in a 43-vote, a special use permit

00:48:24.000 --> 00:48:32.800
filed by OASIS Stop and Go, LLC, to construct an eight-pump gas station with convenience

00:48:32.800 --> 00:48:41.880
store and drive through at the corner of Falls Avenue West and Grandview Drive North. The

00:48:41.880 --> 00:48:51.320
gas station will be constructed amidst residents, mostly that aren't there yet. In a neighborhood

00:48:51.320 --> 00:48:58.400
commercial overlay zone that had been previously approved for small-scale commercial develop,

00:48:58.400 --> 00:49:06.280
not to include gas stations or drive-thrues, but a region designed to provide services

00:49:06.280 --> 00:49:08.840
to the surrounding neighborhood.

00:49:08.840 --> 00:49:13.560
An eight-pump gas station is not a small-scale operation.

00:49:13.560 --> 00:49:18.480
It does not make our neighborhood more walkable or bikeable.

00:49:18.480 --> 00:49:27.160
It presents health risks, will increase noise, traffic, litter, possibly crime, and will

00:49:27.160 --> 00:49:34.680
reduce the value of homes in the area. We, as residents in that neighborhood, are opposed

00:49:34.680 --> 00:49:42.440
to the project. We believe that a gas station located in any residential area violates the

00:49:42.440 --> 00:49:48.720
Twin Falls Planning and Zoning Commission's decision-making standards of operations, specifically

00:49:48.720 --> 00:49:58.240
number three, number four, and number seven, enumerated in the special use code 10-13-2-2,

00:49:58.240 --> 00:50:06.400
and violates the stated intent of the 2016 Twin Falls Comprehensive Plan to promote developments

00:50:06.400 --> 00:50:09.040
that are in harmony with neighborhoods.

00:50:09.040 --> 00:50:15.440
We respectfully request that the Twin Falls City Council use its authority defined under

00:50:15.440 --> 00:50:23.600
Section 10-17-2 of the Twin Falls Code to review and overturn the decision made by the

00:50:23.600 --> 00:50:28.540
Planning and Zoning Commission in improving this special use permit.

00:50:28.540 --> 00:50:29.540
Thank you.

00:50:29.540 --> 00:50:30.540
Thank you.

00:50:30.540 --> 00:50:32.540
Do you have any questions?

00:50:32.540 --> 00:50:34.540
We'll have some discussion.

00:50:34.540 --> 00:50:36.940
Thank you.

00:50:36.940 --> 00:50:37.940
Thank you.

00:50:37.940 --> 00:50:43.280
Anybody else here that wishes to come down and address Council before we close the public

00:50:43.280 --> 00:50:44.280
input?

00:50:44.280 --> 00:50:48.130
Go on down.

00:50:48.130 --> 00:50:52.330
Thank you, Mayor Piers.

00:50:52.330 --> 00:50:59.330
Members of the City Council, my name is David Tebow, and I do reside in the City of Twin Falls at 503 Stone-Hageway.

00:50:59.330 --> 00:51:04.330
And I'm just here representing Oasis Stop and Go.

00:51:04.330 --> 00:51:10.330
Our firm made application for the special use permit on behalf of Oasis Stop and Go for this application.

00:51:10.330 --> 00:51:19.330
Ran through the formal processes, received a proving vote from the political subdivision body that has authority to do so.

00:51:19.330 --> 00:51:29.330
And we noted that there was not a formal appeal filed, and in a timely manner, and the due process has been served in this matter.

00:51:29.330 --> 00:51:34.330
This plan for neighborhood commercial overlays have been in existence for many, many years.

00:51:34.330 --> 00:51:40.590
The entire east side of Grandview Drive is built out in homes.

00:51:40.590 --> 00:51:48.590
The south west side has had its first couple phases of homes constructed within the middle west subdivision.

00:51:48.590 --> 00:51:54.590
and the residential users are established within the area for this proposed field station.

00:51:54.590 --> 00:52:02.190
So we would hope that this city council would not take the next step in an unusual manner

00:52:02.190 --> 00:52:08.270
to appeal it unto yourselves a matter that's been formally held and due process upheld

00:52:09.310 --> 00:52:18.080
with regard to the special use of issuance. Thank you. Thank you. Is there anybody else

00:52:18.080 --> 00:52:28.810
close the public input section Travis do you have some guidance for us on this

00:52:28.810 --> 00:52:36.430
issue so I do and I also have Jonathan Spentlove the planning director here to

00:52:36.430 --> 00:52:41.470
make sure that I get this right he's been trying to coach me all day slow

00:52:41.470 --> 00:52:48.790
learner and we'll see if he's a good teacher and I'm a okay student and so

00:52:48.790 --> 00:52:56.150
So the process tonight is really for you to determine whether or not you want to hold

00:52:56.150 --> 00:53:04.420
a special meeting to determine whether or not you would consider appealing the planning

00:53:04.420 --> 00:53:06.540
and zoning decision.

00:53:06.540 --> 00:53:08.020
No per our city code.

00:53:08.020 --> 00:53:14.940
There is a 15 day limitation on when appeals can be timely.

00:53:14.940 --> 00:53:19.540
That appeal expires this Wednesday.

00:53:19.540 --> 00:53:26.060
This was not agentized, so you cannot take up the issue of moving forward with an appeal

00:53:26.060 --> 00:53:27.340
tonight.

00:53:27.340 --> 00:53:31.100
All you can do is say you want to have a special meeting.

00:53:31.100 --> 00:53:35.460
There's enough window to be able to have a special meeting, and that special meeting

00:53:35.460 --> 00:53:41.820
time would be on Wednesday evening of this week to honor the special meeting requirements

00:53:41.820 --> 00:53:54.610
as described in Idaho Code, as well as to be within the 15-day appeal guidelines as described in City Code.

00:53:54.610 --> 00:54:02.870
There is nothing stating, so as I understand it, the appeal process is still open,

00:54:02.870 --> 00:54:14.630
and that the citizens still have an opportunity to file their appeal, should they choose to move forward with it.

00:54:14.630 --> 00:54:22.230
So, you may or may not elect to move forward with an appeal that would be your decision.

00:54:22.230 --> 00:54:27.630
You would need to decide that at a separate meeting, again, because it's not agentized.

00:54:27.630 --> 00:54:33.190
The citizens who have expressed their thoughts and the concerns with the development, their

00:54:33.190 --> 00:54:39.630
window to appeal the decision is still open and also does not close until Wednesday.

00:54:39.630 --> 00:54:44.120
Two head shakes.

00:54:44.120 --> 00:54:55.450
So just to be clear, prior appeals that we've heard P&Z appeals have been filed by citizens,

00:54:55.450 --> 00:54:56.970
is that correct?

00:54:56.970 --> 00:55:01.460
Yes, I am not.

00:55:01.460 --> 00:55:11.540
While the city code does say the council has the right to review and consider and even change

00:55:11.540 --> 00:55:19.220
an appeal, a decision made by the Planning and Zoning Commission or any one of its advisory

00:55:19.220 --> 00:55:23.490
commissions on a myriad of issues.

00:55:23.490 --> 00:55:32.030
I have never in my tenure seen the council formally appeal the decision.

00:55:32.030 --> 00:55:38.970
There was one point in time in which the council made a decision and the council was asked

00:55:38.970 --> 00:55:53.510
to reconsider its action, but I have not seen a council in my 10 year take a step to over

00:55:53.510 --> 00:55:58.030
PO or to appeal a decision made by the Planning and Zoning Commission.

00:55:58.030 --> 00:56:05.670
Just because it hasn't happened doesn't mean you can't do it, I just haven't seen it.

00:56:05.670 --> 00:56:11.830
Okay, given that, maybe if anybody wants to have some discussion let's start with Spencer.

00:56:11.830 --> 00:56:14.830
I didn't have a question just about process.

00:56:14.830 --> 00:56:20.830
The email the council received last night, there was some concern from residents about cost to appeal.

00:56:20.830 --> 00:56:23.400
So, do I understand right?

00:56:23.400 --> 00:56:25.400
They still have a window that they could appeal.

00:56:25.400 --> 00:56:27.400
There's some cost to them.

00:56:27.400 --> 00:56:35.400
Otherwise the council could call or post an agenda for special meeting, and that would mean the residents don't bear that cost.

00:56:35.400 --> 00:56:37.400
We're invoking the appeal more or less.

00:56:37.400 --> 00:56:45.120
Yes, so whoever moves forward with appeal would be the one that would be responsible for the costs the costs are

00:56:46.640 --> 00:56:54.360
So there is for the appeal it'd be very similar to the cost that we would assess for a special use permit, which is five hundred dollars

00:56:55.120 --> 00:56:57.120
there is the cost of

00:56:59.280 --> 00:57:03.220
Renting the sign that are needed to be posted or

00:57:03.220 --> 00:57:10.220
or an individual could go through the cost and they could create their own sign using city code.

00:57:10.220 --> 00:57:16.220
And then there is a, that's about $53 if you were to go to the firm that rents them.

00:57:16.220 --> 00:57:20.220
I can't speak to what the cost would be if you were to make them.

00:57:20.220 --> 00:57:29.220
And then if you would go $42 for the cost of the newspaper, there is a $200 deposit

00:57:29.220 --> 00:57:35.220
that is placed at the time in which you rent it, and then my understanding is if those signs are returned

00:57:35.220 --> 00:57:41.220
in the manner in which they were rented, they are that $200 fee is returned.

00:57:41.220 --> 00:57:46.220
So the net cost based upon staff estimate is $595.

00:57:46.220 --> 00:57:54.050
That's the best, I mean, that's using the 70 names that were on the initial list at 60

00:57:54.050 --> 00:58:03.810
cents per mailing, $53 net cost of the rent of the signs, and the $500 associated with

00:58:03.810 --> 00:58:09.370
the cost of staff time and newspaper publication and the like.

00:58:09.370 --> 00:58:16.730
The $500 is not a fee that we would assess ourselves, but we would still have costs associated

00:58:16.730 --> 00:58:23.100
associated with the publication, and you'd have the cost associated with the staff time.

00:58:23.100 --> 00:58:27.120
All the other costs would be hard cost borne by the city.

00:58:27.120 --> 00:58:33.970
That answer your question, okay?

00:58:33.970 --> 00:58:44.840
What are your wishes?

00:58:44.840 --> 00:58:49.980
I guess I just share my thoughts.

00:58:49.980 --> 00:58:52.940
Whether or not we agree with the initial vote is one thing.

00:58:52.940 --> 00:58:59.060
The other thing is do we disagree strong enough to, I guess, override the planning and zoning.

00:58:59.060 --> 00:59:01.060
So that's where mine's kind of at.

00:59:01.060 --> 00:59:08.560
How would I have voted initially, but is it so egregious that we think that we need to override the planning and zoning so?

00:59:09.700 --> 00:59:15.400
Well, and just to be clear, this is not we're not making a decision tonight. It's strictly whether

00:59:15.900 --> 00:59:20.860
We are going to be the ones appealing versus citizens appealing and again

00:59:20.900 --> 00:59:26.380
They have the same window we have and have had up now 13 days

00:59:26.380 --> 00:59:33.300
I guess everybody's had 13 days to appeal that and so we're down to the deadline and that's why we have to

00:59:33.620 --> 00:59:39.480
If we choose if we choose to appeal it we have to have a meeting on Wednesday

00:59:40.950 --> 00:59:44.330
Discuss it

00:59:44.770 --> 00:59:50.610
So I mean ultimately the question that keeps coming to my mind is what would we be appealing?

00:59:50.850 --> 00:59:57.970
Would we be be appealing if it if it fits in the area or if it fits in line with what was

00:59:58.330 --> 01:00:04.910
Zoned? I guess those would be the questions that I have that come to my mind at least initially,

01:00:04.910 --> 01:00:13.330
as if we went forward with the appeals process. What would we be gaining or what would we be overriding?

01:00:13.330 --> 01:00:21.830
So under the section that was cited in the letter and by the citizens, it would be a significant adverse impact

01:00:21.830 --> 01:00:26.390
Based on the fact that a special use permit was granted in this situation it'd be

01:00:27.070 --> 01:00:33.550
Subjective to this property and you would be undoing or questioning whether or not a special use permit should be granted

01:00:33.870 --> 01:00:35.660
in the

01:00:35.660 --> 01:00:39.130
As the burden there is

01:00:39.730 --> 01:00:42.650
Was pointed out does this council believe it's this

01:00:43.610 --> 01:00:45.610
financial adverse impact

01:00:45.610 --> 01:00:50.360
Thank you, you know tip

01:00:51.040 --> 01:00:55.840
Typically we don't step in and override something unless it's appealed

01:00:56.400 --> 01:01:01.790
I don't know that that's necessarily our place.

01:01:01.790 --> 01:01:03.790
I don't know how everybody else feels.

01:01:03.790 --> 01:01:05.790
I would agree with you, Mayor.

01:01:05.790 --> 01:01:07.790
I think that this is we have a process in place.

01:01:07.790 --> 01:01:13.790
I understand that there is a neighborhood that's frustrated and that's not for us to decide.

01:01:13.790 --> 01:01:16.790
I know that there's been many when I was on P&Z being here.

01:01:16.790 --> 01:01:18.790
There's been areas that are frustrated.

01:01:18.790 --> 01:01:22.790
The process needs to be followed without in my opinion,

01:01:22.790 --> 01:01:26.150
without the city council coming in and stepping in and saying,

01:01:26.150 --> 01:01:28.470
you know, we're going to do this or we're not going to do this.

01:01:29.130 --> 01:01:32.070
Once the process has come, then we'll make a decision.

01:01:32.070 --> 01:01:32.830
It will come here.

01:01:33.230 --> 01:01:35.550
I know that there's a cost associated with it.

01:01:36.270 --> 01:01:39.550
That's not always fun to pay, but you need to have those things

01:01:39.550 --> 01:01:40.630
and follow the process.

01:01:41.110 --> 01:01:46.960
Um, not only for this one, but for future situations like this,

01:01:46.960 --> 01:01:51.840
if we are always stepping in, then we're pretty much pushing the process out

01:01:51.840 --> 01:01:54.160
and saying, no, just come to us and we'll take care of it.

01:01:54.160 --> 01:01:56.480
I think we need to follow the process.

01:01:56.480 --> 01:01:57.960
Thank you.

01:01:57.960 --> 01:02:02.380
Any other thoughts?

01:02:02.380 --> 01:02:04.860
Madam Mayor, I would agree with those comments.

01:02:04.860 --> 01:02:06.940
And my other concern would be, if we

01:02:06.940 --> 01:02:08.940
are the ones initiating the appeal,

01:02:08.940 --> 01:02:10.420
then at some point when we actually

01:02:10.420 --> 01:02:13.500
have to sit and hear the appeal, one side

01:02:13.500 --> 01:02:16.420
is going to argue that we are already biased by initiating

01:02:16.420 --> 01:02:17.580
Senate.

01:02:17.580 --> 01:02:19.980
And I would like to avoid that appearance

01:02:19.980 --> 01:02:22.020
as much as possible.

01:02:22.020 --> 01:02:26.300
Even though I don't think it's an outright conflict to do that,

01:02:26.300 --> 01:02:31.540
but it's enough of an appearance that I would like to avoid it if we can.

01:02:31.540 --> 01:02:34.460
The window for an appeal has not closed.

01:02:34.460 --> 01:02:38.620
Applicants still have the ability to initiate it.

01:02:38.620 --> 01:02:45.260
And so for that, I would strongly urge us to decline the invitation

01:02:45.260 --> 01:02:48.540
to step in and initiate those.

01:02:48.540 --> 01:02:49.540
Thank you.

01:02:49.540 --> 01:02:51.500
So this is not necessarily a vote.

01:02:51.500 --> 01:02:56.500
So head nod, we don't choose to have a meeting.

01:02:58.140 --> 01:02:59.720
So that's our first option,

01:02:59.720 --> 01:03:03.700
or we choose to appeal it and have a meeting on Wednesday.

01:03:03.700 --> 01:03:07.380
So what is heads to nod?

01:03:07.380 --> 01:03:09.540
No, we don't want to appeal it.

01:03:09.540 --> 01:03:11.100
I'm not a favorite of appealing.

01:03:11.100 --> 01:03:15.240
Okay, looks like it's unanimous.

01:03:15.240 --> 01:03:16.640
Almost so.

01:03:16.640 --> 01:03:18.240
Okay, thank you.

01:03:18.240 --> 01:03:25.240
Next on the agenda is advisory board reports.

01:03:25.240 --> 01:03:31.920
Before we do that, I just want to thank Chief Kingsbury and his guys at the parade.

01:03:31.920 --> 01:03:35.920
Actually, I want to thank all departments for the parade on Friday.

01:03:35.920 --> 01:03:39.920
It was a fabulous parade, and though it was super cold.

01:03:39.920 --> 01:03:44.920
The coordination between all the departments, fire, police,

01:03:44.920 --> 01:03:51.320
I know Roberke had helped just streets, parks and rec, the city manager's office, and then

01:03:51.320 --> 01:03:56.720
of course, Chief saved the day with his microphone, so we were able to light the tree, but it

01:03:56.720 --> 01:03:59.360
was just a great evening.

01:03:59.360 --> 01:04:06.400
Allieck, very cold, and I just shout out to all the apartments.

01:04:06.400 --> 01:04:10.440
So anybody else have any advisory board reports?

01:04:10.440 --> 01:04:25.440
Madam Mayor, I do the Public Arts Commission at last Wednesday and I am happy to report that they have finalized their application for public arts and I think it's going to go live if it has a public website.

01:04:25.440 --> 01:04:30.440
So, should be able to start accepting applications for the public.

01:04:30.440 --> 01:04:31.440
That's been.

01:04:31.440 --> 01:04:32.440
Wow.

01:04:32.440 --> 01:04:33.440
Yes.

01:04:33.440 --> 01:04:34.440
Thank you.

01:04:34.440 --> 01:04:35.440
Anybody else?

01:04:35.440 --> 01:04:37.270
Okay.

01:04:37.270 --> 01:04:39.070
City Manager's Office.

01:04:39.070 --> 01:04:43.190
Yeah, just a quick public announcement that tomorrow,

01:04:43.190 --> 01:04:46.150
the general operational aspects of our organization

01:04:46.150 --> 01:04:48.670
are going to be closed for the day as the city goes

01:04:48.670 --> 01:04:51.870
to a TANU organizational meeting.

01:04:51.870 --> 01:04:53.590
Emergency services and emergency groups

01:04:53.590 --> 01:04:55.550
will continue to respond and they'll

01:04:55.550 --> 01:05:00.590
be business as usual and normal with the exception of deploying

01:05:00.590 --> 01:05:02.190
maybe from offsite locations.

01:05:02.190 --> 01:05:05.750
But really, it's a great opportunity for the city council

01:05:05.750 --> 01:05:09.110
or to engage with employees, employees to come together.

01:05:09.110 --> 01:05:11.270
I really talk about the successes of the year

01:05:11.270 --> 01:05:14.590
and to focus forward on what the future looks like.

01:05:14.590 --> 01:05:19.030
So again, tomorrow from eight to five organization,

01:05:19.030 --> 01:05:23.230
we will not be out open for normal business for Zoom.

01:05:24.390 --> 01:05:29.270
Normal business on Wednesday morning,

01:05:29.270 --> 01:05:33.230
19th the city council will host its last meeting

01:05:33.230 --> 01:05:37.730
of the calendar year 2022.

01:05:37.730 --> 01:05:52.710
Okay, with that, the last item on the agenda is an action item to move into executive session

01:05:52.710 --> 01:06:00.710
under 74-206-1B to consider the evaluation, dismissal, or disciplining of or to hear complaints

01:06:00.710 --> 01:06:06.550
or charges brought against the public officer employee, staff member or individual agent

01:06:06.550 --> 01:06:09.630
or public school student.

01:06:09.630 --> 01:06:10.710
So moved.

01:06:10.710 --> 01:06:12.510
Thank you, Jason, do I have a second?

01:06:12.510 --> 01:06:13.430
OK.

01:06:13.430 --> 01:06:14.590
Thank you.

01:06:14.590 --> 01:06:17.790
Motion by Jason Brown, second by Alex Kaval.

01:06:17.790 --> 01:06:22.830
To move into executive session under 74-206-1B.

01:06:22.830 --> 01:06:25.520
Amy Rolkov, please.

01:06:25.520 --> 01:06:26.440
Ninky Boyd.

01:06:26.440 --> 01:06:26.940
Yes.

01:06:26.940 --> 01:06:27.600
Frank Hawkins.

01:06:27.600 --> 01:06:28.100
Yes.

01:06:28.100 --> 01:06:28.800
Jason Brown.

01:06:28.800 --> 01:06:29.480
Yes.

01:06:29.480 --> 01:06:30.240
Alex Kaval.

01:06:30.240 --> 01:06:30.760
Yes.

01:06:30.760 --> 01:06:31.600
Spencer Cutler.

01:06:31.600 --> 01:06:32.100
Yes.

01:06:32.080 --> 01:06:32.760
Ruth Pierce.

01:06:32.760 --> 01:06:33.320
Yes.

01:06:33.320 --> 01:06:34.320
And Chris Reed.

01:06:34.320 --> 01:06:35.200
Yes.

01:06:35.200 --> 01:06:40.980
Thank you. Motion passes 7-0. We will not be adjourning back and we will not be making

01:06:40.980 --> 01:06:44.660
any decisions. So we're adjourned. Thank you.