WEBVTT

00:02:16.140 --> 00:02:18.640
Are you guys ready?

00:02:18.640 --> 00:02:26.000
Good evening, ladies and gentlemen, and welcome to the July 18, 2022 City Council meeting.

00:02:26.000 --> 00:02:27.960
I want to confirm we have a quorum.

00:02:27.960 --> 00:02:35.440
We have six members present in chambers and Councilman Hawkins is excused tonight.

00:02:35.440 --> 00:02:38.840
The first item on the agenda is the Pledge of Allegiance.

00:02:38.840 --> 00:02:41.200
If you wish to join me, please rise.

00:02:41.200 --> 00:03:05.440
Acclamations tonight, so we'll move right on to the consent calendar

00:03:14.920 --> 00:03:17.720
Thank you, it's a second

00:03:18.200 --> 00:03:21.320
I'm a motion by chris for read second by chon bierger to

00:03:22.680 --> 00:03:25.000
Approve the consent calendar as written

00:03:26.370 --> 00:03:32.260
Aaron rocov. Oh, please mayor pierce. Yes. Nice. Mary. Yes

00:03:32.980 --> 00:03:40.500
Sean bierger. Yes. Nikki boyd. Yes. Jason brown. Yes. That's your color. Yes. Thank you motion passes

00:03:40.580 --> 00:03:48.860
If you were here for the final plan for Washington Fire Station subdivision, the Twin Falls Library

00:03:48.860 --> 00:03:56.380
Read and Treat, Arm Bureau Magic Valley District Picnic and a Bench Donation on Canyon Room

00:03:56.380 --> 00:04:03.520
Trail, we've approved all those and you're welcome to stay or you can, next item on the

00:04:03.520 --> 00:04:11.440
agenda is a presentation under items of consideration, HIDO Power Presentation of Energy Efficiency

00:04:11.440 --> 00:04:17.560
Incentive check to the city of Munfals, and we have our staff engineer, Lee Glesman.

00:04:17.560 --> 00:04:18.560
Welcome, Lee.

00:04:18.560 --> 00:04:20.560
Good evening, Mayor and Council.

00:04:20.560 --> 00:04:29.160
I'd hope Power has an Energy Incentive program that whenever you construct a project that

00:04:29.160 --> 00:04:34.680
utilizes energy efficiency, that they will actually provide incentive checks.

00:04:34.680 --> 00:04:40.380
A city of Twin Falls built the PRI P.I. station a couple of years ago.

00:04:40.380 --> 00:04:47.380
incentive for that is 21,579 dollars. We're saving about 119,000 kilowatt

00:04:47.380 --> 00:04:56.680
hours a year. I'm sad. I've worked and said it was about 8,000 dollars of actual energy savings from Chris.

00:04:56.680 --> 00:05:14.510
Chris, did you? This is Chris Bell with Idaho Power and wealth since.

00:05:14.510 --> 00:06:11.220
And we have a check. Awesome. Thank you.

00:06:11.220 --> 00:06:14.220
So, we've had our programs for a few years now.

00:06:14.220 --> 00:06:18.220
When I was going back and looking at the history of the City of Twin Falls

00:06:18.220 --> 00:06:22.220
and it looks like you guys have saved about a little over 8 million kilowatt hours

00:06:22.220 --> 00:06:28.220
with incentives for animal power and we've given about 865,000 dollars to the city.

00:06:28.220 --> 00:06:34.220
Oh, thank you for using our programs. It's nice to see that the Tax Fairs of Guelker

00:06:34.220 --> 00:06:38.220
represented you guys are being efficient with the dollars that you have.

00:06:38.220 --> 00:06:44.200
So thank you so much. Thank you very much. Thank you Lee.

00:06:44.200 --> 00:06:55.200
Okay. Yes, please. In fact, the drive-thru is still open if you want. Okay, so the next item on the agenda is an action item.

00:06:55.200 --> 00:07:06.200
A request to amend city code 1-2-4 to add the economic development director to the list of department heads. Sean Berger.

00:07:06.200 --> 00:07:07.040
Thank you, Mayor.

00:07:07.040 --> 00:07:10.320
So before the Council addresses this item,

00:07:10.320 --> 00:07:15.320
I would like to disclose that I have a real

00:07:15.320 --> 00:07:18.800
or potential conflict of interest related to this item

00:07:20.320 --> 00:07:25.320
because my official action may result in steps toward

00:07:25.440 --> 00:07:27.080
private benefit to me in the future.

00:07:27.080 --> 00:07:30.360
As if this item moves forward,

00:07:30.360 --> 00:07:33.160
this is a position that I think I would consider applying

00:07:33.160 --> 00:07:35.880
for so I'm gonna step down through this discussion

00:07:35.880 --> 00:07:40.190
Go ahead, Mitch.

00:07:40.190 --> 00:07:47.370
As you know, Council, we have had a vacant position at the economic development director for about a year and a half now.

00:07:47.370 --> 00:07:52.370
Travis has been doing double duty for too long.

00:07:52.370 --> 00:08:01.460
We've been thinking about how this position might fit with a bigger restructure kind of concept that we've been going through.

00:08:01.460 --> 00:08:05.460
It's taken us a little time to get to this point, but we're ready to move forward tonight.

00:08:05.460 --> 00:08:11.380
tonight. And so what you have in front of you is a very easy, quick, simple code of it

00:08:11.380 --> 00:08:17.220
writing three words to the city code. There's a section in chapter, title one, chapter two,

00:08:17.220 --> 00:08:23.840
section four, that basically lists out the titles of the department heads of the city.

00:08:23.840 --> 00:08:27.600
And those department heads are the ones that Travis will appoint and that the council will

00:08:28.320 --> 00:08:32.880
confirm the appointment of. Use of the members of the executive leadership team. Use of the

00:08:32.880 --> 00:08:39.240
folks that can obligate the city to do certain things, pay bills and those kinds of things.

00:08:39.240 --> 00:08:43.740
And so what we're proposing to do is add the economic development director to that list

00:08:43.740 --> 00:08:44.740
of department heads.

00:08:44.740 --> 00:08:50.240
So it's very simple, ordinance amendment, but the impact of it I think is a little bit bigger

00:08:50.240 --> 00:08:52.940
than that and it's probably we're talking about a little bit.

00:08:52.940 --> 00:09:00.250
So we would propose to recruit a new economic development director, elevate that position a

00:09:00.250 --> 00:09:05.290
little bit become part of the executive leadership team. We also would like for

00:09:05.290 --> 00:09:10.610
this position to kind of be the spearhead for our prosperous community focus

00:09:10.610 --> 00:09:14.450
area in this strategic plan and so we're talking about lumping that position

00:09:14.450 --> 00:09:17.850
together with the airport which is another big component of prosperous

00:09:17.850 --> 00:09:22.570
community. We think that's a good move we think it'll elevate the maybe the

00:09:22.570 --> 00:09:26.530
importance of or at least the feelings about the airport and how it really is a

00:09:26.530 --> 00:09:31.530
a significant part of our economic development strategies.

00:09:31.530 --> 00:09:34.530
And so this is a big change in its impact,

00:09:34.530 --> 00:09:37.530
but it's a little minor change in the wording of the code.

00:09:37.530 --> 00:09:40.530
And so basically that's where we're at tonight.

00:09:40.530 --> 00:09:44.530
If the council approves this ordinance tonight,

00:09:44.530 --> 00:09:47.530
we will then post for the recruitment very soon,

00:09:47.530 --> 00:09:50.530
if not tomorrow, very soon after that.

00:09:50.530 --> 00:09:54.530
And also it is an ordinance, and so if you want to adopt it tonight,

00:09:54.530 --> 00:09:57.890
to put it on third and final and the rules that whole business.

00:09:57.890 --> 00:10:02.850
And there's an ordinance that's in the packet. I believe it's 2022-1013.

00:10:02.850 --> 00:10:09.780
I'm able to answer your questions if you have any questions. Any questions for

00:10:09.780 --> 00:10:17.300
Mitch Street? Any questions I just want to thank

00:10:17.300 --> 00:10:20.340
City staff for working on this. This has been something that we've been

00:10:20.340 --> 00:10:26.420
missing for quite some time. Portions of this in the past

00:10:26.420 --> 00:10:34.240
areas and so making sure taking the time to get it right, especially with the new

00:10:34.240 --> 00:10:39.940
organization that we're trying to establish here within the city. So thank

00:10:39.940 --> 00:10:43.240
you for doing that. I appreciate that to everybody that's worked on this and made

00:10:43.240 --> 00:10:47.010
sure that we get it right. You mentioned something that I probably should have

00:10:47.010 --> 00:10:49.970
mentioned in my presentation and that is that the stuff that is currently

00:10:49.970 --> 00:10:53.530
belonging to that position will stay with that position. So there'll be that

00:10:53.530 --> 00:10:57.050
coming developed director for the city, also will act as the executive director

00:10:57.050 --> 00:11:01.930
for their renewal agency, as long as that contract with their renewal agency stays in effect.

00:11:01.930 --> 00:11:05.330
So all those duties will stay right through with them, plus a few more.

00:11:05.330 --> 00:11:10.710
So that's all right.

00:11:10.710 --> 00:11:19.990
There, I move that we suspend the rules and place ordinance 2022-013 on 3rd and final by title only.

00:11:19.990 --> 00:11:21.430
Thank you. Do I have a second?

00:11:21.430 --> 00:11:22.270
Second.

00:11:22.270 --> 00:11:24.390
Thank you. Motion by Christopher Reed.

00:11:24.390 --> 00:11:34.770
Seconded by Jason Brown to put, um, ordinance 2022 dash 013 on third and final reading by title only and suspend the rules.

00:11:35.430 --> 00:11:36.890
Aaron Roll, call vote please.

00:11:38.930 --> 00:11:40.410
Vice mayor, read yes.

00:11:40.890 --> 00:11:45.710
John America, you just have to say his name.

00:11:46.840 --> 00:11:47.360
Sorry.

00:11:48.520 --> 00:11:49.320
Thank you, boy.

00:11:50.450 --> 00:11:51.250
Jason Brown.

00:11:51.530 --> 00:11:52.030
Yes.

00:11:52.290 --> 00:11:53.130
Spencer Keller.

00:11:53.410 --> 00:11:53.910
Yes.

00:11:53.850 --> 00:12:01.560
Mayor Parris, yes. Motion passes 5-0. Okay, so I will read the ordinance,

00:12:01.560 --> 00:12:08.280
that ordinance number 2022-013, an ordinance of the City Council of the City

00:12:08.280 --> 00:12:14.520
of Twin Falls, Idaho amending section 4, chapter 2, title 1 of the Twin Falls

00:12:14.520 --> 00:12:22.360
City Code, adding economic development director as a department of a motion.

00:12:22.360 --> 00:12:40.850
So moved to approve ordinance so I move that we approve ordinance 2022 dash 0 1 3

00:12:40.850 --> 00:12:43.780
Thank you.

00:12:43.780 --> 00:12:44.780
Second.

00:12:44.780 --> 00:12:53.310
Motion by Spencer color seconded by Jason Brown to adopt ordinance 2022 dash 0 1 3

00:12:53.310 --> 00:12:56.390
Aaron Rohe called vote please.

00:12:56.390 --> 00:12:57.390
Nikki Boyd.

00:12:57.390 --> 00:12:58.390
Yes.

00:12:58.390 --> 00:12:59.390
Jason Brown.

00:12:59.390 --> 00:13:00.390
Yes.

00:13:00.390 --> 00:13:06.470
Yes, Mayor Pierce. Yes, I'm married. Yes. Thank you. Motion passes 5 to 0

00:13:07.150 --> 00:13:10.560
Thank you, Mitch

00:13:12.120 --> 00:13:16.130
Next item on the agenda is another presentation

00:13:17.210 --> 00:13:18.850
update on

00:13:18.850 --> 00:13:20.850
public transportation in Twin Falls

00:13:21.130 --> 00:13:28.220
We have Mandy Thompson assistant to the city manager. Welcome, Mandy. Thank you. Good evening, mayor and council

00:13:29.220 --> 00:13:32.940
I wanted to come and have a conversation with you tonight

00:13:33.460 --> 00:13:37.900
I was going to have a PowerPoint and then I told Mitch I started on it and I felt like

00:13:37.900 --> 00:13:42.700
I was getting in the weeds and I was so we're going to start with a real basic conversation

00:13:42.700 --> 00:13:47.460
and my hope is that I can come back in the weeks and months to come with some updates

00:13:47.460 --> 00:13:52.340
on progress should you all be okay with this moving forward.

00:13:52.340 --> 00:13:54.790
So a little background.

00:13:54.790 --> 00:14:00.670
I've been up here talking about public transportation since I started with the city nine years ago.

00:14:00.670 --> 00:14:05.670
So Sean is the only one here that can remember, but it's been a conversation that we've been

00:14:05.670 --> 00:14:06.670
having.

00:14:06.670 --> 00:14:12.670
We've been preparing for that eventual cresting over 50,000 in population, and what that means.

00:14:12.670 --> 00:14:14.670
And so we're there.

00:14:14.670 --> 00:14:17.670
All the estimates tell us we're well over 50,000.

00:14:17.670 --> 00:14:22.670
And so now we're kind of in this waiting game, waiting for the 2020 Census to be certified,

00:14:22.670 --> 00:14:25.670
which we anticipate will probably be in January.

00:14:25.670 --> 00:14:33.670
And then we have a little bit of leeway because we get to then go through the process of forming the MPO and getting our ducks in a row.

00:14:33.670 --> 00:14:41.670
But there are some developments that you may or may not be aware of that I wanted to come and have a conversation with you tonight.

00:14:41.670 --> 00:14:48.670
So since 1979, Trans-Hore has been operating through the College of Southern Idaho with the public transportation system here in Twin Falls.

00:14:48.670 --> 00:14:55.090
CSIS served as its fiscal agent, and when asked, I think the history of how that happened,

00:14:55.090 --> 00:15:00.050
they really looked at it as a community service, transformed into somewhere to land, and at

00:15:00.050 --> 00:15:04.330
the time that was when the college was taking on a lot of those organizations that they were

00:15:04.330 --> 00:15:07.490
sort of fostering under the CSI umbrella.

00:15:07.490 --> 00:15:11.970
Transforters of demand, response system, so essentially you have to call 24 hours in

00:15:11.970 --> 00:15:16.330
advance, so you arrange your ride, someone comes to pick them up in one of those buses,

00:15:16.330 --> 00:15:22.840
And they take you to your ride and then also home again.

00:15:22.840 --> 00:15:26.800
It has served our community for all of these years.

00:15:26.800 --> 00:15:30.440
There have been times in 2015.

00:15:30.440 --> 00:15:39.600
They had a high of over 40,000 rides provided in a year and have been struggling over the

00:15:39.600 --> 00:15:44.840
last probably six or seven years with the required match.

00:15:44.840 --> 00:15:48.360
They get their funding through the state, which the state is a pass through, the state

00:15:48.360 --> 00:15:54.360
gets the funding from the federal government, but it's 5311 rural transportation funds.

00:15:54.360 --> 00:16:02.720
And as some of their sources of match have gone away, they have struggled to fully take

00:16:02.720 --> 00:16:08.400
advantage of the funding that they received through the Department of Earth through I-TD

00:16:08.400 --> 00:16:11.480
and the Federal Transportation Authority.

00:16:11.480 --> 00:16:16.640
We've had conversations with them for several years about our intentions of what we envisioned

00:16:16.640 --> 00:16:19.720
public transportation to look like.

00:16:19.720 --> 00:16:26.520
Back in 2016, we commissioned a study that was paid for by the state to look at transit

00:16:26.520 --> 00:16:31.360
and some of the things that we could do in the interim as we were preparing for where

00:16:31.360 --> 00:16:32.360
we are today.

00:16:32.360 --> 00:16:39.160
And those were things like increasing our density, really thinking about public transportation

00:16:39.160 --> 00:16:42.320
from not only the user of the bus, but a pedestrian,

00:16:42.320 --> 00:16:44.600
because everyone that uses a transportation

00:16:44.600 --> 00:16:46.840
is also a pedestrian, and that gave us

00:16:46.840 --> 00:16:48.680
a myriad of things that we could do,

00:16:48.680 --> 00:16:50.560
work on things within our code,

00:16:50.560 --> 00:16:51.960
which I know that some of those things

00:16:51.960 --> 00:16:56.360
were actually included in our complimentary, right?

00:16:56.360 --> 00:16:58.760
So we have been taking little steps a long way.

00:17:00.280 --> 00:17:05.660
Then in 2019, we went back to IITD

00:17:05.660 --> 00:17:13.860
and with some concerns about the eventual 50,000 in designation and really trying to understand

00:17:13.860 --> 00:17:16.340
what our options were.

00:17:16.340 --> 00:17:24.180
So they went ahead and paid for an additional study by an organization out of the one of

00:17:24.180 --> 00:17:28.380
the San Francisco University, it's called the Western Transportation Institute.

00:17:28.380 --> 00:17:33.620
So what that group did was really take a very close look at what transportation, oh transportation

00:17:33.620 --> 00:17:39.700
currently look like at the time in Twin Falls, and some of the options for the future. So kind

00:17:39.700 --> 00:17:45.540
of back to transfer. In the way that it was operating, again, it was a demand response,

00:17:45.540 --> 00:17:52.340
there were no fixed routes, and it was really serving specific clientele essentially it's

00:17:52.340 --> 00:17:58.340
disabled and elderly in our community. The services would run on weekdays only, and like

00:17:58.340 --> 00:18:04.940
like I said, require an appointment and a lot of pre-planning in order to take advantage

00:18:04.940 --> 00:18:08.450
of the service.

00:18:08.450 --> 00:18:14.810
They've really, like I said, struggled with their funding as well as ridership to the point

00:18:14.810 --> 00:18:22.290
where they've dropped to, they're right around 600 rides a month, so they're more than, you

00:18:22.290 --> 00:18:26.450
know, they're less than half of where they were at that peak and so they're definitely

00:18:26.450 --> 00:18:32.450
kind of seeing that with the inability to provide that full match that was a struggle as well.

00:18:32.450 --> 00:18:41.830
So the funding cycle for transfer was on a two-year cycle. So they would apply for it in the middle of a two-year cycle

00:18:41.830 --> 00:18:48.830
for the like following two years. So last fall in 2021 they were in the middle of a two-year funding cycle

00:18:48.830 --> 00:18:54.830
and they had to make the decision by being CSI whether or not they were going to apply for another two-year grant

00:18:54.830 --> 00:18:57.830
through about 53 11 world transportation funds.

00:18:57.830 --> 00:18:59.830
We had a lot of conversations with I.T.D.

00:18:59.830 --> 00:19:02.830
because we were unclear if they could utilize funds,

00:19:02.830 --> 00:19:04.830
if they were given those funds,

00:19:04.830 --> 00:19:07.830
but then Twin Falls was designated small urban,

00:19:07.830 --> 00:19:11.830
if they even legally could use those funds.

00:19:11.830 --> 00:19:14.830
We were just in this very special situation

00:19:14.830 --> 00:19:17.830
and no one could ever really give us a very clear answer.

00:19:17.830 --> 00:19:20.830
And so, the clearest answer was

00:19:20.830 --> 00:19:22.830
is they could not transfer funds.

00:19:22.830 --> 00:19:27.430
funds. So once they were awarded to CSI to operate transfer, they couldn't transfer those

00:19:27.430 --> 00:19:34.590
to the City of Twin Falls. And so CSI made the decision to not reapply, which means that

00:19:34.590 --> 00:19:40.630
they would finish out that second year of funding, which we're getting close to. And

00:19:40.630 --> 00:19:44.990
when we're starting to receive communications in the City Manager's Office, and you may

00:19:44.990 --> 00:19:51.030
or may not have had individuals, residents of the City, come to you with their concerns,

00:19:51.030 --> 00:19:55.030
but transfer will cease operations on September 30th.

00:19:55.030 --> 00:20:00.320
You might wonder why I'm only just coming to you in July having known this for a while.

00:20:00.320 --> 00:20:07.320
But one of the reasons is because, well, one, we just really weren't unclear what solution we were to even be ready to propose.

00:20:07.320 --> 00:20:16.320
And two, we've been working and staying in really close connection with I-T-D's public transportation division.

00:20:16.320 --> 00:20:25.030
And they requested that we wait because they were in the process of setting up a whole new

00:20:25.030 --> 00:20:27.190
public transit system in Idaho Falls.

00:20:27.190 --> 00:20:35.950
So if you go back a few years, in 2015, or excuse me, in 2019, the public transportation

00:20:35.950 --> 00:20:39.910
system in Idaho Falls went bankrupt and closed their doors.

00:20:39.910 --> 00:20:43.430
They were running a fixed route system, and when you looked at it on a map, it looked like

00:20:43.430 --> 00:20:44.430
it was all inclusive.

00:20:44.430 --> 00:20:52.430
But that was a single line with two or three buses, and it was not utilized at all.

00:20:52.430 --> 00:20:54.430
And they eventually had to close their doors.

00:20:54.430 --> 00:20:59.430
So I did these public transportation division came in and worked with them to come up with

00:20:59.430 --> 00:21:00.430
a new system.

00:21:00.430 --> 00:21:05.430
And so they asked that Twin Falls give them a bit to figure out what they were going to propose

00:21:05.430 --> 00:21:12.430
in Idaho Falls because the way that Idaho Falls is spread out is fairly similar to the

00:21:12.430 --> 00:21:21.430
as far as just sort of not there's not a corridor that makes it easy, like it does up it for mountain rides up in the Hailey area.

00:21:21.430 --> 00:21:42.580
And so in mid-June I received a phone call and have had several conversations with Rundran and Summer for Hershel from the public-transfit division about what they've launched in Idaho Falls, and that is a micro-transit system.

00:21:42.580 --> 00:21:51.580
And so what I'm coming here to speak with you about tonight is options that we have going forward here in Twin Falls.

00:21:51.580 --> 00:22:03.580
And I don't want to get into the weeds and go into a lot of detail, but one of the things that I provided to you in your packet was that study that Western Transit Institute conducted in POC Forward to us last year.

00:22:03.580 --> 00:22:08.080
And a few of the key findings were that one, the use of

00:22:08.080 --> 00:22:12.800
transformers was declining rapidly while the cost of their

00:22:12.800 --> 00:22:14.900
service was increasing.

00:22:14.900 --> 00:22:17.800
A traditional fixed route system in Twin Falls would not be

00:22:17.800 --> 00:22:20.680
effective and we would likely have empty buses driving around

00:22:20.680 --> 00:22:23.600
Twin Falls and that we needed to have something that was

00:22:23.600 --> 00:22:27.160
convenient, innovative, and reliable.

00:22:27.160 --> 00:22:30.040
Anything okay, well, we can't have buses, so what does that

00:22:30.040 --> 00:22:31.280
third option mean?

00:22:31.280 --> 00:22:34.400
And so what they put forward to us and what they suggested was

00:22:34.400 --> 00:22:36.780
this idea of microtransit.

00:22:36.780 --> 00:22:39.780
So really, this is an approach to public transportation

00:22:39.780 --> 00:22:43.520
that's based upon the specific service area.

00:22:43.520 --> 00:22:46.120
So we have a very defined service area.

00:22:46.120 --> 00:22:49.600
Set service hours that are characterized

00:22:49.600 --> 00:22:51.800
by whatever we deem important,

00:22:51.800 --> 00:22:53.880
whether it's helping people get to work,

00:22:53.880 --> 00:22:55.920
helping people get to the hospital,

00:22:55.920 --> 00:22:57.560
the doctor's appointments,

00:22:57.560 --> 00:22:59.480
shop grocery shopping.

00:22:59.480 --> 00:23:01.400
There's a lot of flexibility in it.

00:23:01.400 --> 00:23:10.960
Typically, the services are accessible by an app on a smartphone or a computer, and you

00:23:10.960 --> 00:23:16.560
have operations, you contract with the company to do all the scheduling and dispatching, and

00:23:16.560 --> 00:23:24.840
they rely on licensed technology platforms in which to provide that service, and so essentially

00:23:24.840 --> 00:23:32.320
you would put out an RFP to find a provider that could operate a system in Idaho Falls

00:23:32.320 --> 00:23:37.640
similar to what they're operating in, excuse me, in Twin Falls is similar to what they're

00:23:37.640 --> 00:23:39.560
operating in Idaho Falls.

00:23:39.560 --> 00:23:47.200
So really in very simple terms it's kind of thinking of it like the Lyft or Uber of public

00:23:47.200 --> 00:23:48.200
transportation.

00:23:48.200 --> 00:24:00.290
ITD has come to the City of Twin Falls with the opportunity to fund, fully fund, a pilot

00:24:00.290 --> 00:24:03.450
program for the City of Twin Falls.

00:24:03.450 --> 00:24:09.210
There were CARES dollars allocated to our region that have not been utilized, and then

00:24:09.210 --> 00:24:12.490
there's additional CARES dollars that were allocated to the state.

00:24:12.490 --> 00:24:14.170
Not all of those have been utilized.

00:24:14.170 --> 00:24:21.210
And so we have an opportunity to design a pilot program that we can fund with these dollars

00:24:21.210 --> 00:24:29.950
and see how a micro-transit system carefully designed would function and be received in

00:24:29.950 --> 00:24:32.150
Twin Falls.

00:24:32.150 --> 00:24:37.350
With fully the intention of whatever we design is something that would be sustainable into

00:24:37.350 --> 00:24:38.990
the future budget-wise.

00:24:38.990 --> 00:24:47.920
So what I'm hoping to have a conversation about tonight is whether you're in support of

00:24:47.920 --> 00:24:52.080
moving forward with a conversation with ITD and starting to see what that would look like

00:24:52.080 --> 00:24:56.800
in Twin Falls and working on some public outreach because we're gonna have to do a decent amount

00:24:56.800 --> 00:25:02.080
of that too as a part of utilizing the care dollars that they're offering from the state.

00:25:04.020 --> 00:25:09.940
It's a great opportunity with little or no cost to the city and again I think it's a great

00:25:09.940 --> 00:25:15.860
solution that's being utilized throughout the country for communities like Twin Falls that are

00:25:15.860 --> 00:25:20.940
They're just not large enough and don't have the budget, you know, the funding available

00:25:20.940 --> 00:25:28.530
to support fixed route systems that would be utilized and that would really serve the community.

00:25:28.530 --> 00:25:31.250
So something like micro transit.

00:25:31.250 --> 00:25:36.010
And the great thing is you can really put anything into the service contract with the

00:25:36.010 --> 00:25:42.170
vendor that you want so we could write in the use of vouchers so that individuals can

00:25:42.170 --> 00:25:44.310
and continue to use Medicaid vouchers.

00:25:44.310 --> 00:25:52.270
Individuals can continue to use vouchers from like IBC and Link.

00:25:52.270 --> 00:25:57.830
So we have these really great partners that have these vouchers that provide to people

00:25:57.830 --> 00:26:03.470
to use public transportation, and we can allow them to continue to use this in a new format.

00:26:03.470 --> 00:26:06.870
So we can see if you have any questions.

00:26:06.870 --> 00:26:20.770
I actually just heard a story on the radio yesterday about a community of very similar

00:26:20.770 --> 00:26:27.830
pro fixed route systems, lapsed through their buses and storage and gave it a shot and it's

00:26:27.830 --> 00:26:33.830
been very successful there and they said again it's serving a lot of the very underserved

00:26:33.830 --> 00:26:37.830
part of the community, people trying to get to edit appointments, people trying to get

00:26:37.830 --> 00:26:45.930
to a point of transportation so I think it's certainly worthy of pursuing particularly

00:26:45.930 --> 00:27:05.460
there are some partnership funds available on the state level. A question I would have is when they're talking about, I appreciate that we're trying to deal with a public transportation system, the City of Twin Falls, that's our role here. Are there opportunities potentially with

00:27:05.460 --> 00:27:26.660
Yes, and we actually had that conversation because I was thinking along the lines of

00:27:26.660 --> 00:27:31.060
the MPO and all that, but a camp leader can't really be a part of that.

00:27:31.060 --> 00:27:35.060
So yes, you don't have to have another sponsor, like you win because, clearly, Twin Falls

00:27:35.060 --> 00:27:39.260
is not going to operate a system outside of our corporate boundaries, but it's happening

00:27:39.260 --> 00:27:40.260
in idle falls.

00:27:40.260 --> 00:27:45.700
So I don't lose this familiar with idle falls, but idle falls has grown into its neighbor

00:27:45.700 --> 00:27:59.700
and so you go through that area kind of southeast corner of Ammon or vital falls into Ammon and there's no, you know, you know, when you've left one connected to the other, but the buses are geofence so they don't go beyond a certain point.

00:27:59.700 --> 00:28:13.700
So there's been a lot of pressure on the Ammon City Council to essentially tack on services to what they're operating in the program so that they can have the buses come into their community as well.

00:28:13.700 --> 00:28:19.220
And they're just kind of small, I mean, I'll bring you a tremendous amount more information

00:28:19.220 --> 00:28:23.220
that, you know, you lease the buses through, again, through the contractor, and they're

00:28:23.220 --> 00:28:28.620
just kind of like a small van, some of them are paratransit, so that they can transport

00:28:28.620 --> 00:28:30.540
individuals with disabilities.

00:28:30.540 --> 00:28:35.020
Several of the ones, not all of them, also have a bike rack on it, so individuals can,

00:28:35.020 --> 00:28:39.060
you know, utilize their bikes if they want to get to a certain point, and then use their

00:28:39.060 --> 00:28:40.780
bikes from, you know, a point on.

00:28:40.780 --> 00:28:44.820
So, and it's a fixed amount, so there's some revenue generation apart of it, so I don't

00:28:44.820 --> 00:28:50.020
think I'll just chose three dollars, you know, it's really up to the community how much they

00:28:50.020 --> 00:28:55.780
want to charge, what limitations that they place on it, but there's actually, I got really

00:28:55.780 --> 00:28:59.780
excited for the first time ever talking about published transportation because it's normally

00:28:59.780 --> 00:29:03.780
just, it's a weight on your shoulders that you don't want to even consider.

00:29:03.780 --> 00:29:07.410
Right, that's our cover.

00:29:07.410 --> 00:29:08.410
Thanks for bringing this idea.

00:29:08.410 --> 00:29:12.410
This idea, if we have to test the waters, I'd much rather do it on somebody else's dollars

00:29:12.410 --> 00:29:13.410
than ours.

00:29:13.410 --> 00:29:17.410
I do have a question, and if you don't feel like you should answer the knife, you won't

00:29:17.410 --> 00:29:19.410
wait until you come back next time.

00:29:19.410 --> 00:29:25.410
So my understanding is, once the census is finally certified, we become an urban area,

00:29:25.410 --> 00:29:32.410
so CSI is no longer eligible for the rural grant, so the city would be eligible for the

00:29:32.410 --> 00:29:34.410
urban grant.

00:29:34.410 --> 00:29:43.410
But the downside is we have to still come up with 50% of that cost, whether it's mayors or directly subsidized by the city or whatever.

00:29:43.410 --> 00:29:52.410
So the idea now is we kind of test the waters, see what's practical, see what actually provides the service to people, and doesn't just be a money pit.

00:29:52.410 --> 00:30:01.410
Right, and the way Idaho Falls has done it is they started low, they started kind of on the small side, and they actually are finding other, they're planning on adding services.

00:30:01.410 --> 00:30:14.410
So what I'd like to do is give them about quarter to get some time under their belts and then bring those numbers back to you along with an actual proposal of what we'd like to write into an RFP.

00:30:14.410 --> 00:30:30.210
But what I would like to do is whatever we utilize and care dollars, think of it as that would be our total budget and then how much could we afford to come up with that 50% whether that again is money out of our budget,

00:30:30.210 --> 00:30:36.810
whether that's council directed capital, whether that's funds when the urban or no district

00:30:36.810 --> 00:30:38.810
town closes or amfares.

00:30:38.810 --> 00:30:43.610
I mean, there's a lot of different things you can bring on sponsors, but we can get the

00:30:43.610 --> 00:30:47.930
business community involved, in fact, they're wrapping two of the buses in Idaho Falls, and

00:30:47.930 --> 00:30:51.730
they have this kind of sponsorship associated with that.

00:30:51.730 --> 00:30:58.600
And then you could add, like, the Vampool concept, which those are being two communities

00:30:58.600 --> 00:31:02.320
in Washington state, they don't even fund their vampables.

00:31:02.320 --> 00:31:04.960
The vampables are funded by private industry,

00:31:04.960 --> 00:31:08.520
but they're managed by that same contract.

00:31:08.520 --> 00:31:09.520
That's what it's saying.

00:31:09.520 --> 00:31:11.760
Chris Ferri, can you talk about the timeline again?

00:31:11.760 --> 00:31:16.400
You mentioned that transport is done at the end of September.

00:31:16.400 --> 00:31:16.960
Yes.

00:31:16.960 --> 00:31:19.320
So what does the timeline look for us?

00:31:19.320 --> 00:31:21.040
So we started tomorrow.

00:31:21.040 --> 00:31:23.280
We probably wouldn't have found something on the road

00:31:23.280 --> 00:31:24.320
until January.

00:31:24.320 --> 00:31:28.340
So I fully recognize that there will be an interruption

00:31:28.340 --> 00:31:34.100
of service for individuals, and unfortunately, if we couldn't really have a pretty crunch

00:31:34.100 --> 00:31:42.770
timeline to do all of the public outreach that we, and again, I did, I've waited on their

00:31:42.770 --> 00:31:49.090
request, which I think was good because they came to the table with money, they being ITD,

00:31:49.090 --> 00:31:54.890
but it will result in a disruption in services for individuals that utilize transporters.

00:31:54.890 --> 00:31:59.490
Now, like I said, they're averaging about 600 drives a month.

00:31:59.490 --> 00:32:06.100
They no longer track individual right or independent passenger numbers.

00:32:06.100 --> 00:32:11.900
So I don't know if those 600 rights are like 300 people going back and forth or if it's

00:32:11.900 --> 00:32:12.900
50.

00:32:12.900 --> 00:32:16.660
I mean like we don't have a number to tell you how many residents in Twin Falls are relying

00:32:16.660 --> 00:32:18.380
on transport right now.

00:32:18.380 --> 00:32:21.180
It's relatively small but I don't want to diminish the fact that there are P.R.

00:32:21.180 --> 00:32:22.580
people that are utilizing that.

00:32:22.580 --> 00:32:28.720
So the sooner we can get working with I.T.D. to get something before you to go through

00:32:28.720 --> 00:32:33.180
and RFP process the best, the better.

00:32:33.180 --> 00:32:34.020
So.

00:32:34.020 --> 00:32:36.340
And I would say from a communications perspective,

00:32:36.340 --> 00:32:37.700
but you already spoke about that we're

00:32:37.700 --> 00:32:40.620
going to need to have some good outreach,

00:32:40.620 --> 00:32:42.620
also much we have good partners in the community,

00:32:42.620 --> 00:32:44.920
and so ways that we can connect through

00:32:44.920 --> 00:32:49.990
to those services that are not currently using to help.

00:32:49.990 --> 00:32:53.070
The thing I just wanted to mention is for food for thought,

00:32:53.070 --> 00:32:57.510
the story I heard on the wrist at this community,

00:32:57.510 --> 00:33:00.310
not based, but also had a call center.

00:33:00.310 --> 00:33:02.110
Yes, I get to smash center.

00:33:02.110 --> 00:33:02.630
Yes.

00:33:02.630 --> 00:33:15.710
and so while I appreciate technology and all the great things it does, it also tends to train to serve.

00:33:15.710 --> 00:33:21.710
Yes, but I've got a nice difference between how transfer operates now as transfer requires a 24-hour notice.

00:33:21.710 --> 00:33:27.710
So, I mean, some of the early numbers that are getting out of vital falls is the average weight times like 13 minutes.

00:33:27.710 --> 00:33:28.710
No.

00:33:28.710 --> 00:33:32.710
Yeah, in your home or wherever it is that you're at where you're ready to get it right.

00:33:32.710 --> 00:33:38.460
this is great because that was the one the thing I first thought of giving all the

00:33:38.460 --> 00:33:46.980
back-knead these the most some of the seniors they do things on their fun to do

00:33:46.980 --> 00:33:52.740
but I personally know if it's it's really scary to think that they could be in

00:33:52.740 --> 00:34:03.080
trouble and not make them and so they do they're not using a computer either so

00:34:03.080 --> 00:34:15.520
that's that's really good that there would be a yeah and those are all things

00:34:15.520 --> 00:34:21.420
that you can write into the RFP

00:34:25.080 --> 00:34:27.920
and that there's several other partners.

00:34:27.920 --> 00:34:31.700
Not to do these, they've come and received funds from M.P.O.G.

00:34:31.700 --> 00:34:35.010
that I think might be outside of their scope

00:34:35.010 --> 00:34:36.530
but they're not profit.

00:34:36.530 --> 00:34:40.470
I don't want to leave 600 individuals potentially.

00:34:40.470 --> 00:34:43.990
It might be less, it might be more whatever it is,

00:34:43.990 --> 00:34:46.190
especially as we're going to be hitting winter

00:34:46.190 --> 00:34:49.280
during that period, the ability to get to go.

00:34:49.280 --> 00:34:57.600
So maybe reaching out to them during their citizens.

00:34:57.600 --> 00:35:00.360
Yes, and Transfor, Jim Boehm, who's now operating

00:35:00.360 --> 00:35:01.960
and who's the director at Transfor,

00:35:01.960 --> 00:35:04.760
is more than willing to work with the city.

00:35:04.760 --> 00:35:07.460
In fact, has offered his services to help in this process

00:35:07.460 --> 00:35:09.460
and this transition process.

00:35:09.460 --> 00:35:12.740
So I'm hopeful that just through a transfer,

00:35:12.740 --> 00:35:16.140
we can do some public outreach to those individuals

00:35:16.140 --> 00:35:18.380
that are users of the system right now

00:35:18.380 --> 00:35:21.940
and come up with some stop-gap solutions for them.

00:35:21.940 --> 00:35:27.060
Anybody else today?

00:35:27.060 --> 00:35:30.960
So I think you mentioned it a little bit.

00:35:30.960 --> 00:35:33.600
The question one of the questions I had was this.

00:35:33.600 --> 00:35:37.000
So it sounds like there would be still buses

00:35:37.000 --> 00:35:38.680
around the buses wouldn't go away.

00:35:38.680 --> 00:35:44.680
So the contract would bring buses in and run or how, what, uh...

00:35:44.680 --> 00:35:47.680
Yeah, I mean, they're gonna be smaller than what transfer operates, okay?

00:35:47.680 --> 00:35:49.680
And we'll have much more modern.

00:35:49.680 --> 00:35:54.680
Yeah, and we get to choose how many based upon the amount of service we're willing to provide.

00:35:54.680 --> 00:35:57.680
So like I said, I don't know if it has, I think, six vehicles.

00:35:57.680 --> 00:36:00.680
So they have three forks.

00:36:00.680 --> 00:36:07.180
before kind of the comic is small but it's I think smaller than like a sprinter

00:36:07.180 --> 00:36:13.260
but and all four of those are equipped with paratransitists so that they can

00:36:13.260 --> 00:36:17.340
utilize them so individuals that are disabled can utilize that service then

00:36:17.340 --> 00:36:22.060
they have like an event and then they have a exam you have choices and options

00:36:22.060 --> 00:36:27.380
they dictate they dictate whoever that profile looks like if they need a certain

00:36:27.380 --> 00:36:35.060
And there is kind of written into the algorithm that these companies, there are several that

00:36:35.060 --> 00:36:39.140
offer the services across the country, and written into the algorithm are shared rights.

00:36:39.140 --> 00:36:44.740
So if you've got people who are on a shared route, then you'll share a right.

00:36:44.740 --> 00:36:50.140
So in those larger vans, if you've got somebody, you know, five or six blocks away, they'll

00:36:50.140 --> 00:36:55.670
pick them up or take them home, type of a situation.

00:36:55.670 --> 00:37:01.670
And then again, too, if you've got a group of six people that are all going to the same place,

00:37:01.670 --> 00:37:10.460
and you put that in, then it's kind of like lift or they'll sound the appropriate vehicle to pick that map.

00:37:10.460 --> 00:37:14.460
A lesson learned in Idol Falls is they were, they just went with $3, right?

00:37:14.460 --> 00:37:17.460
And it was $3 for one person or it was $3 for six people.

00:37:17.460 --> 00:37:23.460
And they are regretful of that decision and are likely going to in the next funding cycle,

00:37:23.460 --> 00:37:31.700
to change that to a per person cost, but still I think that we get the flexibility to decide

00:37:31.700 --> 00:37:32.700
what that would look like.

00:37:32.700 --> 00:37:36.700
It's $5 for the first writer and two for every additional, so.

00:37:36.700 --> 00:37:39.460
We get to learn some of those pitfalls and maybe I know it's all-

00:37:39.460 --> 00:37:40.460
And there are some lessons learned.

00:37:40.460 --> 00:37:43.820
The voucher system that I spoke of, they didn't think about that.

00:37:43.820 --> 00:37:48.880
And when I asked them, they were like, oh, we should have done that.

00:37:48.880 --> 00:37:50.640
So it's kind of nice to learn from other communities.

00:37:50.640 --> 00:37:55.820
And I have emails out to a couple of other communities that are operating micro-transil

00:37:55.820 --> 00:37:59.280
right now to just kind of get some of those lessons learned.

00:37:59.280 --> 00:38:03.920
I mostly want to speak to who they're utilizing as their vendors or contractors.

00:38:03.920 --> 00:38:04.920
Perfect.

00:38:04.920 --> 00:38:09.520
The other question I have and I'm going to throw this out there just to, and I don't

00:38:09.520 --> 00:38:13.920
know maybe if some other people have thought about it is, would there be some of that money

00:38:13.920 --> 00:38:20.800
to help read that gap with trans4 for the three months from October, November, December,

00:38:20.800 --> 00:38:25.600
to keep those that service going until we can get something.

00:38:25.600 --> 00:38:27.990
I don't know what that cost would be.

00:38:27.990 --> 00:38:30.860
I don't know.

00:38:30.860 --> 00:38:35.800
And I don't know if it's part of their, I mean, they chose that date

00:38:35.800 --> 00:38:37.000
because that's when they're funding.

00:38:37.000 --> 00:38:37.500
True.

00:38:37.500 --> 00:38:38.600
So I don't know.

00:38:38.600 --> 00:38:41.600
And I believe CSIs also on October 1st.

00:38:41.600 --> 00:38:42.500
So yeah, I don't know.

00:38:42.500 --> 00:38:44.400
I mean, I certainly could ask the question.

00:38:44.400 --> 00:38:46.600
I'm happy to approach that with the college.

00:38:46.600 --> 00:38:49.920
But actually, CSIs on June 30th.

00:38:49.920 --> 00:38:50.620
Oh, they are.

00:38:50.620 --> 00:38:51.120
Yeah.

00:38:50.920 --> 00:38:51.620
So, okay.

00:38:51.620 --> 00:38:52.720
So that was a really.

00:38:52.720 --> 00:38:53.220
Yeah.

00:38:53.220 --> 00:38:55.420
Okay, so there could be some.

00:38:55.420 --> 00:39:01.000
And the city, some of you would recall that we used to fund a portion of transverse match

00:39:01.000 --> 00:39:02.000
through the city.

00:39:02.000 --> 00:39:05.700
We used to give them an m-pog-gram, and at some point in time we decided to quit making

00:39:05.700 --> 00:39:10.620
them come ask for it every single time, and we just took a portion out.

00:39:10.620 --> 00:39:14.260
And so we did provide them with some match, so if there's some addition, and they always

00:39:14.260 --> 00:39:18.180
provide an accounting of that, and I don't believe that they will utilize all of their funding

00:39:18.180 --> 00:39:24.260
by the time September 30th has come around and that's from Jim himself saying he's not sure.

00:39:24.260 --> 00:39:27.660
So there is a possibility if there is a match left we could ask them if they'd be willing

00:39:27.660 --> 00:39:30.860
to continue operations for a few months while we get this set up.

00:39:30.860 --> 00:39:31.860
Absolutely.

00:39:31.860 --> 00:39:32.860
Yes, it's an idea.

00:39:32.860 --> 00:39:33.860
I know it's an idea.

00:39:33.860 --> 00:39:34.860
It's an idea.

00:39:34.860 --> 00:39:42.520
If we do have leftover for not spending all of that, maybe there's another mechanism to

00:39:42.520 --> 00:39:45.880
take a look at, at least help fill that gap.

00:39:45.880 --> 00:39:51.890
Do you know what we put in our budget this time?

00:39:51.890 --> 00:39:57.850
So for the coming budget, we did not put, let me take it out.

00:39:57.850 --> 00:40:06.520
I need to know today, but just out of curiosity.

00:40:06.520 --> 00:40:10.520
But funding that we did provide out of the 22 budget,

00:40:10.520 --> 00:40:15.520
we provided a transfer, they started spending that after.

00:40:15.520 --> 00:40:18.940
I don't know, I think they received that in June,

00:40:18.940 --> 00:40:22.730
I believe, for the last four months.

00:40:22.730 --> 00:40:28.800
All questions that I can easily get clarification on.

00:40:28.800 --> 00:40:33.570
Good, thank you, Mandy.

00:40:33.570 --> 00:40:37.970
Okay, next item on the agenda is a says action item,

00:40:37.970 --> 00:40:41.290
but it's a presentation of the city managers recommended

00:40:41.290 --> 00:40:44.530
by CHIP for fiscal year 22, 23,

00:40:44.530 --> 00:40:47.930
and we have a believe Mitch Humble,

00:40:47.930 --> 00:40:56.210
deputy city manager will be leading this discussion.

00:40:56.210 --> 00:41:02.990
Welcome, Mitch.

00:41:02.990 --> 00:41:04.950
You can probably tell by the people in the room tonight

00:41:04.950 --> 00:41:06.920
what we're gonna be talking about.

00:41:06.920 --> 00:41:09.200
We have quite a lot of our public folks,

00:41:09.200 --> 00:41:11.240
public-versus folks here today,

00:41:11.240 --> 00:41:16.900
that will be helping me present this is tonight's presentation is actually quite a lot to it

00:41:16.900 --> 00:41:20.660
so I'm going to probably rush through these intro slides a little bit quicker than I did last week

00:41:20.660 --> 00:41:25.580
to leave more time for the the meat of the presentation to come later and then I'll introduce

00:41:25.580 --> 00:41:35.320
kind of these guys as they come up and take part of this presentation so first slide I'm just going to tell you that we have

00:41:35.320 --> 00:41:41.240
presented to you budget that you've got in your hands to look at that needs all the requirements that it needs to me

00:41:41.240 --> 00:41:46.200
That's basically a lot of words to say that, right?

00:41:46.200 --> 00:41:47.680
This is good.

00:41:47.680 --> 00:41:51.320
It's all of our requirements, OK?

00:41:51.320 --> 00:41:55.000
Also, Government Finance Officers Association best practices

00:41:55.000 --> 00:41:57.600
is in their duty to be fully anticipated to apply for

00:41:57.600 --> 00:42:00.520
and get that award again this year.

00:42:00.520 --> 00:42:05.280
These are the goals that we were trying to aim to for

00:42:05.280 --> 00:42:07.520
with the preparation of this budget you've seen these goals

00:42:07.520 --> 00:42:09.800
before several times.

00:42:09.800 --> 00:42:13.160
The one I want to hit again, I told you last week

00:42:13.160 --> 00:42:16.840
when I had this presentation that there's themes emerge every year, right?

00:42:16.840 --> 00:42:20.520
To me, the theme this year is probably that last one.

00:42:20.520 --> 00:42:28.220
And because of the struggles that we're having with recruiting and maintaining our employee

00:42:28.220 --> 00:42:31.540
core, this is causing us a lot of issues.

00:42:31.540 --> 00:42:35.740
And we really need to focus on that issue of being an employer of choice.

00:42:35.740 --> 00:42:40.220
We're about 29 positions down today at the city.

00:42:40.220 --> 00:42:51.890
And that's a lot of resignation to you, so in flux here.

00:42:51.890 --> 00:42:56.750
It's a problem that we need to stay on top of.

00:42:56.750 --> 00:43:00.350
So we'll talk a little bit tonight about new positions

00:43:00.350 --> 00:43:01.950
that we're going to be requesting,

00:43:01.950 --> 00:43:05.630
and some of our efforts to recruit.

00:43:05.630 --> 00:43:08.330
To me, that seems like one of those big important things

00:43:08.330 --> 00:43:11.280
in this year's budget.

00:43:11.280 --> 00:43:14.980
So I want to show you, again, Travis would say that we're

00:43:14.980 --> 00:43:16.980
going to show you the punchline at the beginning, right?

00:43:16.980 --> 00:43:19.180
That's kind of what this slide does for you.

00:43:19.180 --> 00:43:24.180
This will show you the impact to that average homeowner.

00:43:24.180 --> 00:43:27.570
And the average homeowner is hard to fight,

00:43:27.570 --> 00:43:32.570
but basically this is the median value home that uses the average amount of water and sewer.

00:43:32.570 --> 00:43:37.570
I don't know how many of these guys are out there, but for those guys,

00:43:37.570 --> 00:43:42.500
the tax rate you can put in there is going to drop with this budget.

00:43:42.500 --> 00:43:53.870
It's going to drop by $1.47 per $1,000 of value increased by use of property that we're seeing.

00:43:53.870 --> 00:44:04.640
This is about $288 a year for that average home or $24 and not proposing any increases at all to our utility rates of water sewer or sanitation.

00:44:04.640 --> 00:44:10.640
And so this really, this $24 a month impact is just in the tax rate.

00:44:10.640 --> 00:44:26.790
That's kind of the budget right there. That's how we're going to get most of our revenues from taxes and general fund anyway.

00:44:26.790 --> 00:44:31.790
So this is here to show, share with you what is happening with our property values.

00:44:31.790 --> 00:44:41.990
You can see that number on the top right at 5.6 billion dollar tax assessment, right?

00:44:41.990 --> 00:44:43.990
The valuation for our community.

00:44:43.990 --> 00:44:45.990
That's a big number.

00:44:45.990 --> 00:44:49.990
That's the reason why the tax rate is actually dropping as much as it is.

00:44:49.990 --> 00:44:53.990
It's a 23% decline in the tax rate because the values went up so much.

00:44:53.990 --> 00:45:00.450
That just shows it kind of graphically.

00:45:00.450 --> 00:45:06.860
What this interesting piece of information on this slide here is that we increased $1.5

00:45:06.860 --> 00:45:10.460
billion from year to year, last year to this year.

00:45:10.460 --> 00:45:13.660
It's a 38% increase in valuation of the community.

00:45:13.660 --> 00:45:18.060
That's the same value, dollar value that we saw the prior four fiscal years.

00:45:18.060 --> 00:45:19.660
So this is incredible.

00:45:19.660 --> 00:45:22.260
This probably is one of those other things that's emerging.

00:45:22.260 --> 00:45:26.060
It's the rapid increases in valuation.

00:45:26.060 --> 00:45:33.060
So, this kind of shows that increase in really good graphic form there with the green barbie

00:45:33.060 --> 00:45:35.060
and the big one for next year.

00:45:35.060 --> 00:45:41.950
And this shows the same thing the graphic representation of what's happening with the

00:45:41.950 --> 00:45:47.510
tax rate because of those increases in values.

00:45:47.510 --> 00:45:51.510
So, new construction, this is an interesting issue.

00:45:51.510 --> 00:45:55.300
I think this is interesting.

00:45:55.300 --> 00:45:57.300
I get involved in the new construction stuff a little bit more.

00:45:57.300 --> 00:46:00.300
So I look at this and I go, that's really weird how this is happening.

00:46:00.300 --> 00:46:11.210
But we are increasing this year's value in new constructions $115 million.

00:46:11.210 --> 00:46:16.260
That's more than last year's new construction value at $100.

00:46:16.260 --> 00:46:19.260
Yeah, we're collecting less money than we collected last year.

00:46:19.260 --> 00:46:25.260
So it's just kind of weird how that played out this year because of that tax rate dropping so much, right?

00:46:25.260 --> 00:46:32.660
But that's, like I said, I look at that and it works out.

00:46:32.660 --> 00:46:38.180
It's just something we don't, but it's interesting

00:46:38.180 --> 00:46:44.820
So we have to show it out there for, because of that,

00:46:44.820 --> 00:46:46.820
not necessarily because of that, but this is new construction here.

00:46:46.820 --> 00:46:50.820
You'll see that in the Fiskier 22 budget this year's budget,

00:46:50.820 --> 00:46:54.820
we budgeted on our million dollars in building perimeter revenue.

00:46:54.820 --> 00:46:56.820
We're still on track to meet that.

00:46:56.820 --> 00:46:58.820
When they say meet that, we're not going to exceed that,

00:46:58.820 --> 00:47:00.820
like the prior years, right?

00:47:00.820 --> 00:47:03.820
We're all on this table here, you see a bunch of actuals, right?

00:47:03.820 --> 00:47:05.820
Those are what we actually collected.

00:47:05.820 --> 00:47:08.820
As for your 22, it shows the budgeted amount.

00:47:08.820 --> 00:47:13.820
We're probably going to end up very close to that budget amount and not much, not exceed it very much this year.

00:47:13.820 --> 00:47:19.330
Over on target to still meet it. Building permit activity is declining.

00:47:19.330 --> 00:47:27.910
And so we're not issuing the same number of permits that we issued nears.

00:47:27.910 --> 00:47:30.910
Those permits again, this is not.

00:47:30.910 --> 00:47:40.580
And so I actually wrote down the note here that our permit count just from June this year compared to June last year.

00:47:40.580 --> 00:47:53.230
A permit count is down 41% numbers of permits, but the value of those permits is up 23%.

00:47:53.230 --> 00:47:57.490
So we're going to project a flat building permit revenue.

00:47:57.490 --> 00:48:01.860
That is because the numbers are coming down with the values are going up.

00:48:01.860 --> 00:48:04.300
So we're keeping this one flat for next year.

00:48:04.300 --> 00:48:06.140
How many questions about that?

00:48:06.140 --> 00:48:13.040
I want to talk to you a little bit about the homeowners exemption.

00:48:13.040 --> 00:48:18.060
You've seen this slide before too.

00:48:18.060 --> 00:48:21.740
The homeless exemption increased last year to 125.

00:48:21.740 --> 00:48:23.860
It's going to stay at 125 this year.

00:48:23.860 --> 00:48:29.910
If the exemption were still indexed at the homeless exemption,

00:48:29.910 --> 00:48:32.150
this year would be 176,000.

00:48:32.150 --> 00:48:35.990
So significantly more than 125 that it's going to be.

00:48:35.990 --> 00:48:39.570
If we're indexed, our average older

00:48:39.570 --> 00:48:41.910
than the guy we talked about earlier in the presentation

00:48:41.910 --> 00:48:49.170
would be paying $203 less in taxes than he is now.

00:48:49.170 --> 00:48:58.840
Again, another kind of result of increased property value.

00:48:58.840 --> 00:49:00.620
This is last year's data, right?

00:49:00.620 --> 00:49:02.220
So we don't have this year's data, obviously,

00:49:02.220 --> 00:49:03.820
because we're all still talking about it.

00:49:03.820 --> 00:49:05.620
All the cities are still having this conversation,

00:49:05.620 --> 00:49:07.860
but what we want to illustrate with this slide

00:49:07.860 --> 00:49:10.740
is to show you that living in Twin Falls

00:49:10.740 --> 00:49:13.260
and paying property taxes in Twin Falls

00:49:13.260 --> 00:49:14.980
is still a pretty good deal

00:49:14.980 --> 00:49:18.300
when we compare ourselves to all of our sister cities

00:49:18.300 --> 00:49:19.660
across the state.

00:49:19.660 --> 00:49:21.180
So you have a bunch of cities up here.

00:49:21.180 --> 00:49:23.260
They're the larger cities,

00:49:23.260 --> 00:49:24.460
drums not quite a larger city,

00:49:24.460 --> 00:49:25.740
but drums next to us, right?

00:49:25.740 --> 00:49:27.300
So they're one of our neighbor cities.

00:49:27.300 --> 00:49:30.900
And so when we compare ourselves to our peers,

00:49:30.900 --> 00:49:32.860
we're still a pretty affordable place to live

00:49:32.860 --> 00:49:36.740
in terms of property taxes that are paid to the cities.

00:49:38.100 --> 00:49:43.470
And so that's kind of what this is to show you

00:49:43.470 --> 00:49:44.310
is the breakdown.

00:49:44.310 --> 00:49:45.470
We talked about this a little bit last year,

00:49:45.470 --> 00:49:47.910
the breakdown of the fund types,

00:49:47.910 --> 00:49:50.230
most of the money that we collect,

00:49:50.230 --> 00:49:51.990
and then we're gonna spend 60% of it,

00:49:51.990 --> 00:49:56.150
almost 59.5% of it goes to the general fund departments.

00:49:56.150 --> 00:50:06.210
The general fund is like HR and Finance and IT and all those kind of government city managers

00:50:06.210 --> 00:50:09.540
officer and we're in through two.

00:50:09.540 --> 00:50:13.940
37% of that is our in-price funds, that's water sewer sanitation.

00:50:13.940 --> 00:50:18.940
And then those last little bit, 2.7%, is the other guys, that's the impact fee fund,

00:50:18.940 --> 00:50:22.860
it's the airport construction fund to come with those smaller ones.

00:50:22.860 --> 00:50:29.660
And then by expenditure type, category personnel is again the biggest one, that's typical

00:50:29.660 --> 00:50:35.660
for cities. Our service organization takes people to perform services, so 43, 44% of those

00:50:35.660 --> 00:50:45.270
dollars are going to personnel costs. New employees, we talk about new employees each

00:50:45.270 --> 00:50:50.270
year. You see I put the little good here off to the side here. I may be biased, but I am

00:50:50.270 --> 00:50:54.270
up the belief that city employees are heroes. And we're looking for more heroes, right,

00:50:54.270 --> 00:50:59.940
to add to our superhero team. These top four are the new positions that we're including

00:50:59.940 --> 00:51:03.180
this budget and we'll talk about two of those tonight so I decided to have this

00:51:03.180 --> 00:51:06.300
little thing here when you see this guy pack up on a few future sites

00:51:06.300 --> 00:51:08.500
those are new positions that we're going to talk about.

00:51:08.500 --> 00:51:13.240
Ebony prosecuting attorneys want to them traffic tech engineering department water

00:51:13.240 --> 00:51:16.920
operator position will be fired chief art positions we're going to have this year

00:51:16.920 --> 00:51:20.640
we'll talk about two of those tonight the others up there the planning zoning tech

00:51:20.640 --> 00:51:23.320
and the police officers with the college grant you've already had those

00:51:23.320 --> 00:51:26.660
conversations we've already made those decisions we're including them in this

00:51:26.660 --> 00:51:36.800
budget because they weren't included in the last one. So this looks like an increase of eight positions we're adding for.

00:51:36.800 --> 00:51:44.690
Okay, so this will show you that we have a slight increase in our, no budgets, our maintenance operation budgets.

00:51:44.690 --> 00:52:00.450
The increase is 7.5%. We saw last weekend number come out from the CPI that was, this is fuel, this is electricity, this is travel and training.

00:52:00.450 --> 00:52:07.060
training, this is those kinds of expenses, where those costs are going up, right? We need to reflect those increases

00:52:07.060 --> 00:52:15.540
are going up even more since we gave you the budget last month, right? So that's what that one is. This shows you the increase to capital.

00:52:15.540 --> 00:52:23.960
Now tonight you're going to talk, you're going to hear, you can also talk if you want to talk, and hear most of the capital, right?

00:52:23.960 --> 00:52:29.960
That we have in this year's budget is going to come from these guys here to talk tonight. That's a big number 18 million dollars for the capital projects.

00:52:29.960 --> 00:52:34.960
projects, a lot of that is in water, a little bit more in sewer and streets, so we'll talk

00:52:34.960 --> 00:52:39.960
a lot about those tonight, the capital expenses, those are a big deal for our budget moving

00:52:39.960 --> 00:52:46.960
forward. So that's kind of the brief run through the intro stuff. Again, I'll go back to the

00:52:46.960 --> 00:52:51.960
slide here, you've seen this for the last several years now, we've got all these focus areas and

00:52:51.960 --> 00:52:55.960
they're all important for us as we grow our community, all of them rely on the internal

00:52:55.960 --> 00:53:02.040
organization, all of the rely on the people to do the work and so they're all kind of pointing to that and then we're going to move forward

00:53:03.560 --> 00:53:10.600
Folks here tonight, and so first here we're going to talk about tonight is there a folks here for that's our accessible community

00:53:10.680 --> 00:53:15.440
This is primarily like streets and sidewalks and things like that. So the first

00:53:16.320 --> 00:53:22.880
Person I'm gonna have come up here to join me tonight is gonna be Tom's and you all these are streets superintendent

00:53:22.880 --> 00:53:26.800
He's got another one of his guys here. It's gonna help him out tonight. I'll let him introduce Dan

00:53:27.880 --> 00:53:35.520
I'm going to come up and talk to you a little bit and come back.

00:53:35.520 --> 00:53:37.520
Good evening, Mayor and Council.

00:53:37.520 --> 00:53:45.520
Tonight, the Street Department gets the pleasure of kicking off the discussion of Focus Area 4, which is our accessible community.

00:53:45.520 --> 00:53:57.890
This first slide shows basically our routine and also the replacement schedule.

00:53:57.890 --> 00:54:09.220
Within the Street Department, as with other departments, we really have two separate divisions that we made those responsibilities in.

00:54:09.220 --> 00:54:11.220
What is that as the asphalt of the site?

00:54:11.220 --> 00:54:14.690
It's everything that does

00:54:14.690 --> 00:54:16.690
makes care of the roadways.

00:54:16.690 --> 00:54:17.690
Then we also have

00:54:17.690 --> 00:54:21.690
signing and striping division, which takes care of everything on top of the roads.

00:54:21.690 --> 00:54:23.690
And their responsibilities are

00:54:23.690 --> 00:54:30.610
they maintain all the signage, all the pavement working, all our signalized intersections.

00:54:30.610 --> 00:54:34.090
And AC 2.1.3 of our strategic plans

00:54:34.090 --> 00:54:37.090
is that we'll maintain our traffic signals,

00:54:37.090 --> 00:54:40.090
illumination, signing and striping to meet established.

00:54:40.090 --> 00:54:46.080
One of our capital request this year is the replacement of our pay machine.

00:54:46.080 --> 00:54:55.510
Beanstrap from our signing and striping division to help kind of explain why it's important.

00:54:55.510 --> 00:55:23.360
Pivot markings are an accepted method to communicate both the intended travel path and roadway alignment for drivers during day and night time conditions.

00:55:23.360 --> 00:55:34.620
To ensure consistent application of pavement markings are characteristics and warranty criteria are described in the manual of uniform traffic control device also known as the MUTSIT.

00:55:34.620 --> 00:55:44.970
Section 3A.03 of the MUTSIT requires agencies to use a method designed to maintain longitudinal pavement markings to a minimum level of retro-reflectivity.

00:55:44.970 --> 00:55:54.090
Within the MUTSIT section there are three subtle but important distinctions that categorize pavement markings to three general types.

00:55:54.090 --> 00:55:58.810
not required to be retro-affective. These are payment markings where an

00:55:58.810 --> 00:56:03.750
empty of elimination, which are adequate visibility or payment markings that are

00:56:03.750 --> 00:56:11.250
needed only in the daytime, like access to a park. These payment markings do not need

00:56:11.250 --> 00:56:15.910
to be maintained to a minimum level of retro-reflectivity. Number two,

00:56:15.910 --> 00:56:22.830
required to be retro-affective but not subject to minimum levels. All markings other than those

00:56:22.830 --> 00:56:29.830
discussed in the first bullet must be retro-effective, but some of these markings are not subject to new, minimum, retro-reflective levels.

00:56:29.830 --> 00:56:41.600
Examples of exceptions provided by the new mustard language include truss-fuck markings, otherwise transverse markings, words, samples, arrows, etc.

00:56:41.600 --> 00:56:52.640
etc. Some longitudinal lines are exempt from the new minimum retroreflective levels under certain conditions, such as presence of continuous spread weight lighting or

00:56:52.640 --> 00:56:56.600
of retroreflective payment markings.

00:56:56.600 --> 00:56:59.240
Subject to minimum retroreflective levels,

00:56:59.240 --> 00:57:01.840
this includes the white and yellow longitudinal payment

00:57:01.840 --> 00:57:05.340
markings that are required or recommended in the message,

00:57:05.340 --> 00:57:07.320
such as the center lines, edge lines,

00:57:07.320 --> 00:57:10.680
lane lines, and channelizing lines that the message says shell

00:57:10.680 --> 00:57:13.240
or should be used above certain volumes

00:57:13.240 --> 00:57:15.100
or for certain roadway conditions.

00:57:15.100 --> 00:57:18.920
We currently paint them, roughly 510 miles of white and yellow

00:57:18.920 --> 00:57:21.440
longitudinal payment markings a year

00:57:21.440 --> 00:57:24.340
to maintain the retro-reflectivity levels.

00:57:24.340 --> 00:57:30.350
We usually do this in June, all the way through August.

00:57:30.350 --> 00:57:34.830
In fiscal year 2023, we are asking for $385,000

00:57:34.830 --> 00:57:36.350
to replace our current paint machine

00:57:36.350 --> 00:57:39.460
with the new updated version.

00:57:39.460 --> 00:57:41.740
For the past 11 years, this had been a great machine,

00:57:41.740 --> 00:57:45.300
but we are starting to have cost-free repairs to Duke's age.

00:57:45.300 --> 00:57:47.140
We typically would have replaced this machine

00:57:47.140 --> 00:57:49.260
at the 10-year mark, but due to the cost and amount

00:57:49.260 --> 00:57:51.300
of other equipment in our replacement schedule,

00:57:51.300 --> 00:57:54.350
we had to push it back a couple of years.

00:57:54.350 --> 00:58:00.350
If we do not get this piece of equipment replaced, it can be settled in several years before we get back into our schedule.

00:58:00.350 --> 00:58:08.170
Some error.

00:58:08.170 --> 00:58:17.860
Promise it won't be difficult. The $385,000 is that just for the machinery that's on that truck or is it the truck as well?

00:58:17.860 --> 00:58:18.860
Is it all one thing?

00:58:18.860 --> 00:58:19.860
It's all one thing, yeah.

00:58:19.860 --> 00:58:24.860
And so what do we do with a machine like that when we're not using it anymore?

00:58:24.860 --> 00:58:27.860
Is it a backup for us? Do we have other uses?

00:58:27.860 --> 00:58:29.860
Actually, like that machine we'd probably

00:58:31.160 --> 00:58:35.540
Try to trade that one in ourselves to another like highway district or smallest city

00:58:35.540 --> 00:58:48.860
The other questions is great. I understand the economy

00:58:48.860 --> 00:58:56.260
So I've been talking to the guy MB and I was like six or eight months ago. He was talking like

00:58:57.620 --> 00:59:02.120
Get like a truck itself would be maybe here

00:59:02.120 --> 00:59:07.640
But then he emailed me a couple months ago and said that it's actually move up quite a bit and he will be in town Thursday

00:59:07.640 --> 00:59:10.580
for the first day, around 2.30, so we'll know more.

00:59:10.580 --> 00:59:15.860
Last crisis, yeah, well, prices and then availability.

00:59:15.860 --> 00:59:23.980
Yeah, you can get the added issue with needing to move the fire truck because we didn't

00:59:23.980 --> 00:59:29.080
do, so something that specialized, I was kind of wondering, is that something that we

00:59:29.080 --> 00:59:31.240
would be able to get, sounds like we would be able to be able to.

00:59:31.240 --> 00:59:34.540
Yeah, and we'll talk to more authors, and so if you guys have any more questions, you

00:59:34.540 --> 00:59:37.640
can ask more of them, or I can let you guys know on that.

00:59:37.640 --> 00:59:40.960
It sounds like we should be able to.

00:59:40.960 --> 00:59:42.460
Hey, some ground.

00:59:42.460 --> 00:59:51.120
This might be for Mark, but the reconstruction of Orchard in the Hankins.

00:59:51.120 --> 00:59:56.120
So I know we've got some work on Hankins. Is this just a continuation of what we've done in the last couple of years?

00:59:56.120 --> 01:00:02.410
Two separate projects in Orchard would be from Blue Lakes to Eastland.

01:00:02.410 --> 01:00:05.410
Okay. We have a bunch of shared jurisdiction right in there.

01:00:05.410 --> 01:00:08.410
Okay. Between the Highway District and us.

01:00:08.410 --> 01:00:11.410
That would be actually from a drone into the West.

01:00:11.410 --> 01:00:21.100
I just passed, it's about, just passed the field, entire road place, so that would be that portion of that project right there.

01:00:21.100 --> 01:00:26.630
And then the Hankins project would be a filer, new fire stations going in.

01:00:26.630 --> 01:00:31.620
I'd believe the fire station is only paying in or a portion of that roadway.

01:00:31.620 --> 01:00:35.940
And then the other, we would set money aside to repair that.

01:00:35.940 --> 01:00:40.940
So I took that as the intersection, at the intersection, up or six down eight to six.

01:00:40.940 --> 01:00:43.940
Not two separate projects, okay.

01:00:43.940 --> 01:00:44.940
That clarifies it a little better.

01:00:44.940 --> 01:00:45.940
Okay, thank you.

01:00:45.940 --> 01:00:46.940
Thank you.

01:00:46.940 --> 01:00:52.660
Any other questions? Okay, thank you very much, gentlemen.

01:00:52.660 --> 01:00:59.700
I mean, guys, like Dan in here for these presentations, even though it makes them really nervous,

01:00:59.700 --> 01:01:05.700
but it's kind of fun to introduce you to more of your city employees, super heroes, right?

01:01:05.700 --> 01:01:09.700
So, I'm just going to bring Troy up now as we're still in section, or if I'm sorry,

01:01:09.700 --> 01:01:23.780
Troy is going to talk to you a little bit more from the Engineering Excite service.

01:01:23.780 --> 01:01:32.040
Okay, before you a traffic technician, this person is essentially,

01:01:32.040 --> 01:01:38.410
If I want to upset my mom, I have her sit through two red lights.

01:01:38.410 --> 01:01:44.320
I'm sure you've all felt that frustration too.

01:01:44.320 --> 01:01:48.320
This person is commonly involved with coordination, timing,

01:01:48.320 --> 01:01:51.770
execution, optimization of those throughout the city.

01:01:51.770 --> 01:01:54.410
We have 49 of them.

01:01:54.410 --> 01:01:58.460
We also have the need to move some lights.

01:01:58.460 --> 01:02:03.090
Those flashing ones at school position or even session or out of session.

01:02:03.090 --> 01:02:05.090
Those aren't quite as smart.

01:02:05.090 --> 01:02:11.410
We have to actually go to some effort to program those and tighten those with the school district stuff like that.

01:02:11.410 --> 01:02:14.410
We also look at subdivisions coming in.

01:02:14.410 --> 01:02:18.020
We renew subdivisions and they have a lighting plan.

01:02:18.020 --> 01:02:20.940
Some of them have traffic control.

01:02:20.940 --> 01:02:29.100
Now it's currently utilizing orchard and service announcements

01:02:29.100 --> 01:02:37.660
to try to make sure that we're forming our as much as possible impacts are happening.

01:02:37.660 --> 01:02:43.220
We are also trying to work with schools and we're gone safe for us to schools.

01:02:43.220 --> 01:02:46.220
We do headcounts seeing where we really need to focus on.

01:02:46.220 --> 01:02:57.020
Just trying to follow up.

01:02:57.020 --> 01:02:58.020
Why did this happen?

01:02:58.020 --> 01:02:59.020
Should it happen?

01:02:59.020 --> 01:03:27.200
So Troy, this is a second traffic technician.

01:03:27.200 --> 01:03:28.100
Is that what you're saying?

01:03:28.100 --> 01:03:28.600
That's great.

01:03:28.600 --> 01:03:29.600
OK, thank you.

01:03:29.600 --> 01:03:31.000
Any questions for Troy?

01:03:31.000 --> 01:03:36.590
Off easy.

01:03:36.590 --> 01:03:37.490
Thank you.

01:03:37.490 --> 01:03:41.310
We don't like sitting in red lights either.

01:03:41.310 --> 01:03:46.000
I've got a couple of lights that come with red lights.

01:03:46.000 --> 01:03:48.920
Let's wait till the new person's hired.

01:03:48.920 --> 01:03:52.020
I can tell you that we go through this process every year.

01:03:52.020 --> 01:03:54.820
So I forgot who we're going to put in for new, for new positions.

01:03:54.820 --> 01:03:58.420
And this one has been on the request list for, I don't know,

01:03:58.420 --> 01:04:02.480
how many years Jackie requested this position several times

01:04:02.480 --> 01:04:05.740
before it finally made it to today's presentation.

01:04:05.740 --> 01:04:08.180
So this is one that we've needed for a while,

01:04:08.180 --> 01:04:10.660
and it's written to the top of that.

01:04:10.660 --> 01:04:13.360
That's good, so yeah, this is kind of

01:04:13.360 --> 01:04:15.540
just those choice questions.

01:04:15.540 --> 01:04:17.660
Okay, moving on from focus area four,

01:04:17.660 --> 01:04:19.760
and I shall have questions or comments

01:04:19.760 --> 01:04:22.260
about accessible communities, right?

01:04:22.260 --> 01:04:25.020
Okay, so focus area five is the environmental community.

01:04:25.020 --> 01:04:28.100
This is where we're talking about water and sewer.

01:04:28.100 --> 01:04:33.350
So at first I think I'm going to bring you up with Rob.

01:04:33.350 --> 01:04:35.210
Rob will talk to you about water stuff.

01:04:35.210 --> 01:04:41.880
Welcome Rob.

01:04:41.880 --> 01:04:45.410
Council, appreciate your time this evening.

01:04:45.410 --> 01:04:50.650
I'm happy to come and propose our CIP projects.

01:04:50.650 --> 01:04:53.570
Then, with respect of everybody's time, I've got 11.

01:04:53.570 --> 01:04:56.250
I'm still talking probably about the top five.

01:04:56.250 --> 01:04:57.810
There's any questions on the elements.

01:04:57.810 --> 01:04:59.650
I'll be glad to answer those.

01:04:59.650 --> 01:05:03.850
The first one on our list is the water operator.

01:05:03.850 --> 01:05:11.840
As you can see in the last five years, the work I love for our locating operator has almost

01:05:15.400 --> 01:05:19.050
one tripled in the last five years.

01:05:19.050 --> 01:05:26.880
This position is required to go out and work all over our water, fire hydrants, anything

01:05:26.880 --> 01:05:32.880
that has to do with water in our system for our infrastructure so that when other companies

01:05:32.880 --> 01:05:33.880
go out

01:05:33.880 --> 01:05:40.160
to

01:05:40.160 --> 01:05:41.160
I'm somewhere

01:05:41.160 --> 01:05:44.380
requesting this position

01:05:44.380 --> 01:05:47.380
will also help us with TDS coming to town

01:05:47.380 --> 01:05:49.380
and the fiber locates

01:05:49.380 --> 01:05:52.430
just won't be able to keep up

01:05:52.430 --> 01:05:54.430
they haven't got going for yet

01:05:54.430 --> 01:05:55.430
but when they do

01:05:55.430 --> 01:05:57.680
guys

01:05:57.680 --> 01:06:01.820
also

01:06:01.820 --> 01:06:14.340
EDS

01:06:14.340 --> 01:06:15.340
says they're going to be around

01:06:15.340 --> 01:06:17.100
so we thought

01:06:17.100 --> 01:06:24.160
well this would be a good time for things to happen

01:06:24.160 --> 01:06:25.160
there's a lot to learn out

01:06:25.160 --> 01:06:28.020
then it doesn't

01:06:28.020 --> 01:06:30.020
it doesn't happen in a six month period

01:06:30.020 --> 01:06:31.020
so

01:06:31.020 --> 01:06:34.700
the crest and

01:06:34.700 --> 01:06:47.290
nothing moving forward

01:06:47.290 --> 01:06:54.290
The existing pressure zone boundary and the proposed new pressure zone boundary, it's kind of hard to see on these maps because they're so small.

01:06:54.290 --> 01:06:59.840
The Hankins pressure zone is the zone that we'll be talking about requesting.

01:06:59.840 --> 01:07:32.110
We're asked with this project, the opportunity, Twin Falls is basically the pressure zone systems that work with the water system in the late 70s and 80s.

01:07:32.110 --> 01:07:37.290
Twin Falls is prone exponentially, I know.

01:07:37.290 --> 01:07:43.290
water up hill on moving water down hill either causes either loss of pressure or more pressure

01:07:43.290 --> 01:07:53.740
and we have keep those pressures within the peoples stuff off their utilities and their homes

01:07:53.740 --> 01:07:58.120
or supply enough pressure for them to be able to use it.

01:07:58.120 --> 01:08:04.920
This project will help us use our system more efficiently and improve our boundaries

01:08:04.920 --> 01:08:09.920
and help us fix some of those deficiencies in our pressure zone and it will also provide

01:08:09.920 --> 01:08:17.920
In those areas where we didn't have the pressure, the fire flow, for some industrial growth also in that area.

01:08:17.920 --> 01:08:35.070
But as the blue lakes on the roadside stream project, I'm a project request that we are bringing in Council.

01:08:35.070 --> 01:08:50.460
When we moved to the office streams, where we used to pour water out of the lakeside, we took our pumps and moved them.

01:08:50.460 --> 01:09:08.900
with the city and blue lakes was that we wouldn't even see the scale on those rocks.

01:09:08.900 --> 01:09:13.900
So what this project is, we will be piping off of our 30-inch line,

01:09:13.900 --> 01:09:23.490
of those 12-inch bridge, 12-inch line down to the blue-electropside stream,

01:09:23.490 --> 01:09:45.230
and then the city will, on March 15 through October, have to provide up to 6CFS,

01:09:45.230 --> 01:09:49.230
a stream that will depend on natural stream flow.

01:09:49.230 --> 01:09:52.530
As well be controlled with skater engages in the creek

01:09:52.530 --> 01:09:56.680
It will change how much water we send down with the bell

01:09:56.680 --> 01:10:25.310
to counsel I think in replacement

01:10:25.310 --> 01:10:36.300
waste water, ITD and other entities in town

01:10:36.300 --> 01:10:49.550
zone maintenance and thoughtfully about where we're replacing stuff

01:10:49.550 --> 01:11:15.940
and the lead someone going a bunch of lead

01:11:15.940 --> 01:11:28.120
that starts leaking into them a diligent on where pumps this

01:11:28.120 --> 01:11:38.400
on track some of that out and then we also have our guys in the house

01:11:38.400 --> 01:11:40.400
do some of those smart projects

01:11:40.400 --> 01:11:45.700
Unless I'm at least over on the blue lakeside.

01:11:45.700 --> 01:11:47.700
Also, where are we?

01:11:47.700 --> 01:12:06.620
The spouse we're putting in their kids or park kids for these valves.

01:12:06.620 --> 01:12:12.160
Any more of this requests us to replace us for about a day in summer.

01:12:12.160 --> 01:12:16.380
We pull about two thirds of our water, blue lakeside.

01:12:16.380 --> 01:12:20.550
And we send out to the students.

01:12:20.550 --> 01:12:32.860
Any questions for Rob? Looks like you're off the hook.

01:12:32.860 --> 01:12:36.390
Thank you.

01:12:36.390 --> 01:12:42.070
I'd like water to drink.

01:12:42.070 --> 01:12:44.070
I just want to add one quick thing if you remember.

01:12:44.070 --> 01:12:46.070
In the fiscal year 22, this is Korean fiscal year.

01:12:46.070 --> 01:12:54.070
we changed our water rate structure to create the capital improvement fund for water.

01:12:54.070 --> 01:13:00.620
And we saw that the pressure zone project was about three million dollar project.

01:13:00.620 --> 01:13:05.620
And some others like it are kind of in that sweet spot where they're a little more

01:13:05.620 --> 01:13:10.620
than we can usually afford in a given year, but not enough to really go do a bond for.

01:13:10.620 --> 01:13:14.780
And so this capital fund is now getting put to work,

01:13:14.780 --> 01:13:16.420
and I've spent a point that out,

01:13:16.420 --> 01:13:19.380
the decisions that we made are now marching forward,

01:13:19.380 --> 01:13:23.220
and we're able to do those kinds of a little bit big,

01:13:23.220 --> 01:13:25.920
but not really big projects with that capital fund.

01:13:25.920 --> 01:13:29.160
So that's a good thing moving forward.

01:13:29.160 --> 01:13:31.080
Okay, so next we're gonna talk about wastewater.

01:13:31.080 --> 01:13:32.800
I'm gonna have Doug come up and talk to you a little bit

01:13:32.800 --> 01:13:39.250
about the wastewater expenses.

01:13:39.250 --> 01:13:46.600
Welcome, Doug.

01:13:46.600 --> 01:13:48.790
I'm kind of excited to talk about

01:13:48.790 --> 01:13:51.390
some of the wastewater improvements we have coming up.

01:13:51.390 --> 01:13:58.340
I'm going to kind of talk a little bit about this current year and then into forward years.

01:13:58.340 --> 01:14:04.560
Looking to improve our wastewater system in new and less interested ways.

01:14:04.560 --> 01:14:11.560
We are in the process of putting the other project in this current budget year to utilize the money for mainline improvements.

01:14:11.560 --> 01:14:19.080
a certain place pipe or CIPP pipe is the process we are focused on for pipe improvements this

01:14:19.080 --> 01:14:25.690
year and moving forward into future years. The first slide represents the first area in town

01:14:25.690 --> 01:14:31.530
we are wanting to improve. So I know that's really hard to see but if you hit the top of

01:14:31.530 --> 01:14:37.970
the slide there's that's north, that met meadison going straight across. So it's your right

01:14:37.970 --> 01:14:48.330
That's five points. It has most of the oldest pipe.

01:14:48.330 --> 01:14:57.220
Our crews have done a great job this past year and a half going in and making improvements.

01:14:57.220 --> 01:15:11.310
The CIP being done inspection improvements. We have inspected this whole area.

01:15:11.310 --> 01:15:18.220
Projects we know where the areas that we need. Excuse me to make repairs.

01:15:18.220 --> 01:15:26.040
The tractors come in jobs instead of them coming in and making those improvements.

01:15:26.040 --> 01:15:30.390
We're doing that before. Excuse me. We're doing that before they come.

01:15:30.390 --> 01:15:41.580
We, approximately this year with the money out, we can do 15 to 20 line segments.

01:15:41.580 --> 01:15:45.580
So a line segment would be between manhole to manhole.

01:15:45.580 --> 01:15:47.580
That's one segment of sewer line.

01:15:47.580 --> 01:15:53.320
We can do 15 to 20 segments in this current year's budget.

01:15:53.320 --> 01:16:07.340
And then hopefully be able to do more as this next slide shows basically what the CIPP improvement does.

01:16:07.340 --> 01:16:13.840
It's basically a pipe within a pipe, pulling the sleeve from one manhole to the next, using

01:16:13.840 --> 01:16:19.460
either steam or air to inflate the pipe out to the sides of the host pipe.

01:16:19.460 --> 01:16:30.880
After that, you can use steam, hot water, or you can cure the pipe, and processes done,

01:16:30.880 --> 01:16:40.140
they'll take a camera unit in, better on it, and then they reinstate the services.

01:16:40.140 --> 01:16:48.420
So it's all done with no digging, no disruption to service, and it's just great when you don't

01:16:48.420 --> 01:17:00.090
have to, people are happy, you don't have to, as I showed you on the first slide, that whole

01:17:00.090 --> 01:17:12.980
section of town done, trying to put truck contracts together, chip seal, and just the

01:17:12.980 --> 01:17:19.750
same as chip seal does, they go in and they crack seal and they patching, we do the same

01:17:19.750 --> 01:17:26.540
thing with the pipe.

01:17:26.540 --> 01:17:31.500
So one more thing I'd like to mention, and we've done in this current budget year, this

01:17:31.500 --> 01:17:38.440
This is a piece of equipment we purchased this year, looking still at trying to make pipe

01:17:38.440 --> 01:17:44.580
improvements without having to do any disruption to service or excavation.

01:17:44.580 --> 01:17:48.000
This is actually called a quick lock sleeve.

01:17:48.000 --> 01:17:51.900
We can do point repairs with this equipment.

01:17:51.900 --> 01:17:58.260
The first, the slide furthest to the left is actually showing a repair in a pipe that

01:17:58.260 --> 01:18:06.450
broken spot in a pipe that'd be able to see IPP through unless it was fixed. So the second slide is

01:18:06.450 --> 01:18:15.250
actually what this equipment is is it fits on your camera equipment and it's got a from which that's

01:18:15.250 --> 01:18:23.540
what you see in the pipe. So you take you put a stainless steel sleeve on the packer, the sleeve

01:18:23.540 --> 01:18:36.780
out to the repair point with the camera you can see and he can line up with the sleeve and then

01:18:36.780 --> 01:18:46.670
flates to sleep out. So it inflates out, and you can kind of see right up on the top the

01:18:46.670 --> 01:18:52.830
ridge is it's got a locking system. So as that sleep goes out, and that packer pushes

01:18:52.830 --> 01:18:59.870
it out, it pushes out tight against the pipe, and then once those lock, they just, they

01:18:59.870 --> 01:19:07.440
deflate the pack. So the third, the slide over for this to the right is a finished product.

01:19:07.440 --> 01:19:14.300
what it looks like. These are actual pictures of what we have done in our system. So I thought

01:19:14.300 --> 01:19:21.510
it would be nice to see what these guys are doing. We probably put in 15 or 20 of these,

01:19:21.510 --> 01:19:29.950
and again, it's you, there is no digging. So two guys can go an inspection unit and another

01:19:29.950 --> 01:19:37.260
guy to retrofit the equipment and send it out. It takes about depending on how far he

01:19:37.260 --> 01:19:45.660
to go about an hour to do so and you can also see IPP through these so this not

01:19:45.660 --> 01:19:52.360
only helps a lot say it's a lot safer for our guys to do repairs we use this

01:19:52.360 --> 01:20:04.980
mainly and where there'd be a roadway or an asphalt alley traffic can do this

01:20:04.980 --> 01:20:17.030
without any so the last slide I'm showing you is a liner system that we

01:20:17.030 --> 01:20:23.030
We can align existing manholes that have deteriorated because of corrosive environments.

01:20:23.030 --> 01:20:28.500
A manhole has exposed to these environments over long periods of deteriorate,

01:20:28.500 --> 01:20:33.180
and they'll lose strength and structure.

01:20:33.180 --> 01:20:44.630
We have 150,000 in this next year to make the improvements in areas where they are in these.

01:20:44.630 --> 01:21:04.220
We have an illustration. We did two of these slides here or not in the ones in our system.

01:21:04.220 --> 01:21:09.820
Sorry about that, I didn't have time to put the slides together, but this would give you an idea of what these do.

01:21:09.820 --> 01:21:29.020
So, there's a polyurea, they go in and they, inside the mantle, they'll spray a polyurea first,

01:21:29.020 --> 01:21:40.740
and a polyurethane foam of the orange is what you see is the outside part of the liner.

01:21:41.540 --> 01:21:48.190
This also adds structure to these manholes that desperately need it, if they have a 10-year warranty

01:21:48.190 --> 01:21:54.030
and if we were to go in and we've tried several different corrosive types of

01:21:54.030 --> 01:22:00.940
manholes that hold up to these environments well. The best ones we've had

01:22:00.940 --> 01:22:09.920
that I've seen besides this is it's a full manhole so it requires excavating

01:22:09.920 --> 01:22:19.510
bypass pumping it's it's pretty this they don't have to do any digging and

01:22:19.510 --> 01:22:33.900
and there's a 10-year warranty on it, so these have performed very well too, and this next year to be able to.

01:22:33.900 --> 01:22:46.780
So, um, how does our wastewater flows through town? It ends up down in the canyon. That's the last part of the wastewater.

01:22:46.780 --> 01:22:48.780
I think Jason has a question.

01:22:48.780 --> 01:22:54.780
Sorry. Before we get there, so how much money were you looking at for the liner?

01:22:54.780 --> 01:23:02.490
the slide previous or to the CIPP, what was in the budget for that?

01:23:02.490 --> 01:23:05.490
This current year, we have 250,000.

01:23:05.490 --> 01:23:14.720
And then if you go to that next slide with that, this device on the front end of that,

01:23:14.720 --> 01:23:20.720
can you come then go back behind that and CIPP that to give us additional strength?

01:23:20.720 --> 01:23:21.720
You don't have to do it.

01:23:21.720 --> 01:23:29.010
These here, you can pull the CIPP sleeve through.

01:23:29.010 --> 01:23:36.780
You will just wouldn't have, of course you won't see it.

01:23:36.780 --> 01:23:41.780
This is to be able to go in and make those improvements when some of the repairs are

01:23:41.780 --> 01:23:47.430
fair acts that they cannot just see PIPP.

01:23:47.430 --> 01:24:02.340
These couplers, that's an 8-inch coupler they're about to just ask of me.

01:24:02.340 --> 01:24:06.340
It's a lot more. So this is a great way to make these improvements

01:24:06.340 --> 01:24:09.700
and also with the CIPP, it works well with that.

01:24:09.700 --> 01:24:19.640
Any other questions for you, Ms. Son?

01:24:19.640 --> 01:24:29.470
Thank you, Doug.

01:24:29.470 --> 01:24:36.250
City Council appreciate your time tonight for wastewater treatment. Just have one

01:24:36.250 --> 01:24:42.550
major project in the budget this year that we want to bring for you. That's the

01:24:42.550 --> 01:24:48.790
energy dissipation structure. This would be considered a critical part of the wastewater

01:24:48.790 --> 01:24:55.030
system and just so you have perspective these pictures are taken from down the

01:24:55.030 --> 01:24:59.070
canyon just outside the gate of the wastewater treatment plant. So just

01:24:59.070 --> 01:25:09.200
looking up the canyon wall. Energy dissipation structure is bringing the sewer flow off of the

01:25:09.200 --> 01:25:12.940
canyon rim down to the wastewater tree on plant. That's why I say it's critical. Before this

01:25:12.940 --> 01:25:22.620
to fail, we would have some serious issues. And left picture, as you look at that, the green arrow

01:25:22.620 --> 01:25:28.140
at the top of the canyon rim putting down is where currently there is a box that collects the

01:25:28.140 --> 01:25:35.140
the Grand View sewer trunk line water into that box and then it comes down through a pipe.

01:25:35.140 --> 01:25:41.140
Now to the left of that green arrow you do see a box and two pipes coming out of it.

01:25:41.140 --> 01:25:45.140
That is the old system that is not in use so that's not what we're looking at.

01:25:45.140 --> 01:25:47.720
It's being used currently.

01:25:47.720 --> 01:25:52.720
Actually if you come down from that green arrow you see the yellow arrow in the middle of the picture.

01:25:52.720 --> 01:26:03.520
If that location, you can kind of see it, there's a HDPE pipe, 24-inch pipe, that is actually where the sewer water is coming through.

01:26:03.520 --> 01:26:15.060
It's a 390-feet drop from up on the rim down to the middle picture, which is where the energy dissipation structure of the box is.

01:26:15.060 --> 01:26:24.890
The sewer, the sewage flow, flows into there and it's constructed in a way that the energy of the sewage that comes into that box is dissipated

01:26:24.890 --> 01:26:30.050
and it's slowed down so that it's able to go into the waste water treatment plant without

01:26:30.050 --> 01:26:33.420
all that behind it.

01:26:33.420 --> 01:26:42.170
This system was put in and what was originally brought to the city in 1985, so it's been a

01:26:42.170 --> 01:26:43.170
while.

01:26:43.170 --> 01:26:52.740
In the far right picture you see a sewer cap there on top of the dissipation box.

01:26:52.740 --> 01:26:58.740
It has not been taken off for many years and previous employees have told me that they

01:26:58.740 --> 01:26:59.900
did not dare.

01:26:59.900 --> 01:27:06.900
So the idea is we have a million dollars in this budget, and it is to replace the box

01:27:06.900 --> 01:27:12.380
at the top of the rim and here at the bottom of this patient structure.

01:27:12.380 --> 01:27:18.620
Using the same line that 24-inch HDPE pipe is in good condition, it can be utilized to

01:27:18.620 --> 01:27:28.690
just build a box next to you, think this you want, provide the city a structure that we

01:27:28.690 --> 01:27:35.120
can depend on and know that it's going to last.

01:27:35.120 --> 01:27:36.120
Any questions?

01:27:36.120 --> 01:27:46.380
Yes, those two lines that we're seeing coming down that are exposed, they're not in use.

01:27:46.380 --> 01:27:47.380
They're not in use.

01:27:47.380 --> 01:27:48.380
They're not in use.

01:27:48.380 --> 01:27:49.380
They're not a backup.

01:27:49.380 --> 01:27:58.790
I can imagine that in 1985 that, you know, at this point they were left there as a backup.

01:27:58.790 --> 01:28:05.180
The idea now would be this whole box with the new box.

01:28:05.180 --> 01:28:12.180
So we would have backup boxes or the energy dissipation box would be backups.

01:28:12.180 --> 01:28:22.640
So the ones you see are abandoned, they're not connected at the top at all.

01:28:22.640 --> 01:28:23.640
And they could not be used.

01:28:23.640 --> 01:28:25.310
It's been severed.

01:28:25.310 --> 01:28:30.310
For the reason of what you're looking at and the concern.

01:28:30.310 --> 01:28:34.310
But what is the cost associated with this particular project?

01:28:34.310 --> 01:28:36.310
A million dollars.

01:28:36.310 --> 01:28:37.310
A million dollars.

01:28:37.310 --> 01:28:38.310
Yes.

01:28:38.310 --> 01:29:21.750
So the DIPP, for what was the cost for the CIPP?

01:29:21.750 --> 01:29:27.230
So in the budget, we have 250 in this year and 300 next year.

01:29:27.230 --> 01:29:29.230
Okay, so that's...

01:29:29.230 --> 01:29:33.440
It's in the whole book, right?

01:29:33.440 --> 01:29:35.440
I remember, I tried to find it on the pages.

01:29:35.440 --> 01:29:36.440
I can.

01:29:36.440 --> 01:29:42.660
So each page had a little bar that named in your forecaster,

01:29:42.660 --> 01:29:45.660
named the name of the project, and the dollar amount,

01:29:45.660 --> 01:29:47.070
and that part you did.

01:29:47.070 --> 01:29:51.070
It didn't have dollar amounts, and so that's why I'm just wondering.

01:29:51.070 --> 01:29:59.360
Yes, 300 for next year, 300,000, and then 250 in this year.

01:29:59.360 --> 01:30:00.360
in this year.

01:30:00.360 --> 01:30:04.030
I mean, it's served with this new year as 300.

01:30:04.030 --> 01:30:05.030
The new budget here.

01:30:05.030 --> 01:30:06.030
Yes.

01:30:06.030 --> 01:30:07.030
It's 300, okay.

01:30:07.030 --> 01:30:08.030
So the quick walk, I would end.

01:30:08.030 --> 01:30:17.290
That's where I got loaned to.

01:30:17.290 --> 01:30:18.290
We purchased that equipment this year.

01:30:18.290 --> 01:30:19.290
I just wanted to show you what we were doing for improvements.

01:30:19.290 --> 01:30:20.290
And how?

01:30:20.290 --> 01:30:21.610
Okay.

01:30:21.610 --> 01:30:22.610
Beautiful.

01:30:22.610 --> 01:30:23.610
Is that same with the OVC eyeliner?

01:30:23.610 --> 01:30:26.610
We have 50,000 M for liners this in 23.

01:30:26.610 --> 01:30:42.630
I'm just going to add that this is going to show up as the main line made in its dollar

01:30:42.630 --> 01:30:48.650
maintenance dollars in the wastewater budget.

01:30:48.650 --> 01:30:50.690
Can you just show me some examples of what they're doing

01:30:50.690 --> 01:30:51.690
for maintenance.

01:30:51.690 --> 01:30:56.020
Yeah, that says 500, so.

01:30:56.020 --> 01:30:58.020
So on this page right here.

01:30:58.020 --> 01:30:59.600
Just as it.

01:30:59.600 --> 01:31:01.600
We're on page 14.

01:31:01.600 --> 01:31:02.100
Thank you.

01:31:02.100 --> 01:31:06.280
Like 27 main line maintenance under wastewater's 300,000.

01:31:06.280 --> 01:31:07.280
Right here.

01:31:07.280 --> 01:31:09.440
This was kind of at the start of our presentation,

01:31:09.440 --> 01:31:11.000
all the chemical projects.

01:31:11.000 --> 01:31:13.400
So these are main line maintenance dollars

01:31:13.400 --> 01:31:14.580
that we're talking about.

01:31:14.580 --> 01:31:15.540
Thank you.

01:31:15.540 --> 01:31:20.000
I'll just add in our big book since one one sixty four page one sixty four

01:31:20.000 --> 01:31:32.100
budget book looks like we're clear thank you so excited to learn about wastewater

01:31:32.100 --> 01:31:36.460
collections there's not much more exciting than that well and now you're

01:31:36.460 --> 01:31:39.340
glad you've sent there right because that's some pretty cool stuff that they're

01:31:39.340 --> 01:31:44.460
doing not having to dig up all those pipes and being able to do all that

01:31:44.460 --> 01:31:48.260
is much more efficient much more cost effective and safe way for our

01:31:48.260 --> 01:32:02.280
So that's it for environmental community, I'm just going to move on quickly to the Prospers

01:32:02.280 --> 01:32:09.220
community and that's going to have any more conversation about the fact that we're in

01:32:09.220 --> 01:32:12.510
our process community as our focus area number six.

01:32:12.510 --> 01:32:17.430
So this is the economic development sort of section and as I told you earlier in the

01:32:17.430 --> 01:32:21.930
meeting tonight as we were talking about the economic development director position.

01:32:21.930 --> 01:32:26.170
This is economic development, this is a certain renewal, this is also the airport, so we're

01:32:26.170 --> 01:32:29.470
going to talk to you a few little bit here as we close.

01:32:29.470 --> 01:32:33.470
We had this conversation earlier tonight with the adoption of the ordinance, we're going

01:32:33.470 --> 01:32:38.670
to be underway on the recruitment for the economic development position right away,

01:32:38.670 --> 01:32:42.320
and that's what the changes are going to be there.

01:32:42.320 --> 01:32:48.860
executive leadership team, work with the airport much more closely in this position,

01:32:48.860 --> 01:32:53.800
what kind of focus on that strategic planning effort of Prostras community, right?

01:32:53.800 --> 01:32:54.800
And so that's underway.

01:32:54.800 --> 01:32:59.080
We hope to have that position filled with another one of our, of our Supero team members

01:32:59.080 --> 01:33:00.080
really quickly.

01:33:00.080 --> 01:33:05.530
I just wanted to show you a few things that economic development in association with Urban

01:33:05.530 --> 01:33:09.490
Renewal has done recently and these are, some of these are ongoing projects.

01:33:09.490 --> 01:33:14.850
see this picture on the top left is a picture of the 160 main Avenue Lofts project. That's

01:33:14.850 --> 01:33:18.730
the one that's kitty corner of this building. Obviously that one's a few months ago. They're

01:33:18.730 --> 01:33:22.650
making great progress on it, but this was a good picture across the plaza with the city

01:33:22.650 --> 01:33:28.530
on the side. Anyway, that's a project that's been worked on with Urban & New Lake and see

01:33:28.530 --> 01:33:35.290
that the city has been supporting. The top right picture is an artist rendition of a children's

01:33:35.290 --> 01:33:39.210
museum of the Magic Valley. This is a group that's been coming and working with Urban & New

01:33:39.210 --> 01:33:43.250
and with that kind of development to move forward with the Children's Museum,

01:33:43.250 --> 01:33:51.710
generally in the area of, I don't know, this way from where we're at, and so that project is

01:33:51.710 --> 01:33:57.750
is moving along, making some progress. We have done some place-making. You'll see the art from

01:33:57.750 --> 01:34:02.670
the back wall of City Hall. The second phase of that is now generally complete, so on your way out today,

01:34:02.670 --> 01:34:07.070
if you go out the alley, you can see the whole thing pretty much done. That's another project

01:34:07.070 --> 01:34:08.230
that we worked on.

01:34:08.230 --> 01:34:13.310
And then the bottom right is another one of these downtown

01:34:13.310 --> 01:34:15.470
mixed-use complex, but the parking structure,

01:34:15.470 --> 01:34:18.510
that's on second, out of block, the other way

01:34:18.510 --> 01:34:20.190
behind the 160 project.

01:34:20.190 --> 01:34:21.870
And these are things that are coming,

01:34:21.870 --> 01:34:23.830
they're incoming.

01:34:23.830 --> 01:34:25.630
Urban Hill has been a great project,

01:34:25.630 --> 01:34:29.030
a great partner on these projects with the city

01:34:29.030 --> 01:34:31.030
and working with some also good partners

01:34:31.030 --> 01:34:33.510
in the private sector.

01:34:33.510 --> 01:34:36.390
So these are underway and continuing to go.

01:34:36.390 --> 01:34:39.290
Another thing that we've been working out with Urban Renewal

01:34:39.290 --> 01:34:41.590
that you'll see very soon will be the creation

01:34:41.590 --> 01:34:44.770
of two new revenue allocation areas.

01:34:44.770 --> 01:34:47.370
As you're all aware, there's a current revenue allocation area

01:34:47.370 --> 01:34:51.570
downtown, and that one expires within a year, right?

01:34:51.570 --> 01:34:55.050
So it's gonna go away, but it's been such a fantastic tool

01:34:55.050 --> 01:34:58.170
for us to use to do some of these redevelopment projects

01:34:58.170 --> 01:35:01.370
for the downtown area, this downtown renovation projects

01:35:01.370 --> 01:35:03.690
that the agency is talking a lot about,

01:35:03.690 --> 01:35:06.930
Once that expires, implementing a new revenue allocation area

01:35:06.930 --> 01:35:10.650
out there, map on the left kind of shows an early version

01:35:10.650 --> 01:35:13.780
of their draft of what that might look like.

01:35:13.780 --> 01:35:16.660
Likewise, Orchard Drive East.

01:35:16.660 --> 01:35:18.660
That's another revenue allocation area

01:35:18.660 --> 01:35:20.140
that they've been putting together.

01:35:20.140 --> 01:35:22.460
That is at the corner of Orchard and Champlain.

01:35:22.460 --> 01:35:25.340
This is just a little bit south of the Cliff Bar,

01:35:25.340 --> 01:35:27.900
another industrial park that they're working to put out there.

01:35:27.900 --> 01:35:31.140
And so these are again, some economic development projects

01:35:31.140 --> 01:35:33.380
that are being worked on, they'll continue

01:35:33.380 --> 01:35:38.080
we worked on next year, they're just going to be kind of included in our operations budget.

01:35:38.080 --> 01:35:42.380
I needed money for these apart from hiring the person that's going to do the work.

01:35:42.380 --> 01:35:49.240
And then the agency is going to do some funding of these with the Red River Renewal TIFF money.

01:35:49.240 --> 01:35:53.240
So with that, I'm going to turn some time over, unless you have any questions.

01:35:53.240 --> 01:35:58.430
I'm going to turn some time over to the airport. Bill come talk to you.

01:35:58.430 --> 01:36:01.430
Bill's got Ryan with them and they'll kind of tag team their presentation here

01:36:01.430 --> 01:36:06.430
towards the end and that's actually about what's going on down the airport and also some budget stuff.

01:36:06.430 --> 01:36:13.550
Any questions for Mitch on the economic? You alright? Okay, welcome Bill.

01:36:13.550 --> 01:36:22.150
Thank you Mitch and good evening Councilman and Mayor. I just wanted to pre-do a little bit of what you'll be hearing.

01:36:22.150 --> 01:36:30.150
The airport really has a sort of a potpourri of goals and areas that we work in accessible community,

01:36:30.150 --> 01:36:37.150
Prosperous, responsible, those kinds of things, so we're going to sort of mash it all together

01:36:37.150 --> 01:36:44.500
and deliver it to you tonight, so we're going to look, Ryan's going to help us with the first look at

01:36:44.500 --> 01:36:52.500
some of our accessible, give you an update on our 2022 projects for our secure community stuff,

01:36:52.500 --> 01:36:59.500
related to capital improvements at the airport, what's happening this current year on Access Control and Surveillance.

01:36:59.500 --> 01:37:05.820
He'll also take a look at our capital requests and our operations fund for mowers and things

01:37:05.820 --> 01:37:06.820
like that.

01:37:06.820 --> 01:37:10.020
I'll give you a little preview of where the airport construction fund is.

01:37:10.020 --> 01:37:13.020
That's the fund we use for FAA projects.

01:37:13.020 --> 01:37:18.980
So those lap over different fiscal years and they're very fluid as you guys are familiar.

01:37:18.980 --> 01:37:24.900
We'll talk a little bit about air show planning and where that is and round off a little

01:37:24.900 --> 01:37:29.580
been talking about the airport as infrastructure and certainly an engine for

01:37:29.580 --> 01:37:35.260
economic prosperity in the community. So with that I'd like to introduce Ryan

01:37:35.260 --> 01:37:37.260
Johnson to talk to you about a couple of slides.

01:37:37.260 --> 01:37:54.120
The first thing I'm going to talk to you guys about is just kind of an update on

01:37:54.120 --> 01:38:01.560
last year's access control upgrades project that we had going on. We started

01:38:01.560 --> 01:38:08.080
that are going to implement the access control system from the airport and

01:38:08.080 --> 01:38:14.560
standardize it with the city and as well as the airport surveillance system and

01:38:14.560 --> 01:38:23.160
get it on the exact same platform that the rest of the city uses and the IT department uses.

01:38:23.160 --> 01:38:33.080
So as far as the access control aspect of the project, much like Vice Mayor mentioned,

01:38:33.080 --> 01:38:41.280
it is extremely difficult to acquire parts, especially electronic parts.

01:38:41.280 --> 01:38:50.640
So we are in the process with IT gathering parts because with the access control system,

01:38:50.640 --> 01:38:52.560
You can't really piece it together.

01:38:52.560 --> 01:38:55.280
It's got to be down for an animal amount of time.

01:38:55.280 --> 01:38:58.440
So we want to have all the parts in place

01:38:58.440 --> 01:39:00.040
and do it as quickly as possible.

01:39:00.040 --> 01:39:05.320
So we are still working on the access control portion of that.

01:39:05.320 --> 01:39:07.480
The airport's surveillance system,

01:39:07.480 --> 01:39:10.880
all of the cameras, camera software.

01:39:10.880 --> 01:39:12.920
All of that is up and running.

01:39:12.920 --> 01:39:15.320
And we have implemented all the new cameras

01:39:15.320 --> 01:39:17.640
and replaced all of the original cameras,

01:39:17.640 --> 01:39:25.640
working extremely closely with IT, I haven't figured out all of the capabilities of these

01:39:25.640 --> 01:39:34.160
cameras yet, but when I do, I'm sure I'll be giving you guys a presentation of what we

01:39:34.160 --> 01:39:43.570
went from to what we have now, but that is currently almost complete except for working

01:39:43.570 --> 01:39:51.770
working with our IT department to kind of iron out some, you know, first wrinkles that we find.

01:39:51.770 --> 01:39:57.570
But I didn't want to throw a shout out to our TSA partners.

01:39:57.570 --> 01:40:09.570
They got federal funding to install, as the picture shows, a million dollar baggage screening device behind the Sky West ticket counter.

01:40:09.570 --> 01:40:39.560
So, um, that allows them to efficiently screen, um, every bag they don't have to just run to the machine similar to what you would at a checkpoint and the machine actually will determine whatever's in the bag they, they, uh, it's all automated now, so, that, uh, just kicked off, I think they started using that machine over the weekend, so, uh, first impressions with them are extremely high at the mark.

01:40:39.560 --> 01:40:44.680
Hi, at the moment, but any questions on XS control?

01:40:44.680 --> 01:40:46.680
Survey on XS, any of that?

01:40:46.680 --> 01:40:50.680
Um, the next letter I'm going to be talking about is separate topic, so...

01:40:50.680 --> 01:40:53.680
Any questions on this site?

01:40:53.680 --> 01:40:54.680
Just to ask...

01:40:54.680 --> 01:41:13.520
Correct. Yeah, the machine determines whether it's got to be checked and all of that, so...

01:41:13.520 --> 01:41:17.520
Um, what this machine you don't have to do, any of that, it, uh...

01:41:17.520 --> 01:41:22.520
That's down. The efficiency is a lot higher compared to what it was before.

01:41:22.520 --> 01:41:38.690
Good. I think that's it. So here's some of our 2023 improvements. The phase two of our terminal

01:41:38.690 --> 01:41:47.250
landscape upgrade. This is rehab of the parking lots landscape in front of the terminal or green

01:41:47.250 --> 01:41:56.290
belt leading up to the terminal. This is phase two of a five-year approach. So the total is $45,000

01:41:56.290 --> 01:42:01.270
for Phase 2, which would be this year.

01:42:01.270 --> 01:42:06.310
The second item is a terminal building painting.

01:42:06.310 --> 01:42:09.870
So other than the expansion in 2017,

01:42:09.870 --> 01:42:15.870
the rest of the building hadn't been painted since 2009,

01:42:15.870 --> 01:42:18.670
which is quite a long time.

01:42:18.670 --> 01:42:22.630
That would be $34,500.

01:42:22.630 --> 01:42:32.290
And then a new mower would like to upgrade our current mower, our mower, the end current

01:42:32.290 --> 01:42:36.210
one that we're using is on that picture on the right there is from 2007.

01:42:36.210 --> 01:42:40.170
So we felt like it would be a nice upgrade.

01:42:40.170 --> 01:42:46.330
I didn't pull the oil pan out underneath, but you know, it's quite an old piece of sheeting.

01:42:46.330 --> 01:42:51.370
But that is it for me.

01:42:51.370 --> 01:42:52.720
Any questions?

01:42:52.720 --> 01:42:53.720
Any questions?

01:42:53.720 --> 01:42:55.840
Looks like you're good.

01:42:55.840 --> 01:42:56.840
Thank you.

01:42:56.840 --> 01:43:07.060
Thank you.

01:43:07.060 --> 01:43:11.360
So I'd just like to talk a little bit about the airport construction fund.

01:43:11.360 --> 01:43:14.760
It's a separate fund where we are accounting with our federal projects.

01:43:14.760 --> 01:43:19.760
And often I come in and review the capital improvement plan with you all.

01:43:19.760 --> 01:43:21.460
And we'll continue to do that.

01:43:21.460 --> 01:43:24.560
We usually do that once or twice a year in length.

01:43:24.560 --> 01:43:27.360
So, but really just to look at some of the highlights.

01:43:27.360 --> 01:43:28.560
And there aren't numbers here.

01:43:28.560 --> 01:43:32.760
These federal projects tend to go over one fiscal year.

01:43:32.760 --> 01:43:33.960
It's all federal funding.

01:43:33.960 --> 01:43:36.160
There is a slight component of match.

01:43:36.160 --> 01:43:43.160
So, rather than get caught up with the numbers, we usually just put a placeholder in there and we reconcile at the end of the fiscal year.

01:43:43.160 --> 01:43:47.700
So, Matt Farnsworth's very closely with me on that.

01:43:47.700 --> 01:43:54.700
So, we've been taking just this funding generally as we look historically, we've been taking more and more discretionary type funding.

01:43:54.700 --> 01:43:57.700
There's been more stimulus funding available.

01:43:57.700 --> 01:44:04.700
You've noticed that the capital projects at the airport have been getting pretty expensive.

01:44:04.700 --> 01:44:10.700
So, the first highlight I have here is environmental assessment design, and we've talked about

01:44:10.700 --> 01:44:17.700
the main runway rehabilitation. It's been since 1998, 1999, since the runway was rehabilitated.

01:44:17.700 --> 01:44:23.700
So, we're getting at the point where we're going to need some rehabilitation, some millen overlay,

01:44:23.700 --> 01:44:28.700
and actually some reconstruction where the new crosswind is going to come across this.

01:44:28.700 --> 01:44:32.700
So, we'll have some full depth reconstruction and grades meant for that.

01:44:32.700 --> 01:44:39.120
So, you'll see this year we're starting out, I'll come in with a contract for an environmental

01:44:39.120 --> 01:44:45.060
assessment beginning and 30% design next year, we'll be looking at full-blown design and be

01:44:45.060 --> 01:44:48.460
fairly extensive engineering work next year.

01:44:48.460 --> 01:44:54.140
So, you'll be seeing these types of things rolling through in the coming months.

01:44:54.140 --> 01:45:00.900
Next year we have on our list a lower and a snow blower to sweep or truck, we may be

01:45:00.900 --> 01:45:05.940
ambitious with that but we're aiming high we'll see how if we can negotiate

01:45:05.940 --> 01:45:10.200
some funding there I think we can at least probably get two of those pieces

01:45:10.200 --> 01:45:16.500
next year and we're going to be applying for a discretionary grant through the

01:45:16.500 --> 01:45:21.420
bipartisan infrastructure legislation that came through we've been struggling

01:45:21.420 --> 01:45:25.940
with funding that we have aging infrastructure with the term on roadway

01:45:25.940 --> 01:45:30.920
the sidewalks. I've talked to the council some may remember about the

01:45:30.920 --> 01:45:36.480
front of the terminal building and starting to crumble. The ADA access is

01:45:36.480 --> 01:45:42.760
inferior and not compliant so I think we've got a good chance. We didn't get

01:45:42.760 --> 01:45:46.680
the funding this year but we'll just apply again and fall and I think we

01:45:46.680 --> 01:45:53.860
check a lot of the boxes for some of these terminal funding. Any questions

01:45:53.860 --> 01:45:58.710
about the construction funding in general.

01:45:58.710 --> 01:45:59.630
Looks good Bill.

01:45:59.630 --> 01:46:03.800
We're going to talk a little bit about, you know,

01:46:03.800 --> 01:46:05.920
in the city's mission statement we talk

01:46:05.920 --> 01:46:08.200
about preserving honoring our heritage.

01:46:08.200 --> 01:46:13.200
And next year will be the 75th anniversary of Jawsland Field.

01:46:13.200 --> 01:46:18.360
And you can see the May 2nd headline on Sunday, 1948,

01:46:18.360 --> 01:46:19.960
from our local newspaper.

01:46:19.960 --> 01:46:22.200
There's Mr. and Mrs. Jawsland there.

01:46:22.200 --> 01:46:26.600
And Mayor Lauterbach, I think is the mayor's name at that time.

01:46:26.600 --> 01:46:32.600
They came out 4,000 strong on Saturday the May 1st through snow squalls, believe it or not.

01:46:32.600 --> 01:46:39.600
They had bands from high schools, it was quite a civic event to cut the ribbon on a new airport.

01:46:39.600 --> 01:46:47.600
And these folks had many of the same goals that we do today about prosperity and being accessible and healthy.

01:46:47.600 --> 01:46:50.600
They just wore different fashions and things like that.

01:46:50.600 --> 01:46:55.080
Our forefathers did a great job with taking a decision.

01:46:55.080 --> 01:46:58.920
In fact, the FAA even put out mention recently

01:46:58.920 --> 01:47:03.280
within the trades that we received the very first grant

01:47:03.280 --> 01:47:05.480
after World War II for airport improvement.

01:47:05.480 --> 01:47:08.660
So we had some very progressive people back then,

01:47:08.660 --> 01:47:10.720
lobbying the federal government,

01:47:10.720 --> 01:47:12.680
starting to build an airport for us.

01:47:12.680 --> 01:47:15.520
So more about the air show, the city and counties

01:47:15.520 --> 01:47:18.720
both budgeted 25,000 in next year's budget

01:47:18.720 --> 01:47:25.080
to help fund that event, particularly with its unique characteristic of being an anniversary.

01:47:25.080 --> 01:47:26.080
Any questions about that?

01:47:26.080 --> 01:47:31.080
I'm sure you'll be hearing a lot more about the air shows, we turn into the fall in a

01:47:31.080 --> 01:47:38.580
new year, prosperous community.

01:47:38.580 --> 01:47:44.820
So with tonight's news about the airport joining forces, with the economic development

01:47:44.820 --> 01:47:49.330
directory yet to be hired, I just wanted to talk a little bit about that.

01:47:49.330 --> 01:47:54.050
First of all, I want to say I welcome that pairing with the airport and an economic development

01:47:54.050 --> 01:47:55.050
director.

01:47:55.050 --> 01:47:59.850
I think a lot of good work will come from that in the future years, I think long term,

01:47:59.850 --> 01:48:01.770
that's a nice pairing.

01:48:01.770 --> 01:48:03.250
I wanted to put this up.

01:48:03.250 --> 01:48:08.130
It's almost really what I was thinking in here is what can I say that's very foundational,

01:48:08.130 --> 01:48:13.090
what's almost a definition, what is the core responsibility of an airport and it's much

01:48:13.090 --> 01:48:18.850
like our road systems and many other activities that we do as a public sector organization.

01:48:18.850 --> 01:48:23.090
I just wrote it up there that the airport and it's a belief I have it provides the service

01:48:23.090 --> 01:48:29.170
and infrastructure platform for aeronautical businesses to conduct safe, efficient movement

01:48:29.170 --> 01:48:31.010
of people, goods and services.

01:48:31.010 --> 01:48:37.010
I tried to illustrate some of those things with pictures, but that's what I feel is

01:48:37.010 --> 01:48:39.210
our core responsibility out there.

01:48:39.210 --> 01:48:43.050
You know, when people, you pick up the phone and ask it, when are you going to provide

01:48:43.050 --> 01:48:48.090
more air service, it's something that's really not included in that core definition.

01:48:48.090 --> 01:48:51.410
that we certainly, as public sector organization,

01:48:51.410 --> 01:48:54.410
we try to get together with the private sector out there

01:48:54.410 --> 01:48:56.530
and take advantage of opportunity

01:48:56.530 --> 01:48:59.170
and create prosperity and economic development.

01:48:59.170 --> 01:49:02.170
So I was a highlight here tonight

01:49:02.170 --> 01:49:05.410
and some news about this and I wanted to acknowledge it

01:49:05.410 --> 01:49:07.210
and let you know that I welcome that pairing

01:49:07.210 --> 01:49:13.590
and that restructure that we will see.

01:49:13.590 --> 01:49:14.790
So I wanted to just preview,

01:49:14.790 --> 01:49:16.270
we're gonna talk about three things

01:49:16.270 --> 01:49:19.670
as we just look for improvements in economic development

01:49:19.670 --> 01:49:26.670
I thought I'd just run down, give you a little bit of background and status on where we are with some of these things right here.

01:49:26.670 --> 01:49:33.670
So first off, he's here, so we all know the industry's in pretty rough shape right now.

01:49:33.670 --> 01:49:38.670
Coming off this whole downturn with COVID, now they're suffering with high-fueled prices.

01:49:38.670 --> 01:49:46.670
They've got labor shortages, our local condition, we were really riding a high, we were going to Denver and Salt Lake.

01:49:46.670 --> 01:49:52.250
We had three flights to Salt Lake, one to Denver, and suddenly it seemed like the bottom fell

01:49:52.250 --> 01:49:54.770
out and we reduced to one flight.

01:49:54.770 --> 01:49:57.870
We were asked to provide a minimum of revenue guarantee.

01:49:57.870 --> 01:50:02.590
These are all difficult conversations, so the good news on the revenue guarantee, and

01:50:02.590 --> 01:50:07.610
I've been sending out reports that you've probably seen, it's for fiscal year, just for

01:50:07.610 --> 01:50:10.950
for everyone in the room, it's for fiscal year.

01:50:10.950 --> 01:50:18.950
for calendar year 2022, the revenue guarantee is for $400,000, it's for the 12-month period.

01:50:18.950 --> 01:50:24.750
We had a small payment in the first quarter of $25,000, and the second quarter we're in

01:50:24.750 --> 01:50:25.750
the black.

01:50:25.750 --> 01:50:30.630
There was no subsidy required as a guarantee, so good news.

01:50:30.630 --> 01:50:34.510
I continue to have conversations with the planners at SkyWest.

01:50:34.510 --> 01:50:38.590
We've been also trying to dialogue with Delta when we can.

01:50:38.590 --> 01:50:44.350
Our first goal is to maintain network connectivity with the air transportation system.

01:50:44.350 --> 01:50:48.710
The closest option we have for that is the relationship and the retention of the delta

01:50:48.710 --> 01:50:49.950
service to Salt Lake.

01:50:49.950 --> 01:50:54.750
So that's absolutely our priority to retain and expand that service.

01:50:54.750 --> 01:50:59.110
I think it bodes well that the second quarter of the flights have been very full.

01:50:59.110 --> 01:51:02.710
I think we're averaging about 42% load factors.

01:51:02.710 --> 01:51:05.990
So this isn't lost on the planners at Sky West.

01:51:05.990 --> 01:51:13.990
see this, I've asked them to maybe take a look at that fall schedule, they're very fluid, their fleet is changing.

01:51:13.990 --> 01:51:21.990
There's a lot going on with their organization, but I'm putting as many little placeholders with them as I can at a return.

01:51:21.990 --> 01:51:32.470
So I think as we move into the fall and the last quarter, we'll have to really see what the con to 2023 looks like as this term of this

01:51:32.470 --> 01:51:38.470
of this matter on revenue guarantee starts to expire, so we'll stay tuned on all those

01:51:38.470 --> 01:51:42.670
things that we'll keep you impressed. So economic development, prosperity, I am

01:51:42.670 --> 01:51:48.360
simply we all have a role in that. You know the business community, our citizens, the

01:51:48.360 --> 01:51:53.520
people that fly the business community out at the airport, so I think I'm

01:51:53.520 --> 01:51:58.560
testing out a new slogan for a fly local campaign here tonight, fly local fly twin,

01:51:58.560 --> 01:52:02.400
so we'll have to fit that in somewhere, but I certainly think we all have a role

01:52:02.400 --> 01:52:10.050
in prosperity, general aviation.

01:52:10.050 --> 01:52:14.050
This is activity other than air service.

01:52:14.050 --> 01:52:18.050
For those that aren't familiar with the term, and this is just the sampling

01:52:18.050 --> 01:52:22.050
of the things that happen out at the airport. The photo at the right

01:52:22.050 --> 01:52:26.050
is some overflow from the Allen Convention, I think that was last week.

01:52:26.050 --> 01:52:30.050
So unfortunately we don't look like that every day, but

01:52:30.050 --> 01:52:34.050
I thought I'd just give you a quick shot of what it does look like at times.

01:52:34.050 --> 01:52:37.050
you know, during holidays, sometimes it does look like that.

01:52:37.050 --> 01:52:41.050
But we do have corporate aviation, and I've had people say

01:52:41.050 --> 01:52:44.050
to me, here's Passo, they're all going to Sun Valley,

01:52:44.050 --> 01:52:47.050
and they're all doing this and that, and that's not true.

01:52:47.050 --> 01:52:51.050
There's many businesses in the Magic Valley that use corporate

01:52:51.050 --> 01:52:53.050
aviation to come to town and do business.

01:52:53.050 --> 01:52:56.050
So I'd like to say that they come because we have a nice airport,

01:52:56.050 --> 01:52:58.050
but that's really not why they come.

01:52:58.050 --> 01:53:01.050
They come to do business in the Magic Valley.

01:53:01.050 --> 01:53:05.050
So corporate aviation is a very strong component out there, very important.

01:53:05.050 --> 01:53:10.010
As you know, beyond firefighting, there's strong partners with us.

01:53:10.010 --> 01:53:15.010
We've developed sophisticated firefighting base. I think they'll be with us in a long long haul.

01:53:15.010 --> 01:53:19.010
I'm renegotiating at least renew it with them currently.

01:53:19.010 --> 01:53:24.010
Ag Spring is really hard to quantify. We know Ag is a huge economic driver.

01:53:24.010 --> 01:53:31.010
And aerial applicators that use the airport to use fertilizers and herbicides.

01:53:31.010 --> 01:53:37.810
Those types of things play an important role in the agricultural production and prosperity.

01:53:37.810 --> 01:53:41.770
Like training, I'm really proud of the new school we have out there, we're training more

01:53:41.770 --> 01:53:46.770
pilots, those are the future hand-your-owners, and just people that enjoy flying, maybe they

01:53:46.770 --> 01:53:52.010
take off an east flight flying for other components of business.

01:53:52.010 --> 01:53:58.050
Medical transport, well hours of the day, I can't say enough about that military cargo

01:53:58.050 --> 01:54:00.890
with the FedEx facility is quite an investment

01:54:00.890 --> 01:54:02.690
and certainly the pleasure of flying.

01:54:02.690 --> 01:54:05.130
So that's a sampling of those other things

01:54:05.130 --> 01:54:06.710
that happen out at the airport

01:54:06.710 --> 01:54:13.060
that I think are very important for our community.

01:54:13.060 --> 01:54:16.220
So it was in 2021, I came to the council,

01:54:16.220 --> 01:54:18.700
there was some council directed a capital spending

01:54:18.700 --> 01:54:22.420
that I had requested for utilities to complement

01:54:22.420 --> 01:54:26.340
the Northeast development area and the taxi lanes out there.

01:54:26.340 --> 01:54:28.900
We currently have one hand or pictured up there

01:54:28.900 --> 01:54:33.220
on the right next to FedEx that's being constructed,

01:54:33.220 --> 01:54:35.220
and that should be nearing completion here

01:54:35.220 --> 01:54:36.700
in the next month or two.

01:54:36.700 --> 01:54:39.860
Large hanger, 120 by 100 feet.

01:54:39.860 --> 01:54:42.340
We've got more conversations going on

01:54:42.340 --> 01:54:43.580
about near-term development.

01:54:43.580 --> 01:54:47.260
So, with those utilities, it would have been impossible

01:54:47.260 --> 01:54:48.820
to really get to this point.

01:54:48.820 --> 01:54:51.700
So, appreciate the investment once again,

01:54:51.700 --> 01:54:55.500
and I think long-term land development is steady dollars

01:54:55.500 --> 01:54:59.880
and steady revenue.

01:54:59.880 --> 01:55:01.680
So, if you're happy to answer any questions

01:55:01.680 --> 01:55:54.560
Thank you, thank you, thank you, thank you for your participation, as a liaison, and bringing

01:55:54.560 --> 01:55:58.000
those messages forth in the community as an ambassador.

01:55:58.000 --> 01:56:01.240
Thank you.

01:56:01.240 --> 01:56:02.240
Anybody else?

01:56:02.240 --> 01:56:05.580
Thank you Bill.

01:56:05.580 --> 01:56:06.580
Thank you Mayor.

01:56:06.580 --> 01:56:11.930
Thank you Council.

01:56:11.930 --> 01:56:13.930
All right so that's it for our focus areas tonight.

01:56:13.930 --> 01:56:17.930
So I just have one or two quick more slides for you.

01:56:17.930 --> 01:56:18.930
You've seen this one before.

01:56:18.930 --> 01:56:28.930
This is that list that we've been kind of populating as we've gone through the last several meetings of some of those ideas you might have for your Council directed capital, the 7, and 7,000.

01:56:28.930 --> 01:56:30.930
And notice I added one this week.

01:56:30.930 --> 01:56:35.930
The bottom one on that list is the downtown residential historic district investigation.

01:56:35.930 --> 01:56:43.930
If you all were paying attention this last week we had an open house where we invited all those folks from the downtown area to come and hear it.

01:56:43.930 --> 01:56:47.930
We have a public hearing scheduled on the 15th. There's nothing in the budget.

01:56:47.930 --> 01:56:59.930
Or this investigation happened. So if after the 15th the council would like for us to move forward with that creation process we had Jonathan present to you all a couple of months ago.

01:56:59.930 --> 01:57:04.850
Okay, we have a project estimate what that would cost to do the investigation all that kind of stuff and this is kind of a

01:57:04.850 --> 01:57:09.290
Middle of the road we got range from a little high to a little lower than this number

01:57:09.490 --> 01:57:15.410
So there's nothing budgeted in the 23 budget to move forward that project if we

01:57:15.770 --> 01:57:19.370
It liked to move forward with that project after that hearing on the 15th

01:57:19.570 --> 01:57:22.970
We need to find some money for it here's potentially one source of money for it

01:57:22.970 --> 01:57:28.150
It could also maybe go into contingency or we can grab some reserves or whatever, but I thought I'd throw it up there for you to

01:57:28.150 --> 01:57:30.150
So you're saying August 15th, that's it?

01:57:30.150 --> 01:57:31.150
It's 15th.

01:57:31.150 --> 01:57:37.300
But we have to make our allocation decision for that.

01:57:37.300 --> 01:57:42.300
We will set the maximum spending a couple of weeks before that.

01:57:42.300 --> 01:57:51.850
And so we need to start thinking about, I guess, like I said, there's a couple of sources we can.

01:57:51.850 --> 01:57:52.850
This is one.

01:57:52.850 --> 01:57:54.850
Contingency would be another.

01:57:54.850 --> 01:57:57.850
We need to pull some money out of reserves to put in for that.

01:57:57.850 --> 01:57:59.850
We could do that as well.

01:57:59.850 --> 01:58:07.230
The budget right now doesn't include any of those things for this particular project.

01:58:07.230 --> 01:58:14.350
So, again, we'll need to, we'll need you would ask that we hear from the both sides.

01:58:14.350 --> 01:58:20.350
Certainly at the open house that we had, there was both sides present, more so than the first presentation.

01:58:20.350 --> 01:58:25.350
It's not quite so unanimous as maybe it appeared to be, so we'll hear from them on the 15th.

01:58:25.350 --> 01:58:27.350
It's just you thinking about that.

01:58:27.350 --> 01:58:31.350
And so anyway, not necessarily making a plug for it.

01:58:31.350 --> 01:58:34.350
Just kind of get it up there so we can start thinking about it.

01:58:34.350 --> 01:58:37.350
The other thing that I've done in tonight's presentation,

01:58:37.350 --> 01:58:40.350
if you would like us to go there, this last bullet point

01:58:40.350 --> 01:58:43.350
is the master plan, sidewalk priorities.

01:58:43.350 --> 01:58:46.350
And so I've got several slides here if you would like to.

01:58:46.350 --> 01:58:50.350
We can talk about what some of those other sidewalk projects are,

01:58:50.350 --> 01:58:53.350
if you want to talk about that, or we can save that for next time.

01:58:53.350 --> 01:58:57.120
And I think you're in here too.

01:58:57.120 --> 01:58:58.120
What do you want?

01:58:58.120 --> 01:58:59.120
I think I can talk about those.

01:58:59.120 --> 01:59:00.120
I've been a minute on the sidewalk.

01:59:00.120 --> 01:59:01.120
Okay.

01:59:01.120 --> 01:59:02.120
With my swell.

01:59:02.120 --> 01:59:03.120
While we're in here.

01:59:03.120 --> 01:59:09.590
On a roll.

01:59:09.590 --> 01:59:10.590
Five or six slides here.

01:59:10.590 --> 01:59:11.590
This one will show you.

01:59:11.590 --> 01:59:19.800
Well, I'm here to get some room.

01:59:19.800 --> 01:59:20.800
Okay, Councilman.

01:59:20.800 --> 01:59:22.800
Which was about to steal my thunder.

01:59:22.800 --> 01:59:23.800
Yeah.

01:59:23.800 --> 01:59:28.800
So, this first slide, actually, I think speaks volumes to what we've been able to accomplish

01:59:28.800 --> 01:59:30.800
the last couple of years.

01:59:30.800 --> 01:59:35.800
The Sidewalk Master Plan was kind of the brainchild back in 2019 and we got it.

01:59:35.800 --> 01:59:43.240
It came to you in 2020, like 2020, and kind of showed you some options of different areas

01:59:43.240 --> 01:59:46.520
for sidewalk that would help with connectivity.

01:59:46.520 --> 01:59:50.680
This map actually shows all of the pieces that we have done since that time.

01:59:50.680 --> 02:00:00.120
You can see that there's quite a few pieces completed, is thanks to the Council Director

02:00:00.120 --> 02:00:03.040
funded piece that you were all a part of.

02:00:03.040 --> 02:00:05.000
So, personally, I want to say thank you.

02:00:05.000 --> 02:00:14.000
I did not realize how much of a success this plan was going to be and now that I'm here and looking at it, we've done quite a bit of work.

02:00:14.000 --> 02:00:25.000
So, this has been completed from the original plans. You see, these are what's left and so I went through and kind of chose a few pieces that I thought would be important for you to see.

02:00:25.000 --> 02:00:34.380
We are in the process of adding some more locations to the plan. We've got about six other locations that we're trying to get at it, but of course with the shortage of staff

02:00:34.380 --> 02:00:39.380
staff or superheroes as much call them. We're running just a little bit behind the schedule.

02:00:39.380 --> 02:00:45.800
So the first location that I want to talk about tonight is on Stadium Boulevard.

02:00:45.800 --> 02:00:52.800
This is east of East one Drive. There's a little section of the concrete sidewalk that's missing.

02:00:52.800 --> 02:00:56.800
We estimate about $80,000 to complete this little piece here.

02:00:56.800 --> 02:01:05.560
The question is about that location. I'm going too fast, but I do know your time is valuable.

02:01:05.560 --> 02:01:19.480
That would be part of the original design when we look at it, but I believe we already have the right away in this location.

02:01:19.480 --> 02:01:22.480
So the successor, I'm going to back up one slide.

02:01:22.480 --> 02:01:26.480
So the success story here is both location D and location N.

02:01:26.480 --> 02:01:31.480
Oh, this year we're just doing the design, looking right away only.

02:01:31.480 --> 02:01:34.480
If you're not right, Cammy here, go and we talked about that.

02:01:34.480 --> 02:01:38.480
This year we're almost through the design with both of those two locations.

02:01:38.480 --> 02:01:40.480
There's no right away that's going to be needed.

02:01:40.480 --> 02:01:46.640
So that kind of saves us some time, and then the other nice piece is when the design's done,

02:01:46.640 --> 02:01:51.600
we'll have a very good cost estimate to come back and say, this is what those two locations will cost us.

02:01:51.600 --> 02:01:52.240
Go ahead.

02:01:52.240 --> 02:01:58.730
Aaron, on this map, B does not have a location. A blue box, what is it?

02:01:58.730 --> 02:02:05.560
So B was right there by the nursing school, across the street from North College,

02:02:05.560 --> 02:02:07.400
from CSI, and that was completed.

02:02:07.400 --> 02:02:15.790
So first location, second location is actually right there,

02:02:15.790 --> 02:02:18.550
and the street just crossed the street from the library.

02:02:18.550 --> 02:02:21.750
There's no sidewalk along the city park portion,

02:02:21.750 --> 02:02:26.750
and so this location actually is the piece

02:02:26.750 --> 02:02:29.110
of missing sidewalks, so we believe it'll cost us

02:02:29.110 --> 02:02:33.560
about $271,000 to do.

02:02:33.560 --> 02:02:35.040
We're pretty confident with that cost

02:02:35.040 --> 02:02:37.480
that that's about what it'll cost us.

02:02:37.480 --> 02:02:39.280
So that's another piece that I think is critical

02:02:39.280 --> 02:02:43.690
that adds connectivity to the library

02:02:43.690 --> 02:02:47.690
down to the city buildings. It's just a critical piece that's missing on that side.

02:02:47.690 --> 02:02:55.000
So the next location is down at Southwood, close to South Hills Middle School.

02:02:55.000 --> 02:02:59.000
Now there is a subdivision that's been added so this estimate is going to be high,

02:02:59.000 --> 02:03:03.000
but there's a subdivision that was added that did a piece of that sidewalk already

02:03:03.000 --> 02:03:09.000
so we can, we'll be able to take that portion out. I just don't know what it is yet.

02:03:09.000 --> 02:03:13.000
And the other piece that we've been dealing with a lot with is the rise in inflation and construction

02:03:13.000 --> 02:03:22.150
So a lot of these estimates change, but I think this one, the price, would be the last

02:03:22.150 --> 02:03:26.150
thing that we're showing here because of the peaks that was constructed with the construction

02:03:26.150 --> 02:03:27.150
of the subdivision.

02:03:27.150 --> 02:03:33.500
So Aaron, on this piece, when they get to Washington, they're away from the pedestrians.

02:03:33.500 --> 02:03:40.230
They get bad assumptions and most of the kids get across Washington.

02:03:40.230 --> 02:03:48.510
Don't, so as part of this design, we take a look at that.

02:03:48.510 --> 02:03:52.670
because the last thing I want is people crossing at 45 miles an hour right there

02:03:52.670 --> 02:03:55.770
so we definitely take a look at something to see what that is.

02:03:55.770 --> 02:03:59.870
That would be part of that $350,000 or so.

02:03:59.870 --> 02:04:06.720
Last but not, let's see, no, this is the last month.

02:04:06.720 --> 02:04:11.760
So this is the current, in this current fiscal year we budgeted for the design of this one.

02:04:11.760 --> 02:04:18.320
I've had multiple individuals reach out to us as we were out walking the site with the designer

02:04:18.320 --> 02:04:24.830
and the surveyor, they were approached and the residents very much want the sidewalk to be completed.

02:04:24.830 --> 02:04:30.830
I don't count some member Brown and Rita both heard from citizens and they reached out to me personally say,

02:04:30.830 --> 02:04:36.830
hey we need to get this one done. So this is one that the design is in process and then once we get that design,

02:04:36.830 --> 02:04:43.470
it'll probably be another couple of months. I'll have a good estimate, but we can fund this for design for next year.

02:04:43.470 --> 02:04:50.810
the principal behind this one. The last one is on Elizabeth Boulevard right there

02:04:50.810 --> 02:04:55.290
between Harman Park and it'll create a connection from Harman Park all the way

02:04:55.290 --> 02:04:59.450
to Eastland. There's a short section already towards the east on your map.

02:04:59.450 --> 02:05:04.170
There's already sidewalk and so really we'll just make a solid connection all

02:05:04.170 --> 02:05:08.490
the way through. We've got a few little pieces of art. There's a few little pieces

02:05:08.490 --> 02:05:12.490
in here that they're like an, for example, the box culvert that takes the

02:05:12.490 --> 02:05:19.490
I have to take a look at that, make sure that everything's okay with that, but that's all being taken care of right now with it, with the design.

02:05:19.490 --> 02:05:33.930
So again, a couple of months when I get the final design done, we'll be able to come back with that as done to tell you exactly any questions about anything that I've talked about.

02:05:33.930 --> 02:05:42.380
So, Erica, can you back up to the first one too?

02:05:42.380 --> 02:05:52.840
So, short section, Emanislyn has a sidewalk deferral?

02:05:52.840 --> 02:05:53.840
Yes.

02:05:53.840 --> 02:05:55.840
So, there are no sidewalks that at that corner?

02:05:55.840 --> 02:06:01.840
I believe the sidewalk's already in place on that corner, so the deferral, I'm not sure which she says that's a...

02:06:01.840 --> 02:06:02.840
The sidewalk?

02:06:02.840 --> 02:06:09.680
Yeah, I'm not sure why that line doesn't continue, my guess is, because it was a deferral we didn't include it, but we would...

02:06:09.680 --> 02:06:15.790
to council ask to go after them if they get the sidewalk to come in.

02:06:15.790 --> 02:06:22.570
As we run into some of these projects around, is that a...

02:06:22.570 --> 02:06:23.570
Absolutely.

02:06:23.570 --> 02:06:29.170
Yep, it's, you know, that's one of the tools in our toolbox that we carry around with us, right?

02:06:29.170 --> 02:06:33.170
of those is the deferral mechanism. Others are grants, you know, those kinds of things,

02:06:33.170 --> 02:06:40.230
but that one definitely is a...

02:06:40.230 --> 02:06:44.640
Any other questions? Perfect. Thanks. Good information.

02:06:44.640 --> 02:06:59.820
I think that's it for you for a presentation. If you don't have any more questions, I'll just tell

02:06:59.820 --> 02:07:07.260
you that next week we're going to talk about Focus Area 2 and 3. We're going to have the Library here

02:07:07.260 --> 02:07:10.260
to talk to you a little bit about what's going on with the Library and the Lab on the public safety

02:07:10.260 --> 02:07:15.260
folks, so police and fire and dispatching the city attorney's office is going to train.

02:07:15.260 --> 02:07:39.020
So, that completes the business, next item on the agenda is the time for public input.

02:07:39.020 --> 02:07:46.420
Anybody in the audience wishes to address council on items not, well I guess if there's any comments

02:07:46.420 --> 02:07:55.460
on the budget that would be allowed but also any other items not on the agenda that you wish

02:07:55.460 --> 02:08:05.440
to comment on. There's anybody in the audience? One scene, no one. Advisory board reports.

02:08:05.440 --> 02:08:16.520
Did he have anything to manage his office?

02:08:16.520 --> 02:08:20.970
I think you all have been being aware of this but we are back together as a city for our

02:08:20.970 --> 02:08:26.250
city breakfast squirrely. That's this Thursday, Thursday, just as a reminder for you.

02:08:26.250 --> 02:08:38.020
Okay, so that we will move on to public hearings.

02:08:38.020 --> 02:08:40.020
Do you guys want to take a five minute break?

02:08:40.020 --> 02:08:42.020
You want to go?

02:08:42.020 --> 02:08:46.290
We have two public hearings.

02:08:46.290 --> 02:09:00.120
So we have two public hearings tonight.

02:09:00.120 --> 02:09:03.120
I'm going to go ahead and read the rules to set work.

02:09:03.120 --> 02:09:07.670
Okay, so we're going to follow this agenda.

02:09:07.670 --> 02:09:10.410
City staff will present the request and analysis.

02:09:10.410 --> 02:09:14.010
The applicant will then present their request.

02:09:14.010 --> 02:09:18.710
The council will then ask questions of the applicant or staff.

02:09:18.710 --> 02:09:22.910
And after questions have been asked, the public hearing will be open.

02:09:22.910 --> 02:09:26.610
Anyone in attendance is given the opportunity to comment or ask questions

02:09:26.610 --> 02:09:29.030
about the request being considered.

02:09:29.030 --> 02:09:33.950
When you give testimony in the public hearing, please step up to the podium,

02:09:33.950 --> 02:09:38.710
State your name and address and present your comments and concerns.

02:09:38.710 --> 02:09:44.770
After giving testimony, please sign the public sign and sheet located in the lobby with your

02:09:44.770 --> 02:09:51.670
name and address and we will allow two minutes for those of that testimony.

02:09:51.670 --> 02:09:56.670
After public comments are concluded, the applicant will be invited to answer any questions and

02:09:56.670 --> 02:09:58.870
make a closing statement.

02:09:58.870 --> 02:10:02.390
Staff will then answer or clarify any comments as needed.

02:10:02.390 --> 02:10:08.760
And then we will, after the closing of the public, after the closing statements, public

02:10:08.760 --> 02:10:15.040
hearing will be closed, no further testimony from the applicant or audience, and then council

02:10:15.040 --> 02:10:18.560
will have our discussion.

02:10:18.560 --> 02:10:24.680
So first on the agenda is an action item requesting a zoning district change and zoning

02:10:24.680 --> 02:10:34.240
map amendment from R4 to R4 ZDA for approximately 34 acres on property located at the 1200 to

02:10:34.240 --> 02:10:45.560
of the east side of Harrison Street, South Carolina, on behalf of Idaho Land Holding LLC,

02:10:45.560 --> 02:10:55.170
and we have Lisa Strickland, City Planning, welcome Lisa.

02:10:55.170 --> 02:10:57.410
Good evening Mayor and Council.

02:10:57.410 --> 02:11:02.950
This is a request for the property located along the 1,200 and 1,300 block of Harrison

02:11:02.950 --> 02:11:12.150
Street, to rezone the property from R4 to R4 ZDA for approximately 34 acres. ZDA allows

02:11:12.150 --> 02:11:18.250
development to request variations to the zoning and development standards and provide flexibility

02:11:18.250 --> 02:11:23.190
using a creative approach to land development. The property does not have any significant

02:11:23.190 --> 02:11:29.790
zoning history and is undeveloped. It is surrounded by both residential and undeveloped properties.

02:11:29.790 --> 02:11:36.670
The proposed development is for attached single household dwellings or town homes with four

02:11:36.670 --> 02:11:38.430
units per building.

02:11:38.430 --> 02:11:42.990
The property will be subdivided to allow for individual ownership and will consist of a

02:11:42.990 --> 02:11:47.150
layout that has 75 buildings with 300 residential units.

02:11:47.150 --> 02:11:51.670
The remainder of the area surrounding the lots will be owned and maintained collectively

02:11:51.670 --> 02:11:56.750
by the owners in the subdivision and will provide open space for the residents.

02:11:56.750 --> 02:12:02.470
The Arford Zone allows for attached single household dwellings, also known as townhouses,

02:12:02.470 --> 02:12:05.230
on lots fronting arterials and collectors.

02:12:05.230 --> 02:12:13.150
The development will be constructed along an extension of Pheasant Road, which is a collector.

02:12:13.150 --> 02:12:18.270
The applicant has provided several depictions of varying types of structures with basic architecture,

02:12:18.270 --> 02:12:22.270
such as single story and two story buildings with pitched roofs.

02:12:22.270 --> 02:12:26.070
There will be multiple streets constructed to support this development as well as provide

02:12:26.070 --> 02:12:32.130
future connections as more development occurs. The applicant has provided a phase plan consisting

02:12:32.130 --> 02:12:38.450
of three phases with plans to complete the project by 2027. Currently, the density provided

02:12:38.450 --> 02:12:44.890
for in the R4 zoning district will allow for 11,000 square foot loss with the four plaques

02:12:44.890 --> 02:12:51.170
on each one, which is the equivalent of approximately 400 dwelling units. The applicant

02:12:51.170 --> 02:12:56.170
has applied for a zoning development agreement in order to provide a master development plan

02:12:56.170 --> 02:13:04.130
and to request some exceptions to the code that would allow for this 300 dwelling unit.

02:13:04.130 --> 02:13:08.130
Exceptions include a change in the following requirements.

02:13:08.130 --> 02:13:13.130
The minimum lot area would be changed from 4,000 to 720 square feet.

02:13:13.130 --> 02:13:19.130
The maximum lot occupancy would go from 60% to 100%.

02:13:19.130 --> 02:13:25.130
They would have no property line setbacks which would allow each dwelling to be built on the property line.

02:13:25.130 --> 02:13:30.640
There is no current screening requirement in our city code.

02:13:30.640 --> 02:13:40.640
However, the development is planned to have a six-foot fence installed around the perimeter of the property to minimize the impacts of the surrounding properties.

02:13:40.640 --> 02:13:49.640
Staff has reviewed this request. This is not for C. The exceptions, nor the land uses of townhounds being detrimental.

02:13:49.640 --> 02:13:54.640
that are mentally different from current permitted land uses within the zoning district.

02:13:54.640 --> 02:14:01.640
Each townhouse can be individually owned and is more in line with a typical residential development rather than apartment complexes.

02:14:01.640 --> 02:14:08.640
The design provides a reasonable out of open space and should help lower the visual impacts of the cluster development.

02:14:08.640 --> 02:14:17.640
Staff has determined the overall development will have a similar impact on the surrounding area as a typical subdivision.

02:14:17.640 --> 02:14:22.040
And we find this plan to be in conformance with the overall goals and objectives listed

02:14:22.040 --> 02:14:23.880
within the comprehensive plan.

02:14:23.880 --> 02:14:27.960
Upon conclusion, the Planning and Zoning Commission recommended approval of the request

02:14:27.960 --> 02:14:31.960
as presented on June 14th, 2022 to the Council.

02:14:31.960 --> 02:14:37.720
Should the Council approve the request as presented, staff recommends the following conditions.

02:14:37.720 --> 02:14:41.800
Subject to site plan amendments as required by building, engineering, fire, and zoning

02:14:41.800 --> 02:14:47.040
officials to comply with applicable city code and standards.

02:14:47.040 --> 02:14:53.400
So one of the things I wanted to show you on the site plan that they provided originally

02:14:53.400 --> 02:15:03.480
a pheasant road was going to go straight east and dead end and there were residential homes

02:15:03.480 --> 02:15:04.960
there.

02:15:04.960 --> 02:15:15.240
And we know that in the future there may be plans to have a school on the school property

02:15:15.240 --> 02:15:22.720
that is just southeast of this location, so the developer, we brought them in and they

02:15:22.720 --> 02:15:31.100
worked really closely with us to try and make a better connection for pheasant, so that if

02:15:31.100 --> 02:15:35.420
a school were to develop southeast of this property, they would be able to make a connection

02:15:35.420 --> 02:15:43.300
as well, to pheasant, so that once the area is constructed, we actually will have an east-west

02:15:43.300 --> 02:15:50.100
connection from Blue Lakes to Pheasant, which we think was very important when you're looking

02:15:50.100 --> 02:16:11.220
at the overall picture of how the area is planned to develop.

02:16:11.220 --> 02:16:17.980
So if you see Pheasant Road, it is going to now come from the west, it's going to curve

02:16:17.980 --> 02:16:23.980
down just a little bit, and it's going to connect to Gregory, which is the one that runs north

02:16:23.980 --> 02:16:29.840
and south, and then there will be a way for a connection to occur on the east boundary

02:16:29.840 --> 02:16:52.200
of this property that can be connected to blue lakes. Staff reviewed this site master plan

02:16:52.200 --> 02:16:59.200
and feels like it's pretty compatible with the comprehensive plan. And as stated before,

02:16:59.200 --> 02:17:05.640
the development with an R4 would naturally allow for 400 units. There's 300 in this one

02:17:05.640 --> 02:17:10.640
And there is a much more open space and a walkability.

02:17:12.370 --> 02:17:14.090
This concludes my presentation,

02:17:14.090 --> 02:17:16.690
and the applicant is here to answer any questions

02:17:16.690 --> 02:17:18.570
and do their presentation as well.

02:17:18.570 --> 02:17:20.050
And I'll stand for any.

02:17:20.050 --> 02:17:26.010
Any questions for Lisa?

02:17:26.010 --> 02:17:32.130
Does that look like?

02:17:32.130 --> 02:17:34.010
Evening, Madam Mayor, members of the City Council.

02:17:34.010 --> 02:17:35.210
My name is David Tebow,

02:17:35.210 --> 02:17:38.570
with the EHA Engineer's at 621 North College Road.

02:17:38.570 --> 02:17:39.530
Here in Twin Falls,

02:17:39.530 --> 02:17:41.410
I'm representing the applicant this evening

02:17:41.410 --> 02:17:44.090
for the request for ZDA.

02:17:44.090 --> 02:17:49.450
The applicant has constructed these types of units already, south of Twin, just south

02:17:49.450 --> 02:17:55.080
and west of the middle school that's built on Harrison Street, just kind of south of

02:17:55.080 --> 02:17:56.080
this project.

02:17:56.080 --> 02:18:01.880
And that project was successful, so they've come back and are requesting the ZDA to accomplish

02:18:01.880 --> 02:18:02.880
the same thing.

02:18:02.880 --> 02:18:05.800
Just on Mauryacridge this time, we have 34 acres in this project.

02:18:05.800 --> 02:18:13.280
We're proposing about 75% of the maximum density that's available to us with the base R4 zone.

02:18:13.280 --> 02:18:20.280
So the R4 ZDA zone, there's a couple points I'd like to make, maybe to help clarify just a few points.

02:18:20.280 --> 02:18:27.280
So we're requesting a deviation or change from your city code as it's written today with the minimum lot area.

02:18:27.280 --> 02:18:32.280
So each of these structures, the one that I'm kind of pointing to, has a dashed line around it right there.

02:18:32.280 --> 02:18:37.280
And that is actually a lot. That line sits about two feet out of the proposed building footprint.

02:18:37.280 --> 02:18:44.000
And that is the reason that we're asking for a minimum 722 square foot lot is so that each

02:18:44.000 --> 02:18:49.080
of these residential townhome type units can be located on their own lot.

02:18:49.080 --> 02:18:53.160
And then there will be lots that are the common area around the perimeter.

02:18:53.160 --> 02:18:57.000
There's some advantages financially and managerial relief for that condition.

02:18:57.000 --> 02:18:58.800
And so that's why we're requesting it.

02:18:58.800 --> 02:19:04.640
That request was granted in their other project as well, so it's consistent from project to project.

02:19:04.640 --> 02:19:08.040
at least alluded to the fact that we would provide perimeter fencing, I just want to make

02:19:08.040 --> 02:19:12.240
sure everybody understood perimeter fencing be along the north boundary, potential along

02:19:12.240 --> 02:19:17.740
the east boundary, the south boundary, and it may be somewhat intermittent along here

02:19:17.740 --> 02:19:22.240
since we're here, we would not fence off a pheasant or feather or graggery inside the

02:19:22.240 --> 02:19:23.240
project.

02:19:23.240 --> 02:19:30.420
There will be onsite management on this project, I'm going to have some office space, at least

02:19:30.420 --> 02:19:40.370
available to manage. Similarly with the law size, the minimum law size we are asking for

02:19:40.370 --> 02:19:44.930
zero-lot lines so again the structure can be constructed just right in immediate proximity.

02:19:44.930 --> 02:19:48.770
We still maintain building separation that's consistent with fire code

02:19:48.770 --> 02:19:53.250
recommendations and guidelines that would afford us the most cost-effective

02:19:53.250 --> 02:19:57.620
building structure. I believe they're spaced out at about 20 feet between the

02:19:57.620 --> 02:20:01.900
structures sufficient parking zone sign. We're not deviating from the city's parking

02:20:01.900 --> 02:20:06.970
code, but we're just asking for the ZDA as it's written and presented here this

02:20:06.970 --> 02:20:11.050
evening to be approved. It's very similar to what they've already completed and

02:20:11.050 --> 02:20:17.130
constructed as far as the deviations from city code. This project does have a

02:20:17.130 --> 02:20:20.930
lot of open space and we did work extensively with state staff to make

02:20:20.930 --> 02:20:25.690
sure that Fesin could transition towards the south and have a connection for a

02:20:25.690 --> 02:20:32.040
potential future school. Immediately north is probably notable to point north of

02:20:32.040 --> 02:20:35.400
This project is the Calist-Doga Springs subdivision,

02:20:35.400 --> 02:20:37.640
which is commenced with their first phase of construction

02:20:37.640 --> 02:20:38.480
up on Orchard.

02:20:38.480 --> 02:20:40.500
They'll phase from north to south

02:20:40.500 --> 02:20:45.580
and be towards a construct down to this location.

02:20:45.580 --> 02:20:49.120
It does tie in.

02:20:49.120 --> 02:20:51.960
I stand for any questions that Council might have.

02:20:51.960 --> 02:20:53.720
Not very good.

02:20:53.720 --> 02:20:55.640
You, this is one question.

02:20:55.640 --> 02:21:02.090
So each of the, would be its own mod.

02:21:02.090 --> 02:21:03.090
Yes.

02:21:03.090 --> 02:21:07.280
And the open space would be probably multiple lots.

02:21:07.280 --> 02:21:10.120
Yeah, because of the roadways, same ownership,

02:21:10.120 --> 02:21:12.920
more than likely with the manager management.

02:21:12.920 --> 02:21:15.320
And then the parking lot, so what there?

02:21:15.320 --> 02:21:18.860
So if I went up on a townhouse, is it just the house?

02:21:18.860 --> 02:21:24.350
Yep, that's correct.

02:21:24.350 --> 02:21:25.990
I believe that would be held in common interest

02:21:25.990 --> 02:21:26.830
in management.

02:21:26.830 --> 02:21:40.410
Any questions for staff before?

02:21:40.410 --> 02:21:45.310
Okay, so we will now open up this project

02:21:45.310 --> 02:21:47.330
for a public hearing.

02:21:47.330 --> 02:21:52.090
Again, you come down to the podium, please state your name

02:21:52.090 --> 02:21:57.610
address and present your comments or concerns. Is there anybody that wishes to speak on this

02:21:57.610 --> 02:22:10.330
project? Seeing none, we will close the public hearing. Any questions for staff? Jason?

02:22:10.330 --> 02:22:23.630
I've got a question. So I look at the, I guess the site location, that lateral running through

02:22:23.630 --> 02:22:31.630
that location. The yellow line is associated with that, but on the site map, it looks like

02:22:31.630 --> 02:22:36.830
there's a little bit more something in squaring off. Are we encompassing all of that property

02:22:36.830 --> 02:22:49.480
in this? Yes. The top of the specimen. So since the time that we've submitted this application,

02:22:49.480 --> 02:22:56.640
the landowner to the north and the applicant have actually completed a land on line adjustment.

02:22:56.640 --> 02:23:00.640
That's what I need to say, a lot of line adjustment to square that off.

02:23:00.640 --> 02:23:07.640
And so the plan that you see before you, it has a straight sort of east-west line is the accurate boundary as it exists today.

02:23:07.640 --> 02:23:13.640
Prior to completing that line adjustment, it did follow the center of that line.

02:23:13.640 --> 02:23:28.240
Okay, correct. Thank you. Any other questions? Time for discussion.

02:23:28.240 --> 02:23:49.360
I also wish I did close the public. John Marigar.

02:24:59.240 --> 02:25:06.120
to seek change and map amendment for the property 1200 to 1300 blocks of the east side of Harrison

02:25:06.120 --> 02:25:16.800
Street South. Any further discussion? Aaron roll call vote please. Jason Brown. Yes.

02:25:16.800 --> 02:25:23.200
Andrew Cutler. Yes. Mayor Pierce. Yes. Vice-married. Yes. Sean Baraker. Yes.

02:25:23.200 --> 02:25:25.200
Thank you, Boyd. Yes.

02:25:25.200 --> 02:25:28.200
Thank you. Motion passes 6-0.

02:25:28.200 --> 02:25:30.520
Thank you.

02:25:30.520 --> 02:25:40.120
Okay. Next public hearing is a request for a zoning title amendment to Title 10, Chapter 4, Section 19,

02:25:40.120 --> 02:25:45.020
Canyon Rim Overlay, Removing Permitted and Special Uses,

02:25:45.020 --> 02:25:50.920
Modifying a Loud Maximum Heights, and Removing the CDA Requirement,

02:25:50.920 --> 02:25:55.920
of Ria Ramon on behalf of North County Medical Center.

02:25:56.440 --> 02:26:02.040
Again, we have Lisa Strickland, welcome Lisa again.

02:26:02.120 --> 02:26:04.280
Good evening, Mayor and Council.

02:26:04.280 --> 02:26:08.120
This is a request to amend the Canyon Rim Overlay

02:26:08.120 --> 02:26:11.520
Zoning District Title by removing certain sections

02:26:11.520 --> 02:26:14.720
regulating land use types, ZDA requirements

02:26:14.720 --> 02:26:17.520
and amending location restrictions

02:26:17.520 --> 02:26:19.720
on applying for extra building height.

02:26:19.720 --> 02:26:26.360
Title 10 419 was adopted in 1996, and the intent was to establish an overlay district

02:26:26.360 --> 02:26:27.880
for the Canyon Rim.

02:26:27.880 --> 02:26:32.920
The overlay along the Snake River Canyon Rim includes all of the area within 700 feet of

02:26:32.920 --> 02:26:38.720
the rim and all of the area within 200 feet of the rim along the Rock Creek Canyon.

02:26:38.720 --> 02:26:45.840
In 2006 and 2014, limits to this title dealing with the building high restrictions were approved,

02:26:45.840 --> 02:26:50.840
that additional building heights beyond 100 feet from the canyon rim may be allowed,

02:26:50.840 --> 02:26:54.290
but only in certain locations.

02:26:54.290 --> 02:27:00.290
Within 1,000 feet of state administered highway, or between Washington and Blue Lakes,

02:27:00.290 --> 02:27:09.290
and only for certain land use types, such as hotel, convention center, or private public mixed-use developments.

02:27:09.290 --> 02:27:15.290
The code also requires a zoning development agreement for all development proposed in the overlay area

02:27:15.290 --> 02:27:19.290
within the 700 and the 200 feet from the rent, respectively.

02:27:19.290 --> 02:27:25.290
The applicant has coordinated with staff on the proposal to amend Title 10-419,

02:27:25.290 --> 02:27:29.290
Canyon Ramp Overlay, and upon request, staff provided a draft

02:27:29.290 --> 02:27:33.290
of the proposed changes we've been working on internally.

02:27:33.290 --> 02:27:36.290
These changes would include removing land use regulations,

02:27:36.290 --> 02:27:39.290
updating the building height development standards,

02:27:39.290 --> 02:27:42.290
and removing the requirement for a zoning development agreement

02:27:42.290 --> 02:27:44.290
for proposed developments within the overlay.

02:27:44.290 --> 02:27:49.910
removal of the use regulations would cause the land uses to be determined by the base

02:27:49.910 --> 02:27:55.230
zone district upon which the overlay is placed. Placing the building height development standards

02:27:55.230 --> 02:28:01.830
with a while for the maximum height allowed for the base zone within 100 feet of the canyon

02:28:01.830 --> 02:28:09.630
rim, additional height beyond 50 feet would be required to follow city code 1073, a process

02:28:09.630 --> 02:28:14.710
it requires a public hearing and final approval from the City Council. Currently, a zoning

02:28:14.710 --> 02:28:20.310
development agreement is required if the property is within the Canyon Room overlay and the purpose

02:28:20.310 --> 02:28:26.190
of a zoning district development agreement is to allow for development creativity and

02:28:26.190 --> 02:28:32.350
allow an applicant to request variations from the underlying zoning and development requirements.

02:28:32.350 --> 02:28:38.430
Historically, the ZDA requests have been used for the state of purpose in the code have not

02:28:38.430 --> 02:28:43.190
been used for the state of purpose in the code, rather it's been used to ask for additional

02:28:43.190 --> 02:28:49.870
height and to modify permitted and special use land uses. The Snake River Canyon is a

02:28:49.870 --> 02:28:54.750
space with natural beauty. It's been developed with requirements for public amenities such

02:28:54.750 --> 02:28:59.630
as walking trails for all to enjoy. The Snake River Canyon has been an attractive area for

02:28:59.630 --> 02:29:06.150
development over the years with the majority of undeveloped areas currently master planned

02:29:06.150 --> 02:29:09.590
within an existing planning and development, or a zoning

02:29:09.590 --> 02:29:11.310
development agreement.

02:29:11.310 --> 02:29:14.270
The amendment to the title eliminating the zoning development

02:29:14.270 --> 02:29:17.790
agreement requirement within the governed by the base zoning

02:29:17.790 --> 02:29:20.830
district upon which the overlay is placed.

02:29:20.830 --> 02:29:24.510
For City Code 1014-5, the commission

02:29:24.510 --> 02:29:27.870
was to hold a public hearing and make recommendations

02:29:27.870 --> 02:29:31.630
on proposing a zoning amendment.

02:29:31.630 --> 02:29:34.750
The commission prior to recommending the zoning title

02:29:34.750 --> 02:29:43.190
amendment held that hearing on June 14th, 2022, and made a positive recommendation to

02:29:43.190 --> 02:29:46.590
approve this request as presented.

02:29:46.590 --> 02:29:51.110
Council is charged with deciding to approve the request, deny the request, table the request

02:29:51.110 --> 02:29:55.050
for additional information, or approve with conditions.

02:29:55.050 --> 02:29:59.150
In the event that Council shall approve the amendment, it will be made part of this title

02:29:59.150 --> 02:30:01.550
upon preparation and passage of importance.

02:30:01.550 --> 02:30:06.900
This concludes my presentation. I'll stand for any questions and the applicant is present

02:30:06.900 --> 02:30:15.300
for theirs. Any questions for Lisa at this point? Let's move on to that.

02:30:15.300 --> 02:30:29.330
Council members, Scott Daly, other services from North Canyon Mental Center, are protected

02:30:29.330 --> 02:30:37.230
following the Illinois Law Project granted. This isn't a project specific request, but

02:30:37.230 --> 02:30:57.800
this is what we serve services in the clinic, in adjacent to the property that we use approximately

02:30:57.800 --> 02:31:03.520
that that space is not sufficient to expand the services.

02:31:03.520 --> 02:31:10.750
So we've been working with LCA on a design of a new 20,000 square foot building to expand

02:31:10.750 --> 02:31:14.220
the services that we can offer in the Twin Falls community.

02:31:14.220 --> 02:31:18.220
The design incorporated the look in the field of North Canyon but also took into account

02:31:18.220 --> 02:31:22.400
the location so that it would enhance the location.

02:31:22.400 --> 02:31:26.940
Due to recent events as well as the location of the property we felt had in the outdoor.

02:31:26.940 --> 02:31:36.300
We tasked LCA with creating that space and it was actually on the rooftop so instead

02:31:36.300 --> 02:31:38.300
to have your top access for maintenance.

02:31:38.300 --> 02:31:41.300
We'd have a patio where we can meet and gather outside

02:31:41.300 --> 02:31:46.700
in the process, review process.

02:31:46.700 --> 02:31:57.070
We found out that it's impossible to do the one-leaser in her team.

02:31:57.070 --> 02:32:12.940
So it was determined to request this code change.

02:32:12.940 --> 02:32:19.710
Any questions for the applicant?

02:32:19.710 --> 02:32:28.340
It doesn't look like, okay, so...

02:32:28.340 --> 02:32:30.340
I have a question for Lisa.

02:32:30.340 --> 02:32:32.050
Okay.

02:32:32.050 --> 02:32:36.230
So in your presentation and the notes,

02:32:36.230 --> 02:32:47.950
to this process has been used for construction within the reference that...

02:32:47.950 --> 02:33:00.770
Yes, we had quite a few that are about height and that they want to do the mixed-use developments,

02:33:00.770 --> 02:33:06.770
and so that they adjust their development plans based on special use permits

02:33:06.770 --> 02:33:12.770
and permitted uses moving special use permits, land uses to permitted uses

02:33:12.770 --> 02:33:18.770
and there's only development agreements, so we found that quite a few along the north on the Snake River,

02:33:18.770 --> 02:33:26.730
the Snake River Canyon Rim were related to height and adding that in their agreement.

02:33:26.730 --> 02:33:41.030
So, that's in the packet that basically redlines the east coast and reverts it back to,

02:33:41.030 --> 02:34:01.290
does it have the unscathed purple step backs?

02:34:01.290 --> 02:34:21.020
So, the landscaping currently is that their 20% of the total area included any commercial ratios,

02:34:21.020 --> 02:34:23.820
She has filaments, a canner in the related district,

02:34:23.820 --> 02:34:26.700
shall be devoted to lens open space.

02:34:26.700 --> 02:34:28.060
That's not changing.

02:34:28.060 --> 02:34:30.060
That's what's in the code currently.

02:34:30.060 --> 02:34:34.060
And the street covers and all of that.

02:34:34.060 --> 02:34:35.380
That's not going away.

02:34:35.380 --> 02:34:37.660
That's all in the current.

02:34:37.660 --> 02:34:42.430
That's in the current, yes.

02:34:42.430 --> 02:34:56.620
The other thing I want to show is we have kind of a visual aid.

02:34:56.620 --> 02:35:01.860
So currently, if they're at least 100 feet from the rim,

02:35:01.860 --> 02:35:09.100
They can, the height of the building can gradually go up to 35 feet and this code of

02:35:09.100 --> 02:35:16.780
in with allow for when they get to 150 feet, it could gradually increase from 35 to 50

02:35:16.780 --> 02:35:17.780
foot height.

02:35:17.780 --> 02:35:33.220
The height increase is, it doesn't change how it's allowed currently, it's just allowing

02:35:33.220 --> 02:35:41.030
for them to have a 50 foot building, but they still have to be 150 feet from the rim.

02:35:41.030 --> 02:35:46.270
want to go taller than 50 feet then they have to go through this public hearing

02:35:46.270 --> 02:35:50.230
process which requires two public hearings one for zoning they make a

02:35:50.230 --> 02:35:54.030
recognition council council has public hearing and they make a final decision

02:35:54.030 --> 02:35:57.860
on the additional height.

02:36:14.170 --> 02:36:39.680
But it does not necessarily leave that as how I've been reading it.

02:36:39.680 --> 02:36:41.700
So one could...

02:36:41.700 --> 02:36:51.000
...stroll steak or with a trail?

02:36:51.000 --> 02:36:52.000
Or with...

02:36:52.000 --> 02:36:55.000
...as we typically usually actually require what they've done.

02:36:55.000 --> 02:37:07.700
The trail would be required, but it wouldn't necessarily need to be landscaped as the other buffers are required.

02:37:07.700 --> 02:37:08.700
Thank you, Sean. Jason.

02:37:08.700 --> 02:37:15.700
So, just if I heard you correctly, this would be a global change for the Canyon Rim overlay.

02:37:15.700 --> 02:37:25.910
looking at the meeting minutes from the planning and zoning, this would be a change, the whole

02:37:25.910 --> 02:37:34.700
canneagram overlay, once we're from 100 to 150 feet, we could go up to 50 feet, is that?

02:37:34.700 --> 02:37:40.220
It's based on the base zone, so if it's residential, the maximum height is 35.

02:37:40.220 --> 02:37:45.660
So whatever that base zone is still beyond that point, but this is across the board, can

02:37:45.660 --> 02:37:56.470
Yes, it's commercial, and it's for the whole snake river and rock creek canyon.

02:37:56.470 --> 02:38:01.140
And that's basically the only change.

02:38:01.140 --> 02:38:08.140
Other than taking away the list of land uses that were in there, basically those would go away,

02:38:08.140 --> 02:38:18.500
and whatever the property has for a underlying zone will determine what the land uses would be.

02:38:18.500 --> 02:38:36.790
So intrusive is this on owners.

02:38:36.790 --> 02:38:46.760
They would have to get a special use permit to be on this list that's crossed out.

02:38:46.760 --> 02:38:49.760
Whatever their zone is, that's what they can do.

02:38:49.760 --> 02:38:55.760
And if they wanted to do one of these things in it, they could get a special use permit to do that.

02:38:55.760 --> 02:39:04.760
Actually, what's occurring is this list is what has actually restricted previous owners' abilities to ask for things.

02:39:04.760 --> 02:39:21.480
But we're now taking the restriction away, allowing just the base zone, so in a commercial zone, typically you're permitted to do some of these things like have a bakery, which uses C1 zone as a permanent, right?

02:39:21.480 --> 02:39:27.060
This really actually restricted in saying you need to dismiss use permit.

02:39:27.060 --> 02:39:34.730
Now we're going to remove that and just go with what the permanent uses are of C1, or the special uses of the C1.

02:39:34.730 --> 02:39:40.620
But it's actually removing the regulation on the property.

02:39:40.620 --> 02:39:46.380
So property owner is actually gaining more property rights back.

02:39:46.380 --> 02:39:53.380
I'm going to say 99% of the cases that I can think of, there might be one that I'm missing, but the majority of it, the regulations being removed and they have them.

02:39:53.380 --> 02:40:01.540
For example, if somebody wanted to like the one proposal we had about three years ago,

02:40:01.540 --> 02:40:13.620
other than the height variance, the other uses they were requesting would have just automatically been approved.

02:40:13.620 --> 02:40:18.620
I believe if you're talking about some, yes, and a very specific one that I've stopped on

02:40:18.620 --> 02:40:23.620
because it's come up a few times is the alcohol beverages are consumed on premises.

02:40:23.620 --> 02:40:29.860
The C1 zone says you can do that outright, but if you have or within 300 feet, get a specialist

02:40:29.860 --> 02:40:30.860
permit.

02:40:30.860 --> 02:40:35.020
The canner and overlay said you sell them anywhere in the canner and overlay, get a specialist

02:40:35.020 --> 02:40:36.020
permit, right?

02:40:36.020 --> 02:40:42.160
A matter of it's just around the other commercial businesses, so we've had, I can specifically

02:40:42.160 --> 02:40:46.960
lose place pizza, which actually was split in half with the building where they were selling

02:40:46.960 --> 02:40:52.400
it was in the canner overlay, where they stored it was out of it, and it was very particular,

02:40:52.400 --> 02:40:54.600
So they needed to get a Smoshy's permit.

02:40:54.600 --> 02:40:58.870
This would just take that away, go for what the base zone is.

02:40:58.870 --> 02:41:01.110
We require a lot less work.

02:41:01.110 --> 02:41:05.180
So yes, for some things.

02:41:05.180 --> 02:41:09.950
Any other questions?

02:41:09.950 --> 02:41:16.030
Hey, so we've had a presentation from the applicant and staff.

02:41:16.030 --> 02:41:20.750
And so next I would open up the public hearing.

02:41:20.750 --> 02:41:23.870
Again, anybody in attendance?

02:41:23.870 --> 02:41:26.150
You wish to give testimonies, please step up

02:41:26.150 --> 02:41:28.990
to the podium, state your name and address,

02:41:28.990 --> 02:41:34.470
and don't forget to sign the book when you leave.

02:41:34.470 --> 02:41:36.110
So, thank you, go ahead.

02:41:36.110 --> 02:41:38.310
I'm Raskin Zilopkin, I'm David Tebow.

02:41:38.310 --> 02:41:41.390
This time I'm representing a handful of developers

02:41:41.390 --> 02:41:44.770
that are in the vicinity who've reviewed this language

02:41:44.770 --> 02:41:47.910
as part of North Canyon Medical's request this evening.

02:41:47.910 --> 02:41:50.390
I work from Mr. Taylor, the Ryso family,

02:41:50.390 --> 02:41:52.710
and Mr. Lithommies, and Mr. Shillington,

02:41:52.710 --> 02:41:56.870
who all own properties in some type of ZD or PUD

02:41:56.870 --> 02:41:59.890
on the canyram there in support of this request.

02:41:59.890 --> 02:42:02.850
It appears that the area between Blue Lakes

02:42:02.850 --> 02:42:04.610
and Washington was seriously contemplated

02:42:04.610 --> 02:42:07.170
for additional height, allowing up to 50 feet,

02:42:07.170 --> 02:42:09.130
consistent with the C-1 zone.

02:42:09.130 --> 02:42:11.370
However, there are some other areas outside of that

02:42:11.370 --> 02:42:13.370
that are now being developed.

02:42:13.370 --> 02:42:16.930
And they were forgotten in our underlying city code.

02:42:16.930 --> 02:42:20.420
Similar to what Lisa has presented,

02:42:20.420 --> 02:42:23.540
the canyram overlays extends some 750 feet south

02:42:23.540 --> 02:42:24.780
of the canyon rim.

02:42:24.780 --> 02:42:27.540
In fact, the property that North Canyon Medical Homes

02:42:27.540 --> 02:42:30.220
happens to be on the south side of Pole Line Road,

02:42:30.220 --> 02:42:34.020
and yet is impacted and affected by this height restriction.

02:42:34.020 --> 02:42:35.540
They're not the only ones.

02:42:35.540 --> 02:42:38.820
So we did work with city staff.

02:42:38.820 --> 02:42:40.820
I was involved with this process as well,

02:42:40.820 --> 02:42:45.510
and some of the language review proposed changes

02:42:45.510 --> 02:42:47.230
that are under revision for Title 10

02:42:47.230 --> 02:42:48.590
that have not yet been completed,

02:42:48.590 --> 02:42:50.630
because we've just been a little bit busy developing

02:42:50.630 --> 02:42:52.510
other things in the Valley,

02:42:52.510 --> 02:42:54.950
would have addressed some of these issues,

02:42:54.950 --> 02:42:57.150
and ideas that are being presented,

02:42:57.150 --> 02:42:58.950
and we would hope that we would have the support

02:42:58.950 --> 02:43:00.590
of the council in this request this evening.

02:43:00.590 --> 02:43:01.750
Thank you.

02:43:01.750 --> 02:43:04.160
Thank you, Dan.

02:43:04.160 --> 02:43:06.920
Any other public people from the audience

02:43:06.920 --> 02:43:11.740
that wish to address this issue?

02:43:11.740 --> 02:43:16.150
Seeing none, do you have any response to,

02:43:16.150 --> 02:43:17.790
or are I close to public hearing?

02:43:17.790 --> 02:43:19.790
A public hearing is closed.

02:43:22.770 --> 02:43:28.220
So council, what would you like to have some discussion?

02:43:28.220 --> 02:43:31.430
Any wish to?

02:43:31.430 --> 02:43:34.390
Yes, thank you, Mayor.

02:43:34.390 --> 02:43:46.750
So, were you with some comments on addressing the issues between Washington and Blue Lakes?

02:43:46.750 --> 02:43:48.750
That's where activity was great.

02:43:48.750 --> 02:43:51.040
I was even on the council at that time.

02:43:51.040 --> 02:43:56.040
Maybe raise that question at the time of what we do when everything starts moving the other

02:43:56.040 --> 02:43:59.730
direction, but I'm consistent.

02:43:59.730 --> 02:44:00.730
See there?

02:44:00.730 --> 02:44:08.040
I guess my only general comment I would make because I know that the Canyon Rim is one of

02:44:08.040 --> 02:44:25.550
those discussed past the honest with you, I'm frankly a little surprised we haven't heard

02:44:25.550 --> 02:44:39.400
where you put about this, except for the fact I'm certainly supportive of this revision, as

02:44:39.400 --> 02:44:47.120
long as the who is involved in ownership or property out there and development of property

02:44:47.120 --> 02:44:52.880
understands that the community's voice has spoken in the past and the purpose remains the

02:44:52.880 --> 02:45:27.200
of what the Kingdom of that stated very commissively happier and think responsible as so.

02:45:27.200 --> 02:45:56.790
So the C1 on, say, X, Y, Z, and I think it is a little bit of a slippery slope.

02:45:56.790 --> 02:46:02.090
Yes, I'd make that more as a plea to...

02:46:02.090 --> 02:46:33.500
I know it's late, I guess I have to add my piece.

02:46:33.500 --> 02:46:38.500
When I saw this on the agenda, I thought, oh, I don't feel good about this at all, because I thought about it.

02:46:38.500 --> 02:46:40.500
I got more and more comfortable.

02:46:40.500 --> 02:46:42.500
It's logical, it makes sense.

02:46:42.500 --> 02:46:43.500
It's cleaner.

02:46:43.500 --> 02:46:48.500
So, yeah, I'm just apprehensive on anything with this topic,

02:46:48.500 --> 02:46:51.500
but really I think that's maybe a need trick reaction.

02:46:51.500 --> 02:46:55.110
I do like this when considered in a hole.

02:46:55.110 --> 02:46:56.110
So, thank you.

02:46:56.110 --> 02:46:59.840
What else? Just to comment.

02:46:59.840 --> 02:47:11.760
Any wish to make motion?

02:47:11.760 --> 02:47:21.100
Where options are, prove the amendment, and hide it, or...

02:47:21.100 --> 02:47:24.100
Table of four information, or a conditioner.

02:47:24.100 --> 02:47:32.470
If there's a material change, we would need to talk with Shane about how large that is, isn't it?

02:47:32.470 --> 02:47:36.350
Potential to go back to the not money zoning commission. Thank you

02:47:36.350 --> 02:47:44.050
I mean again, I know Spencer sort of said as as I look at what the change actually is

02:47:44.710 --> 02:47:46.710
It's it's really

02:47:49.020 --> 02:47:52.860
Loosening the kinds of things that can be built out there a little bit

02:47:53.260 --> 02:47:55.660
In some zones, but not much

02:47:56.460 --> 02:48:00.460
There were a ton of absolutely can't do this

02:48:01.580 --> 02:48:03.580
C1 PUD or C1 CDA

02:48:03.580 --> 02:48:13.590
And really sort of standardized the height thing without having to go through a process.

02:48:13.590 --> 02:48:18.590
The rest of the, I mean that's why I was asking a lot of questions about the landscape and things,

02:48:18.590 --> 02:48:22.590
because that's important too, and that's all still there.

02:48:22.590 --> 02:48:34.250
Past, obviously being here, I think the height of the restriction is really what a lot of the conversation in the community

02:48:34.250 --> 02:48:40.250
and their feeling was around some of these, and maybe that's why I asked the question

02:48:40.250 --> 02:48:44.700
of where some of those heights or stretches of things stay in this area.

02:48:44.700 --> 02:48:50.190
We lose that height, the collection is not.

02:48:50.190 --> 02:49:13.020
Yes and no, you know.

02:49:13.020 --> 02:49:16.310
Do I want to, you know, 20 stories skyscraper there?

02:49:16.310 --> 02:49:21.320
Maybe not, but times it's pretty.

02:49:21.320 --> 02:49:25.280
This happens to be North Canyon brought this one up tonight,

02:49:25.280 --> 02:49:32.280
where we're pushing it. I mean the location that that specific facility is intended to go for.

02:49:32.280 --> 02:49:44.130
There's no issues, but I think it goes back to just that feeling of what the community is.

02:49:44.130 --> 02:50:30.620
It is the subject matter that's so hard.

02:50:30.620 --> 02:50:35.540
Isn't that potentially a bit redundant?

02:50:35.540 --> 02:50:39.540
When you're minutes within a certain zone, what you can and can't do,

02:50:39.540 --> 02:50:44.540
and then you list all this other stuff, what's almost like you're repeating, partially?

02:50:44.540 --> 02:50:53.210
I think it's time to clean it up a little bit.

02:50:53.210 --> 02:50:55.490
But, history.

02:50:55.490 --> 02:50:56.490
I'll make a motion.

02:50:56.490 --> 02:51:07.270
I feel that the changes are ultimately in the spirit of what was originally desired.

02:51:07.270 --> 02:51:19.580
Everybody's comment is a little concerning conversations, and people here, I was surprised

02:51:19.580 --> 02:51:24.900
that there's only a few of us here with this.

02:51:24.900 --> 02:51:31.900
So, Mayor, I move that we approve the Zoning Title Amendment to Title 10, Chapter 4, Section 19,

02:51:31.900 --> 02:51:36.860
Overlay removing permitted and special uses, modifying out loud maximum

02:51:36.860 --> 02:51:44.790
heights and removing the CDA requirement. As presented. Thank you. Do I have a second?

02:51:44.790 --> 02:51:54.020
I'll second. Thank you. Motion by Christopher Reed, seconded by Jason Brown,

02:51:54.020 --> 02:51:59.940
to approve the we cause for zoning title amendment to title 10 chapter 4 section

02:51:59.940 --> 02:52:14.800
2019 Canyon Rim Overlay. Any further discussion? Aaron Rokavo, please. Spencer Cutler. Yes. Mayor Pierce. Yes.

02:52:14.800 --> 02:52:24.200
Vice Mayor Reed. Yes. Sean Barreger. Yes. Nicki Boyd. Yes. Jason Brown. Yes. Thank you. Motion passes 6-0.

02:52:24.200 --> 02:52:28.200
Thank you, everyone. That is the end of the meeting.

02:52:28.200 --> 02:52:30.200
Enjoy your evening.