WEBVTT

00:01:38.510 --> 00:01:43.880
members are in attendance this evening these rise for the pledge of

00:01:43.880 --> 00:02:14.780
proclamations this evening so we will move forward to the consent calendar and

00:02:14.780 --> 00:02:22.900
I will turn it to the council. Ruth Pierce? Yes Mayor I move we approve the

00:02:22.900 --> 00:02:29.100
consent calendar. We have a motion from Ruth Pierce seconded by Sean

00:02:29.100 --> 00:02:33.100
to approve the consent calendar as printed.

00:02:33.100 --> 00:02:35.100
Give me roll call vote please.

00:02:35.100 --> 00:02:40.140
Yes. Yes. Yes.

00:02:40.140 --> 00:02:48.470
Yes. Yes. Thank you.

00:02:48.470 --> 00:02:54.140
This is 7-0. If you are here this evening for the Twin Falls Old Town Criterion,

00:02:54.140 --> 00:03:03.300
that was just approved with all of our other house going to move on to our items of consideration.

00:03:03.300 --> 00:03:10.300
And first this evening we have a presentation on the finances of the City of Twin Falls for the third quarter.

00:03:10.300 --> 00:05:13.510
And we have our Chief Financial Officer, Brianna Howard, the C.E.

00:05:13.510 --> 00:05:17.790
for the City of Twin Falls and talk about the budget as a whole.

00:05:17.790 --> 00:05:22.750
And where we are at currently, and talk about the enterprise funds,

00:05:22.750 --> 00:05:27.780
where we said to compare it against the nation and going forward.

00:05:27.780 --> 00:05:31.060
So this first slide has a couple of graphs.

00:05:31.060 --> 00:05:35.900
The first graph shows the total budget as it is split into our

00:05:35.900 --> 00:05:40.300
Property tax are tax-supported funds and are non-tax-supported funds.

00:05:40.300 --> 00:05:46.120
The 40% is our most-ier enterprise funds, which are water, wastewater, and sanitation.

00:05:46.120 --> 00:05:50.880
And the tax-supported funds at 60% is right around 46 million.

00:05:50.880 --> 00:05:55.420
So when we talk about the property taxes that we receive or what we most of our general fund

00:05:55.420 --> 00:05:58.940
is, that's off of the 60% category.

00:05:58.940 --> 00:06:04.220
The major fund composition is a recap of what makes up most of those funds.

00:06:04.220 --> 00:06:13.980
General Fund is 38% as most, water is at 17%, wastewater and street are just under 13 and 12%.

00:06:16.900 --> 00:06:23.740
This next slide shows the fund composition for our tax supported funds. The General Fund makes

00:06:23.740 --> 00:06:30.140
up 64% so most of our tax supported funds is allocated to the General Fund and then the second

00:06:30.140 --> 00:06:36.540
one is that streets at 20%. Our largest contributing revenue sources are from property taxes,

00:06:36.540 --> 00:06:41.500
52% comes from property taxes at $23.9 million.

00:06:41.500 --> 00:06:46.300
The total revenues in the tax-supported funds make up 46 million.

00:06:46.300 --> 00:06:51.190
The six largest revenue sources make up 88%.

00:06:51.190 --> 00:06:58.220
Included in other is airport revenues and permits.

00:06:58.220 --> 00:07:04.520
This next slide is our property taxes for the last four years.

00:07:04.520 --> 00:07:09.800
We budget right around so normally we get 3% increase in property taxes with

00:07:09.800 --> 00:07:11.860
the annexation and new construction.

00:07:11.860 --> 00:07:15.140
So you can see from 2018 starting at 20 million,

00:07:15.140 --> 00:07:17.940
up to the 23 million that we have budgeted

00:07:17.940 --> 00:07:19.860
for this last fiscal year.

00:07:19.860 --> 00:07:21.820
This last fiscal year was quite different

00:07:21.820 --> 00:07:24.780
because of Governor Little's plan

00:07:24.780 --> 00:07:28.140
and the amount that we received when we received it.

00:07:28.140 --> 00:07:29.780
So currently at a property tax,

00:07:29.780 --> 00:07:31.820
as we've only received 12 million,

00:07:31.820 --> 00:07:35.340
as opposed to the 14 almost 15 million last year.

00:07:35.340 --> 00:07:36.180
But if you'll remember,

00:07:36.180 --> 00:07:38.340
we actually opted into Governor Little's plan,

00:07:38.340 --> 00:07:45.020
of three cities, fuel, Kimberly and us, and that was $5.2 million that we pushed back to

00:07:45.020 --> 00:07:51.540
our residents in the city of Twin Falls. So we've received $12 million plus the $5 million

00:07:51.540 --> 00:07:57.620
that we received earlier on the year, which gives us a total of $17,497. We actually just

00:07:57.620 --> 00:08:06.810
received the last $6 million, $6.8 last week. So we've received 100 percent just shortly

00:08:06.810 --> 00:08:12.050
after this close. I talked with Becky Peterson at the Twin Falls County and

00:08:12.050 --> 00:08:17.810
she says collections are at 97.97% and she actually said when I was on the phone

00:08:17.810 --> 00:08:22.090
with her that we are blessed to live in the city of Twin Falls and as I go for

00:08:22.090 --> 00:08:26.850
some of these numbers you'll see that like last time we are starting sky

00:08:26.850 --> 00:08:35.040
rocketing ahead our other states in the nation. This next slide shows our

00:08:35.040 --> 00:08:39.460
for major revenue sources outside of property taxes.

00:08:39.460 --> 00:08:42.220
Franchise fees, 4% of the total revenues

00:08:42.220 --> 00:08:44.420
and the tax-supported funds.

00:08:44.420 --> 00:08:47.860
And I have a detailed slide a little bit in the next one.

00:08:47.860 --> 00:08:52.860
Last year, we'd received 78%, we're just over that at 89%.

00:08:52.860 --> 00:08:54.820
And most of that is because of our power,

00:08:54.820 --> 00:08:59.740
because of the hot summer that we are experiencing.

00:08:59.740 --> 00:09:03.820
State share revenues, we've received quarterly 78%,

00:09:03.820 --> 00:09:07.820
We're at 86% this year at $4.1 million.

00:09:07.820 --> 00:09:11.900
This is an item that we will start to see more closely

00:09:11.900 --> 00:09:13.380
budgeted in the next few years,

00:09:13.380 --> 00:09:16.500
because the state legislature capped us at 1%

00:09:16.500 --> 00:09:18.220
in population size.

00:09:18.220 --> 00:09:20.980
So in the past where we've seen excess money

00:09:20.980 --> 00:09:22.900
coming from state revenue sharing,

00:09:22.900 --> 00:09:25.940
we won't going forward as we start narrowing down

00:09:25.940 --> 00:09:29.340
what that 1% cap is gonna look like.

00:09:29.340 --> 00:09:32.540
Highway actually is a number that can be influenced

00:09:32.540 --> 00:09:33.700
by the economy.

00:09:33.700 --> 00:09:38.700
So we're at 102% and we are ahead of the three-year average.

00:09:38.700 --> 00:09:43.420
We've received a one-time payment of $563,000,

00:09:43.420 --> 00:09:46.460
but this money also comes from vehicle registration fees,

00:09:46.460 --> 00:09:49.660
state fuel taxes, and other transportation-related fees,

00:09:49.660 --> 00:09:51.620
such as fines and forficures.

00:09:51.620 --> 00:09:56.670
So we are significantly over in our highway money.

00:09:56.670 --> 00:09:59.950
The next slide breaks up the franchise fees.

00:09:59.950 --> 00:10:02.230
We've got gas, electric, and cable.

00:10:02.230 --> 00:10:05.110
Gas is the first one in red over the last few years.

00:10:05.110 --> 00:10:10.110
It's relatively consistent around 310,000 until 2018.

00:10:10.270 --> 00:10:12.510
And that's when we had a record cold year

00:10:12.510 --> 00:10:15.270
with daily cold temperatures.

00:10:15.270 --> 00:10:19.470
As opposed to 18 electric this year,

00:10:19.470 --> 00:10:23.230
we've gotten $1.1 million, which is the flip side.

00:10:23.230 --> 00:10:26.550
We've had record high temperatures for months on end,

00:10:26.550 --> 00:10:30.110
and we are receiving more from electric companies.

00:10:30.110 --> 00:10:34.150
Cable's small enough itself continues to decline every year.

00:10:34.150 --> 00:10:38.710
There was an article in the county today quoted Brendan Carr, a Republican member for

00:10:38.710 --> 00:10:43.630
the Federal Communications Commission, saying, we're taxing the telephone networks to pay

00:10:43.630 --> 00:10:49.030
for the broadband network that's like taxing horseshoes to pay for highways.

00:10:49.030 --> 00:10:53.630
Carr, another interview, also said one way to do that is by getting companies such as

00:10:53.630 --> 00:10:56.110
Amazon, Google, and Netflixe to pay.

00:10:56.110 --> 00:11:06.370
If and when I've listened to Travis's presentations enough on sales tax in 1% and yes, knowing

00:11:06.370 --> 00:11:10.650
that would probably. I think that's the last time that I probably answered me and I've

00:11:10.650 --> 00:11:15.210
forgotten already is that strictly television or do we yet the franchise fee on the internet?

00:11:15.210 --> 00:11:19.710
That's television only cable and PMT is what cable that requires state law

00:11:19.710 --> 00:11:24.170
change to be able to collect it on internet or not. As internet's where with

00:11:24.170 --> 00:11:27.650
everybody pulling the flag supposedly everybody's going to stream services

00:11:27.650 --> 00:11:32.890
which are not be taxed because that's your internet so I wanted to have that

00:11:32.890 --> 00:11:38.960
We'll take a state law to help us set on that or not.

00:11:38.960 --> 00:11:43.720
So I think it's important to look at a franchise fee as a rent.

00:11:43.720 --> 00:11:46.600
So the franchise fee is a rent for individuals

00:11:46.600 --> 00:11:51.240
to be able to write some way, not necessarily

00:11:51.240 --> 00:12:02.470
a risk inside of a kid.

00:12:02.470 --> 00:12:05.190
Because of how a franchise fee is set up,

00:12:05.190 --> 00:12:09.190
which gives them the right to utilize our right of ways,

00:12:09.190 --> 00:12:14.490
franchise fee is the rent that they pay for that entirely

00:12:14.490 --> 00:12:18.520
certain the city of New Falls can make a clear waste.

00:12:18.520 --> 00:12:20.320
But when you start looking at streaming services

00:12:20.320 --> 00:12:29.130
that are going to be coming through a satellite provider of service.

00:12:29.130 --> 00:12:38.440
You have the cable and it runs on the same lines.

00:12:38.440 --> 00:12:41.180
It's in our street as the television signal does.

00:12:41.180 --> 00:12:43.280
And I think that we've had conversations in the past

00:12:43.280 --> 00:12:46.500
about how that's protected as a form of communication.

00:12:46.500 --> 00:12:49.240
But Ching can jump into that so big,

00:12:49.240 --> 00:12:54.010
leaves that it might be more.

00:12:54.010 --> 00:12:54.850
And that's correct.

00:12:54.850 --> 00:12:58.430
We're seeing a lot of different municipalities

00:12:58.430 --> 00:13:01.290
wrestle with this idea because you can have one provider come in

00:13:01.290 --> 00:13:05.370
and lay infrastructure that with fiber that could run

00:13:05.370 --> 00:13:09.610
both cable and internet. As you're describing here, there are certain state

00:13:09.610 --> 00:13:14.130
laws for some of those providers that say cities you can't have a separate

00:13:14.130 --> 00:13:17.850
franchise agreement. We're actually working through that that balance right

00:13:17.850 --> 00:13:22.610
now as to are you truly a telephone? Are you truly a cable? Are you just providing

00:13:22.610 --> 00:13:27.210
internet? And so it's not real easy to answer the question because a lot of

00:13:27.210 --> 00:13:33.050
companies do all of those things and expect whatever law at state level helps

00:13:33.050 --> 00:13:37.810
in the best. And so we're negotiating with a couple of companies right now that are wanting

00:13:37.810 --> 00:13:43.450
to come into Twin Falls with the fiber, for example, and they provide us a certificate saying

00:13:43.450 --> 00:13:50.250
you know we've registered with the state of Idaho as a video provider therefore we should

00:13:50.250 --> 00:13:59.610
just get a right-of-way permit and be done and know that's long-winded way of saying it really

00:13:59.610 --> 00:14:08.590
depends on the company that's coming in.

00:14:08.590 --> 00:14:28.170
I think that's something to consider, for example, a one-service at my home, but I only use it for internet, and so I think that that's something to

00:14:28.170 --> 00:14:58.770
dust that same others and that is relative association about those or someone else to...

00:14:58.770 --> 00:15:16.720
Statewide for broadband, and I assume that's going to come in as we see who's...

00:15:16.720 --> 00:15:33.250
The states are struggling with the same issue that the taxes of franchise fees are coming from, something that's irrelevant.

00:15:33.250 --> 00:15:52.710
This next slide shows where we are at budget to actual expenditures.

00:15:52.710 --> 00:15:58.330
The red is what we budgeted for the year, and the yellow is where we have come in.

00:15:58.330 --> 00:16:04.770
Right now the 74% is deceptive, it seems like that's very close to the 75%, but what you'll

00:16:04.770 --> 00:16:12.010
see here and with water and wastewater, water and sanitation specifically is we actually

00:16:12.010 --> 00:16:16.670
have, we're on a biweekly of pay scale, so we have one extra pay check, so that would

00:16:16.670 --> 00:16:21.870
be you'd almost think that we should be just above 75%, which is like everybody in the

00:16:21.870 --> 00:16:31.810
city in the nation, we are significantly our labor shortage and the expense. So we are

00:16:31.810 --> 00:16:39.800
actually under budget in personnel but it's not by will, it's by the amount of positions.

00:16:39.800 --> 00:16:45.320
So deceptive at 74%, it's less than what we budgeted and it's not where we want to be.

00:16:45.320 --> 00:16:56.210
M&O is pretty close right around 75%. It's at 5.8 million. Our capital is less because

00:16:56.210 --> 00:17:01.370
of streets. So typically streets does most of their work later on towards the end of this

00:17:01.370 --> 00:17:06.270
quarter and then the last part of the year. Last year we were actually pretty close to

00:17:06.270 --> 00:17:12.410
right around the same dollar amount. The biggest projects that we've got going is Hankins Road

00:17:12.410 --> 00:17:18.250
and Seal Coating the $6.7 million. So once we see those come to fruition, we'll start

00:17:18.250 --> 00:17:22.210
to see that actually this last quarter we're going to see that. That go back to where it

00:17:22.210 --> 00:17:25.450
It should be.

00:17:25.450 --> 00:17:33.130
It transfers are high because of our annual sweep from the capital improvement to, or from

00:17:33.130 --> 00:17:37.060
the capital improvement.

00:17:37.060 --> 00:17:38.060
We're at 72%.

00:17:38.060 --> 00:17:48.000
Next couple slides, we've talked a little bit in the past about our building permits because

00:17:48.000 --> 00:17:49.000
it's astronomical.

00:17:49.000 --> 00:17:55.480
What we're seeing today is not normal and we see it all over Twin Falls.

00:17:55.480 --> 00:17:58.200
As you can see, we've budgeted $1.1 million

00:17:58.200 --> 00:17:59.640
for our building permit revenue,

00:17:59.640 --> 00:18:06.560
and we're at 141% at $1.6 million.

00:18:06.560 --> 00:18:08.840
We've budgeted slightly down.

00:18:08.840 --> 00:18:11.280
You remember, we're always a year, year and a half,

00:18:11.280 --> 00:18:14.280
and we've budgeted slightly down because of COVID,

00:18:14.280 --> 00:18:16.560
and nobody knew what was gonna happen.

00:18:16.560 --> 00:18:18.840
Obviously, things hindsight is 2020,

00:18:18.840 --> 00:18:21.120
and we all know construction across the nation

00:18:21.120 --> 00:18:24.220
is off the boards.

00:18:24.220 --> 00:18:27.060
The next slide I showed this last time

00:18:27.060 --> 00:18:28.540
is our building permit revenue,

00:18:28.540 --> 00:18:33.900
it's interesting because we've actually seen the slight softening. You can see we

00:18:33.900 --> 00:18:40.540
had what we're at 1.6 million right now with 1.8 million from 2020. You can see

00:18:40.540 --> 00:18:47.700
since 2006 where our building permit revenue has been. So currently through

00:18:47.700 --> 00:18:53.660
three-quarters of the year we have issued 417 new single-family home

00:18:53.660 --> 00:18:58.060
permits through the third quarter of the year. If you take that number divided by

00:18:58.060 --> 00:19:05.740
75% just all things equal. He would get 556 permits that we would estimate would be issued

00:19:05.740 --> 00:19:11.420
through year end. I did that exact same calculation last quarter assuming it was conservative because

00:19:11.420 --> 00:19:18.700
we still had our summer building months to go. Last year, our last quarter, it was 306 divided by

00:19:18.700 --> 00:19:28.700
So just conservatively, all things equal, measuring out, we're softening a little bit

00:19:28.700 --> 00:19:33.040
in what we're seeing from our building permit history.

00:19:33.040 --> 00:19:38.370
Last year the new single family permits were 573 for the total year.

00:19:38.370 --> 00:19:42.330
So if we're at 556, then that's less than what we had last year.

00:19:42.330 --> 00:19:47.090
In the fiscal year 2007, totaled 641.

00:19:47.090 --> 00:19:53.210
So we're still in a great year, but it's probably not as great as what we have potentially projected

00:19:53.210 --> 00:19:54.210
last quarter.

00:19:54.210 --> 00:20:05.260
Next one's of the fun ones, like I said, I'm competitive, I have a good time looking at

00:20:05.260 --> 00:20:09.060
laser reports, this market is what's going on in our inter-nation.

00:20:09.060 --> 00:20:13.500
So the rental market, so Travis hits the housing market a lot, so I took some of those lights

00:20:13.500 --> 00:20:15.180
out so I don't worry a little bit.

00:20:15.180 --> 00:20:18.100
The rental market is crazy, it's off the charts.

00:20:18.100 --> 00:20:23.060
This graph here is printed from a part list national rental report, and it shows the

00:20:23.060 --> 00:20:31.050
the change since March 2020 among the 10 cities with the largest rent increases.

00:20:31.050 --> 00:20:36.770
Leading the trend, they said, is Boise, Idaho, where rents grew by a staggering 6.6% just

00:20:36.770 --> 00:20:42.650
over the past month. This is the fastest month over month growth rate among the nation's 100

00:20:42.650 --> 00:20:47.650
largest cities. And Boise also continues to rank number one for fastest year over year

00:20:47.650 --> 00:20:54.090
growth. On this chart, it shows you Boise, Idaho was a total of 31% with Spokane, Washington

00:20:54.090 --> 00:20:59.090
at 22% and a couple of other cities, California and Samarazona.

00:21:00.240 --> 00:21:01.720
It also states the pandemic,

00:21:01.720 --> 00:21:04.040
which we've heard pandemic did not necessarily

00:21:04.040 --> 00:21:06.080
serve a new trend in these markets,

00:21:06.080 --> 00:21:08.880
so much as accelerated an existing one.

00:21:08.880 --> 00:21:12.880
So by May, Boise has grown to a two-bedroom house

00:21:12.880 --> 00:21:15.920
being rented for $1,229,

00:21:15.920 --> 00:21:20.920
which means it's just at 2.1 times that of San Francisco,

00:21:21.480 --> 00:21:24.360
or San Francisco's 2.1 times of Boise.

00:21:24.360 --> 00:21:26.360
I guess that just kind of caught me off guard.

00:21:26.360 --> 00:21:30.440
You think of California, you think of the higher rents,

00:21:30.440 --> 00:21:33.000
and you think of Boise being at 1229.

00:21:33.000 --> 00:21:36.240
So I talked to Steve Irwin at First Federal

00:21:36.240 --> 00:21:39.040
and got some stats for Twin Falls that he has seen

00:21:39.040 --> 00:21:40.560
in a two-bedroom in Twin Falls.

00:21:40.560 --> 00:21:44.640
It's right around $1,000, a one-bedroom at 800,

00:21:44.640 --> 00:21:48.520
and just for kicks and giggles, three-bedroom is 1,400.

00:21:48.520 --> 00:21:51.840
We are getting almost unaffordable.

00:21:51.840 --> 00:21:56.240
So when I talk about rental market, talk about CPI, talk about these next couple slides,

00:21:56.240 --> 00:22:01.400
it's all in relation to what are our employees experiencing, what can they afford?

00:22:01.400 --> 00:22:06.000
When we talk about pay raises, we talk about things that we can provide, it all relates

00:22:06.000 --> 00:22:07.720
to what are we seeing in the market.

00:22:07.720 --> 00:22:09.920
And the rental market is crazy.

00:22:10.940 --> 00:22:13.480
This next slide is kind of a fun graph.

00:22:13.480 --> 00:22:19.460
And it's by Apartment List, apartment guide, it's a rent report.

00:22:19.460 --> 00:22:27.140
The year-over-year state comparison of two-bedroom houses, you can see by the color, so red,

00:22:27.140 --> 00:22:31.060
deep red actually, is the highest amount of increase.

00:22:31.060 --> 00:22:42.100
Idaho is 58 percent, Louisiana is 45 percent, and a whole lot of greens and light pinks

00:22:42.100 --> 00:22:43.100
and negatives.

00:22:43.100 --> 00:22:51.020
Paper Market.

00:22:51.020 --> 00:22:58.060
This is something that was put together by Advisor Smith from March 2019 to March 2021.

00:22:58.060 --> 00:23:06.740
Idaho is ranked as at 4.1% in job growth, only three states in the nation added jobs.

00:23:06.740 --> 00:23:11.060
Twenty states were above the national average, but only three states added.

00:23:11.060 --> 00:23:16.060
What was interesting here is if you look at this graph on the right, the small cities

00:23:16.060 --> 00:23:25.080
were number eight, as every small city in the entire United States were at 1.3% in job growth.

00:23:25.080 --> 00:23:40.810
There's some other instant comparison there that I've listed, which is intriguing when you look at our 3.3% unemployment rate, as opposed to 5.9% federal, and you look at twin.

00:23:40.810 --> 00:23:45.540
I don't know if you guys have driven around lately.

00:23:45.540 --> 00:23:49.540
This is a bunch of pictures I compiled and has some help from some people.

00:23:49.540 --> 00:23:51.540
I drive blue lakes.

00:23:51.540 --> 00:23:55.540
Travis has told me multiple times he avoids it, so maybe you have not seen blue lakes.

00:23:55.540 --> 00:24:03.340
These are mostly blue lakes. This is all of our businesses. Dairy Queen, that one's a fun one.

00:24:03.340 --> 00:24:07.340
Fifteen day help for managers. It's across the board.

00:24:07.340 --> 00:24:14.980
So as a couple of stats, in May 11th, Governor Little ended Idaho's participation in the federal unemployment program.

00:24:14.980 --> 00:24:19.980
I don't know if you remembered, but we were third in the nation to do that.

00:24:19.980 --> 00:24:24.980
I thought that was pretty good. Don't know why we weren't first, but I thought it was pretty good that we were third.

00:24:24.980 --> 00:24:30.260
We're now part of 21 states, and I think Travis has shared multiple times, too, about

00:24:30.260 --> 00:24:36.340
the 3% equating to 900 people, and then you see this, we almost wonder why isn't it 0%

00:24:36.340 --> 00:24:40.990
AMP-y, economics won't let you, but it's crazy.

00:24:40.990 --> 00:24:45.350
We are in a nationwide shortage that economists say is plaguing employers.

00:24:45.350 --> 00:24:49.740
We've seen creative hiring strategies from one I've read.

00:24:49.740 --> 00:24:54.180
They are hiring workers out of state and boarding them, using middle-men's recruit, which is

00:24:54.180 --> 00:25:01.540
costly measure. Indeed, jobs are changed and reported that 4.1% of all job postings advertised

00:25:01.540 --> 00:25:06.820
have hiring incentives. Sign-on and retention bonuses, one-time cash payments, which has not

00:25:06.820 --> 00:25:14.800
been typical in the past. What are we seeing in the city? We have Twin Falls. I've got some numbers

00:25:14.800 --> 00:25:21.600
from Kristen for the City of Twin Falls. She says applications here to date meet calendar year

00:25:21.600 --> 00:25:28.240
is 755. 2020 just last year we saw 1430, 2019,

00:25:28.240 --> 00:25:38.690
1,098. Job postings, 53 here to date, last year was 62, and then 77.

00:25:38.690 --> 00:25:42.290
Kristen has shared with me that candid it responses down as well as several

00:25:42.290 --> 00:25:46.210
are not responding to requests to complete testing or schedule interviews.

00:25:46.210 --> 00:25:50.450
We've had more repeated postings as compared to the last two.

00:25:50.450 --> 00:25:55.810
Gretchen has shared with me that we typically turn over 10% of our organization each year.

00:25:55.810 --> 00:26:08.800
I wonder what these numbers are going to do. What does this mean? What does it mean for the

00:26:08.800 --> 00:26:16.270
labor market? Average producer prices for truck transportation rose 10% in April from a year ago.

00:26:16.990 --> 00:26:22.030
In an interview with chief executives of chef's warehouse, a $1 billion Bronx-based

00:26:22.030 --> 00:26:27.230
food supplier for restaurants, hotels, and other businesses, said labor shortages are quickly

00:26:27.230 --> 00:26:33.790
translating into higher prices for consumers. 54% increase in 35 pound tub of

00:26:33.790 --> 00:26:38.990
canola and soybean fry oil. 30% increase in kosher salt, chocolate and olive oil.

00:26:38.990 --> 00:26:47.700
20% increase in meat. I've begun out to eat lately. I just went last week, North

00:26:47.700 --> 00:26:57.380
End of town. A salad cost $13. A cup of soup that I added on this $5. I paid for the meal

00:26:57.380 --> 00:26:59.380
and walked out with the $50 bill.

00:26:59.380 --> 00:27:00.380
Two.

00:27:00.380 --> 00:27:04.700
Here's a local place down here I use like to eat.

00:27:04.700 --> 00:27:05.700
I'm parocal.

00:27:05.700 --> 00:27:06.700
I don't like to spend a ton of money.

00:27:06.700 --> 00:27:07.700
It was $7.95.

00:27:07.700 --> 00:27:08.700
I thoroughly enjoyed it.

00:27:08.700 --> 00:27:09.700
It was great.

00:27:09.700 --> 00:27:10.700
Pre-COVID.

00:27:10.700 --> 00:27:11.700
Post-COVID?

00:27:11.700 --> 00:27:14.520
$12.95.

00:27:14.520 --> 00:27:15.520
I hate to admit it,

00:27:15.520 --> 00:27:17.520
but ever since I've had a child,

00:27:17.520 --> 00:27:19.520
I go to McDonald's frequently.

00:27:19.520 --> 00:27:22.520
And I was astonished when I ordered a small fry

00:27:22.520 --> 00:27:26.640
because it didn't come with whatever I was ordering.

00:27:26.640 --> 00:27:28.640
I'm pretty sure there's like 15 fries in that small fry.

00:27:28.640 --> 00:27:30.640
I mean, it's quite small.

00:27:30.640 --> 00:27:39.470
$1.99 for small fry. We hear in the news, hey, your workers more. I stand to say they are,

00:27:39.470 --> 00:27:45.040
and I'm pushing it to the consumer. In a tight margin industry, I wonder if the people crying

00:27:45.040 --> 00:27:54.510
this initiative realize there's no such thing as a free lunch. CPI, Travis has talked about CPI a

00:27:54.510 --> 00:28:00.940
little bit too. Headline CPI includes volatile food and energy prices which is more unreliable.

00:28:00.940 --> 00:28:03.940
Of course, CPI excludes these.

00:28:03.940 --> 00:28:07.940
The headline CPI is the highest level since 2008.

00:28:07.940 --> 00:28:11.940
Or CPI since 1996.

00:28:11.940 --> 00:28:17.230
When we talk about our staff, our employees, what are we going to do?

00:28:17.230 --> 00:28:19.230
How are we going to support them?

00:28:19.230 --> 00:28:21.230
How are we going to support them to live?

00:28:21.230 --> 00:28:24.860
It's with this and what can they buy?

00:28:24.860 --> 00:28:27.460
Purchase and a home.

00:28:27.460 --> 00:28:32.790
Economic snapshot.

00:28:32.790 --> 00:28:36.790
There was a quote saying the Fed views the recent jumps and prices as transitory,

00:28:36.790 --> 00:28:40.410
We will not know the answer for at least a few more months as the domestic and global

00:28:40.410 --> 00:28:51.360
supply chains gradually unclog and resume normal functioning and our price funds.

00:28:51.360 --> 00:28:54.680
This is the next section, talking about the business like functions.

00:28:54.680 --> 00:29:02.070
They don't make a profit, but we charge fees to cover the services that are offered.

00:29:02.070 --> 00:29:06.230
We budgeted conservatively again in 2021 because we didn't know.

00:29:06.230 --> 00:29:07.710
We didn't know what COVID was going to bring.

00:29:07.710 --> 00:29:12.110
We figured people would be more concerned about and for food than watering their lawns.

00:29:12.110 --> 00:29:14.390
And we have been proven wrong.

00:29:14.390 --> 00:29:17.590
As you can see, we've collected 77%.

00:29:17.590 --> 00:29:19.550
So I had a number of interesting conversations

00:29:19.550 --> 00:29:21.150
with Travis today, so if I put for this,

00:29:21.150 --> 00:29:23.470
or any of the water crew, if I put through this,

00:29:23.470 --> 00:29:24.590
let me know.

00:29:24.590 --> 00:29:27.550
So when you look at this number, 5.3 million,

00:29:27.550 --> 00:29:31.310
and it's it indicates we're using water,

00:29:31.310 --> 00:29:33.030
you walk a drive around Twin Falls,

00:29:33.030 --> 00:29:35.070
there's a lot of green lawns out there.

00:29:35.070 --> 00:29:41.960
And you think, well, what's going on?

00:29:41.960 --> 00:29:43.520
This is new information to me.

00:29:43.520 --> 00:29:50.020
So what I've understood is pressurize irrigation is very different than normal water.

00:29:50.020 --> 00:29:58.420
So what happens is most of our houses that have come up since early 2000s are on pressurize irrigation.

00:29:58.420 --> 00:30:05.570
So pressurize irrigation has to do with flow and how the resources get to each house.

00:30:05.570 --> 00:30:13.270
So in all these newer homes, all these newer areas since 2000, we have smaller canals with more water

00:30:13.270 --> 00:30:19.190
to get rapid water movement versus larger canals with low water that doesn't move.

00:30:19.190 --> 00:30:23.910
So if you think about it, if everybody on pressurize irrigation stops using water,

00:30:24.470 --> 00:30:32.400
it would overflow. So the way our system works with pressurize irrigation is you have to use water.

00:30:32.400 --> 00:30:38.640
So if you're on pressurize irrigation, it's okay to use water. Did I butcher that? Am I okay?

00:30:38.640 --> 00:30:42.160
I think you're okay, yep, you did good.

00:30:42.160 --> 00:30:48.160
I'm not definitely not necessarily an ag person, I'm a numbers person, and I can tell you it looks right.

00:30:48.160 --> 00:30:51.160
We're seeing quite a bit in our water.

00:30:51.160 --> 00:30:56.600
The other thing I might add to that is the pressures of irrigation.

00:30:56.600 --> 00:31:01.600
You have to find one that works in your neighborhood, and that may be a three in the afternoon.

00:31:01.600 --> 00:31:03.600
Because that's when the water's there.

00:31:03.600 --> 00:31:06.600
It may not be there in three in the morning when you think you should be watering.

00:31:06.600 --> 00:31:08.600
Because that's what everybody else wants to water.

00:31:08.600 --> 00:31:10.900
That's why you see it in fresh rice irrigation

00:31:10.900 --> 00:31:13.080
a little more throughout the day

00:31:13.080 --> 00:31:14.120
because that's how it can help

00:31:14.120 --> 00:31:15.560
whoever's it can never.

00:31:15.560 --> 00:31:17.930
24 hours it doesn't go for more

00:31:17.930 --> 00:31:19.450
at night than it does during the day.

00:31:19.450 --> 00:31:20.610
So.

00:31:20.610 --> 00:31:21.890
Okay, make sense.

00:31:21.890 --> 00:31:24.250
We have Ruth Pearson and Schunkberger.

00:31:24.250 --> 00:31:28.250
So the other thing is, this doesn't include July,

00:31:28.250 --> 00:31:31.290
August, July being super hot.

00:31:31.290 --> 00:31:34.570
Do you happen to know what the fourth quarter

00:31:34.570 --> 00:31:37.490
from last year dollar amount was?

00:31:37.490 --> 00:31:38.610
I don't know if tough my head,

00:31:38.610 --> 00:31:44.610
I mean it'd be interesting to see but we're going to end up it appears to me 100% over

00:31:44.610 --> 00:31:46.900
100% of budget.

00:31:46.900 --> 00:31:58.080
I would guess based on the numbers and where we're at that we are going to be over 100%.

00:31:58.080 --> 00:32:04.080
It's not as good of a thing as being inside the general fund where you can use that for

00:32:04.080 --> 00:32:07.080
other sources with the water and wastewater.

00:32:07.080 --> 00:32:14.080
There's specific state laws that allows you to only use that excess for the water fund

00:32:14.080 --> 00:32:17.560
the wastewater fund or the sanitation fund which is okay as we'll hear from

00:32:17.560 --> 00:32:21.400
water and wastewater and sanitation or water wastewater later they have quite a

00:32:21.400 --> 00:32:25.600
few projects that they need to use but my guess is is that we are projecting

00:32:25.600 --> 00:32:29.400
that we are going to be over on water well that goes into reserves to those

00:32:29.400 --> 00:32:33.440
in the reserves or to help with maintenance so we don't lose it yes big

00:32:33.440 --> 00:32:38.560
projects it's just not as fun as being able to use it for everything

00:32:38.560 --> 00:32:46.960
So just an observation, and there might be a question rolled in there too.

00:32:46.960 --> 00:32:52.760
So actually at 77% we're not significantly over where we would anticipate this time of

00:32:52.760 --> 00:32:53.760
year.

00:32:53.760 --> 00:32:57.960
No, but I agree with Ruth's analysis that we are still hitting some of the hotter months

00:32:57.960 --> 00:33:00.560
too, so we might see more in that last quarter.

00:33:00.560 --> 00:33:04.960
Though with pressure irrigation that's a flat fee around, so it doesn't flush away based

00:33:04.960 --> 00:33:07.760
upon over usage or additional usage.

00:33:07.760 --> 00:33:14.270
So, maybe this is just a majority of our water users who are using that for you.

00:33:14.270 --> 00:33:18.680
That's the breakdown of irrigation versus potable water.

00:33:18.680 --> 00:33:34.290
But just, I mean, that's an observation is that, yes, much like the electricity and gas that we see fluctuate with cold weather and hot weather.

00:33:34.290 --> 00:33:40.290
We see that some with water though, whatever percentages, pressure irrigation doesn't fluctuate.

00:33:40.290 --> 00:33:44.960
Yes, so from the Council, good to see you guys again.

00:33:44.960 --> 00:34:38.080
I think we have roughly irrigation, but the total usage in town, it's not what bikes, pressurize irrigation fields.

00:34:38.080 --> 00:35:11.760
So we don't care.

00:35:11.760 --> 00:35:15.400
We saw that by sure, pressurize irrigation.

00:35:15.400 --> 00:35:25.840
The next slide is expenditure wise.

00:35:25.840 --> 00:35:30.160
Personnel is the same issue. We are understaffed.

00:35:30.160 --> 00:35:37.160
We are not full. So we personnel is the largest expense, 19% of our total expenditure side for water.

00:35:37.160 --> 00:35:38.160
And we're under.

00:35:38.160 --> 00:35:43.140
It's typical for water to spend most of their maintenance and operation expenses during

00:35:43.140 --> 00:35:50.940
the summer months, similar to straits, so we are less at 50% than what we would expect 75%.

00:35:50.940 --> 00:35:56.620
But it's not as even keeled divided by 12 months.

00:35:56.620 --> 00:36:00.780
After talking with Rob a little bit too, they are still experiencing huge lead times on

00:36:00.780 --> 00:36:04.180
meters and other parts sometimes 12 weeks or more.

00:36:04.180 --> 00:36:10.980
So we are hoping to spend 100% of the M&O, but there might be outside forces that are going

00:36:10.980 --> 00:36:13.980
to have to struggle with.

00:36:13.980 --> 00:36:18.900
Capital's 27% of the total budget expenditures, some of the larger projects that we budgeted

00:36:18.900 --> 00:36:22.700
for that are not significantly started, is solid wall number 5.

00:36:22.700 --> 00:36:28.300
That's at 2.1 million, the digester boiler replacement for 550,000.

00:36:28.300 --> 00:36:33.930
Only 11% of what we've been budgeted so far has been spent on the water side.

00:36:33.930 --> 00:36:41.250
That is another one that should be small, we only have two payments, we pay twice a year,

00:36:41.250 --> 00:36:43.250
interest in March, principal interest in September.

00:36:43.250 --> 00:36:48.330
We've had quite a few conversations on the bond and we will be paying off that bond in

00:36:48.330 --> 00:36:53.130
September of principal interest which will leave us with only two bonds left.

00:36:53.130 --> 00:36:59.930
2012 bond, that's 355,000 and the 2017 bond for 1.5 million.

00:36:59.930 --> 00:37:06.910
most of our dad and the water fund will be going away for the next time we talk.

00:37:06.910 --> 00:37:13.310
Overall, we spend about 36% of our budget, which is not abnormal for water because of the timing.

00:37:13.310 --> 00:37:24.250
Waste water is a lot more consistent, and we don't have much fluctuation.

00:37:24.250 --> 00:37:30.810
So the last three years, four years, you can see here, we typically are 6.8 to 7, just over 7 million,

00:37:31.370 --> 00:37:36.410
and we're at 76%. We're pretty close to where we budget from year to year.

00:37:36.410 --> 00:37:44.120
On the expenditure side, personnel is not the highest because we contract most of that service out,

00:37:44.120 --> 00:37:52.650
but we're at 66.4%, which is the same story as everything else, we're understaffed,

00:37:53.370 --> 00:38:00.350
and we don't have, we're not expending the 75% that we've anticipated. In the wastewater fund,

00:38:00.350 --> 00:38:11.210
we spend about 53.8%, maybe 5% the way through the year. Enterprise fund is sanitation,

00:38:11.210 --> 00:38:15.130
which is much more consistent than the other ones, and not a lot of fluctuation.

00:38:15.130 --> 00:38:24.910
Sanitation is about 3.5 million, of which we're just over 78% and on the expenditure

00:38:24.910 --> 00:38:37.000
side, there's not much at all, M&O and some transfers, transfers are spot-on at 75%.

00:38:37.000 --> 00:38:43.800
In total, for our enterprise funds, water revenues we've received 77% we've expended

00:38:43.800 --> 00:39:08.640
We've experienced some transition in utility building and so we are working.

00:39:08.640 --> 00:39:10.640
I'll have those numbers next time.

00:39:10.640 --> 00:39:30.200
Also I've taken some to I like to run and so I'm always on the trail with my son and so sometimes

00:39:30.200 --> 00:39:33.680
Sometimes the other day I was driving outside of sports

00:39:33.680 --> 00:39:35.480
and the sun was just coming out.

00:39:35.480 --> 00:39:36.640
I think I used one of the pictures

00:39:36.640 --> 00:39:39.040
and I stopped the car and I jumped down.

00:39:39.040 --> 00:39:40.200
James, what are you doing, Mom?

00:39:40.200 --> 00:39:41.040
What are you doing?

00:39:41.040 --> 00:39:43.760
I'm taking pictures of some cars honking behind me.

00:39:43.760 --> 00:39:44.680
This is important.

00:39:44.680 --> 00:39:46.600
It's a pretty picture.

00:39:46.600 --> 00:39:47.600
That's right.

00:39:47.600 --> 00:39:56.990
Priorities, very much.

00:39:56.990 --> 00:40:01.910
Action item, and it is a request to increase compensation

00:40:01.910 --> 00:40:04.110
for the mayor and city council.

00:40:04.110 --> 00:40:14.000
we have our city attorney shay nope to walk us through all of this.

00:40:14.000 --> 00:40:21.660
Members of the City Council, for the staff report attached to kind of a template ordinance,

00:40:21.660 --> 00:40:31.120
what it would look like, just input 10% in terms of compensation adjustment in their workplace filler.

00:40:31.120 --> 00:40:39.830
Today, just as a reminder, the ordinance has to be published 75 days prior to the election, which is November 2nd.

00:40:39.830 --> 00:40:52.900
and so while there is some exact number 75 days between I believe close if there's something so

00:40:52.900 --> 00:41:02.720
we really need to have by this Thursday to the each and ordinance so it can be public Thursdays

00:41:02.720 --> 00:41:10.360
state statute so should the council wish to move forward with a compensation adjustment too

00:41:10.360 --> 00:41:29.030
that has to be be awarded in essence this has been the rules and pass it today so we can get a bit

00:41:29.030 --> 00:41:40.470
on this screen for now though but when I was anticipating as if the council wanted to discuss

00:41:40.470 --> 00:41:46.190
the draft I did send late to the council of draft just so everyone's aware that

00:41:46.190 --> 00:41:53.890
excludes the option of submitting some of the payment to a 125 or cafeteria type

00:41:53.890 --> 00:42:01.950
plan and so just we're just discussing compensation just we'll stand for any

00:42:01.950 --> 00:42:05.950
questions the council has and I'll try to give there's edits that need to be made

00:42:05.950 --> 00:42:11.830
we can make those we can pull it up on the screen and then there should that be

00:42:11.830 --> 00:42:25.980
the council's wishes. The copy that is here still has the section 125 information in it. Right, but this is the one they left that

00:42:25.980 --> 00:42:31.960
if it's passed for me to sign and it's still in here so I don't I just want to make sure that we're doing it.

00:42:31.960 --> 00:42:50.120
like Shane Chaired should expect the amendments would be for your signature

00:42:50.120 --> 00:43:23.700
Counsel in November of 2005 taking seat in

00:43:23.700 --> 00:43:30.930
2006 everybody does their math at 60 almost 16 years ago but there was a slight

00:43:30.930 --> 00:43:39.680
change in compensation within a couple years of beginning on council and it

00:43:39.680 --> 00:43:43.760
really wasn't an increase in compensation we just did that point when I got on we

00:43:43.760 --> 00:43:51.760
We had a salary and then we had a certain amount, one to one twenty-five, every person got a thing, it was two fifty a month.

00:43:51.760 --> 00:44:09.210
There was a decision made that since that was different than the regular employees were doing it, we probably wouldn't be better if we made it so it was closer to what in the same way it was being paid.

00:44:09.210 --> 00:44:16.570
paid, so that $250 was moved over into the compensation portion, which didn't actually

00:44:16.570 --> 00:44:21.910
increase it, it actually decreased it because the $250 was tax-free, when it was moved into

00:44:21.910 --> 00:44:27.930
compensation, suddenly it was available for taxes, for low security, for perceived income

00:44:27.930 --> 00:44:32.570
tax, for state income tax, everything, so actually, we actually took a reduction in

00:44:32.570 --> 00:44:38.330
pay, and I believe it was 2008, as it worked out, but it was cleaner for everybody because

00:44:38.330 --> 00:44:43.330
I'm not sure when we actually, the council actually got a race.

00:44:43.330 --> 00:44:45.330
It had to be before 2005.

00:44:45.330 --> 00:44:52.040
I don't know what our record show would probably 2000 or somewhere, I guess, that's 21 years.

00:44:52.040 --> 00:44:58.040
I'm not sure what compensation race we have given to staff in those 21 years.

00:44:58.040 --> 00:44:59.040
And it's been substantial.

00:44:59.040 --> 00:45:02.040
Far more than we're going to be discussing tonight.

00:45:02.040 --> 00:45:09.040
we have given to staff in those 21 years, and it's been substantial. Far more than we were going to be discussing tonight.

00:45:09.040 --> 00:45:22.040
I'm going to throw a figure out of 15 percent. I could be persuaded to support more, or less, depending on what the council is.

00:45:22.040 --> 00:45:31.040
I'm bringing this up because I'm one of the two that has already announced that I'm not running, and so nobody's going to come after me at the ballot box

00:45:31.040 --> 00:45:36.160
box because I won't be there. My name won't be on the ballot, but I do think it's fair that we,

00:45:39.120 --> 00:45:44.320
it's a touchy subject, it's an always-hast but that's the reason we haven't touched it for 20 years.

00:45:44.320 --> 00:45:50.240
And so I'm suggesting 15% of somebody has a different number. I'm willing to listen.

00:45:50.240 --> 00:45:56.490
Thank you, Ruth Pierce. So with my little geeky brain, I ran some numbers.

00:45:56.490 --> 00:46:05.260
I asked Gretchen to put together the health insurance, how it had increased over the years

00:46:05.260 --> 00:46:11.340
and in 2007 which is in the ordinance that that's when the last increase was, the health

00:46:11.340 --> 00:46:18.220
insurance was $300 so for just four employees, employee paid.

00:46:18.220 --> 00:46:27.190
So if you pull that off our balance right now, which is, I'm talking about council only

00:46:27.190 --> 00:46:34.990
at this point in time 1160 that puts our base salary down at 860 if you compare

00:46:34.990 --> 00:46:40.990
to the other communities that really puts us in the middle if you don't count health

00:46:40.990 --> 00:46:46.430
insurance because it's a package outside their base salary. Does that make sense to

00:46:46.430 --> 00:46:56.270
everybody? So and then since then it's increased another $463. So if you back off

00:46:56.270 --> 00:47:05.790
Often you're at 860 and you added in another 700, whatever that puts you almost at 2000,

00:47:05.790 --> 00:47:10.070
which is more like a 25 to 30% increase.

00:47:10.070 --> 00:47:11.550
I'm not advocating that.

00:47:11.550 --> 00:47:19.310
I'm just saying if you back us off and compare us apples to apples to the other councils who

00:47:19.310 --> 00:47:25.350
meet like twice a month and don't have some of the commitments, it puts us right in the

00:47:25.350 --> 00:47:38.590
metal as a base salary. So just some food for thought. So months ago that I will not be seeking

00:47:38.590 --> 00:47:43.830
reelection this year and that is one of the reasons why I felt like this is a good year

00:47:43.830 --> 00:47:49.510
for this conversation. When I am through with my term in December, I will have served just

00:47:49.510 --> 00:47:58.860
a few months short of ten years. In those ten years, the amount of time that this job has

00:47:58.860 --> 00:48:04.820
required and the energy and the emotional stress and wear and tear believe it or not

00:48:04.820 --> 00:48:12.240
has definitely increased and I think we want good people to serve on our council

00:48:12.240 --> 00:48:18.720
and part of that is treating each other fairly and I think it is time that we

00:48:18.720 --> 00:48:25.930
acknowledge that compensation for this position is important as well as our

00:48:25.930 --> 00:48:31.890
city family. We have all I know love to serve and we have served from our hearts

00:48:31.890 --> 00:48:36.490
with everything else and I would not trade a minute of that but I think it is

00:48:36.490 --> 00:48:40.490
fair as expenses are going up and cost of living is going up at the amount of

00:48:40.490 --> 00:48:44.170
time and I mean if you look at fuel and the amount of time we spend in our

00:48:44.170 --> 00:48:50.010
vehicles traveling that is all on our own expense. So we do spend money out of

00:48:50.010 --> 00:48:58.040
our pocket to do this job and I think we all try to do it very well. 10% I'm

00:48:58.040 --> 00:49:03.750
come 15 if that's what the council looks at and again this isn't something I'm

00:49:03.750 --> 00:49:08.960
standing to benefit from. It is the right thing to do for our community so that in

00:49:08.960 --> 00:49:17.070
the future we have strong leaders in these seats. I'll have to say this is the first

00:49:17.070 --> 00:49:21.430
time I've ever been able to even discuss giving myself an increase. It's not the

00:49:21.430 --> 00:49:25.830
most enjoyable thing to be completely honest. It's actually really awkward

00:49:25.830 --> 00:49:30.990
especially talking with a lot of people. I was one of those individuals

00:49:30.990 --> 00:49:42.760
that any time the federal government gave themselves an increase, so at the same time

00:49:42.760 --> 00:49:47.400
understanding that people should be fairly compensated for their time. No matter what

00:49:47.400 --> 00:49:57.260
job you're doing, looking at the numbers, understanding that we can go back 20 years,

00:49:57.260 --> 00:50:04.470
we can go back, and there was a recession in there, so there weren't some increases or

00:50:04.470 --> 00:50:11.970
decreased. I guess I have a hard time going back in time and saying pay me for

00:50:11.970 --> 00:50:15.450
we should go in there should be an increase for that period of time. I

00:50:15.450 --> 00:50:19.950
struggle with that because if that was the case then the council should have done

00:50:19.950 --> 00:50:25.240
that at that point in time and so understanding that we just take care of

00:50:25.240 --> 00:50:33.110
the time that we have right now I guess I would be in favor of an 8% that keeps

00:50:33.110 --> 00:50:39.780
says that $92 a month increases not over $100, annual and I'm talking city council

00:50:39.780 --> 00:50:50.100
members, an annual increase of $1,113.60, 8%. I understand it doesn't go back 20

00:50:50.100 --> 00:50:59.900
years. I wanted to keep that under $100 a month. I feel like looking at the time

00:50:59.900 --> 00:51:05.130
that we've taken hasn't been an increase. We should have done an increase. We should

00:51:05.130 --> 00:51:10.470
done at that point in time I'm just not comfortable saying well we haven't done

00:51:10.470 --> 00:51:17.360
it for 20 years we should take it for all that period of time the max amount

00:51:17.360 --> 00:51:43.600
for me with Chris this is really I see where Chris is coming from this past

00:51:43.600 --> 00:52:21.760
years been relatively part of me says to us little bit and said you know you

00:52:21.760 --> 00:52:27.840
look at other cities and so forth or those it's not apples to councils let me

00:52:27.840 --> 00:52:59.760
twice

00:52:59.760 --> 00:53:08.640
here's one question that was for Travis but Gretchen maybe and Shane my

00:53:08.640 --> 00:53:16.220
My understanding is it's possible to split an increase and do part this year and part next

00:53:16.220 --> 00:53:26.250
year as long as we hold it within the two-year election cycle is that correct I honestly don't

00:53:26.250 --> 00:53:38.760
know the answer to that the statute the 75 days published breeding it's doing this year

00:53:38.760 --> 00:53:42.820
they're doing seven and a half percent this year and seven and a half percent next year

00:53:42.820 --> 00:53:48.410
I may ask because I haven't seen that did they do that in the one ordinance just it's

00:53:48.410 --> 00:53:52.410
I didn't see a copy of their ordinance, I just heard it.

00:53:52.410 --> 00:53:55.460
Their council members told me that.

00:53:55.460 --> 00:53:59.460
So maybe we can confirm that with Travis, because it was Travis that told me that.

00:53:59.460 --> 00:54:05.060
I was told that it's not as clean at once.

00:54:05.060 --> 00:54:09.060
It's more transparent to just...

00:54:09.060 --> 00:54:21.340
Travis, my question is...

00:54:21.340 --> 00:54:30.340
And speaking to you, you thought potentially we could split a raise and do part this year and part next.

00:54:30.340 --> 00:54:31.540
Is that just a...

00:54:31.540 --> 00:54:34.720
So I'll look to Shane, but I believe that...

00:54:34.720 --> 00:54:36.910
Huh?

00:54:36.910 --> 00:54:45.300
So my understanding is there are cities that have done that, and be that...

00:54:45.300 --> 00:54:51.620
What you're doing is you are defining the rates of compensation that are going to occur.

00:54:51.620 --> 00:55:22.000
It is what if, let me change drastically, and we've already obligated ourselves to increase the...

00:55:22.000 --> 00:55:52.480
In the code section, they're ordinance and it does ordinance because of that, you're passing the ordinance for the statute.

00:55:52.480 --> 00:56:15.350
I percent basically a hundred dollars. Is it slightly over? Chris.

00:56:15.350 --> 00:56:17.930
That's one sixteen.

00:56:17.930 --> 00:56:29.020
Among the very small.

00:56:29.020 --> 00:56:46.380
The reason I'm thinking that is because what you said is that as people for this position, there has to be some fairness in this or some.

00:56:46.380 --> 00:57:10.630
Now we're asking people to give up a lot of their time, so I guess if we're only going to raise it $92, I hate to say that that's not enough to really make a difference.

00:57:10.630 --> 00:57:19.100
I think it should be easily 10 or 15% and potentially more. That makes a difference in the future.

00:57:19.100 --> 00:57:35.990
I also think that things could change in the next six months, and so then, but we still have to make decisions in a timely fashion, because there's a role that has to be done by Thursday.

00:57:35.990 --> 00:57:42.290
done by Thursday, so I think we have to move the best that we know at this time and what

00:57:42.290 --> 00:57:49.550
we think, see how the vote comes out. We do this next year, but I think it should be done

00:57:49.550 --> 00:58:02.780
all at one tiny kind of substantial amount of money, but for $50 or $92 or $116, it just

00:58:02.780 --> 00:58:14.080
seems like a bunch of paperwork here's...

00:58:14.080 --> 00:58:22.680
Just one thing to add, the increase of cumulative for the employees over the last 14 years is

00:58:22.680 --> 00:58:31.320
about 41% and it includes years where there's no increase and it's not increasing on increase

00:58:31.320 --> 00:58:41.000
it's just a flat total of 41%. I kind of agree with Chris I don't I what we do and what full-time

00:58:41.000 --> 00:58:46.120
employees do are very different and when I first brought this up it wasn't about

00:58:47.240 --> 00:58:52.840
catching the council up to what has happened in the past with city employees to me I look at this

00:58:52.840 --> 00:58:59.160
is a separate issue. We all knew what the pay was when we decided to run for this job.

00:58:59.160 --> 00:59:06.130
We all did that gladly. No regrets. Right now it's just about maybe catching up a little

00:59:06.130 --> 00:59:11.370
bit with the cost of living and some of the things that Brianna was discussing this evening

00:59:11.370 --> 00:59:18.170
and making this job at least help cover our expenses and some of our time for the hours

00:59:18.170 --> 00:59:24.060
that we do donate and I know on top of that that everybody here wants to donate to our

00:59:24.060 --> 00:59:32.940
community and be giving there is a real cost to it and so try to make it so that those who

00:59:32.940 --> 00:59:39.700
want to serve can serve was more of what I was looking for not catching up with past years

00:59:39.700 --> 00:59:45.060
where we didn't get a raise or keeping up with the percentages that full-time employees

00:59:45.060 --> 00:59:51.660
make this is not a full-time job and so more just kind of getting us current with

00:59:51.660 --> 01:00:01.780
where what is a fair compensation 10% was where I started and that was the

01:00:01.780 --> 01:00:14.390
number I threw out and I'm very comfortable with that 10% still in a motion

01:00:14.390 --> 01:00:35.280
and we'll see where it goes maybe this may be our struggle number ex-ordinates

01:00:35.280 --> 01:00:41.300
the ordinance

01:00:41.300 --> 01:00:46.800
proposing the actual ordinance

01:00:46.800 --> 01:00:56.210
2021-014 thank you

01:00:56.210 --> 01:01:06.360
considering this evening is on your screen

01:01:06.360 --> 01:01:13.560
Wama changed a little bit from what I said down here because I said it was open to thought processes

01:01:13.560 --> 01:01:19.560
proposed it on January 1st 2022 that there will be a 7.5% race

01:01:19.560 --> 01:01:31.560
January 1st of 2023, there'll be another 7.5% raise that keeps it under Chris 100 for the first year and makes a total of 15%.

01:01:31.560 --> 01:01:46.560
I do believe when you pass that in a public eating future council by the fact that they do the change the arguments and decide not to give that second 7.5% should the economy be at a point where they don't feel like an afforded.

01:01:46.560 --> 01:01:48.820
So that's what we would that would be my promotion

01:01:48.820 --> 01:01:52.280
standardized for lack of a second. I'll listen to somebody else's motion.

01:01:52.280 --> 01:01:56.120
Is there a second to that motion?

01:01:56.120 --> 01:02:13.800
I'll second that. Right. So we have a motion and a second to, I guess, I don't know if we need to do this through legal motions, but I think to keep it clean we will, um, to

01:02:13.800 --> 01:02:21.580
on this ordinance dash zero one four and change the ten percent the seven point five percent

01:02:22.220 --> 01:02:47.000
again seven point five percent more i'm in favor of emotion because half percent this year and then

01:02:47.000 --> 01:02:51.240
another seven and a half percent is actually more than fifteen because you're taking the increase

01:02:51.240 --> 01:02:57.480
off the second amount not a lot but a little bit and i think it's just cleaner if we deal with it at

01:02:57.480 --> 01:02:58.480
one time.

01:02:58.480 --> 01:03:08.610
I guess it's a general comment on us.

01:03:08.610 --> 01:03:30.800
This is a complex enough issue and all of us at one grabs up ten percent.

01:03:30.800 --> 01:03:41.770
It'll basis they actually review this as part of the budget process.

01:03:41.770 --> 01:03:56.600
What's the amendment?

01:03:56.600 --> 01:04:03.590
So I would move to amend the motion in person.

01:04:03.590 --> 01:04:31.320
So we have instead of doing seven and a half percent for the next two years to do a flat ten percent this year.

01:04:31.320 --> 01:05:08.300
Comments or questions on that amendment before we call for a vote passes five to two

01:05:08.300 --> 01:05:35.340
So this was not an emotion to put this on third and though since the M.S. So now we needed to vote on the motion

01:05:35.340 --> 01:05:47.280
Essentially the same thing that was just made

01:05:47.280 --> 01:05:52.220
Rubber's rule process

01:05:52.220 --> 01:05:58.860
Alright, John Beherger? Yes

01:05:58.860 --> 01:06:13.620
Yes, Mr. Beher's motion passes six to one

01:06:13.620 --> 01:06:37.630
So, we counsel and mayor's compensation increased by the 10% amount, ordinance 2021-014 on the screen is exactly

01:06:37.630 --> 01:06:48.860
five if somebody would like to.

01:06:48.860 --> 01:06:54.860
Mayor, I move that we place artist 2021, 014 on third and final.

01:06:54.860 --> 01:07:01.380
My title only and my name is someone that buys my suspension rules. Thank you.

01:07:01.380 --> 01:07:04.520
Second.

01:07:04.520 --> 01:07:07.220
Second.

01:07:07.220 --> 01:07:17.220
Motion from Greg Lampteen seconded by Craig Hawkins to suspend the rules and place ordinance 2021-014, a third and final by title only.

01:07:17.220 --> 01:07:24.560
Yes.

01:07:24.560 --> 01:07:35.650
Depasses six to one.

01:07:35.650 --> 01:07:46.650
Ordinance 2021-014, an ordinance of the City Council of the City of Twin Falls, repealing and replacing ordinance number 2913,

01:07:46.650 --> 01:07:51.930
setting forth the compensation plan for the mayor and city council and providing

01:07:51.930 --> 01:07:53.590
for an effective date.

01:07:53.590 --> 01:08:06.630
I move that we pass ordinance 2021 day 0-1-4.

01:08:06.630 --> 01:08:10.070
I'll second that.

01:08:10.070 --> 01:08:17.690
I have a motion from grade 19 seconded by Ruth Pierce to pass ordinance 2021-0-1-4.

01:08:17.690 --> 01:08:41.960
6-1.

01:08:41.960 --> 01:08:45.800
Dane is there anything else you need from us on that?

01:08:45.800 --> 01:08:51.370
Which place do we have that right here?

01:08:51.370 --> 01:09:09.450
possible. I have a traveston that would be next on our agenda is a request to

01:09:09.450 --> 01:09:14.410
consider entering into a memorandum of understanding with Twin Falls County

01:09:14.410 --> 01:09:18.930
regarding building department permits and we have our city manager Travis

01:09:18.930 --> 01:09:30.720
Frathweiler. Madam Mayor members of the city council tonight I am bringing

01:09:30.720 --> 01:09:39.620
a Ford and has been developers of the city staff and the county commissioners as

01:09:39.620 --> 01:09:43.060
as it relates to building services.

01:09:43.060 --> 01:09:47.140
So as you recall over a period of time,

01:09:47.140 --> 01:09:49.020
we have always come before you,

01:09:49.020 --> 01:09:53.580
and we said we would like to have you wave a collection

01:09:53.580 --> 01:09:57.660
of fees as it relates to building inspection services

01:09:57.660 --> 01:09:59.820
and building safety services.

01:09:59.820 --> 01:10:04.400
And at the last conversation, we asked if you'd be interested

01:10:04.400 --> 01:10:06.640
in entering into a memorandum of understanding

01:10:06.640 --> 01:10:12.140
with basically have us take responsibility

01:10:12.140 --> 01:10:14.900
for our own services and in exchange,

01:10:14.900 --> 01:10:19.610
we wouldn't assess a building permit fee.

01:10:19.610 --> 01:10:21.610
Now the city of Flint Falls would still assess

01:10:21.610 --> 01:10:23.170
its connection fees from the appropriate

01:10:23.170 --> 01:10:24.690
and its impact fees were appropriate

01:10:24.690 --> 01:10:27.130
because those are fees that we cannot waive.

01:10:27.130 --> 01:10:30.330
But all the work fees that we would assess from work

01:10:30.330 --> 01:10:37.080
that we would for us would assess.

01:10:37.080 --> 01:10:39.480
And basically what the agreement says

01:10:39.480 --> 01:10:43.660
is that we will appoint one another

01:10:43.660 --> 01:10:51.550
to serve as their own building, official building inspector projects.

01:10:51.550 --> 01:10:56.390
So rather than the City of Twin Falls overseeing any construction related projects for the county,

01:10:56.390 --> 01:11:00.190
the county's team would oversee their own work.

01:11:00.190 --> 01:11:04.270
And that's a real benefit because they can work at their pace that they need to.

01:11:04.270 --> 01:11:13.080
In addition to that, we all follow the exact same rules, those processes.

01:11:13.080 --> 01:11:19.100
For the City of Twin Falls, they will still come forward and they will look at plan review

01:11:19.100 --> 01:11:23.540
those type of things to make sure they're in compliance with all land use items because

01:11:23.540 --> 01:11:31.300
that would be something that we're going to be here at Stiction Organization number one

01:11:31.300 --> 01:11:43.520
expediency but number two organization when we're sitting back in conversation about this

01:11:43.520 --> 01:11:51.560
we can't recall the time and so rather than waiting for that fee waiver inside of the

01:11:51.560 --> 01:11:57.600
it has that fee waiver built in so rather than waiting for a council meeting or a commission

01:11:57.600 --> 01:12:05.940
meeting that sets out the times so with that I'd be happy to stand for any questions Shane

01:12:05.940 --> 01:12:07.940
and can assist as well as he was.

01:12:07.940 --> 01:12:22.430
So this only covers building farm and fees.

01:12:22.430 --> 01:12:25.430
I remember again, I'm going to go back here

01:12:25.430 --> 01:12:29.430
because I was on plenty of zoning for eight years before I was on council.

01:12:29.430 --> 01:12:32.430
And there was a gap in there for a while, so it's been a long time ago.

01:12:32.430 --> 01:12:37.430
We got in there for you to get spatted plenty of zoning with the County of

01:12:37.430 --> 01:12:43.430
Uxner-Himpleman, I believe, who was, they were doing a building and didn't want to follow it.

01:12:43.430 --> 01:12:48.430
We have our landscape rules and we've, I don't know what the council wants.

01:12:48.430 --> 01:12:52.430
I can't remember what the council wants to go or not because I can't feel what the council wants.

01:12:52.430 --> 01:12:56.430
So this is just, we're many fees which is your right.

01:12:56.430 --> 01:12:58.430
I've been out here for like 16 years.

01:12:58.430 --> 01:13:06.430
I can never remember requiring them for the school district or the county because it's the same taxpayers for the most part.

01:13:06.430 --> 01:13:09.630
So, I just wanted to make sure that it's just the belly of the family,

01:13:09.630 --> 01:13:14.470
which we would still have landscaping and things like that.

01:13:14.470 --> 01:13:15.470
It's so big.

01:13:15.470 --> 01:13:25.080
This does not resolve or remove the city of Twin Falls,

01:13:25.080 --> 01:13:32.400
or any other things that we would still be subject to all those things.

01:13:32.400 --> 01:13:37.760
So Travis, we don't have attachments today,

01:13:37.760 --> 01:13:45.960
so the original memorandum hasn't changed since it was posted.

01:13:45.960 --> 01:13:46.960
It has not.

01:13:46.960 --> 01:14:34.430
Okay.

01:14:34.430 --> 01:14:35.430
Thank you.

01:14:35.430 --> 01:14:36.430
Yes.

01:14:36.430 --> 01:14:39.120
And it passes 7-0.

01:14:39.120 --> 01:14:48.140
And our agenda is a presentation of the city manager's recommended budget for the fiscal

01:14:48.140 --> 01:14:52.130
year 2022 at this presentation.

01:14:52.130 --> 01:15:18.090
Right.

01:15:18.090 --> 01:15:21.600
Sometimes that's as you continue to do.

01:15:21.600 --> 01:15:29.380
So as we approach, we're also going to be asking the city council to continue to deliberate

01:15:29.380 --> 01:15:30.380
and make decisions.

01:15:30.380 --> 01:15:35.380
So I want to, I want to share that with those decisions be this evening or whether they

01:15:35.380 --> 01:15:40.100
be next week. Really, we want to have a good understanding about the council

01:15:40.100 --> 01:15:44.860
capital projects that you want to fund this year. As you know, we allocate

01:15:44.860 --> 01:15:49.980
$770,000, generally under the city council, under capital, and those are the

01:15:49.980 --> 01:15:55.440
projects that the council has embarked on over a period of time. We want you to

01:15:55.440 --> 01:15:59.040
be thinking about those this week and next week as you're going to hear

01:15:59.040 --> 01:16:03.720
focus areas four, five, and seven this week, and area focus areas one and six

01:16:03.720 --> 01:16:07.280
next week be really thinking about how that we move forward and I promised math that I would

01:16:07.280 --> 01:16:14.820
make that plug at the very very beginning so that we can get it with our budgeting process.

01:16:14.820 --> 01:16:21.800
Some of this is going to be a bit of a repeat. We do that intentionality number. We share

01:16:21.800 --> 01:16:29.380
the thoughts that we use to construct the budget because we don't know who's joining

01:16:29.380 --> 01:16:35.580
us along in this journey. So we've been having this conversation about a budget for the last

01:16:35.580 --> 01:16:40.780
several meetings. We started the initial conversations at the council level in April.

01:16:40.780 --> 01:16:46.580
We had subsequent meetings in May and June and then we've been having a conversation about the city's budget

01:16:46.580 --> 01:17:02.350
every single week to continue that August when we started that process.

01:17:02.350 --> 01:17:07.850
We really wanted to hit on some broader themes and I think that Brianna in her

01:17:07.850 --> 01:17:13.850
finance presentation really kind of talked about several of these themes

01:17:13.850 --> 01:17:18.850
when she was talking about the numbers that we're seeing inside of the budget.

01:17:18.850 --> 01:17:20.850
We wanted to create a stable and nimble budget.

01:17:20.850 --> 01:17:23.850
We talked about how dynamic the environment has been,

01:17:23.850 --> 01:17:25.850
and if you just take a look at the building permit numbers

01:17:25.850 --> 01:17:27.850
that she was talking about in the third quarter,

01:17:27.850 --> 01:17:29.850
we were expecting to break all records,

01:17:29.850 --> 01:17:32.850
and then we've seen a softening over the course of the last couple of months

01:17:32.850 --> 01:17:34.850
as it may be related to supply.

01:17:34.850 --> 01:17:36.850
It may be related to cost.

01:17:36.850 --> 01:17:43.660
It may be, so we've seen a softening in the increments.

01:17:43.660 --> 01:17:47.810
We're still going to see record number building permits

01:17:47.810 --> 01:17:51.650
being issued inside the City of Twin Falls, but we don't know if that's

01:17:51.650 --> 01:17:56.270
often is going to continue into fiscal year 22. And so when we construct the

01:17:56.270 --> 01:18:01.130
budget, we want to make sure that it is able to be responsive to a dynamic

01:18:01.130 --> 01:18:05.930
environment that is ever changing. When we created the budget for last fiscal year,

01:18:05.930 --> 01:18:13.750
it was in the middle of the COVID pandemic. And now we're starting to watch the

01:18:13.750 --> 01:18:21.610
Delta variant begin to increase in certain parts of our country and certainly inside the City

01:18:21.610 --> 01:18:22.610
of Twin Falls.

01:18:22.610 --> 01:18:27.290
How that is ultimately going to play out in a year from now is really anybody's guess.

01:18:27.290 --> 01:18:32.130
But what's important is we are creating a budget that requires you to use a crystal ball

01:18:32.130 --> 01:18:36.170
to make the best sound financial decisions to create a stable budget.

01:18:36.170 --> 01:18:38.210
We believe that we've done that.

01:18:38.210 --> 01:18:41.650
We want to make sure that we tie every single expenditure to our strategic plan.

01:18:41.650 --> 01:18:45.970
The strategic plan serves as our guide post, and it is something that was built not only

01:18:45.970 --> 01:18:48.770
by this council, but also in concert with the citizens.

01:18:48.770 --> 01:18:53.030
It creates the community we all want to live in by the year two.

01:18:53.030 --> 01:19:00.010
And with that, we want to continue to honor that strategic plan, the water bill.

01:19:00.010 --> 01:19:02.530
And in addition to that, we want to be the employer choice.

01:19:02.530 --> 01:19:07.830
We want to be the place that people choose to work.

01:19:07.830 --> 01:19:10.110
And this year, we're going to see more turnover.

01:19:10.110 --> 01:19:13.630
We're going to see a significant number of retirements that are going

01:19:13.630 --> 01:19:22.440
to occur this year, individuals that have spent 25 and 30 years and as an employer, choice

01:19:22.440 --> 01:19:29.220
that's a really, really good marker, longevity, but also what happens on that next day is they

01:19:29.220 --> 01:19:37.120
take tremendous institutional knowledge with them to make sure that we have the next man

01:19:37.120 --> 01:19:42.040
or woman ready to stand up and to fill in those roles because public services provided

01:19:42.040 --> 01:19:46.040
by people. And as we've shared last week, and then we're going to chair to their presentation,

01:19:46.040 --> 01:19:51.860
the firetruck's not going to drive itself to the fire. And when our citizens are in their

01:19:51.860 --> 01:19:57.860
greatest time of need, is when our employees perform at their level best. And that is when

01:19:57.860 --> 01:20:03.260
retention matters. No one wants the fire department or the police department that you

01:20:03.260 --> 01:20:08.540
can afford. They want the best when they're at that time of need, and we try to do everything

01:20:08.540 --> 01:20:13.340
that we can to attract and retain the best employees in our organization. That's why they

01:20:13.340 --> 01:20:16.380
will always remain at the center of what we're trying to do.

01:20:16.380 --> 01:20:19.580
And hopefully last week during Focus Area 8, Gretchen

01:20:19.580 --> 01:20:23.580
illustrated the things that we're doing not only in the areas of compensation,

01:20:23.580 --> 01:20:27.340
but also in the areas that are really not compensatory,

01:20:27.340 --> 01:20:31.730
trying to be the employer of choice through policy as well.

01:20:31.730 --> 01:20:34.690
So here's a quick demographics about the City of Twin Falls.

01:20:34.690 --> 01:20:38.050
Tonight we're going to spend time about that census.

01:20:38.050 --> 01:20:41.330
Focus Area 7, we have members of our team tonight that's going to talk about what

01:20:41.330 --> 01:20:43.490
What does it mean for the City of Twin Falls

01:20:43.490 --> 01:20:45.450
to be a small urban community?

01:20:45.450 --> 01:20:47.610
What are those impacts going to be

01:20:47.610 --> 01:20:49.730
as we continue to move forward?

01:20:49.730 --> 01:20:53.070
We continue to be concerned about fast

01:20:53.070 --> 01:20:59.530
the median household income as continuing comparison

01:20:59.530 --> 01:21:06.020
to the home facing falls.

01:21:06.020 --> 01:21:08.220
But if you do a quick search,

01:21:08.220 --> 01:21:11.540
it's absolutely amazing to look at the home values

01:21:11.540 --> 01:21:14.820
in Meridian and Boise where they're nearing

01:21:14.820 --> 01:21:24.830
or exceeding, it's something that as being an employer,

01:21:24.830 --> 01:21:26.150
we need to take a look at.

01:21:26.150 --> 01:21:29.350
So right here, the median home value in the state of Idaho

01:21:29.350 --> 01:21:31.030
is $403,000.

01:21:31.030 --> 01:21:37.380
You can see the median value in Twin Falls is 490, or 290.

01:21:37.440 --> 01:21:40.740
At least it wasn't June, because what we shared in May

01:21:40.740 --> 01:21:44.180
was that it was actually $10,000 less,

01:21:44.180 --> 01:21:49.110
and we watched the significant incline in the next slide.

01:21:49.110 --> 01:21:50.310
We take a look at costs.

01:21:50.310 --> 01:21:53.150
The cost of us providing services based upon municipal

01:21:53.150 --> 01:22:03.310
cost index. June, it was up nearly 10%. So the municipal cost index is very different

01:22:03.310 --> 01:22:10.270
than the consumer price index because as an economic indicator, it takes a look at bushel,

01:22:10.270 --> 01:22:16.510
if you will, of services that we acquire in the materials that we use, diesel fuel, cement,

01:22:16.510 --> 01:22:21.910
asphalt, and it puts us into a basket and it looks to see how those have been increasing

01:22:21.910 --> 01:22:27.590
over a period of time because your price index really kind of reflects what is the cost of

01:22:27.590 --> 01:22:33.230
inflation based upon normal and typical household goods. And you can see that both are growing

01:22:33.230 --> 01:22:40.200
in Brianna shared in her presentation. Both seem to be growing at record. This is an illustration

01:22:40.200 --> 01:22:47.690
of what is occurred inside of the city of Twin Falls and the housing market. Property taxes

01:22:47.690 --> 01:22:56.500
are going to be based upon these numbers right here. Idaho code states that it shall be value

01:22:56.500 --> 01:23:04.640
as of shall be the property value that is used in determining an individual's property tax

01:23:04.640 --> 01:23:11.870
for the so while we continue to grow to two hundred and ninety thousand dollars know that it is going

01:23:11.870 --> 01:23:18.860
to be based upon somewhere lower and as this number continues to grow hopefully the Idaho

01:23:18.860 --> 01:23:24.140
legislature will continue to look at a homeowner's exemption that is more closely tied to indexing

01:23:24.140 --> 01:23:31.100
as opposed to a flat fee and also that the tax rate that will be created next year will

01:23:31.100 --> 01:23:35.580
be largely based upon the total growth of the city's taxable value in future years.

01:23:37.620 --> 01:23:41.940
So last week we had shared that we had some new numbers and the numbers had changed slightly

01:23:42.660 --> 01:23:48.420
as a result of the county's work and again I wanted to send out a great thanks to Brad

01:23:48.420 --> 01:23:53.540
Willes over at the assessor's office because it's really with his work in giving us information

01:23:53.540 --> 01:23:58.660
very, very early that we're able to engage in a conversation that's meaningful with the council.

01:23:59.620 --> 01:24:03.940
So there's a couple of things that are slightly different based upon the total taxable value of

01:24:03.940 --> 01:24:11.540
the city. So right here, and this is what we choose to focus on, right? Everybody wants to know

01:24:11.540 --> 01:24:19.520
how much more is going to cost me next year. And what we're able to illustrate is over all

01:24:19.520 --> 01:24:28.880
all based upon the median household or the median value of a home, less home-wide exemption,

01:24:28.880 --> 01:24:33.680
multiplied by the tax rate, and then taking a look at different rates and those type of

01:24:33.680 --> 01:24:41.560
things, we are able to believe that that median person, person who uses 18,000 gallons of

01:24:41.560 --> 01:24:47.360
water and 12,000 gallons of suitor, who sewer and participates in sanitation recycling and

01:24:47.360 --> 01:24:54.880
lives in that median hope, whoever that median person is, they would save $1.43 under this

01:24:54.880 --> 01:24:57.080
budget in comparison to the prior year.

01:24:57.080 --> 01:25:04.990
Now, $1.43 isn't significant, but what is significant is we're saving $1.43 per month

01:25:04.990 --> 01:25:08.920
in an era in which we're seeing a 10% increase in cost.

01:25:08.920 --> 01:25:14.140
And that is a credit to the members of our team really looked within their budgets to

01:25:14.140 --> 01:25:19.510
find the best ways that we can forward.

01:25:19.510 --> 01:25:22.990
So here are some of the changes in the numbers, and I'll be flucked off of this and kind of

01:25:22.990 --> 01:25:28.540
share what it was in the last slide.

01:25:28.540 --> 01:25:34.540
So one of the numbers I want to talk about is if you take a look at your paying attention

01:25:34.540 --> 01:25:40.380
to Brianna's slides, you would have seen that Brianna's share that the city's budget adopted

01:25:40.380 --> 01:25:45.720
for fiscal year 21 was $77,424,565.

01:25:45.720 --> 01:25:51.490
And now you're wondering over the course of the last hour, how in the world did it shrink

01:25:51.490 --> 01:25:57.610
5 million bucks, right? How did that happen? So it's important is when Brianna is taking

01:25:57.610 --> 01:26:02.990
a look at her number, both numbers are right. In fact, we even described that at the very

01:26:02.990 --> 01:26:09.630
first page of the city's budget message. Brianna is looking at the entirety of the city's budget

01:26:09.630 --> 01:26:14.470
would include transfers from the enterprise funds to the tax-supported funds for the

01:26:14.470 --> 01:26:20.950
rent of staff. Essentially, what Brianna shared is we asked all of the enterprise funds to

01:26:20.950 --> 01:26:25.470
act like they are a small business. The water fund, while it has, you know,

01:26:25.470 --> 01:26:30.590
rock serving as an amazing superintendent, it doesn't have its own human resource

01:26:30.590 --> 01:26:38.070
director. It doesn't have its own legal staff. It doesn't have the other pieces

01:26:38.070 --> 01:26:43.230
of the organization that allow them to be successful and viable. They pay a rent.

01:26:43.230 --> 01:26:49.630
That rent is referred to in government as a transfer. And so we remove transfers.

01:26:49.630 --> 01:26:56.230
And if we were to take a look at net budgets, those are reflected up there.

01:26:56.230 --> 01:27:01.750
If you were to take a look at the entirety of the budget, rather than being $69 million,

01:27:01.750 --> 01:27:06.470
that number would be $73,453,000.

01:27:06.470 --> 01:27:09.550
So for those who are paying attention, why are the two numbers?

01:27:09.550 --> 01:27:11.110
I wanted to explain that.

01:27:11.110 --> 01:27:15.470
We have historically focused on the net budget because when you start looking at the transfers,

01:27:15.470 --> 01:27:19.230
it really is a double accounting where you're taking it from one pocket and you're pushing

01:27:19.230 --> 01:27:24.030
pushing it over to another. This keeps it very, very clean and we'll continue to do that.

01:27:24.030 --> 01:27:27.710
But tonight I wanted to just take a minute because we had the presentation for Brianna

01:27:27.710 --> 01:27:34.850
to explain the differences in the numbers. In addition to that, you see that there is a decline

01:27:34.850 --> 01:27:44.020
in the tax rate. Last week we had illustrated that this was going to be $6.22 now and it's $6.24

01:27:44.020 --> 01:27:48.820
and you would ask why did that increase? It's not that the government spending site increased

01:27:48.820 --> 01:27:58.650
The size of the total tax of the value decreased from 4.0 to 4.1 million that is reflected on the screen.

01:27:58.650 --> 01:28:04.650
So that decrease in the total tax of the value created a different tax rate.

01:28:04.650 --> 01:28:08.650
Determining a tax rate inside the state of Idaho is incredibly easy.

01:28:08.650 --> 01:28:17.650
It is probably the most elementary math that you can take and that is taking the total tax dollars spent divided by the total tax of the value.

01:28:17.650 --> 01:28:22.350
gives you a multiplier that is then taken to every single property.

01:28:22.350 --> 01:28:39.420
So that is going to be the tax rate, and it is reflected cost of living when falls next year compared to this year has changed slightly.

01:28:39.420 --> 01:28:46.420
This is an increase or an illustration, an increase in the city's total taxable value since fiscal year 2013.

01:28:46.420 --> 01:28:49.100
And another number that changed was the total taxable value

01:28:49.100 --> 01:28:50.960
of the Herbinger New Agency.

01:28:50.960 --> 01:28:56.600
That number before the Board of Equalization was 654 million.

01:28:56.600 --> 01:29:02.610
That is now 600.

01:29:02.610 --> 01:29:09.480
Any questions on this?

01:29:09.480 --> 01:29:13.400
Is an illustration of the city's tax rate over a period of time?

01:29:13.400 --> 01:29:16.200
And you can see that the tax rate that we're issuing here

01:29:16.200 --> 01:29:19.680
is among the lows that has been issued by the city of Twin

01:29:19.680 --> 01:29:24.570
Falls.

01:29:24.570 --> 01:29:27.490
The budget that we have in here takes advantage

01:29:27.490 --> 01:29:30.170
of what is allowed under Idaho Code.

01:29:30.170 --> 01:29:32.610
It takes a 3% statutory increase.

01:29:32.610 --> 01:29:35.770
It takes the value of the new construction and annexation

01:29:35.770 --> 01:29:39.170
rolls, and it takes a portion of the foregone balance

01:29:39.170 --> 01:29:43.570
equivalent to 1% to cover additional operation and maintenance

01:29:43.570 --> 01:29:44.530
costs.

01:29:44.530 --> 01:29:51.340
The donation of the arsenic debt.

01:29:51.340 --> 01:29:54.780
And we've shared over the course of the last several weeks

01:29:54.780 --> 01:29:57.980
the importance of using those dollars and applying and creating

01:29:57.980 --> 01:30:00.780
a new capital fund that would allow us to complete

01:30:00.780 --> 01:30:05.820
several projects. We're not recommending any increase in the sewer fund. We're not recommending

01:30:06.780 --> 01:30:11.580
a sizable increase in sanitation recycling. In fact, that's a pass through with our relationship

01:30:11.580 --> 01:30:16.940
that we have as a service provider. And when you take a look at the water, we will, based upon our

01:30:16.940 --> 01:30:29.680
analysis, presidential customers will also receive a decrease in their water bill able to place those

01:30:30.400 --> 01:30:36.880
into significant capital projects over a period of termination of the new fees will

01:30:36.880 --> 01:30:44.600
just slightly more than $2.3 million based upon current customers in use that can be used

01:30:44.600 --> 01:30:48.360
not only to increase mainline maintenance which members of our team are going to spend

01:30:48.360 --> 01:30:53.520
time talking to you tonight but also it's going to be a allow us to complete some significant

01:30:53.520 --> 01:30:58.170
capital projects that are part of our water facility plan.

01:30:58.170 --> 01:31:02.730
So with that, I get to turn it over to members of the team who are going to kind of roll through

01:31:02.730 --> 01:31:07.130
the next several slides, the first piece that we're going to talk about is an accessible

01:31:07.130 --> 01:31:30.060
community, and I'm going to turn the time I believe over to John Keaton. First person

01:31:30.060 --> 01:31:33.560
speaking for Public Works Science is actually going to be the street superintendent, Mark

01:31:33.560 --> 01:31:42.150
Thompson, so I'll be talking later. So this is what happened when he asked the city manager

01:31:42.150 --> 01:31:48.510
to, you know, head-in for the deputy who's unable to be with us tonight, so... Mark?

01:31:48.510 --> 01:32:33.380
It's all good, love Mark. If you see about our steel coating, spreadsheet up there, it is

01:32:33.380 --> 01:32:53.090
It's really some more effect to flow within the city, as a signal going up within the city of intersections.

01:32:53.090 --> 01:33:01.760
V49, cross your fingers hopefully, next to all the pieces and parts are in, so we should be good to go.

01:33:01.760 --> 01:33:02.760
Oh sorry.

01:33:02.760 --> 01:33:13.590
Up those four sections, that also includes all the signals on row state routes.

01:33:13.590 --> 01:33:38.320
And depending on the complexity of the intersection, we kind of, a signal alone here is actually 6th Avenue.

01:33:38.320 --> 01:33:55.970
It can be a stand-alone system, set it up to different intersections, change things around.

01:33:55.970 --> 01:34:13.960
So we start with an optical system, every one of our signals has an optical system, which is an emergency preemption system, EMS vehicle direction they're flowing.

01:34:13.960 --> 01:34:22.000
Then we also get into a detection system, and we have two types within the city right now.

01:34:22.000 --> 01:34:26.840
We have an infrared system, and we have a detection system.

01:34:26.840 --> 01:34:33.440
Video is never sees it

01:34:33.640 --> 01:35:11.680
Fred system is based off of the heat signature of what's coming up to so that's kind of where we're headed

01:35:11.680 --> 01:35:19.760
There's also a UPS system which stands for un-airappable power supply

01:35:20.080 --> 01:35:39.260
That's basically a battery protection system to intersections

01:35:39.760 --> 01:36:03.260
option system or intersections in

01:36:11.520 --> 01:37:17.840
System points are focusing on like those two

01:37:19.150 --> 01:37:22.010
Signals on Kimberly Road are fairly new

01:37:22.010 --> 01:37:41.490
Yes, they are, um, and the problem we're having is the way they were designed.

01:37:41.490 --> 01:37:48.980
Puck system, and I'm not sure how the puck system works, but we've had nothing but problem.

01:37:48.980 --> 01:38:00.370
Traffic situation is good in my book.

01:38:00.370 --> 01:38:01.370
Yes.

01:38:01.370 --> 01:38:28.590
This is my maiden voyage up here, so bear with me.

01:38:28.590 --> 01:38:31.900
I've never been here, at least presenting it.

01:38:31.900 --> 01:38:33.900
We're going to make sure you get lots of questions then.

01:38:33.900 --> 01:38:35.900
Okay, thanks.

01:38:35.900 --> 01:38:40.500
We'll see our three capital requests for next year.

01:38:40.500 --> 01:38:45.500
The one I want to start off with and really focus on is the shop expansion.

01:38:45.500 --> 01:39:01.950
In 20 department and golf course came to us and requested that we take over 100% of the maintenance and repair their equipment that they had been doing for the last 75 years.

01:39:01.950 --> 01:39:08.710
We took that on to increase the workload in the shop substantially.

01:39:08.710 --> 01:40:13.890
To the point that whole section that you see in the picture movements in it, I think lights and other shop expansions, it's a lot total.

01:40:13.890 --> 01:40:23.860
This includes, of course, because we've tried more 191 pieces of equipment on the handle list, just a few.

01:40:23.860 --> 01:40:52.730
Just a few. Doesn't include string trimmers and backpack loaders, and some of that smaller equipment that I've changed so that's not all.

01:40:52.730 --> 01:40:56.730
So right now, without this workspace, we have no room to add another.

01:40:56.730 --> 01:41:07.340
Yeah, the proof this area, our intention is to move all weird stuff

01:41:07.340 --> 01:41:34.420
Onto that into the things I don't work on, actually I want to move on to the kill replacement

01:41:34.420 --> 01:41:36.420
Because that's pretty important also

01:41:36.420 --> 01:41:42.220
So that heater replacement amount is for the main portion of the shop

01:41:42.220 --> 01:41:45.980
We spent several thousand dollars over the last two or three years

01:41:45.980 --> 01:41:54.260
To try and repair, continually repair the heater system that it was installed when the building was built

01:41:54.260 --> 01:41:56.730
That was in 1980.

01:41:56.730 --> 01:42:07.180
Companies that we've used over the last few years are telling us now there are no more parts available.

01:42:07.180 --> 01:42:15.210
But this would replace the entire heat system in the main portion of the shop and our wash base.

01:42:15.210 --> 01:42:51.460
Councilman, I'd like to just tip on the items for water.

01:42:51.460 --> 01:42:55.860
This year we're asking for a hydro-exclamation truck.

01:42:55.860 --> 01:43:10.760
We have wastewater departments and last year we need a budget unit.

01:43:10.760 --> 01:43:19.890
Working around with all the utilities now in twin hoodies, but on this subdivision on the

01:43:19.890 --> 01:43:33.660
farm grounds pretty easy because there's a lot of things you can go up, get into for

01:43:33.660 --> 01:44:16.980
the next grader around this stuff. There's new technology, there's better ways to do it now, utilize some of that, and see the benefits of huge safety.

01:44:16.980 --> 01:44:31.310
Nice and clean things, you can see where they're at, and they're just taking each benefit. Less space, most of the time, and with the next grader.

01:44:31.310 --> 01:44:57.460
There's also guys who are feet and rocks on the side.

01:44:57.460 --> 01:45:03.090
It's with an ex-computer and you're not sure what's all there.

01:45:03.090 --> 01:45:08.690
It's laying along the side with fiber up to connect stuff.

01:45:08.690 --> 01:45:12.040
If you get one of those lines, it can be thousands of dollars.

01:45:12.040 --> 01:45:18.950
Because it just makes it a whole lot easier for our guys.

01:45:18.950 --> 01:45:21.430
We're able to get, if in an emergency,

01:45:21.430 --> 01:45:34.770
we're able to get right out there on the job site immediately.

01:45:34.770 --> 01:45:42.780
It's on time.

01:45:42.780 --> 01:45:45.320
It's our main placement.

01:45:45.320 --> 01:45:49.940
We're getting 50,000 this year.

01:45:49.940 --> 01:45:51.940
over the next five years you'll see

01:45:51.940 --> 01:45:52.940
um

01:45:52.940 --> 01:45:54.940
as being the arsenic off

01:45:54.940 --> 01:45:57.740
we don't look at ramping up

01:45:57.740 --> 01:46:01.300
replacement

01:46:01.300 --> 01:46:02.910
this year

01:46:02.910 --> 01:46:10.700
five thousand next two years

01:46:10.700 --> 01:46:13.700
we're really excited to be able to finally start doing some of this

01:46:13.700 --> 01:46:16.700
we've worked a long time and tried to figure out how to afford it

01:46:16.700 --> 01:46:20.200
the arsenic bill

01:46:20.200 --> 01:46:31.900
a couple jobs already designed

01:46:31.900 --> 01:46:33.900
litter almost shelf ready to go

01:46:33.900 --> 01:46:39.450
the lakes can be revocussed

01:46:39.450 --> 01:47:01.540
not messing up throughout athlete

01:47:01.540 --> 01:47:07.420
just get through trying not to do that

01:48:23.400 --> 01:48:57.880
The place they stay is, well, some stuff that's in, so yeah, it's kind of like a car you don't wait until the motor blows up before you change the oil, but when, you know, there's a maintenance schedule, and so we're like, our facility, plan, since we should be done.

01:48:57.880 --> 01:49:02.870
It's like a good step in the way. This is fantastic. Thank you. I'm excited about it.

01:49:02.870 --> 01:49:08.370
The meter replacement, I'll just touch on it.

01:49:08.370 --> 01:49:13.980
um, place, trying to replace roughly 1,000 to 1,200 meters a year

01:49:13.980 --> 01:49:15.980
I'm on our meter replacement program

01:49:15.980 --> 01:49:19.990
I'm replacing meters and we've got meters

01:49:19.990 --> 01:49:27.940
and we're getting every replacement time on meters

01:49:27.940 --> 01:49:30.940
it's a 20-year lifecycle, I'm not a cell

01:49:30.940 --> 01:49:34.390
I'm losing our revenue, that's what we do

01:49:34.390 --> 01:49:50.030
so when we're accelerating through 1,000 or 1,200

01:49:50.030 --> 01:49:55.580
at pace and then we can kind of slow down

01:49:55.580 --> 01:50:13.240
to be started, I believe, about 70 to about 17,000

01:50:13.240 --> 01:50:25.480
You are seeing no attention

01:50:25.480 --> 01:50:28.380
and being able to get parts and that kind of stuff

01:50:28.380 --> 01:51:03.800
and that kind of stuff. The chipboards that go now in the weeks, but it also what works

01:51:03.800 --> 01:51:13.330
for that is everybody else will. That was all on distribution side. We've got our water

01:51:13.330 --> 01:51:32.940
facility plan in months and water supply this year. We just put in 60,000 in there for

01:51:32.940 --> 01:51:38.500
fault replacements. We've got nine different pressure zones in our system and those faults

01:51:38.500 --> 01:51:48.210
I'm going to try to control the pressure between the South and 80 PSI.

01:51:48.210 --> 01:51:52.900
We lose 100 feet of elevation and we'll be on PSI.

01:51:52.900 --> 01:51:56.900
So those pressure faults have pressure releasing valves in them.

01:51:56.900 --> 01:52:07.500
A lot of them are formed up some boards and little dead iron, and that's how it's.

01:52:07.500 --> 01:52:11.500
So we want to get those to where they're safe for the guys to get in.

01:52:11.500 --> 01:52:13.500
We have good lids and hatches on them.

01:52:13.500 --> 01:52:43.690
I think that was the council.

01:52:43.690 --> 01:52:48.150
The waste would have treated them.

01:52:48.150 --> 01:53:02.640
items. There's only five there listed I want to talk about. Two of the big dollar ones. So one is a

01:53:02.640 --> 01:53:10.710
sledge truck. Chassis is in slicker bed. The waste water tree plant has four of these currently. The oldest one I

01:53:10.710 --> 01:53:20.430
live is in 1993. It has about 600,000 miles on it. Seen better days. And what happens is through the

01:53:20.430 --> 01:53:26.830
the treatment process, the liquids are separated from the solids, and those solids are then physically

01:53:26.830 --> 01:53:31.350
and can we treat it to create a bio-solid, and you have to get rid of those bio-solids

01:53:31.350 --> 01:53:36.190
in one of the best ways, it's still not an apply it to the local farmers field, so we

01:53:36.190 --> 01:53:38.430
work with DEQ for that regular process.

01:53:38.430 --> 01:53:43.590
They can get rid of something that we are trying to get rid of, and also give a nutrient-rich

01:53:43.590 --> 01:53:48.950
bio-solid farmer, so it's a win-win, and I just want to show you what it looks like,

01:53:48.950 --> 01:53:56.400
Maybe this isn't exactly it, but this is a different version of how you would see biosols and what this slinger trick can do.

01:53:56.400 --> 01:54:01.500
Oh, see.

01:54:01.500 --> 01:54:13.080
When you see it, you'll think it's slinger because it is pretty cool.

01:54:13.080 --> 01:54:24.380
This is the figure.

01:54:24.380 --> 01:54:31.380
So imagine this, the waste search you're planning taking a farmer field, and the farmer's like it because you're not going up as many passes.

01:54:31.380 --> 01:54:33.380
It really is slinging across the field.

01:54:33.380 --> 01:54:38.380
And the waste water you can plant would take that and equally distribute it across the field.

01:54:38.380 --> 01:54:40.380
So it's kind of a cool thing that we can do.

01:54:40.380 --> 01:55:04.090
So what you saw was a tractor pulling an actual bed, what we're looking at is that the truck itself is able to do it all on its own.

01:55:04.090 --> 01:55:12.670
And then the other item I was going to discuss was another $250,000.00 smasher.

01:55:12.670 --> 01:55:15.670
We have some old boilers, we're trying to replace them.

01:55:15.670 --> 01:55:28.630
We've already procured the money in the Siskir for the boilers, and the $250,000 is the cost to do some additional piping and the installation of that boiler for this year.

01:55:28.630 --> 01:55:38.900
The thing that is noteworthy there is when you want to make sure that bugs are doing their job and actually taking care of the digestion.

01:55:38.900 --> 01:55:44.740
So it's important of when you make their replacement as opposed to doing that in the dead of winter once it's cold, it doesn't work well.

01:55:44.740 --> 01:55:48.140
So I think the intent of me to do it probably in the spring is a little hotter.

01:55:48.140 --> 01:55:52.100
So that would be the cost to install those.

01:55:52.100 --> 01:55:59.700
And those are two projects I have that I can answer any questions you might have on any of them or those specific projects.

01:55:59.700 --> 01:56:02.360
Christopher Reed.

01:56:02.360 --> 01:56:17.650
A few months we had a presentation and there some of the equity aside to look at some of

01:56:17.650 --> 01:56:18.650
our old equipment.

01:56:18.650 --> 01:56:26.160
I don't think it was the boiler, there an update on that, understanding that we're doing

01:56:26.160 --> 01:56:34.640
a budget, we're putting funds towards that, wishing that I remembered all the terminology.

01:56:34.640 --> 01:56:35.640
Me and you both.

01:56:35.640 --> 01:56:41.500
I know there's also a digester project that was coming out there.

01:56:41.500 --> 01:56:42.500
That was the digester.

01:56:42.500 --> 01:56:48.420
We're but on the even a couple of weeks before I should be coming to council with requests

01:56:48.420 --> 01:56:53.500
so we'll work a bit on the digester project that is intended to replace one of the digesters

01:56:53.500 --> 01:56:58.260
that we'll be looking at or at least repairing or rehabilitating a digester.

01:56:58.260 --> 01:57:05.860
We'll be looking at the second digester and making sure it's up to par and if not potentially

01:57:05.860 --> 01:57:06.860
rehabilitating it as well.

01:57:06.860 --> 01:57:09.930
Okay, so that'll be in this year's budget.

01:57:09.930 --> 01:57:11.170
Yes, this is one.

01:57:11.170 --> 01:57:20.460
I think it's $500,000 in this year's budget, maybe more in the next year's budget.

01:57:20.460 --> 01:57:21.660
I'm not pausing on that.

01:57:21.660 --> 01:57:24.860
I don't see it on the list, but I'm pretty sure it's all taken care of under this current

01:57:24.860 --> 01:57:25.860
fiscal year's budget.

01:57:25.860 --> 01:57:26.860
Perfect.

01:57:26.860 --> 01:57:27.860
I'll lighten up that changes.

01:57:27.860 --> 01:58:15.990
We do have, for us, to under just for this fail, that several, it's been something

01:58:15.990 --> 01:58:33.060
that the, what's important is the digester's full balance that are in it and this takes

01:58:33.060 --> 01:59:00.800
time to start that process and the other digester as well.

01:59:00.800 --> 01:59:08.100
We just wanted a collection superintendent, but he is on vacation, so I'm going to touch

01:59:08.100 --> 01:59:11.100
on just a couple of these things as well, but just like Josh was saying,

01:59:11.100 --> 01:59:25.710
these feel free. We just wanted a collection that is in a similar place to water replacement,

01:59:25.710 --> 01:59:35.940
and how it's outlined in our master plans. It takes, not only money, but it takes a program.

01:59:35.940 --> 01:59:38.940
I liked what Rob said when he said it's a maintenance schedule.

01:59:38.940 --> 01:59:43.260
That's what Reid was asking questions about. Is it going to tie in towards our maintenance?

01:59:43.260 --> 01:59:47.940
I was really glad you asked that question because obviously it's really important that

01:59:47.940 --> 01:59:53.940
our underground utilities are maintained properly if we have a robust surface treatment, if we

01:59:53.940 --> 01:59:59.460
have a robust street maintenance program, it doesn't matter if the utilities.

01:59:59.460 --> 02:00:04.300
What I found interesting over the almost 14 years I've been here, the streets get so much

02:00:04.300 --> 02:00:11.900
attention from our customers that it does get funded and over the years it's been really

02:00:11.900 --> 02:00:20.080
hard to build a program. No criticism on anybody but you know they're the two

02:00:20.080 --> 02:00:23.760
enterprise funds you think we'd be able to you know make this happen but it's

02:00:23.760 --> 02:00:28.760
been years in the making and so I'm really excited as well about the arsenic

02:00:28.760 --> 02:00:35.890
potential that we could do with that money difference and so let me go back

02:00:35.890 --> 02:00:43.020
to sewer because that's where I was talking about it so the things that can

02:00:43.020 --> 02:00:47.980
help us take our mainline dollars a long way is trenchless rehabilitation so

02:00:47.980 --> 02:00:54.220
you do the traditional open trench, it can, and it costs what it costs. I, the number I put on there

02:00:54.220 --> 02:00:59.980
is pretty optimistic. There are, there is data out there that shows that for every dollar you spend

02:00:59.980 --> 02:01:08.220
on an open trench replacement, you could spend 25 cents on CIPP for that length. Generally for

02:01:08.220 --> 02:01:13.100
planning purposes, they're going to say it's half the cost, but I've been looking, J.E.B.'s really

02:01:13.100 --> 02:01:16.580
really helped us get these facts and page put together.

02:01:16.580 --> 02:01:18.700
Cordolane is a great program.

02:01:18.700 --> 02:01:21.900
They have a great program more than since 2004.

02:01:21.900 --> 02:01:27.130
They've been CIPP every year in the amount,

02:01:27.130 --> 02:01:28.970
on average about $400,000.

02:01:28.970 --> 02:01:33.290
So they're doing miles and miles of rehabilitation

02:01:33.290 --> 02:01:37.650
each year for cost.

02:01:37.650 --> 02:01:39.570
And that's exactly what we're trying to do

02:01:39.570 --> 02:01:48.180
is to build up to the reason it's taken us a while is,

02:01:48.180 --> 02:01:51.720
when you start looking at rehabilitating,

02:01:51.720 --> 02:02:02.630
miles of sewer line condition of it and they seem to say and so we've we've

02:02:02.630 --> 02:02:08.270
simplified how we assess is keep it simple there's a beauty to keep it

02:02:08.270 --> 02:02:13.790
simple and so we've we've modified several things several ways with we

02:02:13.790 --> 02:02:19.950
assess the pipe and go out as you all know we use a TV camera to the sewer to

02:02:19.950 --> 02:02:24.870
it's video inspect the sewer score it prioritize it we put it on the list to

02:02:24.870 --> 02:02:31.340
I'm excited because this year we've done some, and I'll show you a picture, we've done some,

02:02:31.340 --> 02:02:39.680
but test the IPPs, been around for years and years, here in place piping is what it's called,

02:02:39.680 --> 02:02:48.150
it's a trenchless technology. This will be the first year that we will in this next budget

02:02:48.150 --> 02:02:59.120
we should have a large contract to put, at least a mile plus is the process for CIPP.

02:02:59.120 --> 02:03:13.100
see IPP you can see this gentleman and Costco there a sock it's a it's um it's

02:03:13.100 --> 02:03:21.770
unfelving but it's like it's a fabric that's impregnated with resin and they

02:03:21.770 --> 02:03:25.850
keep it cold you can see in that back of the truck there's bags of ice so they

02:03:25.850 --> 02:03:34.300
have to keep it temperature controlled they pull it in into the to the sewer

02:03:34.300 --> 02:03:42.710
the inflated, I get to temperature with steam, basically cook it in place and it becomes a whole new pipe.

02:03:42.710 --> 02:03:50.170
Most of the time you don't capacity and it gets smaller.

02:03:50.170 --> 02:03:56.170
Well it also gets smoother in many cases. It improves the situations where we're not really losing capacity

02:03:56.170 --> 02:04:01.580
and we're replacing a pipe and PVC pipe's got at least 100 years.

02:04:01.580 --> 02:04:07.740
Um, so, uh, CIPP.

02:04:07.740 --> 02:04:17.590
Do you hide your gender first year on the routes that takes it in place or do you...

02:04:17.590 --> 02:04:20.090
There's this force that runs out.

02:04:20.090 --> 02:04:22.090
Yes, I... good, great question.

02:04:22.090 --> 02:04:26.090
There's a lot that goes into getting a pipe ready for CIPP.

02:04:26.090 --> 02:04:32.090
And it takes us, you know, we'll see, but it's gonna take us, you know, a good part of the year

02:04:32.090 --> 02:04:35.090
to get a mile of pipe ready for CIPP.

02:04:35.090 --> 02:04:38.090
It means you're cleaning it, you're making spot repairs.

02:04:38.090 --> 02:04:42.570
This stuff will bridge problems pretty well. It'll bridge gaps

02:04:43.530 --> 02:04:47.390
But but they want any do need to remove roots

02:04:50.340 --> 02:05:03.860
So yes, there's a lot of prep that goes into it going to the other item. I'm excited about

02:05:04.900 --> 02:05:15.880
This Vanguard pathogen defense system is what it's called and really what it is. It's a system that is vehicle mounted

02:05:16.280 --> 02:05:18.940
We have four systems that we're posing

02:05:18.940 --> 02:05:30.780
one two for two jets and one you can see in this picture on the left what you're

02:05:30.780 --> 02:05:39.040
seeing is a jet hoses being pulled back from the sewer and you can see below that

02:05:39.040 --> 02:05:44.870
coupling it's pretty gross and up to the picture in the middle you can see

02:05:44.870 --> 02:05:49.550
there's nozzles in the jet that spray the hose and remove all the all the stuff

02:05:49.550 --> 02:05:54.150
and it disinfects it kills pathogens and things like that so when you pull the

02:05:54.150 --> 02:06:01.150
the hose retract the hose from the sewer, the operators man handling the hose getting it back on the reel.

02:06:01.150 --> 02:06:07.670
It's a lot when it's coming back clean.

02:06:07.670 --> 02:06:13.630
The other thing to do is you get it on things, you get it on your boots, you get it where.

02:06:13.630 --> 02:06:25.250
And so there's also a hand held gun that you can spray down disinfect your boots all day long.

02:06:25.250 --> 02:06:39.440
This is a really nice feature for our operators that I'm really looking forward to.

02:06:39.440 --> 02:06:52.440
That's the S-Man one for questions.

02:06:52.440 --> 02:06:57.550
I still seem to be a lot more choice.

02:06:57.550 --> 02:07:18.470
Yes, so I'm going to start and kind of share some of the processes that I'm going to turn

02:07:18.470 --> 02:07:30.660
it over to members of our team, planning its owning to relate to fees.

02:07:30.660 --> 02:07:35.270
One of the things I had shared at the very beginning was what does it mean when the city

02:07:35.270 --> 02:07:38.560
of Flint falls crests over the 50,000 population.

02:07:38.560 --> 02:07:44.560
And as we had shared, there was a point in time where the federal government was considering

02:07:44.560 --> 02:07:46.560
to increase that 200,000.

02:07:46.560 --> 02:07:52.480
Then recently they made the decision that they were in June, so it still remains at 50,000.

02:07:52.480 --> 02:07:59.480
In this result of that, there are a whole series of federal requirements that are passed on to those cities that are now considered urban.

02:07:59.480 --> 02:08:06.700
Once they hit that 50,000 legislation, it's not a designation that we requested.

02:08:06.700 --> 02:08:08.700
It's a designation that counts as a result.

02:08:08.700 --> 02:08:15.700
So we believe that the city from falls is going to surpass the 50,000 population threshold

02:08:15.700 --> 02:08:22.960
When the 2020 Census is officially certified, it probably won't be certified for probably about another...

02:08:22.960 --> 02:08:32.630
He has to make that in 2019, the City of Twin Falls' population had crescent over,

02:08:32.630 --> 02:08:35.630
and as you've seen the amount of building activity you've seen,

02:08:35.630 --> 02:08:39.810
we have seen inside of the City of Twin Falls,

02:08:39.810 --> 02:08:44.740
not only when we talk about sick of family permits, but we also talk about what we believe

02:08:44.740 --> 02:08:52.980
that the City of Twin Falls is going to be close to when that Census is finally certified.

02:08:52.980 --> 02:09:00.710
So with that becomes a whole series of processes, and none of these should be surprised to use

02:09:00.710 --> 02:09:07.190
one of them is that we're looking at a metropolitan statistical area, which is that area that encompasses

02:09:07.190 --> 02:09:15.360
not only twin falls, but also drone inside of that eventually the census will create what's

02:09:15.360 --> 02:09:18.160
called an urbanized zone.

02:09:18.160 --> 02:09:22.360
That urbanized zone is going to be critical when they start taking a look at the creation

02:09:22.360 --> 02:09:26.680
of a metropolitan area and some initial conversations

02:09:26.680 --> 02:09:30.040
with some essential stakeholders that will be a part

02:09:30.040 --> 02:09:32.080
of the MPO they believe.

02:09:32.080 --> 02:09:34.240
We know the city of Twin Falls will be included.

02:09:34.240 --> 02:09:39.030
We know that the city of Kimberly will be included.

02:09:39.030 --> 02:09:41.520
That will also include county as part of that

02:09:41.520 --> 02:09:46.970
on the corporate areas, the state and the highway districts.

02:09:46.970 --> 02:09:50.130
How it continues to grow outside of that will ultimately

02:09:50.130 --> 02:09:52.430
be through the census period.

02:09:52.430 --> 02:09:54.070
But there's a whole series of stakeholders.

02:09:54.070 --> 02:09:55.510
We've had one meeting.

02:09:55.510 --> 02:10:00.320
the committee says we're looking at standing up an organization.

02:10:00.320 --> 02:10:16.040
In addition to that, as Ian and members of the planning team have presented, even had a conversation

02:10:16.040 --> 02:10:23.440
about the CDBG projects that are incorporated, so you'll notice that we have the 20 allocation,

02:10:23.440 --> 02:10:32.870
the 20 CARES allocation, the 21 allocation of about $1.1 million, including this budget.

02:10:32.870 --> 02:10:37.370
We've defined how those projects are going to be spent through the portionality of the public

02:10:37.370 --> 02:10:47.470
hearing and the over-representatives from starting to projects and present those to you,

02:10:47.470 --> 02:10:57.040
but also by being a part of a responsible community to make sure that we're covering our costs.

02:10:57.040 --> 02:11:03.120
Taking a low process review, what is the cost of us doing business?

02:11:03.120 --> 02:11:09.120
And if government is supposed to operate like a private entity,

02:11:09.120 --> 02:11:16.280
what we would and should be responsible to ensure that our costs are being covered.

02:11:16.280 --> 02:11:21.840
And especially when we start talking about how growth needs to pay for growth, many of

02:11:21.840 --> 02:11:27.040
the planning and zoning fees are really driven through a growth process.

02:11:27.040 --> 02:11:31.780
So members of our planning and zoning team really took upon the challenge to explore

02:11:31.780 --> 02:11:34.460
what is the cost of providing a service?

02:11:34.460 --> 02:11:36.300
What is the cost of reviewing a plan?

02:11:36.300 --> 02:11:40.040
What is the cost of reviewing a special use permit?

02:11:40.040 --> 02:11:43.740
What is the cost of then publishing it and creating

02:11:43.740 --> 02:11:47.780
an ordinance and going through all of those parts and pieces?

02:11:47.780 --> 02:11:52.410
What is the cost of staff time that

02:11:52.410 --> 02:11:58.050
relates to the new subdivision in the infrastructure there?

02:11:58.050 --> 02:11:59.770
So members of our planning and zoning team

02:11:59.770 --> 02:12:01.730
have taken a look at this, and they

02:12:01.730 --> 02:12:06.210
are going to be sharing those costs with you,

02:12:06.210 --> 02:12:08.610
as we will ask for you to consider

02:12:08.610 --> 02:12:33.120
increasing those costs during the digest that information as well. So with that, I'm going to turn it over to members.

02:12:33.120 --> 02:12:40.690
Nice to see everybody tonight, and members. As you recall, I'm pin-shitting tonight, obviously.

02:12:40.690 --> 02:12:50.690
But as you recall, Jonathan and I were here a while ago to discuss the proposal that we had to increase our planning and zoning application fees.

02:12:50.690 --> 02:12:58.920
So, the answer for emotional support.

02:12:58.920 --> 02:13:02.720
The first slide is a review of what you guys saw last time.

02:13:02.720 --> 02:13:19.600
So, Jonathan took the preliminary and the final application fee was created in comparison

02:13:19.600 --> 02:13:26.640
the cost of a new home was 62.5 and going down and the same thing with the zoning applications

02:13:26.640 --> 02:13:32.880
last time they were updated. Cost of a new home was 166 and going down and as you can see

02:13:33.600 --> 02:13:40.520
in the previous presentation the cost of a median home in Twin Falls is nowhere near either one of

02:13:40.520 --> 02:14:08.460
those but our fees are stayed the same. This is just a list of our current application fees in

02:14:09.580 --> 02:14:16.060
alphabetical order the last two are the preliminary and the final plats and the years that they were

02:14:16.060 --> 02:14:22.940
established anywhere from 1978 with the plats to 2010 with design permits and these are all

02:14:22.940 --> 02:14:33.210
categories categorized under as planning and zoning applications. You had asked us to go back and

02:14:34.170 --> 02:14:41.870
break down our costs more than we had. So the required public notice in the paper,

02:14:41.870 --> 02:14:47.870
the costs are recent and voices range anywhere from $50 to $200 depending on the length of the item

02:14:47.870 --> 02:14:52.470
And how many items are on that posting?

02:14:52.470 --> 02:14:55.350
The average public hearing item, each item,

02:14:55.350 --> 02:14:57.160
lasts an hour.

02:14:57.160 --> 02:15:00.120
Many can be less, but I know you guys

02:15:00.120 --> 02:15:03.920
know that many can be more.

02:15:03.920 --> 02:15:08.520
And the required staff at a planning and zoning public hearing

02:15:08.520 --> 02:15:11.240
is our city attorney or planning and zoning director,

02:15:11.240 --> 02:15:15.880
assistant city engineer, a planner, a member of IT,

02:15:15.880 --> 02:15:19.210
and me, the administrative assistant.

02:15:19.210 --> 02:15:24.990
So, heart cost, we know that every public hearing

02:15:24.990 --> 02:15:26.630
has to be publicized in the paper.

02:15:26.630 --> 02:15:29.830
It's around $100, we're estimating,

02:15:29.830 --> 02:15:33.400
depending on the number of hearings.

02:15:33.400 --> 02:15:38.120
Though, breaking down just at the fully burdened rate

02:15:38.120 --> 02:15:42.640
of those six staff members per hour,

02:15:42.640 --> 02:15:47.640
Our public hearing staff time costs $317 an hour.

02:15:48.560 --> 02:15:54.040
And that was, Kristen helped me come up with that number.

02:15:54.040 --> 02:15:57.720
That's not taking into consideration prep and review time.

02:15:57.720 --> 02:16:00.800
And we went back and forth.

02:16:00.800 --> 02:16:02.360
We estimated the time.

02:16:02.360 --> 02:16:04.200
I was supposed to have a handout for you guys

02:16:04.200 --> 02:16:05.480
with the full breakdown,

02:16:05.480 --> 02:16:07.520
but I couldn't find it today.

02:16:07.520 --> 02:16:10.560
So I can get you that information.

02:16:10.560 --> 02:16:14.760
But, so the estimated average amounts very greatly

02:16:14.760 --> 02:16:19.720
from $220 to upwards of $1,200 depending on the type of application.

02:16:19.720 --> 02:16:26.960
Okay, so this is just a sample of some of our application costs,

02:16:26.960 --> 02:16:29.880
me applications, we couldn't fit them all on one slide,

02:16:29.880 --> 02:16:33.120
so Jonathan, I think he took the top 12.

02:16:33.120 --> 02:16:36.240
So the first is just the list of applications.

02:16:36.240 --> 02:16:40.080
The second column is the number of public hearings that each of

02:16:40.080 --> 02:16:42.640
these applications require.

02:16:42.640 --> 02:16:53.380
And for the hearing cost alone is what staff time would cost in the second column.

02:16:53.380 --> 02:16:59.500
It is by hour or so for an annexation is too public hearing so average staff cost for that

02:16:59.500 --> 02:17:04.180
public hearing time is $635 and so forth.

02:17:04.180 --> 02:17:07.140
The review cost is different.

02:17:07.140 --> 02:17:13.030
This is all behind the scenes stuff that we do getting prepped for the meeting.

02:17:13.030 --> 02:17:16.930
For me personally, it's sending out public notice packets,

02:17:16.930 --> 02:17:21.930
contact with the applicants, taking minutes at the meeting

02:17:22.370 --> 02:17:26.210
and preparing them for approval on the back end,

02:17:26.210 --> 02:17:29.290
plus all the review time of all of our other staff members.

02:17:29.290 --> 02:17:34.290
It could be our engineering tax, engineers, planners,

02:17:35.570 --> 02:17:38.150
other assistance building department,

02:17:38.150 --> 02:17:39.710
depending on the type of application

02:17:39.710 --> 02:17:41.690
who gets involved with those.

02:17:41.690 --> 02:17:47.650
So, the total of those two columns is that that's just a cost of staff time.

02:17:47.650 --> 02:17:52.410
That's not taking into consideration the hard costs that we talked about earlier.

02:17:52.410 --> 02:17:57.830
And in the last column are the proposed fees that we have come up with.

02:17:57.830 --> 02:18:00.830
These were the fees that we showed you at the last meeting.

02:18:00.830 --> 02:18:10.810
And this is how they compare now to the actual cost per staff, by application for staff.

02:18:10.810 --> 02:18:12.610
And then this is the technical practice for staff.

02:18:12.610 --> 02:18:14.990
Yeah, of course, Steve, one more minute.

02:18:14.990 --> 02:18:21.900
Sorry.

02:18:21.900 --> 02:18:27.060
And so this is a slide you guys saw before.

02:18:27.060 --> 02:18:29.960
This was my part of the first presentation,

02:18:29.960 --> 02:18:33.460
is I took all of our current applications

02:18:33.460 --> 02:18:36.600
at our current rate and compared them

02:18:36.600 --> 02:18:39.860
to similar jurisdictions of our size,

02:18:39.860 --> 02:18:42.180
plus it included Twin Falls County.

02:18:42.180 --> 02:18:45.900
We have a more extensive, we went all over,

02:18:45.900 --> 02:18:48.620
but these were the five, five or six

02:18:48.620 --> 02:18:53.020
that are closest to us in size or never.

02:18:53.020 --> 02:18:56.060
And so here's our current cost.

02:18:56.060 --> 02:18:58.120
Here's our current application fees

02:18:58.120 --> 02:19:02.340
compared to the other jurisdictions on the low end.

02:19:02.340 --> 02:19:04.380
That's how they compare.

02:19:04.380 --> 02:19:06.550
And then on the high end,

02:19:06.550 --> 02:19:10.430
that's the third column is the high end cost.

02:19:10.430 --> 02:19:13.270
And then the last column is what we are proposing

02:19:13.270 --> 02:19:16.780
to increase our fees to.

02:19:16.780 --> 02:19:29.450
Does anybody have any question to digest here?

02:19:29.450 --> 02:19:31.450
There is, there is.

02:19:31.450 --> 02:19:33.150
I guess not a question, but just to comment.

02:19:33.150 --> 02:19:43.290
So in the print, since these had enix.

02:19:43.290 --> 02:19:44.690
Oh, yeah, yours are covered, huh?

02:19:44.690 --> 02:19:45.190
Yeah.

02:19:45.190 --> 02:19:45.690
OK.

02:19:45.690 --> 02:19:48.290
So if we could just get those before we have to.

02:19:48.290 --> 02:19:48.790
Sure.

02:19:48.790 --> 02:19:49.740
Get to the point.

02:19:49.740 --> 02:19:51.140
Get that in the decisions on them.

02:19:51.140 --> 02:19:52.620
What's important is this is also,

02:19:52.620 --> 02:19:54.660
so we're bringing this up this evening.

02:19:54.660 --> 02:19:56.300
Again, this is going to be a part of the field

02:19:56.300 --> 02:19:59.580
for all public hearing that we'll walk through next week.

02:19:59.580 --> 02:20:20.910
Oh, we have Jonathan.

02:20:20.910 --> 02:20:24.340
They're aware that they might know that not know the numbers

02:20:24.340 --> 02:20:31.700
because they're not said yet, but they're aware that we are recognizing it's time to

02:20:31.700 --> 02:20:37.410
do some changes, make some changes to the fees.

02:20:37.410 --> 02:20:43.210
So that's it on public, I mean the planning and zoning application fees, and then now to

02:20:43.210 --> 02:20:50.210
the impact fees, this will be coming before you as a public hearing later.

02:20:50.210 --> 02:20:54.610
Our first public hearing for impact fees with planning and zoning is August 10th, so

02:20:54.610 --> 02:21:10.660
next week and it's kind of the same thing. It's time to take a look at these. We can look at these every five years, I believe, and assess the fees and what's an equitable program for our growth.

02:21:10.660 --> 02:21:32.380
So again, for Chris for your question, they have extensively gone over these impact fees with these certain, I know Johnson's made a lot of field trips to different associations.

02:21:32.380 --> 02:21:58.300
we've had people in the office that he's gone over and explained and they kind of they understand they don't probably don't like it but they understand it so so moving forward we're going to have public hearings with Planning and Zoning Commission to see if what's been studied and looked at is equitable or okay with them and then we'll bring it to you for public hearing.

02:21:58.300 --> 02:22:01.940
I think that is all I have.

02:22:01.940 --> 02:22:13.920
Thanks guys.

02:22:13.920 --> 02:22:14.920
Thank you.

02:22:14.920 --> 02:22:15.920
Thank you for stepping in.

02:22:15.920 --> 02:22:16.920
Appreciate it.

02:22:16.920 --> 02:22:25.780
I just want to go back to the impact fees just really quickly.

02:22:25.780 --> 02:22:58.440
It's important to also recognize that we have an impact fee advisory committee's project for a very long time associated with the members of the building of subdivisions and the creation of homes.

02:22:58.440 --> 02:23:02.710
So the fees are increasing.

02:23:02.710 --> 02:23:16.140
members of. So one of the things that we talked about was the need for the Council

02:23:16.140 --> 02:23:23.560
to have a conversation about the $770,000 that we've allocated each of the last several years.

02:23:25.420 --> 02:23:33.020
We're not looking for a decision this evening, but maybe some guidance as to where projects

02:23:33.020 --> 02:23:37.580
that you might be most interested in, projects that you would like for us to

02:23:37.580 --> 02:23:42.150
We will go through some of these items.

02:23:42.150 --> 02:23:49.150
One of the things that the Council has passed for was what was the category B list of projects.

02:23:49.150 --> 02:23:56.910
Here's the list of category B projects that we have as it relates into the budget.

02:23:56.910 --> 02:24:05.910
Remember that we established category B projects to ensure that we were able to advance the project list that we've created

02:24:05.910 --> 02:24:15.130
and then take advantage of a more robust economy than maybe we'll, and so what we have done this

02:24:15.130 --> 02:24:20.330
year and what we will continue to do is we will identify projects that are important but didn't make

02:24:20.330 --> 02:24:26.820
the fine, that's what we refer to as a category B project. Those projects will come before the City

02:24:26.820 --> 02:24:33.540
Council. I'm at the conclusion of the second quarter of fiscal 2022. Should revenues be

02:24:33.540 --> 02:24:45.260
how pacing projections, your tax collections, can be recalled that we were able to fund projects

02:24:45.260 --> 02:25:00.200
of the second quarter. Here are some of those projects. You can see the department referenced

02:25:00.200 --> 02:25:06.680
as well as the specific piece of equipment. So if there are items that you'd like to learn

02:25:06.680 --> 02:25:13.400
more about, our hope is to have the department leaders present next week to share. So if there's

02:25:13.400 --> 02:25:16.760
There's anything on this list that is exciting to you,

02:25:16.760 --> 02:25:17.840
because we have more, right?

02:25:17.840 --> 02:25:22.280
I can scroll down to the next page,

02:25:22.280 --> 02:25:26.430
but next page, because what I think this illustrates is

02:25:26.430 --> 02:25:34.020
there is never for us to be able to accomplish goals

02:25:34.420 --> 02:25:36.740
and objectives, and so we make a whole series

02:25:36.740 --> 02:25:41.460
of difficult choices, whether it be in budget balancing,

02:25:41.460 --> 02:25:43.420
where we create category B projects,

02:25:43.420 --> 02:25:46.260
or whether it be through the long-term planning process

02:25:46.260 --> 02:26:00.770
starts in January where projects are not advanced by members of that question. So something I would like to get a little more detail on is what the

02:26:00.770 --> 02:26:41.800
opens on this time. I was trying to remember everything that was presented last week. Like safety and I'm not sure that that's all included on this list.

02:26:41.800 --> 02:26:50.460
Everything that has gone, so everything that has gone officially through our processes, including on the list.

02:26:50.460 --> 02:26:56.380
Here's some additional long-term planning things that you might be taking a look at.

02:26:56.380 --> 02:27:40.100
So these are the real list of police and fire items that are, I guess, maybe not our city engineers in here, copious notes, because he'll be ready.

02:27:40.100 --> 02:27:48.460
This does seem like I'm picking up.

02:27:48.460 --> 02:27:57.380
For issues with our streaming, is it the second one?

02:27:57.380 --> 02:28:06.170
No, that can't explain that more.

02:28:06.170 --> 02:28:56.880
It's more about that, but that's really more of what we do, as I understand it, with also next week as your call area is six, and so that's where really parks and recreation will be able to answer several of the questions, and then also the airport is will be following under prosperous community this year.

02:28:56.880 --> 02:29:06.200
Projects to consider these are not necessarily projects that we had placed on our list, but they had come up through a series of other conversations.

02:29:06.200 --> 02:29:15.070
will say that the conversation has been about floral avenue. We brought up last

02:29:15.070 --> 02:29:20.870
year's numbers. What we can share with you is that we will leave that these

02:29:20.870 --> 02:29:28.260
numbers are low in comparison to what it would actually cost to construct. But we

02:29:28.260 --> 02:29:33.100
didn't want to spend a lot of staff time if there wasn't considerable interest

02:29:33.100 --> 02:29:38.780
from the city council to kind of move forward with some of these projects. What

02:29:38.780 --> 02:29:44.780
What I will share with you is based upon current spending and level of cash reserve in the

02:29:44.780 --> 02:29:45.780
street fund.

02:29:45.780 --> 02:29:57.140
The top two options mean significantly altering the husband presented this evening as it relates

02:29:57.140 --> 02:29:59.140
to the zone maintenance program.

02:29:59.140 --> 02:30:07.790
So these are certainly projects that we could, if interest accounts that we can floor and save

02:30:07.790 --> 02:30:14.570
for, it does not have capacity.

02:30:14.570 --> 02:30:36.810
It's in the executive condition and leads from.

02:30:36.810 --> 02:30:47.850
So there may be a spend significant cost and program.

02:30:47.850 --> 02:30:53.200
It was not in interest from the city council to advance those projects this year.

02:30:53.200 --> 02:30:58.200
Not saying that you may not in a subsequent year, but just if there wasn't the desire to move.

02:30:58.200 --> 02:31:19.020
So for this year, we're going to focus our efforts on those things that you're more interested in that list back up.

02:31:19.020 --> 02:31:24.020
And obviously, as you have a chance to digest this list,

02:31:24.020 --> 02:31:34.150
please send us an email, a little bit staff member,

02:31:34.150 --> 02:31:40.310
these items is available.

02:31:40.310 --> 02:31:41.310
And, Travis, we have started,

02:31:41.310 --> 02:31:52.130
two years ago, working on touch-up, because we didn't have the money to rebuild

02:31:52.130 --> 02:31:56.080
that or disaster thing we need to look at it.

02:31:56.080 --> 02:32:23.540
So that's going to conclude, focus areas four, five, and seven,

02:32:23.540 --> 02:32:27.540
and then we're going to move into focus areas one and six.

02:32:27.540 --> 02:32:31.310
Next week, it's a pretty big week going to,

02:32:31.310 --> 02:32:38.920
and only here focus areas one and six, but you're also going to get a overview of the budget again.

02:32:38.920 --> 02:32:50.840
Because we're going to ask you to adopt the preliminary budget, which is one of the first moves that you have to make in accordance with, I don't know, adopting a preliminary budget means you're going to set the maximum spending.

02:32:50.840 --> 02:33:08.090
So in setting that maximum spending, with changes in what the council has done in the past is they've incorporated the pin that left open the possibilities of including your foregone balance.

02:33:08.090 --> 02:33:13.090
in its entirety, that option has been taken away by the legislature, but yet you still

02:33:13.090 --> 02:33:16.590
have to go through the formality of taking a look at the preliminary budget, and also

02:33:16.590 --> 02:33:22.590
as a part of that, you will go through the process of establishing the public hearing date which

02:33:22.590 --> 02:33:28.070
has already been set when we placed all of that information to the counties when they

02:33:28.070 --> 02:33:33.070
sent out tax information. They also published on the notice when the public hearing dates

02:33:33.070 --> 02:33:44.210
and scheduled to occur on the E-third any sooner than six o'clock or see

02:33:44.210 --> 02:33:54.410
public will ask the council to consider the budget. Proud of is if you think

02:33:54.410 --> 02:34:05.670
about the number of conversations that we've had but also to illustrate the

02:34:05.670 --> 02:34:10.540
purposes behind decisions or I guess the rationale behind the decisions that

02:34:10.540 --> 02:34:19.930
we've made and contrast that to other organizations I think we have to stand for.

02:34:19.930 --> 02:34:56.180
Travis was asked on what was presented item that is just general public input so if

02:34:56.180 --> 02:35:03.180
If there's anyone in the audience who has questions or comments for the council that was not on this evening's agenda,

02:35:03.180 --> 02:35:10.920
now is your opportunity to bring those forward, right?

02:35:10.920 --> 02:35:14.920
Council for advisory board reports or announcements?

02:35:14.920 --> 02:35:26.540
Six o'clock?

02:35:26.540 --> 02:35:27.540
Yes, sir.

02:35:27.540 --> 02:35:30.540
So, um, national light out.

02:35:30.540 --> 02:35:31.540
Is out.

02:35:31.540 --> 02:35:36.540
You want to give us a quick invitation to National Night out tomorrow night.

02:35:36.540 --> 02:35:41.140
Thanks for calling on me in the last minute.

02:35:41.140 --> 02:35:44.940
You want to know tomorrow is our annual event national night out in City Park.

02:35:44.940 --> 02:35:49.340
This is part of a nationwide program that we started participating in several years ago.

02:35:49.340 --> 02:35:56.140
We will have representatives from almost every public safety entity in the tribe, excuse me, the Magic Valley.

02:35:56.140 --> 02:35:58.740
You can come out and meet officers in joy.

02:35:58.740 --> 02:36:05.590
I'm in the serve here, King of Fire, Sheriff's Law Enforcement, and EMS.

02:36:05.590 --> 02:36:07.090
And we look forward to seeing you there.

02:36:07.090 --> 02:36:11.630
Sorry, it's from five to eight in City Park tomorrow.

02:36:11.630 --> 02:36:29.920
the city park. Thank you for the city manager's office. We have no public hearings this evening,

02:36:29.920 --> 02:36:30.920
so we are adjourned.