WEBVTT

00:06:54.830 --> 00:07:00.670
To order the meeting at the Twin Falls City Council for Tuesday, January 3rd, 2017.

00:07:00.670 --> 00:07:02.270
Happy New Year everyone.

00:07:02.270 --> 00:07:09.090
For those of you wishing to join us, please rise for the Pledge of Allegiance.

00:07:09.090 --> 00:07:22.170
I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.

00:07:22.170 --> 00:07:27.100
Stand like can you hear?

00:07:27.100 --> 00:07:30.120
Yes, I can hear.

00:07:30.120 --> 00:07:31.120
Welcome everyone.

00:07:31.120 --> 00:07:33.320
I would confirm we do have a quorum of the council.

00:07:33.320 --> 00:07:40.440
Our four members are here in person, Vice Mayor Suzanne Hawkins is on the phone.

00:07:40.440 --> 00:07:43.360
Mr. Rothwell, do we have any amendments to our agenda?

00:07:43.360 --> 00:07:47.020
Mr. Mayor, members of the council, there are no amendments this evening.

00:07:47.020 --> 00:07:48.020
Thank you.

00:07:48.020 --> 00:07:49.020
We have no proclamations.

00:07:49.020 --> 00:07:51.060
So the first item is a general public input.

00:07:51.060 --> 00:07:55.420
This is an opportunity for anyone here to address the council on an issue that is not on

00:07:55.420 --> 00:07:57.260
this evening's agenda.

00:07:57.260 --> 00:07:59.220
There's anyone wishing to do so.

00:07:59.220 --> 00:08:03.160
You can come forward now.

00:08:03.160 --> 00:08:06.680
Seeing no one, we will move on with the agenda.

00:08:06.680 --> 00:08:09.280
First item for consideration is the consent calendar.

00:08:09.280 --> 00:08:10.640
Council wishes.

00:08:10.640 --> 00:08:12.000
Chris Dockington.

00:08:12.000 --> 00:08:14.200
Move approval, the consent calendar is approved,

00:08:14.200 --> 00:08:15.920
but I do have one question on the budget.

00:08:15.920 --> 00:08:17.440
I'd like to pose the city manager

00:08:17.440 --> 00:08:19.960
after we're through with this motion.

00:08:19.960 --> 00:08:22.030
Okay. Second.

00:08:22.030 --> 00:08:23.510
A motion by Chris Dockington,

00:08:23.510 --> 00:08:27.070
seconded by Ruth Pierce to approve the consent calendar.

00:08:27.070 --> 00:08:29.110
Did you need your question before we vote on it?

00:08:29.110 --> 00:08:31.990
Well, Mr. Manager, I'm terribly upset

00:08:31.990 --> 00:08:34.470
that on pay the sex of the main payables,

00:08:34.470 --> 00:08:39.470
we had a $519.23 bill for damage caused

00:08:40.070 --> 00:08:42.590
by a deer breaking through a window of the airport.

00:08:42.590 --> 00:08:44.630
And I'd like to have an explanation of that.

00:08:44.630 --> 00:08:47.550
Because the city manager is avoiding me.

00:08:47.550 --> 00:08:51.190
I mean, the airport manager is avoiding me.

00:08:51.190 --> 00:08:53.590
So the city manager was on vacation

00:08:53.590 --> 00:08:55.550
at the time in which the accounts approved,

00:08:55.550 --> 00:08:58.310
but the acting city manager would be more

00:08:58.310 --> 00:09:00.070
than happy to answer your question.

00:09:00.070 --> 00:09:05.770
Have we no order on this society?

00:09:05.770 --> 00:09:13.710
So is there an answer from Brian?

00:09:13.710 --> 00:09:15.710
Brian, do you want to leave us the answer?

00:09:15.710 --> 00:09:20.710
Brian shared that we'll be addressing animal cruelty later on in the agenda.

00:09:20.710 --> 00:09:28.400
So did you just jump through the window or something?

00:09:28.400 --> 00:09:34.540
Alright, the other discussion on the consent calendar?

00:09:34.540 --> 00:09:35.540
None of it.

00:09:35.540 --> 00:09:38.380
Seeing none, Sharon and roll call vote please.

00:09:38.380 --> 00:09:40.120
Suzanne Hopkins.

00:09:40.120 --> 00:09:42.180
Yep.

00:09:42.180 --> 00:09:43.180
Sean Baraker.

00:09:43.180 --> 00:09:44.020
Yes.

00:09:44.020 --> 00:09:44.860
Chris Hockington.

00:09:44.860 --> 00:09:45.360
Yes.

00:09:45.360 --> 00:09:46.260
Greg Lanting.

00:09:46.260 --> 00:09:46.760
Yes.

00:09:46.760 --> 00:09:47.420
Ruth Pierce.

00:09:47.420 --> 00:09:48.970
Yes.

00:09:48.970 --> 00:09:51.310
Motion passes five to zero.

00:09:51.310 --> 00:09:53.730
Under items for consideration, the first item on the agenda

00:09:53.730 --> 00:09:56.850
is a presentation of a public safety award.

00:09:56.850 --> 00:10:05.580
And for that, we have Deputy City Manager Brian Pike.

00:10:05.580 --> 00:10:08.300
Thank you, Mayor and members of the council.

00:10:08.300 --> 00:10:10.740
About five years ago, the Twin Falls Police Department

00:10:10.740 --> 00:10:15.260
started a tradition of providing our officers with their oath of office on their first-year

00:10:15.260 --> 00:10:16.760
anniversary date.

00:10:16.760 --> 00:10:22.260
This tradition really focused on reaffirming that oath that oath that all of our officers

00:10:22.260 --> 00:10:23.260
take.

00:10:23.260 --> 00:10:28.000
And it was designed really to remind them, following a challenging year of training

00:10:28.000 --> 00:10:33.740
and experience and exposure to readiness, why they decided to choose a career in law

00:10:33.740 --> 00:10:34.740
enforcement.

00:10:34.740 --> 00:10:38.700
Tonight, I would like to honor Chief Craig Kingsbury with his oath of office, and I'd

00:10:38.700 --> 00:10:44.050
I'd like to ask the chief to come forward.

00:10:44.050 --> 00:10:47.210
Just feel comfortable to come right up, right up, right up.

00:10:47.210 --> 00:10:51.210
No, just right up here.

00:10:51.210 --> 00:10:53.610
I mean, let yourself right at home.

00:10:53.610 --> 00:10:56.260
No surprises here.

00:10:56.260 --> 00:11:01.020
Yes, Chief, it has been one year.

00:11:01.020 --> 00:11:02.900
And everywhere I've been with the chief,

00:11:02.900 --> 00:11:04.300
he's been sharing that with everyone.

00:11:04.300 --> 00:11:06.820
I've been here for one year.

00:11:06.820 --> 00:11:10.540
He actually was sworn in prior to his official date.

00:11:10.540 --> 00:11:14.000
but its official date was January 1st, 2016.

00:11:14.000 --> 00:11:16.400
And really looking back over the past year,

00:11:16.400 --> 00:11:18.760
I would say that it's been quite a challenging

00:11:18.760 --> 00:11:20.020
and rewarding year.

00:11:21.940 --> 00:11:25.220
You know, when I was thinking about the oath of office,

00:11:25.220 --> 00:11:29.720
and all that it means to our law enforcement officers,

00:11:29.720 --> 00:11:31.840
I was really thinking about the things

00:11:31.840 --> 00:11:34.480
that we all kind of experienced and witnessed

00:11:34.480 --> 00:11:36.260
taking place right here.

00:11:36.260 --> 00:11:38.400
And I like to call this the year of the oath

00:11:38.400 --> 00:11:40.380
in action for you, Chief,

00:11:40.380 --> 00:11:42.180
Because in this particular situation,

00:11:42.180 --> 00:11:45.140
I think it was a guide to moral and ethical leadership

00:11:45.140 --> 00:11:46.820
for the department.

00:11:46.820 --> 00:11:51.100
It was a statement to perform to the best of one's ability

00:11:51.100 --> 00:11:53.900
every time that you came up here and in doing so

00:11:53.900 --> 00:11:56.460
with a sense of honor.

00:11:56.460 --> 00:11:59.900
Chief, you've demonstrated in this very council chambers

00:11:59.900 --> 00:12:03.540
a commitment to these ideals and a dedication to our community.

00:12:03.540 --> 00:12:08.620
And it's my honor to present you your official oath of office

00:12:08.620 --> 00:12:45.290
and to thank you for your dedication and commitment to our community.

00:12:45.290 --> 00:12:49.220
Chief, a few words?

00:12:49.220 --> 00:12:53.000
You don't mean mayor, I'm always short on words.

00:12:53.000 --> 00:12:56.720
Mayor and council and the city managers and the fine men and women

00:12:56.720 --> 00:13:01.240
of Twin Falls Police Department and our other fellow Twin Falls City

00:13:01.240 --> 00:13:02.560
family members in our community.

00:13:02.560 --> 00:13:03.680
It's been an honor.

00:13:03.680 --> 00:13:07.760
It is hard to believe it's been a year, but it has been.

00:13:07.760 --> 00:13:13.280
As we know this year has been a year of some major incidents

00:13:14.460 --> 00:13:16.400
with the police department and the community.

00:13:16.400 --> 00:13:19.400
And I think we've come out on this end

00:13:19.400 --> 00:13:21.200
better for what we went through.

00:13:21.200 --> 00:13:24.200
And I'm just proud to serve with these fine minimum.

00:13:24.200 --> 00:13:25.800
And I thank you for your faith in me

00:13:25.800 --> 00:13:30.130
and we'll continue and hope for many more years to come.

00:13:30.130 --> 00:13:37.600
Thank you very much, Chief, congratulations.

00:13:37.600 --> 00:13:39.640
Next on the agenda is a presentation reviewing

00:13:39.640 --> 00:13:42.360
the penalties for animal cruelty.

00:13:42.360 --> 00:13:49.670
City Manager, Brian Pike, just a second to make technology work for me. Hopefully not

00:13:49.670 --> 00:14:08.550
against me. And may I have any questions or need to do the group Eric Price who was one

00:14:08.550 --> 00:14:18.350
of the spokespeople from the O'Leary School is available. Thank you. Sure he's enthusiastic

00:14:18.350 --> 00:14:29.070
about you volunteering him to speak. It's actually a great segue because just a little

00:14:29.070 --> 00:14:32.590
while ago the city council listened to presentation from the student group

00:14:32.590 --> 00:14:36.310
referenced an animal cruelty and during the presentation and it was it was a

00:14:36.310 --> 00:14:40.670
fine presentation one of the students and I wasn't for sure which one suggested

00:14:40.670 --> 00:14:45.350
that the city of Twin Falls should have a progressive or a tiered penalty system

00:14:45.350 --> 00:14:51.870
for animal cruelty violations and why they were presenting we we decided that we

00:14:51.870 --> 00:14:55.230
would look into this take a look at the code and then come back to council with

00:14:55.230 --> 00:15:03.230
and I really want to start tonight with just looking at Idaho Statute Title 25, which really focuses on animals.

00:15:03.230 --> 00:15:10.230
And from that title, drilling down into Title 25 and looking at Chapter 35, which is animal care.

00:15:10.230 --> 00:15:18.230
And there's two issues here that the state statute has, 253504, which is committing cruelty to animals.

00:15:18.230 --> 00:15:22.230
And there's a whole definition section for that. I did not include that tonight.

00:15:22.230 --> 00:15:27.230
And then 253520a is the penalty for those violations.

00:15:27.230 --> 00:15:33.230
And as I was going through this, looking at what other cities and what the state is doing,

00:15:33.230 --> 00:15:38.000
what I found under that penalty.

00:15:38.000 --> 00:15:47.340
So under the penalty of this section, there is a provision and a tiered system that has been provided through state statute.

00:15:47.340 --> 00:15:51.500
So the first violation, very, very similar, actually identical to what

00:15:51.500 --> 00:15:54.500
Ketchum and what was presented to you from the City of Ketchum.

00:15:54.500 --> 00:15:59.340
The first violation is a Jelsons of not more than six months, or by a fine, not

00:15:59.340 --> 00:16:02.700
less than $100 or more than $5,000 or both.

00:16:02.700 --> 00:16:08.620
And then the state allows for a tiered system, a second violation within 10 years

00:16:08.620 --> 00:16:13.260
of the same offense, a Jelsons of not more than nine months, or if a fine, not less

00:16:13.260 --> 00:16:20.620
than 200 or more than 7,000 or both, and then we step into the third violation, which I believe,

00:16:20.620 --> 00:16:24.080
and maybe, for instance, you could help me. I believe the third violation is considered

00:16:24.080 --> 00:16:32.510
in this moment. Within 15 years of the same penalty, a jail sense of not more than 12 months

00:16:32.510 --> 00:16:38.550
or a fine of not less than 500 or more than 9,000 or both. So some of the exact language

00:16:38.550 --> 00:16:42.870
that the students shared with us reference a tiered system related to

00:16:42.870 --> 00:16:48.270
animal cruelty is actually provided under the state statute and as you can see

00:16:48.270 --> 00:16:53.150
really our first violation is somewhat comparable so when in working with Fritz

00:16:53.150 --> 00:16:57.270
and our city's attorney's office one of the things that we discussed is that we

00:16:57.270 --> 00:17:02.990
have a lot of flexibility we can use the city code on the first offense we could

00:17:02.990 --> 00:17:06.390
we could use the state code under first offense.

00:17:06.390 --> 00:17:09.750
But subsequent violations of that specific penalty

00:17:09.750 --> 00:17:12.170
with individuals within a certain time frame,

00:17:12.170 --> 00:17:14.350
the state statute would apply to.

00:17:14.350 --> 00:17:17.510
So we already have a tiered system that's in place

00:17:17.510 --> 00:17:19.010
and established for us.

00:17:20.030 --> 00:17:23.190
And our recommendation would be for the city

00:17:23.190 --> 00:17:26.870
to utilize the statutes provided through the state

00:17:26.870 --> 00:17:32.920
and not to try to rewrite this as an ordinance for the city.

00:17:32.920 --> 00:17:35.680
With that, I'd be happy to try to stand for questions

00:17:35.680 --> 00:17:38.540
or to yield.

00:17:39.740 --> 00:17:40.580
Chris talking.

00:17:40.580 --> 00:17:44.860
Well, I'm supposing that second, third animal

00:17:44.860 --> 00:17:48.260
cruelly charges are relatively rare.

00:17:48.260 --> 00:17:50.340
I've not heard of many, but nonetheless,

00:17:50.340 --> 00:17:52.980
what we're saying, no accident is required.

00:17:52.980 --> 00:17:57.060
We could simply use the existing city code

00:17:57.060 --> 00:17:59.540
and then step into the state code.

00:17:59.540 --> 00:18:01.300
If there should be a second or third

00:18:01.300 --> 00:18:03.060
or multiple offenses.

00:18:03.060 --> 00:18:07.880
We can't with no action required with no action required as a matter of fact

00:18:07.880 --> 00:18:13.140
I suppose it could be it could be argued that we can't preempt what the state is established

00:18:13.140 --> 00:18:19.680
But I think the code is clear and really accomplishes what I think the student group asked

00:18:20.220 --> 00:18:22.220
And it's and it's always been available to us

00:18:23.820 --> 00:18:26.110
Ruth Pierce

00:18:26.110 --> 00:18:31.110
Do you know what the county law reads?

00:18:32.950 --> 00:18:34.430
Did you happen to check that out?

00:18:34.430 --> 00:18:38.150
You know, I do not know if the county has a specific ordinance

00:18:38.150 --> 00:18:39.630
or if they use the state code.

00:18:39.630 --> 00:18:42.710
You know, one of the things that we've tried to do

00:18:42.710 --> 00:18:45.910
is to really mirror what the state has

00:18:45.910 --> 00:18:47.310
so there's not confusion.

00:18:47.310 --> 00:18:52.310
And certainly if you wanted to be a little more specific,

00:18:52.310 --> 00:18:56.190
to be a little more specific, we could do that,

00:18:56.190 --> 00:19:00.150
but very similar to what we've seen with bicycles, right?

00:19:00.150 --> 00:19:03.910
Consistency across both city and county is important,

00:19:03.910 --> 00:19:07.800
and the state code really allows for that to take place.

00:19:07.800 --> 00:19:08.920
I think it's a great idea.

00:19:08.920 --> 00:19:12.360
I would just be curious as to what the county code said.

00:19:12.360 --> 00:19:13.600
I can certainly look into that.

00:19:13.600 --> 00:19:16.800
Yeah, thank you.

00:19:16.800 --> 00:19:17.600
Greg Lantham.

00:19:17.600 --> 00:19:20.120
All right, I would have, or Fritz, possibly.

00:19:20.120 --> 00:19:22.320
Would it make it stronger if we went ahead

00:19:22.320 --> 00:19:27.320
and put the state tiered into our own city code.

00:19:27.320 --> 00:19:29.280
Does that help us or not?

00:19:29.280 --> 00:19:32.540
Just clear it up or?

00:19:32.540 --> 00:19:35.460
And as Brian mentioned, I think an argument could be made

00:19:35.460 --> 00:19:38.340
that the state has already occupied the field

00:19:38.340 --> 00:19:41.540
and were preempted from having a separate one

00:19:41.540 --> 00:19:43.820
that looks just like what the state has already done.

00:19:43.820 --> 00:19:48.820
Okay, so, but ours, our staff and yourself,

00:19:49.260 --> 00:19:50.900
we understand that the state is there

00:19:50.900 --> 00:19:52.700
so we can enforce that if necessary.

00:19:52.700 --> 00:19:58.500
And we and we do that on various violations sometimes we use the city code sometimes we use the state code

00:19:59.140 --> 00:20:00.200
Thank you

00:20:00.200 --> 00:20:09.930
Suzanne did you have anything to add? I do. Thank you Sean. You're welcome Ryan. I'm just curious you have any numbers on how many

00:20:11.530 --> 00:20:13.530
I'm sorry animal cruelty

00:20:14.810 --> 00:20:19.850
Violations we had in the city last year, you know what I don't so I can get that for you

00:20:19.850 --> 00:20:23.410
I'm I I know we've had a few not

00:20:23.410 --> 00:20:28.610
It's not a high number, and when you look at second and third violations, I don't think

00:20:28.610 --> 00:20:33.970
you'll see any second or third violations of animal cruelty.

00:20:33.970 --> 00:20:34.970
Thank you.

00:20:34.970 --> 00:20:42.920
So you'll actually need to come up so we can get you on the microphone please.

00:20:42.920 --> 00:20:45.840
There were 15 violations last year.

00:20:45.840 --> 00:20:48.640
15 last year that you researched.

00:20:48.640 --> 00:20:49.640
Thank you.

00:20:49.640 --> 00:20:50.640
Don't go too far.

00:20:50.640 --> 00:20:51.640
I need you.

00:20:51.640 --> 00:20:52.640
Chris Tockington.

00:20:52.640 --> 00:21:03.640
But I think it needs to be clarified that we think that that's a higher number because we've begun our own enforcement and here before it's been a county jurisdictional issue.

00:21:03.640 --> 00:21:10.760
That is our recall of some of the background on where we're looking at it a couple months ago.

00:21:10.760 --> 00:21:17.760
You know, one of the things that we are doing too is trying to develop a tie between our code enforcement teams.

00:21:17.760 --> 00:21:22.420
And these are really, they tie right into code enforcement as a whole and quality of

00:21:22.420 --> 00:21:23.420
life issues.

00:21:23.420 --> 00:21:28.420
And one thing that Sean Stanley is doing a really good job of blending both animal control

00:21:28.420 --> 00:21:33.320
and our code enforcement officers, and really taking advantage of the fact that they're both

00:21:33.320 --> 00:21:38.860
in the fields and they're capitalized on their time and it's a really efficient approach

00:21:38.860 --> 00:21:40.800
to handling these issues.

00:21:40.800 --> 00:21:42.670
So.

00:21:42.670 --> 00:21:43.670
Thank you.

00:21:43.670 --> 00:21:44.670
Chris Stockington.

00:21:44.670 --> 00:21:48.910
I'm pleasantly surprised that we have an ordinance that might work, and I like Ruth's

00:21:48.910 --> 00:21:53.610
idea to get additional information, but I really think we need to complement the group from

00:21:53.610 --> 00:21:59.350
Maleri for gathering the four to five pages of petitions of people that are concerned

00:21:59.350 --> 00:22:07.150
enough about protecting animals in Twin Falls and Twin Falls having a record as a community

00:22:07.150 --> 00:22:13.990
that cares not only for his people, but animals that Eric and his cohort should be really plotted

00:22:13.990 --> 00:22:19.270
for this. And I think we can have this be a little bit more information come to you, as

00:22:19.270 --> 00:22:26.510
Ruth suggested, and for us to direct the city, even though we don't need to, to utilize the

00:22:26.510 --> 00:22:31.870
state code for any second or tertiary abuse complaints.

00:22:31.870 --> 00:22:38.320
The Fritz did jump on the county website. He's not finding anything on the site related to

00:22:38.320 --> 00:22:42.720
this. So we're just assuming that they're using the state code also.

00:22:42.720 --> 00:22:49.760
Well Eric thanks to you and your your students and for bringing this information forward again

00:22:49.760 --> 00:22:51.760
I think the resolution here is that

00:22:51.840 --> 00:22:56.480
We do have that tool available to us that you all requested to be able to make sure we're

00:22:56.920 --> 00:23:04.420
Having that tiered system and trying to reduce the number of repeat offenders certainly with animal cruelty and I think it's been a chance to help

00:23:05.160 --> 00:23:09.160
Enlighten us and hopefully the public as well. They'll learn a little bit more about it

00:23:09.160 --> 00:23:35.040
Thank you. Next on the agenda is a request to adopt an ordinance for a zoning district change and zoning map amendment from R4 to C1, 4.16 plus or minus acres of undeveloped property located west of 515 Washington Street North, Renee Caraway Johnson.

00:23:35.040 --> 00:23:36.040
Welcome, Renee.

00:23:36.040 --> 00:23:37.960
Thank you.

00:23:37.960 --> 00:23:39.960
I need to name my hearing and council.

00:23:39.960 --> 00:23:42.960
It's a pleasure to start my year in front of you.

00:23:42.960 --> 00:23:43.960
I'm sure.

00:23:43.960 --> 00:23:52.500
This is a request this evening to ask for your adoption of an ordinance for a rezone of

00:23:52.500 --> 00:23:53.500
property.

00:23:53.500 --> 00:23:59.800
In the spring of 2016, EHM engineers did approach the city on behalf of Dan Willy, the OASIS

00:23:59.800 --> 00:24:05.920
stop and go to expand a parking area that was located west of the OASIS at 515 Washington

00:24:05.920 --> 00:24:07.400
Street North.

00:24:07.400 --> 00:24:12.880
It was determined at that time that that property that dates on this map subject property was

00:24:12.880 --> 00:24:17.200
zone residential and would need to go through a rezone process to zone it to

00:24:17.200 --> 00:24:24.040
commercial in order to develop as a parking lot. On November 8th of 2016 the

00:24:24.040 --> 00:24:27.960
Commission did hold the public hearing and was asked to make a recommendation to

00:24:27.960 --> 00:24:33.400
the City Council on a request to rezone this property. The adjacent property

00:24:33.400 --> 00:24:39.400
owner to the west of this did have some concerns. There's a different level of

00:24:39.400 --> 00:24:41.400
of property grade level.

00:24:41.400 --> 00:24:43.520
And he was concerned that that would be taken care of

00:24:43.520 --> 00:24:45.440
through the development process.

00:24:45.440 --> 00:24:48.720
And he was assured by EHM at that public hearing

00:24:48.720 --> 00:24:51.760
that they would work with him and make sure it met code.

00:24:53.160 --> 00:24:55.520
Upon conclusion of the public hearing

00:24:55.520 --> 00:24:58.280
and the discussion of the commission members,

00:24:58.280 --> 00:25:00.280
Commissioner Tatum did make a motion

00:25:00.280 --> 00:25:04.800
to recommend approval to you as presented.

00:25:04.800 --> 00:25:06.920
The Commissioner Gray seconded the motion

00:25:06.920 --> 00:25:10.160
and all members voted in favor of that motion.

00:25:10.160 --> 00:25:13.360
On December 12th, this request had come to you.

00:25:13.360 --> 00:25:14.720
There was no public comment

00:25:14.720 --> 00:25:17.800
through the public hearing at this meeting.

00:25:20.040 --> 00:25:23.680
At the close of the public hearing and deliberation,

00:25:23.680 --> 00:25:26.160
Council Member Lansing did make a motion

00:25:26.160 --> 00:25:30.240
to approve the reason of this property to C1

00:25:30.240 --> 00:25:34.000
and it was seconded by Council Member Boyd.

00:25:34.000 --> 00:25:35.840
The motion was approved six to zero.

00:25:35.840 --> 00:25:40.440
So I am here this evening to ask, as you directed staff

00:25:40.440 --> 00:25:43.180
to prepare an ordinance for your consideration,

00:25:43.180 --> 00:25:45.880
it's in your packet and then asking you to adopt it

00:25:45.880 --> 00:25:47.160
so that it can be published

00:25:47.160 --> 00:25:50.520
and the property can be developed in the spring.

00:25:50.520 --> 00:25:51.360
Thank you, Renee.

00:25:51.360 --> 00:25:52.200
You're welcome.

00:25:52.200 --> 00:25:53.800
Sharon, do you have an ordinance number please?

00:25:53.800 --> 00:25:58.770
Ordinance number 2017-1.

00:25:58.770 --> 00:25:59.690
Greg Lansing.

00:25:59.690 --> 00:26:02.810
Mayor, I move that we place what was the number again?

00:26:02.810 --> 00:26:04.370
2017-1.

00:26:04.370 --> 00:26:07.250
2017-1, that should be easier, remember?

00:26:07.250 --> 00:26:14.090
to suspend the rules of place 2017-1 on third and final by title only second

00:26:14.090 --> 00:26:20.840
motion by Greg Lansing seconded by Chris Tockington to place ordinance 2017-1

00:26:20.840 --> 00:26:24.400
on third and final reading by title only under suspension of the rules is

00:26:24.400 --> 00:26:32.450
there any discussion seeing and hearing none Sharon Volkow please Sean

00:26:32.450 --> 00:26:39.010
Baraker yes Chris Tockington yes Greg Lansing yes Ruth Pierce yes Suzanne

00:26:39.010 --> 00:26:46.230
Hawkins. Yes. Motion passes five to zero. Sharon, would you read the title please.

00:26:46.230 --> 00:26:59.240
Ordinance number 2017-1, an ordinance of the City Council of the City of Twin Falls, Idaho

00:26:59.240 --> 00:27:06.600
rezoning real property below describe, providing the zoning classification therefore and ordering

00:27:06.600 --> 00:27:13.680
the necessary amendments to the area of impact and zoning district map and the revised area

00:27:13.680 --> 00:27:24.010
of impact. Motion by Chris Stockington seconded by Greg

00:27:24.010 --> 00:27:28.250
Lanting to approve Ordinance 2017 dash one is there any

00:27:28.250 --> 00:27:32.710
discussion? Seeing and hearing none Sharon roll call vote

00:27:32.710 --> 00:27:38.110
please. Sean Beriker yes Chris Stockington Greg Lanting yes

00:27:38.110 --> 00:27:44.910
Ruth Pierce yes Suzanne Hawkins yes passes five to zero. Thank

00:27:44.910 --> 00:27:54.750
Next, we have a request to accept the recommendation of the Canyon Springs Grade Ad-Hoc Committee

00:27:54.750 --> 00:27:58.790
and direct staff to finish engineering and develop a funding strategy.

00:27:58.790 --> 00:28:12.540
We have our Assistant City Engineer, Troy Vitek, and Entourage.

00:28:12.540 --> 00:28:18.900
Thank you, Mayor and City Council, Troy, Vitek, Assistant Engineer, and I'll begin the discussion

00:28:18.900 --> 00:28:22.530
of our brain here, sets up the presentation.

00:28:22.530 --> 00:28:28.770
So in September of 2015, we came before the City Council per your direction to set up an

00:28:28.770 --> 00:28:34.250
ad hoc committee to kind of go over what are the recommendations for Canyon Springs grade.

00:28:34.250 --> 00:28:38.730
That committee met a total of nine times with nine different options.

00:28:38.730 --> 00:28:43.570
It's a night Brian's going to briefly discuss those, maybe skip a few, but really he's going

00:28:43.570 --> 00:28:45.810
to focus on what the committee came up with.

00:28:45.810 --> 00:28:51.130
There are members of the committee that are in the audience tonight and they may want to

00:28:51.130 --> 00:28:55.930
voice, some of what they felt the committee was about, but really tonight it's really just

00:28:55.930 --> 00:29:05.480
a discussion with Council, what they found out, and what we plan to go forward with, so with

00:29:05.480 --> 00:29:12.680
the presentation on that, Brian and Phil kind of set this up, but Phil will kind of begin

00:29:12.680 --> 00:29:16.720
the discussion and then Brian will actually go through the presentation and I'll stand for

00:29:16.720 --> 00:29:17.720
additional questions.

00:29:17.720 --> 00:29:18.720
Great.

00:29:18.720 --> 00:29:19.720
Thank you, Trey.

00:29:19.720 --> 00:29:28.070
Thank you, Troy. Good evening, your honor. Welcome, Council. Again, my name is Phil Cushlan,

00:29:28.070 --> 00:29:34.830
post office box 8463, Boise. I think I'll talk just a couple minutes about the process that

00:29:34.830 --> 00:29:39.390
we went through and then lead the technical information after those who have understand

00:29:39.390 --> 00:29:46.790
that far better than I. In addition to the committee members who participated, the Council

00:29:46.790 --> 00:29:49.990
certainly had a significant role in this in establishing

00:29:49.990 --> 00:29:52.990
originally the charter that kind of sets the sideboards

00:29:52.990 --> 00:29:56.150
around the conversation that was to be held.

00:29:56.150 --> 00:29:58.870
And I think that was really useful in terms of kind of

00:29:58.870 --> 00:30:00.310
keeping us on track.

00:30:01.270 --> 00:30:04.830
The mayor certainly was stalwart in attending

00:30:04.830 --> 00:30:07.710
virtually all of the meetings that we had.

00:30:07.710 --> 00:30:11.110
And let's put on the spot a few times as mayors

00:30:11.110 --> 00:30:14.070
want to be, so that was we appreciate your willingness

00:30:14.070 --> 00:30:15.630
to do that.

00:30:15.630 --> 00:30:23.310
Again, Mr. Roy indicated, you have people in the audience who are members of the committee

00:30:23.310 --> 00:30:26.790
and just run quickly through the membership.

00:30:26.790 --> 00:30:32.510
Katie Breckenridge served on the committee, Todd Schwartz, John Matamis, Tony Mannin, Dave

00:30:32.510 --> 00:30:41.790
McCallen, Rick Novicek, Jim Olson, Linda Roberts, and J.V.T., were the people who participated.

00:30:41.790 --> 00:30:44.430
And this was a group that really worked.

00:30:44.430 --> 00:30:51.430
they were there when they couldn't be there, they called in, they asked questions, made

00:30:51.430 --> 00:30:56.550
us go back and reanalyse things that we thought we'd kind of put in the can, but they wanted

00:30:56.550 --> 00:30:58.910
some more information on that.

00:30:58.910 --> 00:31:04.750
So I think it's really safe to say that I had the process that you set up, I think,

00:31:04.750 --> 00:31:06.550
is working for you.

00:31:06.550 --> 00:31:11.350
And of course, we're certainly interested in reporting back and finding out if we hit the

00:31:11.350 --> 00:31:12.350
mark.

00:31:12.350 --> 00:31:18.870
The other thing that I'll talk just a moment about is through the process, we were committed

00:31:18.870 --> 00:31:23.110
to kind of getting other opinions in this conversation as well.

00:31:23.110 --> 00:31:28.190
We met in this room, so all our meetings were televised.

00:31:28.190 --> 00:31:32.950
Each agenda had an opportunity for citizen commentary, and we actually had people show

00:31:32.950 --> 00:31:37.430
up and talk about their interest in these issues.

00:31:37.430 --> 00:31:44.090
And then, at one point, I was even called to be on a radio talk show here locally, so

00:31:44.090 --> 00:31:45.390
about the subject.

00:31:45.390 --> 00:31:48.510
So I think the issue is out there.

00:31:48.510 --> 00:31:50.150
I think people are aware of it.

00:31:50.150 --> 00:31:55.550
I think we've kind of put some sideboards around the conversation that I think in looking

00:31:55.550 --> 00:32:02.950
at what we believe to be the preferred alternative to dig deeper and focus our energies to give

00:32:02.950 --> 00:32:06.910
you some more information on what to do and possibly how to fund it.

00:32:06.910 --> 00:32:16.510
So again, I think while the committee has gone in advance, I don't think they've gone away

00:32:16.510 --> 00:32:21.150
but expressed an interest if issues come up that they need to be called back, they're

00:32:21.150 --> 00:32:27.110
willing to come back and have additional conversations with the council.

00:32:27.110 --> 00:32:31.030
So they're still out there but we're not going to use their time anymore.

00:32:31.030 --> 00:32:35.230
They're absolutely necessary and I do appreciate their braving the weather to come out this

00:32:35.230 --> 00:32:36.910
this evening to kind of back me up.

00:32:36.910 --> 00:32:41.170
So I'm sure that when the time's appropriate for the area,

00:32:41.170 --> 00:32:43.370
they'll be happy to provide any commentary

00:32:43.370 --> 00:32:45.490
that they might have in addition to what you're gonna hear.

00:32:45.490 --> 00:32:46.810
So is that on the?

00:32:46.810 --> 00:32:47.650
Thank you.

00:32:47.650 --> 00:32:48.730
I hope for the, bye.

00:32:53.130 --> 00:32:54.650
Thanks Bill, thanks Troy.

00:32:54.650 --> 00:32:55.850
Mr. Mayor and members of the Council,

00:32:55.850 --> 00:32:57.770
Brian Smith, J.U.B. engineers.

00:32:57.770 --> 00:33:00.010
So thank you again for the opportunity to be here

00:33:00.010 --> 00:33:03.290
and I appreciate seeing members of the Ad Hoc Committee

00:33:03.290 --> 00:33:04.810
in the audience.

00:33:04.810 --> 00:33:06.450
It was a great process I felt

00:33:06.450 --> 00:33:10.250
I thought it was very informative and very educational for me as well.

00:33:10.250 --> 00:33:13.950
So I think we covered a lot of ground and I don't want to backtrack too much.

00:33:13.950 --> 00:33:16.450
Phil and Troy did a great job in the introductions.

00:33:16.450 --> 00:33:21.050
A number of my first couple slides here we can probably go through pretty quick as they

00:33:21.050 --> 00:33:25.450
covered data stars there being a total nine ad hoc committee meetings that started about

00:33:25.450 --> 00:33:29.050
a year ago this time and we wrapped them up in November.

00:33:29.050 --> 00:33:35.650
So it was a pretty consistent, a lot of good input, a lot of good questions, good recommendations

00:33:35.650 --> 00:33:39.400
and suggestions from the committee.

00:33:39.400 --> 00:33:44.720
So the charter, which was established back in September of 2015, a lot of the objectives

00:33:44.720 --> 00:33:48.080
or the primary objectives are listed right there.

00:33:48.080 --> 00:33:52.160
Reconstruction of the roadway was certainly a primary objective along with improving some

00:33:52.160 --> 00:33:57.640
of the drainage as well as looking at improvements for the pedestrians and the cyclists that use

00:33:57.640 --> 00:34:03.480
it, looking at some of the slope stability and some of the access also from some of the

00:34:03.480 --> 00:34:07.700
larger trucks that are using it particularly during construction associated with the wastewater

00:34:07.700 --> 00:34:08.700
treatment plant.

00:34:08.700 --> 00:34:14.220
So just a little bit of background, the ADT, the average data traffic, that's probably

00:34:14.220 --> 00:34:18.940
a couple of years old, it's around 1,340 vehicles per day, it might be a little better

00:34:18.940 --> 00:34:20.220
than that now.

00:34:20.220 --> 00:34:26.100
The city staff did some pedestrian counts this past summer and the average count was around

00:34:26.100 --> 00:34:27.100
150.

00:34:27.100 --> 00:34:31.300
There was one day I think where the football team was doing some training and that count

00:34:31.300 --> 00:34:34.100
went way up but I believe that was backed out.

00:34:34.100 --> 00:34:39.380
So, roughly 150 on an average day, pedestrians use that.

00:34:39.380 --> 00:34:43.940
The width of the road itself is, it varies, down to 22, there's probably a couple of areas

00:34:43.940 --> 00:34:48.640
that are actually a little bit less than that, and the average grade on that road from

00:34:48.640 --> 00:34:52.660
top to bottom is right at 10%, so it's pretty steep and obviously anybody that's walked,

00:34:52.660 --> 00:34:56.420
it can attest to that for sure.

00:34:56.420 --> 00:35:02.420
So there's been some work, and this is just a recap of strata geotechnical engineers, and

00:35:02.420 --> 00:35:06.520
They were a sub-consultant to us actually on this particular phase of the project.

00:35:06.520 --> 00:35:12.940
They started looking at the grade back in 2009 and did a two-phase approach where they

00:35:12.940 --> 00:35:18.900
sent a technical engineer, a licensed geologist out there who has experience in rock fall

00:35:18.900 --> 00:35:22.860
and in looking at these types of facilities.

00:35:22.860 --> 00:35:29.060
And they looked at about 2,200 feet of the canyon rim that's above the upper hairpin

00:35:29.060 --> 00:35:35.740
of the roadway, and tried to put together or did put together a risk matrix analyzing

00:35:35.740 --> 00:35:42.780
a space, mostly on visual observation with their expertise and trying to assess risk of

00:35:42.780 --> 00:35:47.880
different areas that may have some rock fall concerns.

00:35:47.880 --> 00:35:53.260
So that was completed in 2009, 2010, and that report I think was presented to Council back

00:35:53.260 --> 00:35:55.700
at that time.

00:35:55.700 --> 00:36:02.620
Since that time in March 2014 then, we teamed again with Strata on a conceptual design evaluation

00:36:02.620 --> 00:36:09.340
that was presented in 2014 and looked at those recommendations from 2009, 2010, and then

00:36:09.340 --> 00:36:15.300
also identified a couple of potential alternatives to address the recommendations in those previous

00:36:15.300 --> 00:36:16.300
reports.

00:36:16.300 --> 00:36:21.540
Those alternatives from that 2014 report actually show up in this presentation as alternatives

00:36:21.540 --> 00:36:22.740
two and three.

00:36:22.740 --> 00:36:30.820
So just real quickly, the Strata reports, that risk matrix, they use some different factors,

00:36:30.820 --> 00:36:35.180
zero to one being pretty low risk, two to three maybe a little bit more risk, and four

00:36:35.180 --> 00:36:42.580
to five a higher risk, and I want to say higher risk in their view, that is a larger

00:36:42.580 --> 00:36:47.460
type of boulder or a cobble that has enough energy and has a higher likelihood to come

00:36:47.460 --> 00:36:53.900
down off of the rock phase and potentially do damage to significant damage to a vehicle

00:36:53.900 --> 00:36:57.900
or obviously someone walking or riding their bike on the grade.

00:36:57.900 --> 00:37:00.780
So they identified a total of 44 different locations

00:37:00.780 --> 00:37:02.380
along the canyon wall.

00:37:02.380 --> 00:37:07.180
Four of them were listed as the higher risk factor areas.

00:37:07.180 --> 00:37:11.500
And then the other 40 at various degrees of lower risk.

00:37:11.500 --> 00:37:13.100
It's not to say that something couldn't happen

00:37:13.100 --> 00:37:18.300
in those lower areas, but just from a risk evaluation,

00:37:18.300 --> 00:37:24.560
that's where they landed anyway.

00:37:24.560 --> 00:37:28.800
So the ad hoc committee, like I said did, in my opinion,

00:37:28.800 --> 00:37:30.960
great job in looking at a number of different alternatives.

00:37:30.960 --> 00:37:34.120
Those first two that we discussed from the 2014 report,

00:37:34.120 --> 00:37:38.280
but then also asked us to look at a number of others.

00:37:38.280 --> 00:37:42.880
That's the design team in the city staff, total of nine alternatives,

00:37:42.880 --> 00:37:47.200
and those alternatives range from simple signing on the grade,

00:37:47.200 --> 00:37:50.360
which is roughly $15,000 to more than $66 million.

00:37:50.360 --> 00:37:52.720
And we'll go into each of those alternatives now

00:37:52.720 --> 00:37:55.360
I just kind of briefly talk about them.

00:37:55.360 --> 00:37:57.260
And I ask if there's any questions that I'm going through,

00:37:57.260 --> 00:37:58.860
please feel free to interrupt

00:37:58.860 --> 00:38:00.400
because there's a lot of information.

00:38:00.400 --> 00:38:02.200
And Suzanne, if you have any questions,

00:38:02.200 --> 00:38:04.650
just yell real loud.

00:38:04.650 --> 00:38:05.650
Thank you.

00:38:05.650 --> 00:38:09.360
I will let you know.

00:38:09.360 --> 00:38:12.480
Well, alternative one, this is the first description.

00:38:12.480 --> 00:38:15.040
I'll show a couple exhibits to kind of demonstrate this.

00:38:15.040 --> 00:38:20.830
So this, in essence, was less of a mitigation.

00:38:20.830 --> 00:38:22.190
There's still mitigation on the rock ball,

00:38:22.190 --> 00:38:27.630
more of really widening the roadway to the uphill side, if you will, of the canyon rim

00:38:27.630 --> 00:38:31.950
and providing a 20-plus foot rock catch ditch.

00:38:31.950 --> 00:38:35.510
The idea there is, and that was based on some recommendations from Federal Highways

00:38:35.510 --> 00:38:39.670
and ITD for similar type of facilities.

00:38:39.670 --> 00:38:43.870
So the idea is that if there was a rock full event in the future that it would roll into

00:38:43.870 --> 00:38:48.390
the ditch and have a higher likelihood of being caught on that.

00:38:48.390 --> 00:38:53.270
In order to accomplish that, we were looking at approximately 180,000 cubic yards of rock

00:38:53.270 --> 00:38:56.590
blasting and removing, which is pretty significant effort.

00:38:56.590 --> 00:39:00.190
There would be pedestrian as part of this alternative.

00:39:00.190 --> 00:39:04.990
We installed pedestrian improvements along the north side of the road, which would move

00:39:04.990 --> 00:39:07.670
the pedestrians further away from the rock phase.

00:39:07.670 --> 00:39:13.670
The estimated construction cost for this alternative, we put an estimate between $29 and $39 million.

00:39:13.670 --> 00:39:22.130
And a lot of that had to be with, obviously, the significant rock excavation that occurred.

00:39:22.130 --> 00:39:27.410
Even with my glasses on, that's kind of tough to see, but you can get an idea of the dark

00:39:27.410 --> 00:39:33.870
line along the north side of the road, north is pointing down.

00:39:33.870 --> 00:39:44.130
What that pathway side would be, it's really tough to see.

00:39:44.130 --> 00:39:47.970
That's about what the limit of the rock excavation would be.

00:39:47.970 --> 00:39:56.320
That's pretty close, you probably got steady hands in me.

00:39:56.320 --> 00:40:00.560
So it's obviously really close to those homes and not very practical from that point of view

00:40:00.560 --> 00:40:06.460
without taking some of that property.

00:40:06.460 --> 00:40:11.380
That's a cross-section view of that upper roadway up above the first hairpin.

00:40:11.380 --> 00:40:15.700
You can see the laying back of the slope and then that rock catch ditch.

00:40:15.700 --> 00:40:20.340
Really the width of that ditch varies from 10 to 20 feet depending on how high above the

00:40:20.340 --> 00:40:23.190
ditch you have the rock.

00:40:23.190 --> 00:40:27.250
On the lower side of the road with this alternative is lower side being on the downhill

00:40:27.250 --> 00:40:31.650
side of that first hairpin, you're more in a fill section, and so the way to widen that

00:40:31.650 --> 00:40:35.970
because we really did not want to get into that talus slope, particularly where the boulder

00:40:35.970 --> 00:40:40.890
field is from the previous excavation and construction, we would widen it to the downhill

00:40:40.890 --> 00:40:43.970
side and use a mechanical stabilized earth wall.

00:40:43.970 --> 00:40:50.010
We'll use that term quite a bit here to accomplish the fill on that side, pushing the roadway

00:40:50.010 --> 00:40:58.420
out further to the west on that north and west.

00:40:58.420 --> 00:41:04.180
So the advantage on that is pretty high reliability for the rock fall protection along the full

00:41:04.180 --> 00:41:06.420
length of the canyon wall.

00:41:06.420 --> 00:41:11.020
It would add some dedicated pedestrian facilities and the improvements as far as the roadway

00:41:11.020 --> 00:41:12.340
and drainage would be accomplished.

00:41:12.340 --> 00:41:16.660
Obviously the disadvantages are the cost and a lot of blasting risks and one of the things

00:41:16.660 --> 00:41:19.940
that we didn't talk about or haven't talked about yet but we certainly talked about what

00:41:19.940 --> 00:41:21.740
the committee was.

00:41:21.740 --> 00:41:27.260
There is the city's main sewer trunk line that goes down this road and it's not very deep.

00:41:27.260 --> 00:41:32.060
We don't want to obviously risk damaging that or try to minimize the risk to damaging that

00:41:32.060 --> 00:41:34.700
because that could be a significant problem.

00:41:34.700 --> 00:41:41.020
The other thing is when you're talking about this much rock exploration or rock excavation,

00:41:41.020 --> 00:41:46.020
we really haven't done as a part of the conceptual analysis at this point any significant or really

00:41:46.020 --> 00:41:50.860
any field evaluation that includes putting holes on the ground.

00:41:50.860 --> 00:41:55.100
so we don't know what we'd get into necessarily when we started executing that hillside from

00:41:55.100 --> 00:41:59.430
that rock face.

00:41:59.430 --> 00:42:03.110
So this is alternative 1A.

00:42:03.110 --> 00:42:06.470
The bottom alternative will be alternative 8, I said there's 9, so we have a 1A in here.

00:42:06.470 --> 00:42:09.470
So this is similar to alternative 1.

00:42:09.470 --> 00:42:12.550
It's a lot more significant excavation.

00:42:12.550 --> 00:42:18.710
In essence, the advantage of this one was it would provide a connectivity of the path from

00:42:18.710 --> 00:42:22.910
up above on either side of the Breckenridge property, both the west and east side to the

00:42:22.910 --> 00:42:28.190
property, and basically take the path from that point down to the canyon grade.

00:42:28.190 --> 00:42:34.150
And you can imagine at that location we want to vertically run out of horizontal rooms.

00:42:34.150 --> 00:42:42.920
So you're going to have to switch back to keep a grade somewhere near 10%, which is about

00:42:42.920 --> 00:42:48.680
what the existing grade is going to be right now.

00:42:48.680 --> 00:42:55.390
That is a view, I'll put my glass on again, that alternative where you can see the switch

00:42:55.390 --> 00:43:03.070
back of the upper pathway that we come down and meet the grade at that point there. It

00:43:03.070 --> 00:43:06.670
also shows connectivity up above on the top of the canyon rim so you can kind of get an

00:43:06.670 --> 00:43:12.150
idea on how much rock excavation would be required or the limits horizontally anyway to accommodate

00:43:12.150 --> 00:43:20.430
that path con activity across the northern side of the property. A lot of excavation that

00:43:20.430 --> 00:43:26.710
The entire face would obviously have to be removed to the tune of about 320,000 cubic

00:43:26.710 --> 00:43:29.150
yards that leaves what we came up with.

00:43:29.150 --> 00:43:33.750
That is a section cut of alternative 1A, so that gives you some pretty good perspective

00:43:33.750 --> 00:43:35.230
of what that would look like.

00:43:35.230 --> 00:43:42.180
The pathway moving downhill would be protected with rock catch ditches as well.

00:43:42.180 --> 00:43:45.860
Estimant cost for alternative 1A, and that's a pretty wide range.

00:43:45.860 --> 00:43:50.020
They're 50 to 66 million, so very expensive alternative.

00:43:50.020 --> 00:43:55.020
similar advantages and disadvantages to alternative one.

00:43:55.020 --> 00:44:02.020
This, the rock excavation would occur further to the west from alternative one.

00:44:02.020 --> 00:44:07.020
So it gives a little bit more distance away from the houses there on the canyon rim,

00:44:07.020 --> 00:44:11.020
which would help, but there's still some other disadvantages to that,

00:44:11.020 --> 00:44:15.840
as far as risk of controlling that nature.

00:44:15.840 --> 00:44:16.840
I'll turn it two and three.

00:44:16.840 --> 00:44:20.840
So these are the ones I talked about that were presented in that 2014 report.

00:44:20.840 --> 00:44:27.080
This in essence consists of a top-down construction along the north side of the road on the upper

00:44:27.080 --> 00:44:34.920
hairpin anyway that would excavate the rock down adjacent to the existing roadway and create

00:44:34.920 --> 00:44:38.480
a bench, a 12-foot wide bench that would be for pedestrians.

00:44:38.480 --> 00:44:43.800
Now, in order to do that and to accomplish that top-down construction without impacting

00:44:43.800 --> 00:44:49.960
the boulder field or trying to fill on top of that steep slope on the downhill side, we

00:44:49.960 --> 00:44:53.520
It would start again, like I said, with that top end construction.

00:44:53.520 --> 00:44:57.220
I'll show you a little picture there to show.

00:44:57.220 --> 00:45:01.600
So adjacent to the roadway, and this would also include a reconstruction of the road and

00:45:01.600 --> 00:45:03.600
some improvements to the drainage.

00:45:03.600 --> 00:45:08.640
The cost included in this alternative included some of the rock foam mitigation that was mentioned

00:45:08.640 --> 00:45:12.580
in the original Strata report for those four high-risk areas.

00:45:12.580 --> 00:45:16.780
And then you can see on the right-hand side there where the path would be separated vertically

00:45:16.780 --> 00:45:18.280
from the traffic.

00:45:18.280 --> 00:45:21.040
And again, that is just on that uphill side.

00:45:21.040 --> 00:45:23.680
So the idea there would be we don't feel anything.

00:45:23.680 --> 00:45:31.320
We drill and blast down carefully and create a vertical separation at that point.

00:45:31.320 --> 00:45:35.080
That vertical separation would be in this alternative somewhere around.

00:45:35.080 --> 00:45:41.950
It would range from 5 to 15 feet plus or minus.

00:45:41.950 --> 00:45:51.430
That's a engineer artist concept of what that might look like.

00:45:51.430 --> 00:45:56.110
So the banish is this, obviously it's a significant less cost than the first two alternatives.

00:45:56.110 --> 00:45:59.710
It does move the pedestrians, keeps them away from traffic, and it moves them quite a bit

00:45:59.710 --> 00:46:01.430
away from the rock fall.

00:46:01.430 --> 00:46:04.750
Some of the disadvantages in this came up during the discussions with the Committee,

00:46:04.750 --> 00:46:08.350
for sure, is that with that path being on the north side of the road and particularly

00:46:08.350 --> 00:46:13.390
lower, there's going to be some freezing issues, some maintenance issues, safety.

00:46:13.390 --> 00:46:18.070
You're really out of sight there from a sight distance, and then lighting could become an

00:46:18.070 --> 00:46:19.070
issue as well.

00:46:19.070 --> 00:46:24.000
Alternative 3 and we go through that real quick is very similar to alternative 2.

00:46:24.000 --> 00:46:30.360
This was more designed to reduce some of the excavation costs with, instead of going with

00:46:30.360 --> 00:46:36.520
a paved path, more of a natural path, a steeper path with grades up to 20% in some locations.

00:46:36.520 --> 00:46:42.080
It would be more in line with what FHWA has for some of their mountainside design paths,

00:46:42.080 --> 00:46:44.480
things like that.

00:46:44.480 --> 00:46:49.360
Rock wall protection is still using the same rock bolting and the rock scaling and netting

00:46:49.360 --> 00:46:52.000
on the higher risk areas.

00:46:52.000 --> 00:46:54.060
So the estimated construction cost on this one,

00:46:54.060 --> 00:46:59.700
this all turns about four and a half to $5 million.

00:46:59.700 --> 00:47:02.600
Some of the same advantages and disadvantages

00:47:02.600 --> 00:47:03.440
that we just talked about.

00:47:03.440 --> 00:47:05.200
Now that actually the disadvantage of that is there would be

00:47:05.200 --> 00:47:10.500
some very steep sections of the pathway.

00:47:10.500 --> 00:47:12.540
One of the things the committee asked us to look at was just,

00:47:12.540 --> 00:47:14.500
what if we just fix the road?

00:47:14.500 --> 00:47:18.940
And don't really talk about the pedestrians,

00:47:18.940 --> 00:47:23.480
but widen the road to the 28 feet where we'd have two feet

00:47:23.480 --> 00:47:28.880
of shoulder on either side and then a full 24 foot wide pavement for the travel lanes.

00:47:28.880 --> 00:47:31.400
So it would be generally an improvement over what's there now.

00:47:31.400 --> 00:47:37.600
It would be a full reconstruction of the road, but really no additional improvements at that

00:47:37.600 --> 00:47:38.600
point.

00:47:38.600 --> 00:47:41.960
I think the idea, which is more of a baseline of what that might look like.

00:47:41.960 --> 00:47:55.330
So probably looking at about 1.4 to 1.7 million dollars, and that's what that would look like.

00:47:55.330 --> 00:47:58.850
Some of the advantages and disadvantages are really from a cost point of view significantly

00:47:58.850 --> 00:48:05.890
lower and it does address some of the goals of the charter, but really as far as the separation

00:48:05.890 --> 00:48:13.450
of pedestrians from the traffic does not accommodate that objective.

00:48:13.450 --> 00:48:18.690
This was kind of a fun one looking at alternative five was to say, all right, let's think out

00:48:18.690 --> 00:48:23.490
of the box a little bit and move the pathway west or move it to a different location to

00:48:23.490 --> 00:48:30.090
see if we can connect to an existing city pedestrian facility and still get folks down to the canyon

00:48:30.090 --> 00:48:34.730
floor and accomplish maybe some of the same ideas.

00:48:34.730 --> 00:48:38.270
So this connection that we're talking about,

00:48:38.270 --> 00:48:39.910
and I'll show you a picture over here in just a minute

00:48:39.910 --> 00:48:41.510
as far as where it is.

00:48:41.510 --> 00:48:47.650
The estimated cost on this was around 9 1.5 to $11.4 million.

00:48:47.650 --> 00:48:50.030
Big part of that is it's where we're looking at

00:48:50.030 --> 00:48:53.190
for this location, there's a lot of vertical difference

00:48:53.190 --> 00:48:55.950
between the existing canyon room up there, obviously,

00:48:55.950 --> 00:49:00.470
and trying to meet where the canyon floor is next

00:49:00.470 --> 00:49:04.140
to the westward treatment plant.

00:49:04.140 --> 00:49:05.580
So I'm playing to you, that's the location,

00:49:05.580 --> 00:49:08.380
just west of the gun club and you can see the treatment plant

00:49:08.380 --> 00:49:11.660
just above that arrow there.

00:49:11.660 --> 00:49:13.060
And that's a pretty good view if you're standing

00:49:13.060 --> 00:49:14.980
at the bottom of how much work you'd have ahead

00:49:14.980 --> 00:49:18.230
and you're going up that hill.

00:49:18.230 --> 00:49:20.190
You have fun planning that, when you're saying.

00:49:20.190 --> 00:49:24.390
I was trying to, our designer tried to make that fit

00:49:24.390 --> 00:49:27.990
and you can see kind of on the bottom of the picture,

00:49:27.990 --> 00:49:29.470
trying to make that fit within,

00:49:29.470 --> 00:49:31.910
you've got that rock face still.

00:49:31.910 --> 00:49:33.950
And then once you get on that tala slope,

00:49:33.950 --> 00:49:35.950
which is on about a 45 degree angle,

00:49:35.950 --> 00:49:39.390
trying to make that fit, get the grays that you want.

00:49:39.390 --> 00:49:41.310
That's probably not an optimal layout,

00:49:41.310 --> 00:49:45.470
but it works, at least for the concept ideas anyway,

00:49:45.470 --> 00:49:52.980
of trying to put some figures to paper.

00:49:52.980 --> 00:49:55.100
That's a quick section cut of what it would look like,

00:49:55.100 --> 00:49:57.140
where the rock face would be, again,

00:49:57.140 --> 00:49:58.820
go with the rock catch ditch to try

00:49:58.820 --> 00:50:01.260
and catch anything that might fall.

00:50:02.180 --> 00:50:04.700
And then on the fills section, on the downhill side

00:50:04.700 --> 00:50:10.340
that talis slope use, the idea here would be to use gavian baskets or another mechanically

00:50:10.340 --> 00:50:16.140
stabilized earth type of structure. The advantage of gavian baskets is you're going to generate

00:50:16.140 --> 00:50:19.620
a lot of excavated material from that rock phase so you can just build the baskets up

00:50:19.620 --> 00:50:24.060
with them. It's a little less expensive, but you'd still have to reinforce behind them,

00:50:24.060 --> 00:50:30.190
as you can see. The other nice thing about that is if you use the rock that's excavated

00:50:30.190 --> 00:50:36.340
there, it would look more natural, I think. So this, you know, like I said, we were talking

00:50:36.340 --> 00:50:40.780
around a $10 million construction cost for that, less than those first alternatives.

00:50:40.780 --> 00:50:45.260
Does provide some closer pedestrian connectivity, dog or falls, and largely the way it's what

00:50:45.260 --> 00:50:47.740
a treatment plan, if there's interest in that.

00:50:47.740 --> 00:50:50.660
It is still a significant cost.

00:50:50.660 --> 00:50:54.860
And I think some of the committee felt like people are still going to use the grade, the

00:50:54.860 --> 00:50:55.860
Cambridge Grades.

00:50:55.860 --> 00:51:00.380
So it really does not address any of those issues associated with the grade.

00:51:00.380 --> 00:51:04.280
But there was discussion that maybe this is something to look at in the future, or hybrid

00:51:04.280 --> 00:51:11.870
this alternative to provide more access over on the one side closer to the other falls.

00:51:11.870 --> 00:51:18.630
Alternative 6, which I'll give away the end game here, is the recommended alternative.

00:51:18.630 --> 00:51:26.070
And it's similar to those presented in alternatives 2 and 3 as far as a top-down construction,

00:51:26.070 --> 00:51:30.190
particularly on the area above the first hairpin.

00:51:30.190 --> 00:51:35.110
But then what we would do is instead of excavating that down and then just leaving it below grade,

00:51:35.110 --> 00:51:41.070
is using mechanically stabilized earth walls adjacent to the face there of where the cut

00:51:41.070 --> 00:51:47.360
is and back fill up so that there's the plan to do it again.

00:51:47.360 --> 00:51:50.120
But it looks something like that on that upper section.

00:51:50.120 --> 00:51:52.840
So pedestrians would be at grade.

00:51:52.840 --> 00:51:57.280
There's still be some separation with a concrete jersey barrier or some of the form of protection

00:51:57.280 --> 00:52:03.560
from traffic, although you know that that speed, Kerbin Gutter would work as well, not

00:52:03.560 --> 00:52:08.600
the same level of protection, I guess, but it addressed to a lot of the safety concerns that

00:52:08.600 --> 00:52:14.720
were brought up from the committee as far as that graded separated path that was shown

00:52:14.720 --> 00:52:24.890
in alternatives to human-3, that same view on the downhill side of that first hairpin.

00:52:24.890 --> 00:52:30.650
So this one probably meant the object is better than the other alternative that came up.

00:52:30.650 --> 00:52:37.010
It does provide the strong conductivity and the separation of pedestrians from the traffic.

00:52:37.010 --> 00:52:42.600
The construction cost is a little bit higher than some of the other alternatives on the

00:52:42.600 --> 00:52:47.210
range of $4.8 to $5.8 million for that one.

00:52:47.210 --> 00:52:52.130
The last two alternatives, this is the lease costly alternative and this is basically signing

00:52:52.130 --> 00:52:54.810
the roadway prohibiting pedestrian use.

00:52:54.810 --> 00:52:59.010
So the estimated cost just assigned and some of the installation and things along those

00:52:59.010 --> 00:53:02.930
lines is somewhere between $15,000 and $20,000.

00:53:02.930 --> 00:53:10.250
This would require a bit of enforcement from the sheriff's department, really doesn't address

00:53:10.250 --> 00:53:11.250
the project goals and objectives.

00:53:11.250 --> 00:53:16.250
I guess safety would be accomplished just by keeping pedestrians off of the grade.

00:53:16.250 --> 00:53:20.450
Although I think the thought process was, it's folks still would like to use the grade because

00:53:20.450 --> 00:53:23.570
that's something that has seen a lot of use.

00:53:23.570 --> 00:53:29.260
It's obviously an attraction.

00:53:29.260 --> 00:53:34.380
Final alternative, this would be to install a traffic signal at the top and the bottom

00:53:34.380 --> 00:53:39.440
the grade, basically create a one-way roadway similar to what you see over on the north side

00:53:39.440 --> 00:53:42.840
of the river by the country club over there.

00:53:42.840 --> 00:53:48.120
This may cost for this one, it's around $400,000.

00:53:48.120 --> 00:53:53.480
Again this really, I think it was good to explore it is to see what type of impact that would

00:53:53.480 --> 00:53:54.720
have.

00:53:54.720 --> 00:53:58.720
We did not really get into any traffic queuing but you can kind of imagine that with the time

00:53:58.720 --> 00:54:05.080
would take to go one-way traffic up and down that steep grade, you'd get some pretty significant

00:54:05.080 --> 00:54:10.640
cues that would probably certainly impact the property driveways along the canyon there,

00:54:10.640 --> 00:54:15.480
but also back up likely into the film or intersection. So really looking at some lengthy traffic

00:54:15.480 --> 00:54:25.720
delays. That is a summary of the different alternatives, the different, the nine different

00:54:25.720 --> 00:54:33.540
alternatives with the range of the cost forum. It's kind of a brief recap of that.

00:54:33.540 --> 00:54:34.540
Any questions?

00:54:34.540 --> 00:54:38.200
I went through that really fast and then I'll jump in and I'll turn it in and I'll get

00:54:38.200 --> 00:54:39.200
it away.

00:54:39.200 --> 00:54:41.200
Suzanne, I'm going to start with you.

00:54:41.200 --> 00:54:43.920
Do you have any questions at this point?

00:54:43.920 --> 00:54:46.730
No, I'm good right now.

00:54:46.730 --> 00:54:47.730
Thank you.

00:54:47.730 --> 00:54:48.730
Chris talking to me.

00:54:48.730 --> 00:54:55.910
Not sure who to address the question to, but none of these improvements would meet

00:54:55.910 --> 00:54:59.170
ADA compliance for grade as I understand.

00:54:59.170 --> 00:55:02.870
They're all for an excessive 5%.

00:55:02.870 --> 00:55:07.190
Is that going to be a problem for us on the utilization

00:55:07.190 --> 00:55:11.510
of public funding for a non-ADA compliant project

00:55:11.510 --> 00:55:13.380
of this size?

00:55:13.380 --> 00:55:15.900
I don't know, Fritz, if you have an idea on that,

00:55:15.900 --> 00:55:19.070
or Travis or Brian?

00:55:19.070 --> 00:55:21.470
One of the things that we did with some of the research

00:55:21.470 --> 00:55:22.470
and included that.

00:55:22.470 --> 00:55:25.390
It looks like we're making ourselves out of compliance

00:55:25.390 --> 00:55:26.390
by doing this.

00:55:26.390 --> 00:55:28.030
That's what I'm trying to say.

00:55:28.030 --> 00:55:28.530
Right.

00:55:28.530 --> 00:55:33.530
There is some provisions with, and it's in the report.

00:55:34.050 --> 00:55:35.930
I can probably read from that,

00:55:35.930 --> 00:55:38.850
but at the back of the report, there's some caveats in there

00:55:38.850 --> 00:55:40.570
that we listed.

00:55:40.570 --> 00:55:43.490
And the Americans with Disability Act,

00:55:43.490 --> 00:55:47.050
there are some provisions with some of the,

00:55:47.050 --> 00:55:48.810
I guess you could call them the regulatory authorities,

00:55:48.810 --> 00:55:50.610
where if you've got an existing facility

00:55:50.610 --> 00:55:53.650
that has a grade in excess of the 5%,

00:55:53.650 --> 00:55:56.770
and it's not practical, it's not,

00:55:56.770 --> 00:56:00.010
you know, you just really can't practically meet that 5% grade.

00:56:00.010 --> 00:56:03.850
There is some allowances in there that I think would keep you out of trouble

00:56:03.850 --> 00:56:07.130
in that regard. I think that's something that

00:56:07.130 --> 00:56:11.450
certainly want to confirm, but our interpretation of reading through that

00:56:11.450 --> 00:56:14.810
and some provisions there is that it should be fine.

00:56:14.810 --> 00:56:18.010
You would not meet the 5%. There's no way.

00:56:18.010 --> 00:56:21.170
There's no way. I mean the very nature of that existing grade and

00:56:21.170 --> 00:56:24.850
what you have to work with, and I don't know about your goat trail coming down the

00:56:24.850 --> 00:56:28.850
wall, but it doesn't look like 5% is anywhere in the books.

00:56:28.850 --> 00:56:35.210
No, no, and that's like I said, I can get some more information and I think we quoted

00:56:35.210 --> 00:56:42.210
a chapter in the subsection of, I'm trying to remember the title of the manual, but basically

00:56:42.210 --> 00:56:44.210
it addresses some of the ADA concerns.

00:56:44.210 --> 00:56:51.510
Well, Dr. I do think we should at least have some verification of them.

00:56:51.510 --> 00:56:58.950
So that came out of the Access Board guidelines and standards for pedestrian accessibility

00:56:58.950 --> 00:57:00.910
routes within the public right-of-way.

00:57:00.910 --> 00:57:07.030
So in those sections there, there are some, again, in our interpretation, but I think it's

00:57:07.030 --> 00:57:12.110
good to look into that maybe a little bit further, maybe get further legal advice to

00:57:12.110 --> 00:57:18.150
make sure that my interpretation is not eroding some of that, but there are some areas of

00:57:18.150 --> 00:57:20.450
of allowance and obviously, you know,

00:57:20.450 --> 00:57:22.250
Twin Falls is not alone where you have streets

00:57:22.250 --> 00:57:26.010
that exceed that grade and there's just no practical way

00:57:26.010 --> 00:57:30.850
to construct a year route that would meet that 5%.

00:57:30.850 --> 00:57:38.050
Do you have anything?

00:57:38.050 --> 00:57:42.980
Well, one we can look at for reference would be the trail

00:57:42.980 --> 00:57:47.740
up out of Shusham Falls, which was built with Centennial funds,

00:57:47.740 --> 00:57:50.060
but we certainly maintain it to a certain degree

00:57:50.060 --> 00:57:53.700
and it certainly has percentages well above 20,

00:57:53.700 --> 00:57:54.860
Well, about 5%.

00:57:54.860 --> 00:57:58.660
I think they probably had something closer to 20% coming up

00:57:58.660 --> 00:57:59.940
out of Shoshim Falls.

00:57:59.940 --> 00:58:04.300
And so that doesn't seem to have been an ADA name.

00:58:04.300 --> 00:58:05.620
That's a fairly new trail.

00:58:05.620 --> 00:58:06.820
The whole trail is new.

00:58:06.820 --> 00:58:08.460
I mean, what, 10 years ago?

00:58:08.460 --> 00:58:09.700
Well, maybe 15 now.

00:58:09.700 --> 00:58:14.020
But so well after the ADA requirements were put into place.

00:58:14.020 --> 00:58:16.380
So Jackie's got to talk.

00:58:16.380 --> 00:58:21.340
So to Brian's point, there are roadways that have managed

00:58:21.340 --> 00:58:26.980
to be so steep that compliance with ADA was not even close

00:58:26.980 --> 00:58:28.820
to being a reasonable opportunity

00:58:28.820 --> 00:58:31.910
or perhaps even achievable.

00:58:31.910 --> 00:58:36.510
We don't have a sample spot to show you on a picture,

00:58:36.510 --> 00:58:38.430
but I've seen them and I know they exist.

00:58:38.430 --> 00:58:41.670
And before we actually pursued funding construction,

00:58:41.670 --> 00:58:43.590
of course we ended up going through a process

00:58:43.590 --> 00:58:47.710
where we had to validate that as part of the design

00:58:47.710 --> 00:58:49.270
of the people path.

00:58:49.270 --> 00:58:52.430
And that would apply to most of those options,

00:58:52.430 --> 00:59:12.400
except for the sign either comments or questions for Ryan or Phil or Troy or

00:59:12.400 --> 00:59:17.980
Kristoff. I'll just make a comment that it certainly looks like six is the

00:59:17.980 --> 00:59:24.200
desirable one by keeping the pedestrians which my use of the of that trail in

00:59:24.200 --> 00:59:28.560
times past that hundred and fifty day I'll I'll vouch for but keeping them at

00:59:28.560 --> 00:59:33.560
great I think is an integral part of overall safety.

00:59:33.560 --> 00:59:41.560
And also to put the pedestrian walkway to the outside in minimizing rockfall.

00:59:41.560 --> 00:59:45.560
I've had at least one experience where I was on the outside of a trail coming up.

00:59:45.560 --> 00:59:47.560
The lady was on the inside.

00:59:47.560 --> 00:59:51.560
The canyon side of a rock fell between us, between here and that wall.

00:59:51.560 --> 00:59:56.560
And it was a known size rock and I have no idea how far it fell,

00:59:56.560 --> 00:59:58.100
but it could have killed somebody.

00:59:58.100 --> 01:00:01.840
So minimizing the rock following, keeping pedestrians

01:00:01.840 --> 01:00:09.400
that great are important for me.

01:00:09.400 --> 01:00:14.560
Well, I will add as the committee was going

01:00:14.560 --> 01:00:17.040
through the alternatives, and I commend them

01:00:17.040 --> 01:00:18.840
for pushing the envelope a little bit to come up

01:00:18.840 --> 01:00:23.300
with a couple of other alternatives too.

01:00:23.300 --> 01:00:26.780
The safety concerns of the original recommendations

01:00:26.780 --> 01:00:31.340
of two and three were a long discussion, the fact

01:00:31.340 --> 01:00:33.240
that you were down below grade.

01:00:33.240 --> 01:00:36.780
You couldn't see the discussion of would you need lighting

01:00:36.780 --> 01:00:41.080
down there, certainly on a day like this or a day like the past couple

01:00:41.080 --> 01:00:43.880
of weeks, the fact that that's just going to be a solid sheet of ice

01:00:43.880 --> 01:00:46.780
for six weeks or two months.

01:00:46.780 --> 01:00:52.580
I think alternative six gives the same concept, separates pedestrians,

01:00:52.780 --> 01:00:57.700
keeps that access, hopefully mitigates the rock fall issues.

01:00:57.700 --> 01:01:06.040
And also in the discussion was pretty good discussion of the matrix, the risk matrix,

01:01:06.040 --> 01:01:10.100
and talking about the fact that if we were to move forward with this, once you get out

01:01:10.100 --> 01:01:13.900
there and start doing some of that work, being able to have some flexibility to address

01:01:13.900 --> 01:01:20.940
areas that maybe were a two or a three on the original matrix, but once you're up there

01:01:20.940 --> 01:01:26.900
being able to address some of those, you know, you can't eliminate it all, but to mitigate

01:01:26.900 --> 01:01:30.800
those areas that were at risk so again I commend the committee I thought they did

01:01:30.800 --> 01:01:37.340
an outstanding job of really delving in maybe even to a certain extent to a greater

01:01:37.340 --> 01:01:42.420
detail level than I expected them to at the beginning so it was enlightening and I

01:01:42.420 --> 01:01:47.060
said many times I don't speak for the council when I was in those meetings so

01:01:47.060 --> 01:01:57.000
I don't think I was speaking great. Any other comments from the council?

01:01:57.000 --> 01:01:59.000
So try and we'll move.

01:01:59.000 --> 01:02:01.000
So going forward.

01:02:01.000 --> 01:02:06.000
I guess tonight we're before you really to see what the council wishes are.

01:02:06.000 --> 01:02:10.000
I mean the committee has made a recommendation but really it is up to the council to make a decision.

01:02:10.000 --> 01:02:16.000
And we are recommending the council adopt the committee's recommendation of option six.

01:02:16.000 --> 01:02:24.000
And there was already design funds available, engineering design funds to go forward with the project so that is already budgeted and taken care of.

01:02:24.000 --> 01:02:27.460
So at this time we would recommend the council allow the

01:02:27.460 --> 01:02:31.380
engineering to continue on option six and we can go forward and just kind of

01:02:31.380 --> 01:02:35.160
start solidifying things. We have to talk to a bunch of property owners, really a

01:02:35.160 --> 01:02:40.940
more detailed analysis of the design, what it looks like, and bring that back

01:02:40.940 --> 01:02:44.720
before the council as well as a funding solution. I know that's gonna be a very

01:02:44.720 --> 01:02:51.420
long discussion. The Travis and the City Council on that and four point eight to

01:02:51.420 --> 01:02:55.740
5.8 is a large sum of money and it really needs to be delved into but we

01:02:55.740 --> 01:02:59.100
would like to solidify the numbers to make sure those are absolutely accurate

01:02:59.100 --> 01:03:04.140
before we present to you and then we'll come back with a full project at that

01:03:04.140 --> 01:03:09.260
point and I guess tonight we're just asking to go forward the project and I

01:03:09.260 --> 01:03:12.860
just want to say thank you to the committee members all of them there's

01:03:12.860 --> 01:03:19.720
quite a few of them here tonight and they were really fantastic and they did

01:03:19.720 --> 01:03:26.320
think outside the box and they brought both concerns of being a user of it and

01:03:26.320 --> 01:03:32.620
also looking at the financial aspect they know there's a lot of people in the city

01:03:32.620 --> 01:03:41.200
that would be impacted by a large dollar cost so they really I think we're a fantastic group to work with.

01:03:41.200 --> 01:03:43.740
So Chris talking to you.

01:03:43.740 --> 01:03:45.100
Well I would say there will be a

01:03:45.100 --> 01:03:47.240
have the recommendation number six and

01:03:47.240 --> 01:03:50.940
instruct the city staff and associate at

01:03:50.940 --> 01:03:53.080
consultants to proceed with further

01:03:53.080 --> 01:03:55.360
engineering and cost refinement of the

01:03:55.360 --> 01:03:59.180
project report back to us in 90 days okay

01:03:59.180 --> 01:04:04.980
I'll second that is that feasible

01:04:04.980 --> 01:04:07.460
at this time I think we need probably a

01:04:07.460 --> 01:04:08.860
little bit more time with that just for

01:04:08.860 --> 01:04:11.860
91 days

01:04:11.860 --> 01:04:15.860
Oh, and then that to 48 inches of snow tonight.

01:04:15.860 --> 01:04:17.860
So, four months?

01:04:17.860 --> 01:04:22.660
Yeah, we can work and we'll try to have something in the spring time.

01:04:22.660 --> 01:04:24.650
Travis?

01:04:24.650 --> 01:04:35.650
So, it would be our intent to be able to try to include this recommendation for funding for the FY18 budget.

01:04:35.650 --> 01:04:42.810
And so I think that from a timeline perspective, so long as we could vet this during that budgeting

01:04:42.810 --> 01:04:49.970
process would probably give the staff the appropriate time to be able to find those true costs,

01:04:49.970 --> 01:04:55.730
the revenue sources are actually, I mean just to kind of talk a little bit about that tonight,

01:04:55.730 --> 01:05:04.210
may not be as challenging as you might think trying to find $4.8 to $5.8 million.

01:05:04.210 --> 01:05:10.810
So remember that you took a million dollars from the bond proceeds of the wastewater treatment

01:05:10.810 --> 01:05:17.540
facility and you reserved those back for this project because of the damage done to the roadway.

01:05:17.540 --> 01:05:24.620
We also advanced constructed part of the Washington Street project several years ago in which we

01:05:24.620 --> 01:05:30.620
utilize cash reserves and we have received our portion of that back from the state.

01:05:30.620 --> 01:05:33.860
So that is now in cash reserves.

01:05:33.860 --> 01:05:37.700
The Street Fund Cash Reserves account is also very healthy.

01:05:37.700 --> 01:05:40.740
And we have used the Cash Reserve account

01:05:40.740 --> 01:05:45.020
in the Street Fund for one-time capital projects.

01:05:45.020 --> 01:05:48.420
In addition to that, this has been a priority project

01:05:48.420 --> 01:05:49.980
that has been discussed by the Council,

01:05:49.980 --> 01:05:51.500
and we could also augment that

01:05:51.500 --> 01:05:53.180
within coming Street Fund reserves.

01:05:53.180 --> 01:05:58.700
And so really, if it stays within this $4.8 to $5.8 million

01:05:58.700 --> 01:06:04.820
project, I believe it really is financially achievable for the city to move forward with

01:06:04.820 --> 01:06:09.580
construction. Should it climb significantly above that as they get into their engineering

01:06:09.580 --> 01:06:14.980
work? That's when I think that we need to come back and begin to explore other alternatives

01:06:14.980 --> 01:06:18.420
with the Council on this option and its fundability.

01:06:18.420 --> 01:06:23.360
So I'll get right to you, sir. Great to do you have another comment.

01:06:23.360 --> 01:06:29.840
I just had a question for a vote. What's the estimated breakdown between the rock and

01:06:29.840 --> 01:06:36.480
fall mitigation in the new trail or the whitening for the trail. Do we have just

01:06:36.480 --> 01:06:40.640
an estimated breakdown between those? I'm more interested. I'll be honest with you

01:06:40.640 --> 01:06:43.920
whenever I walked out of the canyon I did it for several years. I went down to

01:06:43.920 --> 01:06:47.080
Shoshan Falls where I didn't have to worry about any traffic and walked out

01:06:47.080 --> 01:06:52.600
there because it's a nice 10 feet wide trail with those cars on it and I just

01:06:52.600 --> 01:06:57.480
felt safer there. So I'm not as worried about the trail as I am the the rock

01:06:57.480 --> 01:07:01.480
I mean, to me, the rock fall mitigation is under me.

01:07:01.480 --> 01:07:05.480
We need to address just to keep our treatment plan open

01:07:05.480 --> 01:07:07.480
if not in else.

01:07:07.480 --> 01:07:12.830
So the rock fall mitigation, if you look at that,

01:07:12.830 --> 01:07:15.830
that reconstruction.

01:07:15.830 --> 01:07:20.830
So the rock fall mitigation, as far as just the higher risk areas,

01:07:20.830 --> 01:07:24.830
those four higher risk areas, we're looking for around $1.5 million

01:07:24.830 --> 01:07:29.270
of $5.5 million plus or minus for those areas.

01:07:29.270 --> 01:07:34.430
If you got into some of the more risk matrix three type levels,

01:07:34.430 --> 01:07:36.350
you know, add some costs to that.

01:07:36.350 --> 01:07:38.790
But just to give you an idea of what we're sitting at right now,

01:07:38.790 --> 01:07:40.910
to really focus in on those four high risk areas,

01:07:40.910 --> 01:07:42.870
probably about a half million dollars of rock,

01:07:42.870 --> 01:07:46.870
bolting, netting, scaling, things like that.

01:07:46.870 --> 01:07:51.800
OK, so 10% of the pen?

01:07:51.800 --> 01:07:52.800
I think that's.

01:07:52.800 --> 01:07:56.530
So we're, you know, I'm just thinking a lot here.

01:07:56.530 --> 01:08:00.970
We're basically paying $4.5 million to $5.5 million

01:08:00.970 --> 01:08:05.970
to for 150 people to walk up and down a roadway.

01:08:06.050 --> 01:08:09.090
Well, the other thing that that cost does not include

01:08:09.090 --> 01:08:10.690
is any improvements to the roadway itself

01:08:10.690 --> 01:08:12.410
as far as the reconstruction, so.

01:08:12.410 --> 01:08:13.210
I forgot that part.

01:08:13.210 --> 01:08:14.050
Thank you.

01:08:14.050 --> 01:08:15.810
That's a good question, very good question.

01:08:19.250 --> 01:08:20.850
So do you have a gentleman in the audience here

01:08:20.850 --> 01:08:23.320
who has a comment that I'd like to make.

01:08:23.320 --> 01:08:24.680
So you're welcome to come forward, sir,

01:08:24.680 --> 01:08:30.610
and please state your name for the record.

01:08:30.610 --> 01:08:37.610
I walk on the grade in excess, well, several hundred miles annually.

01:08:37.610 --> 01:08:42.610
I probably spend as much mileage there as anybody in the county.

01:08:42.610 --> 01:08:54.610
I feel I probably stand to gain as much as anybody in the county through the advantages of safety for alternative six, which I do not support in any way.

01:08:54.610 --> 01:09:00.120
I'd like to compare alternative four and alternative six.

01:09:00.120 --> 01:09:07.470
Both of them provide rock stabilization, identical rock stabilization.

01:09:07.470 --> 01:09:14.470
Both of them provide widening of the road, which will in fact make it safer for pedestrians.

01:09:14.470 --> 01:09:20.470
Both of them provide for a two-foot shoulder on either side of the road,

01:09:20.470 --> 01:09:23.470
which will make more room and more safety for the pedestrians.

01:09:23.470 --> 01:09:31.490
Both of them, at that point, cost $1.7 million maximum.

01:09:31.490 --> 01:09:34.650
That's where we separate from the two proposals.

01:09:34.650 --> 01:09:42.730
Proposal six adds a two-thirds of a mile sidewalk down to the second switchback.

01:09:42.730 --> 01:09:50.910
The purpose of that sidewalk is to add pedestrian safety by getting them out of the road, as you've already heard.

01:09:50.910 --> 01:09:52.830
I'd like to address the safety aspect.

01:09:52.830 --> 01:10:00.160
I've talked to all of the regular walkers that I've ever had a chance to meet.

01:10:00.160 --> 01:10:05.520
None of them have any awareness of any pedestrian ever having been hit by a car on that section

01:10:05.520 --> 01:10:06.520
of the road.

01:10:06.520 --> 01:10:11.600
I've got an 88-year-old friend and twin who's very active in the community and extremely

01:10:11.600 --> 01:10:14.040
sharp lived here for 88 years.

01:10:14.040 --> 01:10:17.760
He's never ever heard of an accident on that stretch of the road.

01:10:17.760 --> 01:10:22.960
I submit to you that the accident rate, pedestrian versus automobile, on that stretch of road

01:10:22.960 --> 01:10:28.870
is zero and has been for the entire duration of the road.

01:10:28.870 --> 01:10:35.630
So in fact what you get for alternative six over alternative four is four million dollar

01:10:35.630 --> 01:10:38.680
sidewalk to nowhere.

01:10:38.680 --> 01:10:44.320
And the sole purpose for that is to improve on a zero percent accident rate, not with

01:10:44.320 --> 01:10:45.320
my money.

01:10:45.320 --> 01:10:46.320
Thank you.

01:10:46.320 --> 01:10:55.890
Thank you, sir.

01:10:55.890 --> 01:11:01.210
So we do have a motion before us by Chris Stock and then seconded by Ruth Pierce to

01:11:01.210 --> 01:11:11.370
Accept the recommendation of the Canyon Springs grade ad hoc committee and direct staff to move forward at the engineering and develop a funding strategy to return

01:11:12.010 --> 01:11:15.130
To the council is there any discussion on that motion?

01:11:18.780 --> 01:11:21.340
Seeing and hearing then Sharon roll call vote, please

01:11:23.760 --> 01:11:26.640
Chris Hockington. Yes, Greg Lanthine. No

01:11:28.440 --> 01:11:30.440
Ruth Pierce

01:11:30.440 --> 01:11:32.620
Suzanne Hawkins

01:11:32.620 --> 01:11:34.620
Yes

01:11:34.620 --> 01:11:36.060
Sean Baraker

01:11:36.060 --> 01:11:44.000
Yes, motion passes four to one.

01:11:44.000 --> 01:11:48.380
Once again, thank you to the committee members for your service on the committee.

01:11:48.380 --> 01:11:54.380
If we need more work from you, we'll definitely come find you because you did a fine job. Thank you.

01:11:54.380 --> 01:11:56.670
Yes, thank you. I agree.

01:11:56.670 --> 01:12:04.670
And next on the agenda is a request to authorize modification of city code sections related to driving site obstructions.

01:12:04.670 --> 01:12:10.140
And we have our city engineer, Jackie Fields. Welcome, Jackie.

01:12:10.140 --> 01:12:21.980
Good evening. The request this evening is to seek some kind of willingness in your part

01:12:21.980 --> 01:12:28.060
to consider code changes that deal with sight distances. We have some sections of code that

01:12:28.060 --> 01:12:34.940
may not work as well as they could work. We have businesses that have complied perfectly

01:12:34.940 --> 01:12:42.380
with the laws that stated and it's still difficult or maybe scary to pull out of their driveway

01:12:42.380 --> 01:12:52.000
approaches onto the roadway. We've also had some ongoing conversations about

01:12:52.000 --> 01:12:58.280
intersections like Fillmore and Canyon Springs Great. You know, is that actually

01:12:58.280 --> 01:13:04.240
safe enough for sight distance and people are feeling somewhat uncomfortable and so

01:13:04.240 --> 01:13:11.320
we wanted to spend the time and effort to consider revising the city code to

01:13:11.320 --> 01:13:22.450
perhaps update some of our codes to be more in line with ASHTO and or which is

01:13:22.450 --> 01:13:26.830
I can't remember the name of the acronym but it's our transportation

01:13:26.830 --> 01:13:37.270
federal transportation guidelines and perhaps improve some pedestrian

01:13:37.270 --> 01:13:43.870
visibility which doesn't always appear to be the case so we've had citizens

01:13:43.870 --> 01:13:48.190
call in and they say, gee, you know, my neighbor has a fence right at the edge of the alley,

01:13:48.190 --> 01:13:53.390
and I just about hit that kid who was walking on the street. And they're really concerned,

01:13:53.390 --> 01:13:58.710
but their neighbor has complied with the law. So maybe we need to investigate that a little

01:13:58.710 --> 01:14:05.310
bit more and see if we can make it a little bit easier or more comfortable for people.

01:14:05.310 --> 01:14:10.350
Because when they call, they are horrified that they've been in a spot where they could have

01:14:10.350 --> 01:14:17.510
heard someone legitimately. I think it's worth looking into. So I'm asking that you

01:14:17.510 --> 01:14:22.910
authorize us to propose modifications to the city code related to visual

01:14:22.910 --> 01:14:34.650
obstructions for the drivers. Any comments or questions from the Council? Suzanne

01:14:34.650 --> 01:14:41.370
do you have anything? I do. So your request might suggest you market because of the

01:14:41.370 --> 01:14:48.370
So you were a little muffled on that, Suzanne, can you try it once more, please?

01:14:48.370 --> 01:14:58.370
Sorry, so the request is to further investigate what these codes should say or to accept the changes that we're in our packet.

01:14:58.370 --> 01:15:10.370
Oh, in theory, there's no changes in your packet, so you're just authorizing staff or basically accepting the idea that staff may come to you with proposed code changes in the future.

01:15:10.370 --> 01:15:13.590
changes in the future.

01:15:13.590 --> 01:15:14.590
Got it.

01:15:14.590 --> 01:15:15.590
Thank you.

01:15:15.590 --> 01:15:22.800
I would think if there are potentially identified problems, it would be silly of us not to authorize

01:15:22.800 --> 01:15:25.200
you to go look at making changes to address those.

01:15:25.200 --> 01:15:27.120
I would certainly be supportive of that.

01:15:27.120 --> 01:15:29.120
Sorry, it was very intense.

01:15:29.120 --> 01:15:30.120
That's okay.

01:15:30.120 --> 01:15:31.120
Chris talking.

01:15:31.120 --> 01:15:36.120
I'm just wondering why this wouldn't come through the traffic safety commission with the engineer.

01:15:36.120 --> 01:15:40.120
Is that not part of the traffic safety commission's jurisdiction?

01:15:40.120 --> 01:15:42.120
Certainly it could.

01:15:42.120 --> 01:15:49.120
I'd send them out to Bird Dog and get all the hazards for you and help you with that a little bit.

01:15:49.120 --> 01:15:52.120
Bird, do you have them all red tagged already?

01:15:52.120 --> 01:15:57.120
No, I don't have them all red tagged and it certainly would be worth it to have a conversation with that group.

01:15:57.120 --> 01:16:05.480
I wouldn't want to engage them in a conversation if it was not the time and the place to do that.

01:16:05.480 --> 01:16:07.480
Without you come here and ask.

01:16:07.480 --> 01:16:17.470
I think it sounds like a great idea, and thank you for bringing it to our attention, and we look forward to seeing the future potential code changes.

01:16:17.470 --> 01:16:19.470
Thank you.

01:16:19.470 --> 01:16:33.050
Next on the agenda, another opportunity for public input. If there is anyone here left from the public who would like to address the council on any issues, now is your time.

01:16:33.050 --> 01:16:40.170
Dave Moore, 230 Coronado Twin Falls, and this is basically basically a request I was fascinated

01:16:40.170 --> 01:16:45.330
with the multiple options shown for the Kenyon Springs grade.

01:16:45.330 --> 01:16:51.050
Will those be posted, can those be posted on the city's website for review by citizens

01:16:51.050 --> 01:16:56.130
who are not here, who may have questions once they see it in the paper?

01:16:56.130 --> 01:17:00.930
So I actually believe those are probably already on the website as a part of the minutes from

01:17:00.930 --> 01:17:07.650
the ad hoc committee, their November meeting when that final report was included, but we

01:17:07.650 --> 01:17:10.450
certainly can do a better job of trying to direct a second there.

01:17:10.450 --> 01:17:11.450
Very good.

01:17:11.450 --> 01:17:12.450
Thank you.

01:17:12.450 --> 01:17:16.810
Yeah, there's a written report that has all, actually a much more detailed review of each

01:17:16.810 --> 01:17:17.810
of those recommendations.

01:17:17.810 --> 01:17:18.810
Travis.

01:17:18.810 --> 01:17:26.610
It was also included in tonight's packet, so if you look at tonight's agenda, it is the

01:17:26.610 --> 01:17:34.780
The entire report that Brian went through that was submitted by GUB was included for review.

01:17:34.780 --> 01:17:36.420
Thank you, Mr. Moore.

01:17:36.420 --> 01:17:39.450
Any items from the City Manager?

01:17:39.450 --> 01:17:44.680
Anything from the City Council?

01:17:44.680 --> 01:17:47.480
Meeting is adjourned.

01:17:47.480 --> 01:17:52.160
There's just some indication of how all meetings in 2017 really are.