WEBVTT

00:00:00.000 --> 00:00:11.200
Council to order. It is August 17, 2015, about 30 seconds after 5 p.m. The first item on the agenda is the Pledge of Allegiance. So those of you wishing to join us please rise.

00:00:11.200 --> 00:00:22.750
I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.

00:00:22.750 --> 00:00:37.750
Thank you all and welcome. I do want to confirm we have a quorum of the City Council. Five members are here this evening, both council member Lanting and

00:00:37.750 --> 00:00:47.940
Munn were not able to make this evening due to prior engagements. Mr. Rothweiler, our city manager, do we have any amendments to our agenda tonight?

00:00:47.940 --> 00:00:53.340
Mr. Mayor, members of the council, on item number two on the consent calendar and just

00:00:53.340 --> 00:00:57.180
for the record, there are corrected meeting minutes that have been supplied to you for

00:00:57.180 --> 00:01:02.500
your approval for the July 27th meeting.

00:01:02.500 --> 00:01:05.060
We'd just like that to be reflected in the record.

00:01:05.060 --> 00:01:08.140
The second is on consent calendar item number three.

00:01:08.140 --> 00:01:12.700
We would request that that be removed from the consent calendar this evening and it will

00:01:12.700 --> 00:01:15.940
be considered at a later date.

00:01:15.940 --> 00:01:25.340
And then the executive session this evening, 74206 subsection 1F, we're asking to be removed

00:01:25.340 --> 00:01:30.340
from this evening's agenda and be placed on an agenda when all members are present.

00:01:30.340 --> 00:01:31.340
Excellent, thank you, Travis.

00:01:31.340 --> 00:01:32.820
I would do accept the modified agenda.

00:01:32.820 --> 00:01:34.780
Second.

00:01:34.780 --> 00:01:35.780
Second.

00:01:35.780 --> 00:01:40.420
And motion on floor to accept the modified agenda, and minutes, and minutes, and consent

00:01:40.420 --> 00:01:42.820
calendar and seconded by Rebecca Mills-Soyka.

00:01:42.820 --> 00:01:46.380
Do we have any further on that motion council?

00:01:46.380 --> 00:01:48.380
Chairman Roll call vote please.

00:01:48.380 --> 00:01:54.380
Suzanne Hawkins.

00:01:54.380 --> 00:01:55.380
Yes.

00:01:55.380 --> 00:01:57.380
Jim R. Schonberger.

00:01:57.380 --> 00:01:58.380
Yes.

00:01:58.380 --> 00:01:59.380
Chris Tockington.

00:01:59.380 --> 00:02:00.380
Don Hall.

00:02:00.380 --> 00:02:01.380
Yes.

00:02:01.380 --> 00:02:02.380
Rebecca Mills-Sortka.

00:02:02.380 --> 00:02:03.380
Yes.

00:02:03.380 --> 00:02:05.380
Motion passes 50.

00:02:05.380 --> 00:02:07.380
Thank you, Travis, for that.

00:02:07.380 --> 00:02:15.380
Next item on the agenda is I have the privilege of reading a proclamation for ADA, the American

00:02:15.380 --> 00:02:17.380
Disability Act.

00:02:17.380 --> 00:02:25.480
On July 26, 1990, President George H.W. Bush signed into law the Americans with Disability

00:02:25.480 --> 00:02:31.460
Act, ADA, as we know it, to ensure the civil rights of people with disabilities.

00:02:31.460 --> 00:02:39.500
This legislation established a clear and comprehensive national mandate for the elimination

00:02:39.500 --> 00:02:44.540
of discrimination against individuals with disabilities.

00:02:44.540 --> 00:02:52.860
On July 26, 2015, we celebrated the 25th anniversary of the signing of the ADA.

00:02:52.860 --> 00:02:58.860
The ADA has expanded opportunities for Americans with disabilities by reducing barriers and

00:02:58.860 --> 00:03:03.900
changing perceptions and increasing full participation in community life.

00:03:03.900 --> 00:03:10.300
However, the promise of the ADA will only be reached if we remain committed to continue

00:03:10.300 --> 00:03:18.260
our efforts to fully implement the ADA on the 25th anniversary of the American Disability

00:03:18.260 --> 00:03:19.780
Act Act.

00:03:19.780 --> 00:03:26.100
I, Don Hall, Mayor of the City of Twin Falls, celebrate and recognize the progress that has

00:03:26.100 --> 00:03:32.340
been made by reaffirming the principles of equality and inclusion by recommitting our efforts

00:03:32.340 --> 00:03:35.020
to reach the full ADA compliance.

00:03:35.020 --> 00:03:41.180
Now therefore, I don't hall mayor of the city of Twin Falls do hereby reaffirm to continue

00:03:41.180 --> 00:03:44.700
to work towards full ADA compliance.

00:03:44.700 --> 00:03:51.660
And with that, I'd like to invite Melva Heinrich from link to come up and accept this and say

00:03:51.660 --> 00:03:52.660
a few words.

00:03:52.660 --> 00:04:11.140
At the swing that microphone around them, there we go, after, must.

00:04:11.140 --> 00:04:16.380
Mr. Mayor, City Council and City of Twin Falls, thank you for recognizing the importance of the

00:04:16.380 --> 00:04:23.860
I just returned from the National Convention in Washington, D.C. for the Nickel Conference,

00:04:23.860 --> 00:04:28.340
and where I saw again firsthand how the civil rights law has changed lives of people with

00:04:28.340 --> 00:04:34.660
disabilities, giving equal opportunity with employment, housing, and access to private

00:04:34.660 --> 00:04:37.220
and public businesses.

00:04:37.220 --> 00:04:43.140
On July 26, 1990, President Bush signed the Americans with Disability Act, and he proclaimed

00:04:43.140 --> 00:04:49.300
shameful laws of exclusion finally we're falling down. The ADA is a milestone in the Civil Rights

00:04:49.300 --> 00:04:56.380
Movement, fully recognizing people with disabilities. We have come a long, long way and the 25th

00:04:56.380 --> 00:05:02.220
anniversary of the ADA deserves to be celebrated as so do those who make it possible. But

00:05:02.220 --> 00:05:06.940
like those who've come before us, we must continually look to what comes next. And once

00:05:06.940 --> 00:05:11.980
we achieve that, we must reach for more until every person with a disability has full and

00:05:11.980 --> 00:05:18.840
equal access to our great society that what our great society has to offer until full inclusion

00:05:18.840 --> 00:05:23.420
is no longer a dream but a reality to all. So thank you very much for this.

00:05:23.420 --> 00:05:24.420
Thank you.

00:05:24.420 --> 00:05:36.210
Did I have a Boy Scout sneak into the back of the room? This is your opportunity, sir. Could

00:05:36.210 --> 00:05:40.930
you come forward to the microphone? You didn't know we were going to do this, did you? What

00:05:40.930 --> 00:05:45.370
we always do is give the opportunity to Boy Scouts or Girl Scout troops when they come to

00:05:45.370 --> 00:05:49.750
to come forward, tell us your name, what troop you're with,

00:05:49.750 --> 00:05:51.730
what badge you're working on, I'm assuming,

00:05:51.730 --> 00:05:54.730
and who's your sponsoring location, where do you meet?

00:05:56.170 --> 00:06:00.970
So I'm taking downs and I'm from troop 164,

00:06:00.970 --> 00:06:05.970
and I'm working on Meribad, the communications Meribad.

00:06:06.810 --> 00:06:08.690
And where do you meet?

00:06:08.690 --> 00:06:11.450
The Linwood Building, or East Lin Building?

00:06:11.450 --> 00:06:12.930
East Lin Building, very good.

00:06:12.930 --> 00:06:14.330
Thank you very much.

00:06:14.330 --> 00:06:17.720
you're earning your badge by coming forward.

00:06:17.720 --> 00:06:19.440
All right, next item on the agenda.

00:06:19.440 --> 00:06:22.240
As always, we opened up the first part of the agenda

00:06:22.240 --> 00:06:24.520
for anyone from the public that would like to address

00:06:24.520 --> 00:06:28.040
the city council on something that's not on the agenda.

00:06:28.040 --> 00:06:32.900
So now is your time to come forward.

00:06:32.900 --> 00:06:34.400
All right, I see no one coming forward.

00:06:34.400 --> 00:06:36.500
So I'll move to the next item,

00:06:36.500 --> 00:06:40.140
which is the consent calendar that has been adjusted,

00:06:40.140 --> 00:06:41.980
obviously, so I'll turn that over to council

00:06:41.980 --> 00:06:44.300
for their direction.

00:06:44.300 --> 00:06:45.140
Sean Barringer.

00:06:45.140 --> 00:06:49.750
would move approval of the consent calendar as amended.

00:06:49.750 --> 00:06:50.490
Second.

00:06:50.490 --> 00:06:55.850
Motion on 4 by Sean Berger, seconded by Suzanne Hawkins

00:06:55.850 --> 00:06:58.010
to approve the consent calendar as amended.

00:06:58.010 --> 00:07:02.380
Anything further on that motion council?

00:07:02.380 --> 00:07:04.460
Sharon, roll call vote, please.

00:07:04.460 --> 00:07:05.540
Sean Berger.

00:07:05.540 --> 00:07:06.420
Yes.

00:07:06.420 --> 00:07:07.340
Chris Tockington.

00:07:07.340 --> 00:07:08.140
Yes.

00:07:08.140 --> 00:07:08.980
Don Hall.

00:07:08.980 --> 00:07:09.540
Yes.

00:07:09.540 --> 00:07:11.100
Rebecca Mills-Slica.

00:07:11.100 --> 00:07:12.260
Yes.

00:07:12.260 --> 00:07:13.540
And Suzanne Hawkins.

00:07:13.540 --> 00:07:14.180
Yes.

00:07:14.180 --> 00:07:15.740
Motion passes 5-0.

00:07:15.740 --> 00:07:18.410
The consent calendar is approved.

00:07:18.410 --> 00:07:21.610
Next item on the agenda is under items for consideration.

00:07:21.610 --> 00:07:23.530
So if you're here for a consent calendar item

00:07:23.530 --> 00:07:24.610
and you would like to leave,

00:07:24.610 --> 00:07:26.130
not gonna hurt our feelings.

00:07:26.130 --> 00:07:28.070
Okay.

00:07:28.070 --> 00:07:30.410
Next item is a request to approve

00:07:30.410 --> 00:07:32.730
the Saver Southern Idaho Fundraiser

00:07:32.730 --> 00:07:36.050
sponsored by the Twin Falls Area Chamber of Commerce

00:07:36.050 --> 00:07:40.090
to be held on Friday, August 21st, 2015.

00:07:40.090 --> 00:07:40.930
Sean Berger.

00:07:42.130 --> 00:07:43.770
Obviously as I'm the applicant for this

00:07:43.770 --> 00:07:46.810
and I'm going to step down from the discussion.

00:07:46.810 --> 00:07:49.350
Very good, sir.

00:07:49.350 --> 00:07:53.430
So we have Staff Sergeant Dennis Pulling coming forward.

00:07:53.430 --> 00:07:55.350
Thank you, Mayor Hall and City Council.

00:07:57.430 --> 00:08:00.070
We've so ago we received a request to hold the Saver Sutter

00:08:00.070 --> 00:08:02.190
night a whole fundraiser.

00:08:02.190 --> 00:08:05.710
Sean provided that on behalf of the Twin Falls Chamber

00:08:05.710 --> 00:08:06.790
of Commerce.

00:08:06.790 --> 00:08:11.110
This event is to be held on this coming Friday, August 24th

00:08:11.110 --> 00:08:13.790
from 6 p.m. to 8 p.m.

00:08:13.790 --> 00:08:18.790
During the event they will have food and the like

00:08:19.830 --> 00:08:22.830
available to the public, it is a ticketed event.

00:08:22.830 --> 00:08:27.830
They will also be serving alcohol at the event.

00:08:27.830 --> 00:08:32.830
That in amplified noise is what triggers a special event process.

00:08:32.830 --> 00:08:38.830
We do not foresee any issues as far as police responses or having to provide security.

00:08:38.830 --> 00:08:44.830
We have met with all of the relevant city entities regarding this event,

00:08:44.830 --> 00:08:48.830
and we've approved it and just want to bring this before you.

00:08:48.830 --> 00:08:52.150
first time we've had an event, or this specific event anyway,

00:08:52.150 --> 00:08:54.950
we have had smaller events out there in the past,

00:08:54.950 --> 00:08:58.110
but we have approved this at this time

00:08:58.110 --> 00:09:01.670
with your approval, we'll move forward with it.

00:09:01.670 --> 00:09:03.110
Thank you, Staff Sergeant.

00:09:03.110 --> 00:09:03.950
Chris Stockton.

00:09:03.950 --> 00:09:06.750
I'd love to accept the recommendation

00:09:06.750 --> 00:09:09.350
of the Police Department for approval

00:09:09.350 --> 00:09:11.070
of the August 21st,

00:09:11.070 --> 00:09:14.030
Haver Southern Edo Fundraiser.

00:09:14.030 --> 00:09:14.870
Second.

00:09:14.870 --> 00:09:16.270
Motion on the floor by Chris Stockton,

00:09:16.270 --> 00:09:18.310
and seconded by Suzanne Hawkins.

00:09:18.310 --> 00:09:21.900
you think further on that motion council?

00:09:21.900 --> 00:09:23.980
John's now is your chance to speak, if you want.

00:09:23.980 --> 00:09:27.060
I mean, outside of the city council, it's a great opportunity.

00:09:27.060 --> 00:09:31.700
I take plenty of time to speak.

00:09:31.700 --> 00:09:34.100
Just want to mention that, so this event, this is actually,

00:09:34.100 --> 00:09:35.940
I think the fifth year we've done this event,

00:09:35.940 --> 00:09:38.300
it's the first time we've done it at the new visitor center.

00:09:38.300 --> 00:09:42.660
We've held it at Ganycrest and the Arts Center in the past.

00:09:42.660 --> 00:09:44.940
The plan was to eventually move it out here,

00:09:44.940 --> 00:09:46.860
and we got accelerated a year in that.

00:09:46.860 --> 00:09:48.980
So it should be a great event.

00:09:48.980 --> 00:09:51.820
The weather looks like it's going to be a little better

00:09:51.820 --> 00:09:56.420
this week than it was last week for an evening event out there.

00:09:56.420 --> 00:09:59.020
This is a great opportunity to celebrate our agricultural

00:09:59.020 --> 00:10:00.020
heritage in the region.

00:10:00.020 --> 00:10:04.380
So we get ingredients donated from local farmers and

00:10:04.380 --> 00:10:05.300
producers.

00:10:05.300 --> 00:10:07.300
We give those over to local chefs.

00:10:07.300 --> 00:10:09.540
They prepare them into dishes.

00:10:09.540 --> 00:10:15.380
We pair that with wines and Idaho beers and have live music

00:10:15.380 --> 00:10:20.460
can auction and everything, so we'd appreciate your approval,

00:10:20.460 --> 00:10:22.860
and certainly if folks are still interested in attending,

00:10:22.860 --> 00:10:27.440
tickets are still available, $25 a person, $40 a couple.

00:10:27.440 --> 00:10:30.960
But we're getting close to our $300, so.

00:10:30.960 --> 00:10:32.640
We have to answer any questions if you have any.

00:10:32.640 --> 00:10:33.140
Thank you, Sean.

00:10:33.040 --> 00:10:35.490
Do we have any questions for Sean?

00:10:35.490 --> 00:10:36.170
Suzanne Hawkins.

00:10:36.170 --> 00:10:37.610
Sure, why not?

00:10:37.610 --> 00:10:40.290
So the funders, or what do the funds get used for?

00:10:40.290 --> 00:10:42.970
So the funds are actually split between the Twin Falls Chamber

00:10:42.970 --> 00:10:46.010
and Southern Idaho Tourism, which are, and we use that

00:10:46.010 --> 00:10:49.930
in our efforts to market tourism and visitation to the area.

00:10:49.930 --> 00:10:52.680
Great, thank you.

00:10:52.680 --> 00:10:53.520
Thank you, Sean.

00:10:53.520 --> 00:10:54.360
I see no further light.

00:10:54.360 --> 00:10:59.670
So at this time, roll call vote for the remaining four members.

00:10:59.670 --> 00:11:00.830
Chris Hockington.

00:11:00.830 --> 00:11:02.070
Yes.

00:11:02.070 --> 00:11:02.710
Don Hall.

00:11:02.710 --> 00:11:03.630
Yes.

00:11:03.630 --> 00:11:05.430
Rebecca Melsoica.

00:11:05.430 --> 00:11:06.430
Yes.

00:11:06.430 --> 00:11:07.510
Suzanne Hawkins.

00:11:07.510 --> 00:11:08.510
Yes.

00:11:08.510 --> 00:11:14.980
Motion passes four in favor, one abstain.

00:11:14.980 --> 00:11:18.220
I know we have several other agenda items,

00:11:18.220 --> 00:11:21.980
but I noticed that a few boys out came in.

00:11:21.980 --> 00:11:25.100
So this is the opportunity and the time for our boys

00:11:25.100 --> 00:11:29.300
scouts to come forward and introduce themselves

00:11:29.300 --> 00:11:36.300
and tell us what troop you're with and where you meet.

00:11:37.100 --> 00:11:39.260
If you come forward and what you're working on,

00:11:39.260 --> 00:11:45.590
what merit badge you're working on.

00:11:45.590 --> 00:11:50.440
We make you earn it here boys.

00:11:50.440 --> 00:12:00.030
So right there, just pull the mic down, tell us your name.

00:12:00.030 --> 00:12:06.390
Okay, I'm Isaac Reynolds and I am the senior

00:12:06.390 --> 00:12:09.630
patrol leader, group 74.

00:12:09.630 --> 00:12:13.270
And we're working on the citizenship in the community,

00:12:13.270 --> 00:12:16.470
citizenship in the community member at Marybaj.

00:12:16.470 --> 00:12:20.030
And we meet at the Harrison Street,

00:12:20.030 --> 00:12:21.670
for she's Christ of Latter-day Saints.

00:12:21.670 --> 00:12:22.510
Very good.

00:12:22.510 --> 00:12:24.710
And are you all working on the same badge?

00:12:24.710 --> 00:12:26.910
So you lucked out all you have to do to say your name now.

00:12:26.910 --> 00:12:28.910
He had to do the lion's share.

00:12:28.910 --> 00:12:35.320
Yes, he does.

00:12:35.320 --> 00:12:40.730
Thank you, John.

00:12:40.730 --> 00:12:42.250
I am Ben Bird.

00:12:42.250 --> 00:12:45.000
Thank you, Ben.

00:12:45.000 --> 00:12:46.600
And I'm Jeremy Wallace.

00:12:46.600 --> 00:12:48.390
You Jeremy?

00:12:48.390 --> 00:12:50.070
I'm Nathan Hire, the Scout Master.

00:12:50.070 --> 00:12:51.350
Thank you, Nathan.

00:12:51.350 --> 00:12:53.590
Chris Crozier, I'm here for leadership.

00:12:53.590 --> 00:12:54.230
Thank you.

00:12:54.230 --> 00:12:55.030
Thank you, Chris.

00:12:55.030 --> 00:12:56.830
Well, thank you all for being here this evening.

00:12:56.830 --> 00:12:59.870
And thank your senior patrol leader

00:12:59.870 --> 00:13:02.630
for leading the charge, although he did try to delegate,

00:13:02.630 --> 00:13:05.230
which is a sign of leadership, OK?

00:13:05.230 --> 00:13:07.070
So good job.

00:13:07.070 --> 00:13:08.790
Next item on the agenda is a request

00:13:08.790 --> 00:13:14.870
approved the Cruz and Magic Valley bicycle ride sponsored by the Magic Valley Trail Enhancement

00:13:14.870 --> 00:13:21.830
Committee to be held on Saturday, August 29, 2015. And we have Staff Sergeant Dennis Pullen

00:13:21.830 --> 00:13:26.550
back with us. Welcome Dennis. Thank you. As you said, this event will be held a week from

00:13:26.550 --> 00:13:32.870
this coming Saturday on August 29th. It's from 7 a.m. to 5 p.m. throughout the day. This ride

00:13:32.870 --> 00:13:40.230
is broken down at this time into, I believe it's four different rides, different

00:13:40.230 --> 00:13:44.950
distances. So they have several volunteers that will help be helping

00:13:44.950 --> 00:13:50.750
monitor the streets. They'll be meeting near the, I believe, the chamber area as

00:13:50.750 --> 00:13:56.660
well. They are going to have experienced riders riding with the groups,

00:13:56.660 --> 00:14:00.860
especially the smaller groups, if they have families participating in this, they'll

00:14:00.860 --> 00:14:05.540
make sure that they have somebody kind of overseeing the little ones if they're

00:14:05.540 --> 00:14:09.080
riding. One area that they will be riding on is the sidewalks long pole

00:14:09.080 --> 00:14:13.700
line for more safety. I was advised that the more experienced riders will go ahead

00:14:13.700 --> 00:14:17.700
and ride in the roadway because they have a pretty good antelongue. What needs to be

00:14:17.700 --> 00:14:22.760
done during this time they will be provide the match value brewing company

00:14:22.760 --> 00:14:29.170
will be providing beer for the event. They will also have sandwiches from the

00:14:29.170 --> 00:14:30.970
Twin Falls Sandwich Company.

00:14:30.970 --> 00:14:33.730
This event will be a fundraiser for money

00:14:33.730 --> 00:14:38.730
to go towards the Canyon Rim Trail.

00:14:38.730 --> 00:14:41.930
We've met with all the relevant city staff members

00:14:41.930 --> 00:14:44.050
that based on the volunteers that they have

00:14:44.050 --> 00:14:45.530
and the experienced hires that they have,

00:14:45.530 --> 00:14:48.570
we will not be providing any police services

00:14:48.570 --> 00:14:49.970
for the event.

00:14:49.970 --> 00:14:52.250
Speaking with Denise, she's here today.

00:14:52.250 --> 00:14:55.610
If you have any questions for how she did advise it,

00:14:55.610 --> 00:14:59.940
request it if they could have like a pilot type car

00:14:59.940 --> 00:15:05.300
staying behind with Flash as well and I felt that was a pretty good idea so when they first

00:15:05.300 --> 00:15:10.140
take off their own polynomial they'll also have that to help for safety reasons.

00:15:10.140 --> 00:15:16.760
Based on all of that information we have approved this and again with your approval we'll have

00:15:16.760 --> 00:15:18.120
them move forward with it.

00:15:18.120 --> 00:15:22.280
I would like to ask Denise come forward and maybe this is a great opportunity for you

00:15:22.280 --> 00:15:27.760
to advertise, tell us how we buy or register for it, all those dynamics.

00:15:27.760 --> 00:15:31.080
Okay, we do have our website, MavTech.org.

00:15:31.080 --> 00:15:33.840
You can go on there and register that way.

00:15:33.840 --> 00:15:38.340
There's 150, a 30, and a 12 mile bicycle ride.

00:15:39.260 --> 00:15:41.020
The routes will all be well marked.

00:15:41.020 --> 00:15:45.300
They go out, obviously the longer ones go clear out

00:15:45.300 --> 00:15:48.460
to fuel all the way over to Murton back.

00:15:48.460 --> 00:15:52.940
And the shorter ones are just out to meander point back.

00:15:52.940 --> 00:15:57.400
And so all the proceeds are going to the Canyon Rump Trail.

00:15:57.400 --> 00:16:00.480
And so you can register online.

00:16:00.480 --> 00:16:02.840
How much is the cost, what's the?

00:16:02.840 --> 00:16:06.480
It just depends on the length of the ride.

00:16:06.480 --> 00:16:10.040
Obviously the longer distance we have more expenses,

00:16:10.040 --> 00:16:10.960
so we charge more.

00:16:10.960 --> 00:16:16.960
So the 150 mile riders, it's $50 and the 30 mile riders

00:16:16.960 --> 00:16:18.800
are 30 in the family.

00:16:18.800 --> 00:16:22.000
Just depending on what you have, you get a discount.

00:16:22.000 --> 00:16:23.400
OK, very good.

00:16:23.400 --> 00:16:24.200
Thanks.

00:16:24.200 --> 00:16:25.360
Thank you.

00:16:25.360 --> 00:16:26.120
Any other questions?

00:16:26.120 --> 00:16:27.920
Any other questions?

00:16:27.920 --> 00:16:28.980
I don't see any lights.

00:16:28.980 --> 00:16:29.480
OK.

00:16:29.480 --> 00:16:31.920
Well, tell everybody to get out there and get registering.

00:16:31.920 --> 00:16:32.440
We'll do it.

00:16:32.440 --> 00:16:35.040
I'm assuming that Travis is going to be riding this,

00:16:35.040 --> 00:16:37.120
and he'll be on the sidewalks because the less experienced

00:16:37.120 --> 00:16:39.240
riders.

00:16:39.240 --> 00:16:40.760
Sean Berger.

00:16:40.760 --> 00:16:45.320
Amer, I would move approval of the cruising Magic Valley

00:16:45.320 --> 00:16:48.680
Bicycle Ride event as presented.

00:16:48.680 --> 00:16:49.320
Second.

00:16:49.320 --> 00:16:50.840
Motion on 4 by Sean Berger.

00:16:50.840 --> 00:16:54.920
Seconded by Rebecca Mills-Soyka as stated.

00:16:54.920 --> 00:16:58.430
Anything further on that motion council?

00:16:58.430 --> 00:17:04.040
Sharon roll call vote please.

00:17:04.040 --> 00:17:06.160
Susan, wait.

00:17:06.160 --> 00:17:07.000
Don Hall?

00:17:07.000 --> 00:17:08.160
Yes.

00:17:08.160 --> 00:17:09.640
Rebecca Mills-Soyka?

00:17:09.640 --> 00:17:10.840
Yes.

00:17:10.840 --> 00:17:12.120
Suzanne Hawkins?

00:17:12.120 --> 00:17:13.580
Yes.

00:17:13.580 --> 00:17:14.500
Sean Barriker?

00:17:14.500 --> 00:17:15.420
Yes.

00:17:15.420 --> 00:17:16.260
Chris Tocking?

00:17:16.260 --> 00:17:17.100
Yes.

00:17:17.100 --> 00:17:18.100
Motion passes five to zero.

00:17:18.100 --> 00:17:19.840
Thank you, Dennis.

00:17:19.840 --> 00:17:23.080
Next item on the agenda, request to amend city code two

00:17:23.080 --> 00:17:27.600
dash 12 dash three regarding membership of the improvement

00:17:27.600 --> 00:17:34.040
reimbursement commission and we have Mitch Humboldt, our Deputy City Manager, making

00:17:34.040 --> 00:17:38.520
presentation. Welcome Mitch. Thank you. I might start talking about this one and the

00:17:38.520 --> 00:17:42.040
next one together because they're kind of related if you don't mind and I know

00:17:42.040 --> 00:17:46.320
the next one has Don's name on it but I'll I'll start and Mayor if you want to

00:17:46.320 --> 00:17:51.620
pipe in feel free to jump in and correct me where I miss be. Yeah it would be the

00:17:51.620 --> 00:17:55.720
office and so I appreciate you speaking.

00:17:55.720 --> 00:17:59.920
So this will look somewhat familiar to you from a few months ago we did the same thing

00:17:59.920 --> 00:18:03.480
with the golf commission and the Parks and Recreation Commission that we're going to propose to

00:18:03.480 --> 00:18:04.480
do here.

00:18:04.480 --> 00:18:09.200
Only in this case we're looking at the Improvement and Reimbursement Commission and in the staff

00:18:09.200 --> 00:18:14.500
reported did the bit of history about what that commission is and what they do.

00:18:14.500 --> 00:18:19.480
Generally what they get involved in is when the developer develops the subdivision and

00:18:19.480 --> 00:18:24.480
is asked to oversize some utility or public infrastructure.

00:18:25.480 --> 00:18:27.920
When future developments come along the tie-in to the infrastructure,

00:18:27.920 --> 00:18:30.160
there's a payback that's involved in.

00:18:30.160 --> 00:18:34.360
This commission basically helps the city staff kind of judge

00:18:34.360 --> 00:18:39.360
whether those paybacks are reasonable in keeping with the city resolutions

00:18:39.360 --> 00:18:40.880
and such.

00:18:40.880 --> 00:18:43.480
And it's good commission for that purpose.

00:18:43.480 --> 00:18:45.800
But there's also lately, specifically,

00:18:45.800 --> 00:18:48.360
has been a huge demand on their time.

00:18:48.360 --> 00:18:51.480
And it's been probably almost two years since they've last met.

00:18:51.480 --> 00:18:54.020
And we've had several terms expire.

00:18:54.020 --> 00:18:56.960
Right now, there's only one person left on this commission

00:18:56.960 --> 00:18:59.560
of, I want to see nine is what it starts with,

00:18:59.560 --> 00:19:01.440
or seven actually, is what it starts with.

00:19:01.440 --> 00:19:03.840
The other one is nine.

00:19:03.840 --> 00:19:08.120
And so we have trouble filling these seats.

00:19:08.120 --> 00:19:11.160
And so when I was having this conversation with Dawn

00:19:11.160 --> 00:19:13.760
a couple of months ago about trying

00:19:13.760 --> 00:19:17.080
to get some people on this commission,

00:19:17.080 --> 00:19:19.780
We were also talking about the same kind of thing happening

00:19:19.780 --> 00:19:21.940
in the Impact Fee Advisory Committee.

00:19:21.940 --> 00:19:24.780
And that one meets a little more frequently,

00:19:24.780 --> 00:19:27.540
but we still have had trouble in recent years

00:19:27.540 --> 00:19:28.840
keeping that one full.

00:19:30.180 --> 00:19:31.900
It's a last month we had a meeting

00:19:31.900 --> 00:19:33.740
with the Impact Fee Advisory Committee in July.

00:19:33.740 --> 00:19:36.440
It was the first time in three or four years

00:19:36.440 --> 00:19:38.220
that we've had a full commission show up

00:19:38.220 --> 00:19:43.060
and that was a good, we're making progress there.

00:19:43.060 --> 00:19:44.700
But at any rate, we were looking through this.

00:19:44.700 --> 00:19:46.460
I got looking at the duties that the two different

00:19:46.460 --> 00:19:50.860
they're both development related and they both have the same kinds of people who are

00:19:50.860 --> 00:19:55.260
on these commissions and if you look at the membership requirements and they require mix

00:19:55.260 --> 00:20:02.260
of developer builder types with the mix of just random you know citizens and the membership

00:20:02.260 --> 00:20:08.380
is even really similar and then we just did the golf thing I got me thinking so we talked

00:20:08.380 --> 00:20:14.100
about it the mare and I and and Troy V tech is also here he's the staff person for our

00:20:14.100 --> 00:20:17.180
Improvement Reimbursement Commission and we all kind of felt like going down this road

00:20:17.180 --> 00:20:20.900
with a good path to go of combining these two into one.

00:20:20.900 --> 00:20:27.780
We brought Chris in on those conversations, Chris is the liaison to the IMPACT fee committee.

00:20:27.780 --> 00:20:32.460
And then in the July meeting we actually went to the, Chris and I went to the IMPACT

00:20:32.460 --> 00:20:37.140
Fee Committee meeting and we talked to the committee about taking on these duties of

00:20:37.140 --> 00:20:41.100
the Improvement Reimbursement Commission and they were all in favor of it.

00:20:41.100 --> 00:20:44.980
As it works out, the one committee member who is still left on the Improvement and Improvement

00:20:44.980 --> 00:20:50.380
Commission is actually on the Impact Fee Committee already in Tony Hughes.

00:20:50.380 --> 00:20:57.660
And so we wouldn't even have to let anybody go without, you know, keeping them around to

00:20:57.660 --> 00:20:58.660
do these duties.

00:20:58.660 --> 00:21:03.260
And so we all felt like this was the positive way to go and a good way to kind of consolidate

00:21:03.260 --> 00:21:09.820
some commissions and maybe make it a little bit easier for us to keep our advisory boards

00:21:09.820 --> 00:21:10.820
full.

00:21:10.820 --> 00:21:15.740
And so what we have in front of you, this first item is an actual city ordinance.

00:21:15.740 --> 00:21:19.500
It's going to be a man section for City Code 212-3.

00:21:19.500 --> 00:21:27.730
And basically all it does is it adds a statement to the bottom of the membership paragraph that

00:21:27.730 --> 00:21:33.010
allows the mayor and council to appoint the impact fee committee to do the duties of the

00:21:33.010 --> 00:21:34.210
Improvement Reimbursement Commission.

00:21:34.210 --> 00:21:38.530
So we're going to keep that discussion in the code and keep those duties listed out

00:21:38.530 --> 00:21:40.330
not what they all are, but then in the end,

00:21:40.330 --> 00:21:43.410
we'll just, this body will be able to appoint

00:21:43.410 --> 00:21:45.410
that commission to do the role of the other one.

00:21:45.410 --> 00:21:47.570
And that's really what it comes down to,

00:21:47.570 --> 00:21:48.650
it's just that simple.

00:21:50.690 --> 00:21:54.170
The next two items, or the next item on the agenda,

00:21:54.170 --> 00:21:57.930
we do have one person who is appointed

00:21:57.930 --> 00:22:00.370
to the Improvement Reimversion Commission.

00:22:00.370 --> 00:22:05.170
And so the idea would be to remove Tony from that role,

00:22:05.170 --> 00:22:08.570
so that we don't have this one guy hanging out there anymore.

00:22:08.570 --> 00:22:11.030
So that needs to be a separate motion.

00:22:11.030 --> 00:22:12.950
And if I want to be clear, and I'm sure Don,

00:22:12.950 --> 00:22:15.530
you would want to be clear that we're not removing Tony

00:22:15.530 --> 00:22:19.330
for any lack of performance or attendance or anything like that,

00:22:19.330 --> 00:22:21.970
it's simply so that we can take care of this other thing

00:22:21.970 --> 00:22:23.730
at a point, the Impact Fee Committee.

00:22:23.730 --> 00:22:26.490
In fact, we're kind of pleased that Tony's

00:22:26.490 --> 00:22:27.730
on the Impact Fee Committee already,

00:22:27.730 --> 00:22:30.170
because he's the only one that has that experience

00:22:30.170 --> 00:22:31.850
with the Improvement Reimbursement Commission.

00:22:31.850 --> 00:22:34.650
So, and then the final action that we'd ask you to take tonight

00:22:34.650 --> 00:22:37.690
would be to appoint the Impact Fee Advisory Committee

00:22:37.690 --> 00:22:40.890
to fulfill the duties of the improvement reimbursement

00:22:40.890 --> 00:22:41.890
commission.

00:22:41.890 --> 00:22:45.970
And so that's kind of not sure what we're asking for you

00:22:45.970 --> 00:22:49.650
to do if any questions, how are we and what

00:22:49.650 --> 00:22:50.730
would the ordinance be?

00:22:50.730 --> 00:22:53.130
So the first item would be the ordinance.

00:22:53.130 --> 00:22:55.130
And what is that number?

00:22:55.130 --> 00:22:58.300
Sharon, do you have that?

00:22:58.300 --> 00:23:00.500
Ordinance number 3104.

00:23:00.500 --> 00:23:01.300
3104.

00:23:01.300 --> 00:23:02.620
Thank you.

00:23:02.620 --> 00:23:03.500
Chris, talking.

00:23:03.500 --> 00:23:07.260
I would move to place ordinance 3104 on third and final

00:23:07.260 --> 00:23:11.140
by Todd Lunder, only under suspension of the rules.

00:23:11.140 --> 00:23:11.980
Second.

00:23:11.980 --> 00:23:13.740
Motion on four by Chris Tockington.

00:23:13.740 --> 00:23:16.780
Seconded by Suzanne Hawkins as stated.

00:23:16.780 --> 00:23:20.340
Anything further on that motion council?

00:23:20.340 --> 00:23:24.700
Sharon Rojalvo please.

00:23:24.700 --> 00:23:26.220
Rebecca Milasoica?

00:23:26.220 --> 00:23:27.820
Yes.

00:23:27.820 --> 00:23:29.020
Suzanne Hawkins?

00:23:29.020 --> 00:23:29.860
Yes.

00:23:29.860 --> 00:23:30.860
Sean Berriger?

00:23:30.860 --> 00:23:31.700
Yes.

00:23:31.700 --> 00:23:32.540
Chris Tockington?

00:23:32.540 --> 00:23:33.420
Yes.

00:23:33.420 --> 00:23:34.100
Don Hall?

00:23:34.100 --> 00:23:36.660
Yes, motion passes five to zero.

00:23:36.660 --> 00:23:40.380
And we need to read the, we have to take and read the

00:23:40.380 --> 00:23:42.780
ordinance and do all that. So if you'd read that title.

00:23:44.300 --> 00:23:49.740
Ordinance number 3104 and ordinance of the city council of the city of Twin Falls,

00:23:49.760 --> 00:23:56.260
Idaho, amending city code two dash 12 dash three by amending the membership

00:23:56.940 --> 00:24:01.700
requirements of the improvement reimbursement commission be it ordained by

00:24:01.700 --> 00:24:05.060
the mayor and the city council of the city of Twin Falls, Idaho.

00:24:05.620 --> 00:24:06.900
Thank you, Suzanne Hawkins.

00:24:06.980 --> 00:24:09.320
I move approval of ordinance 3104.

00:24:09.320 --> 00:24:10.320
Second.

00:24:10.320 --> 00:24:11.320
Motion on 4.

00:24:11.320 --> 00:24:16.320
Suzanne Hawkins seconded by Sean Berger to approve ordinance 3104.

00:24:16.320 --> 00:24:20.440
Anything further on that motion council?

00:24:20.440 --> 00:24:22.440
Sharon Rokhelbo please.

00:24:22.440 --> 00:24:23.440
Suzanne Hawkins?

00:24:23.440 --> 00:24:24.440
Yes.

00:24:24.440 --> 00:24:25.440
Sean Berger?

00:24:25.440 --> 00:24:26.440
Yes.

00:24:26.440 --> 00:24:27.440
Chris Tockington?

00:24:27.440 --> 00:24:28.440
Yes.

00:24:28.440 --> 00:24:29.440
Don Hall?

00:24:29.440 --> 00:24:30.440
Yes.

00:24:30.440 --> 00:24:31.440
Rebecca Mills-Sortka?

00:24:31.440 --> 00:24:32.440
Yes.

00:24:32.440 --> 00:24:33.440
Motion passes 5-0.

00:24:33.440 --> 00:24:36.440
Moving to the next item and they can do that all in one motion.

00:24:36.440 --> 00:24:42.770
Right, we're moving and individual.

00:24:42.770 --> 00:24:48.010
If it's fixed, doesn't it matter if you're a point, you can do it in one motion.

00:24:48.010 --> 00:24:51.770
I list about two separate acts that we're taking, there really are, but if-

00:24:51.770 --> 00:24:52.770
We can do it all.

00:24:52.770 --> 00:24:54.290
Both actions in one motion.

00:24:54.290 --> 00:24:55.290
Sean Berger.

00:24:55.290 --> 00:25:02.730
Mayor, I would move to remove all members of the Improvement Reimbursement Commission

00:25:02.730 --> 00:25:07.410
and to appoint the Development Impact Fee Advisory Committee to fulfill the duties of

00:25:07.410 --> 00:25:10.010
the Improvement Reimbursement Commission.

00:25:10.010 --> 00:25:15.370
second motion on the floor by Sean Berger seconded by Chris talking as stated

00:25:15.370 --> 00:25:19.210
anything further on that motion council Sharon

00:25:19.210 --> 00:25:23.290
will vote please. Sean Berger yes Chris talking to

00:25:23.290 --> 00:25:30.410
yes Don Hall Rebecca Mills like a yes Suzanne Hawkins yes

00:25:30.410 --> 00:25:34.890
motion passes 50 thanks Mitch moving on to the next item on the agenda is

00:25:34.890 --> 00:25:40.090
request to award a contract to ECS environmental solutions in the amount

00:25:40.090 --> 00:25:49.450
of $98,580 for a biotower system to be located on Canyon Springs Road adjacent to the Prine

00:25:49.450 --> 00:25:57.640
Cooling. We have Troy VTech with the City. Welcome Troy. Good afternoon Council. I'm Troy

00:25:57.640 --> 00:26:04.920
VTech Assistant City Engineer. I'm here tonight to ask that we award a contract to ECS in the

00:26:04.920 --> 00:26:12.200
amount of $98,500 for an odor control unit.

00:26:12.200 --> 00:26:17.280
This odor control unit is going to be located at the bottom of the Canyon Springs grade.

00:26:17.280 --> 00:26:18.800
This is the roadway here.

00:26:18.800 --> 00:26:22.440
This is the prank Cooley that comes through this portion of it, and it would be located

00:26:22.440 --> 00:26:25.920
immediately adjacent to the plant, prank Cooley.

00:26:25.920 --> 00:26:32.560
The reason being is that water, waste water travels down the grade there, it gets turned

00:26:32.560 --> 00:26:36.800
up pretty good, and there's a dissipation structure at the bottom that takes out the

00:26:36.800 --> 00:26:37.800
energy.

00:26:37.800 --> 00:26:42.600
They do and solar releases a lot of those gases, those gases off of it into the atmosphere

00:26:42.600 --> 00:26:49.800
here and that's pretty noticeable I guess, if you happen to walk the greater in the vicinity.

00:26:49.800 --> 00:26:57.120
So this unit actually sits directly adjacent to that large gray box and it will take those

00:26:57.120 --> 00:26:59.920
gases in and the cleaner air.

00:26:59.920 --> 00:27:06.760
It's not absolutely 100% efficient but it's above 90s, high 90s percent efficient for

00:27:06.760 --> 00:27:08.840
controlling of those odors.

00:27:08.840 --> 00:27:12.560
This contract before you tonight is for procurement

00:27:12.560 --> 00:27:15.360
of the equipment that would go in there.

00:27:15.360 --> 00:27:18.040
So I'll become a before you again in the future

00:27:18.040 --> 00:27:20.080
for the actual construction package

00:27:21.040 --> 00:27:22.480
in order to put it in.

00:27:22.480 --> 00:27:25.720
But this will be funded out of savings

00:27:25.720 --> 00:27:27.880
from the CH2 and HALE contract

00:27:27.880 --> 00:27:29.480
at the wastewater treatment plant

00:27:29.480 --> 00:27:33.240
and a little bit of reserves funded through there.

00:27:33.240 --> 00:27:36.400
So I'm here tonight to ask for approval

00:27:36.400 --> 00:27:38.200
and answer any questions.

00:27:38.200 --> 00:27:38.920
Thank you, Troy.

00:27:38.920 --> 00:27:40.360
Any questions for Troy?

00:27:40.360 --> 00:27:43.120
When might that be installed?

00:27:43.120 --> 00:27:43.620
I'll send.

00:27:43.600 --> 00:27:49.660
We would, you know, this is kind of up in the air.

00:27:49.660 --> 00:27:51.700
So the reason this got pushed off a little bit

00:27:51.700 --> 00:27:54.520
was because there was concerns about how the project was bid

00:27:54.520 --> 00:27:55.200
for this.

00:27:55.200 --> 00:27:58.200
And I was going to come to you several a month ago.

00:27:58.200 --> 00:27:58.960
That pushed it back.

00:27:58.960 --> 00:28:02.440
So it'll be into the winter construction.

00:28:02.440 --> 00:28:04.440
It'll be on before next year.

00:28:04.440 --> 00:28:07.840
Really, the odors start to come when the temperatures rise.

00:28:07.840 --> 00:28:10.400
So as we get to the end of this fall,

00:28:10.400 --> 00:28:13.780
as the temperatures go down, the odors are less.

00:28:14.680 --> 00:28:18.120
And so it will be up and running in the springtime.

00:28:18.120 --> 00:28:20.760
That is important because a lot of people use that,

00:28:20.760 --> 00:28:23.520
not only for golfing, but exercising on the grade.

00:28:23.520 --> 00:28:27.320
And it's pretty tough at time to get around there.

00:28:27.320 --> 00:28:31.320
So make sure it's next spring and not the spring after next.

00:28:31.320 --> 00:28:32.320
Sure.

00:28:32.320 --> 00:28:34.920
Sooner rather than later.

00:28:34.920 --> 00:28:35.760
Travis Roth?

00:28:35.760 --> 00:28:41.880
Yeah, just to add to what Troy was saying about the payment, the other half of the project

00:28:41.880 --> 00:28:44.880
is being funded with the Chibani project.

00:28:44.880 --> 00:28:51.000
And so this is a project that is being cost shared between the city and tax increment financing.

00:28:51.000 --> 00:28:54.440
And so half the funds will come from the city.

00:28:54.440 --> 00:28:59.640
The other half will be coming from Chibani to support this project.

00:28:59.640 --> 00:29:00.160
Excellent.

00:29:00.160 --> 00:29:01.960
Thank you, Travis.

00:29:01.960 --> 00:29:03.960
All right, direction from council.

00:29:03.960 --> 00:29:05.160
Chris talking.

00:29:05.160 --> 00:29:10.680
I would move to authorize a warding concrete to ECS environmental solutions in the amount

00:29:10.680 --> 00:29:16.640
of $98,580 for the biotower system.

00:29:16.640 --> 00:29:18.510
Second.

00:29:18.510 --> 00:29:21.750
I'm going to give it to Rebecca Mills-Soyka.

00:29:21.750 --> 00:29:25.910
It was almost a tie.

00:29:25.910 --> 00:29:30.070
So we have a motion on the floor by Chris talking and seconded by Rebecca Mills-Soyka.

00:29:30.070 --> 00:29:33.350
Anything further on the motion council?

00:29:33.350 --> 00:29:35.940
Chairman O'gill, please.

00:29:35.940 --> 00:29:36.940
Chris Tockington.

00:29:36.940 --> 00:29:37.940
Yes.

00:29:37.940 --> 00:29:38.940
Yes.

00:29:38.940 --> 00:29:39.940
Rebecca Mills-Sarca.

00:29:39.940 --> 00:29:40.940
Yes.

00:29:40.940 --> 00:29:41.940
Suzanne Hawkins.

00:29:41.940 --> 00:29:42.940
Yes.

00:29:42.940 --> 00:29:43.940
Sean Bericher.

00:29:43.940 --> 00:29:44.940
Yes.

00:29:44.940 --> 00:29:46.940
Motion passes by zero.

00:29:46.940 --> 00:29:48.940
Thank you, Troy.

00:29:48.940 --> 00:29:55.940
Next item on the agenda is presentation of an update of the wastewater treatment plant construction.

00:29:55.940 --> 00:29:59.940
And up to the stage is Troy Vtec again.

00:29:59.940 --> 00:30:02.420
Thank you.

00:30:02.420 --> 00:30:04.420
This is a really exciting project.

00:30:04.420 --> 00:30:16.380
It has changed dramatically since it's conception and I will show you some pictures.

00:30:16.380 --> 00:30:19.980
So I mean this is engineers love this stuff.

00:30:19.980 --> 00:30:23.700
I'm going down there and I'm looking at concrete and it's actually being constructed.

00:30:23.700 --> 00:30:27.300
And I really love it because the contractor has been fantastic to work with.

00:30:27.300 --> 00:30:32.500
They are on schedule and under budget and that is hard to say sometimes.

00:30:32.500 --> 00:30:38.020
There's been things that come up and they are really forthright and very open and they kind

00:30:38.020 --> 00:30:43.140
have an open book and they work with CH2 panel was also doing a fantastic job down there representing

00:30:43.140 --> 00:30:47.940
us as our construction management team on the project. So we have somebody there full time,

00:30:47.940 --> 00:30:50.660
maybe we'll answer those immediate questions that they have.

00:30:50.660 --> 00:30:56.020
That's not knife forever, isn't it? This is not knife forever. This is our SCIA out of Boise.

00:30:56.020 --> 00:30:56.520
Okay.

00:30:56.340 --> 00:31:00.020
Still construction. And I forever is at the top of the grade with the sewer,

00:31:00.740 --> 00:31:06.800
this currently under construction. So they, if you, I'll describe this picture here,

00:31:06.800 --> 00:31:12.840
This is the new clarifier that's going in right at the bottom of the screen would be the fence that delineates the

00:31:13.640 --> 00:31:19.180
waste water treatment plant from the golf course and then Kenish Springs grade would be up here so you're looking kind of

00:31:19.180 --> 00:31:20.440
Westerly

00:31:20.440 --> 00:31:21.720
This large

00:31:21.720 --> 00:31:24.720
Round structure here is where the clarifier comes in and that's

00:31:25.240 --> 00:31:28.960
Waste water comes up in the middle and it kind of goes to the outside and actually

00:31:29.600 --> 00:31:33.280
Dumps over a wall and they're building the secret wall right here

00:31:33.280 --> 00:31:37.660
This has to be constructed and then in between here there's a building being

00:31:37.660 --> 00:31:42.220
constructed that pumps that that raw sewage back up to the start of the treatment plant

00:31:42.220 --> 00:31:45.940
that goes around in a circle several times before it actually gets over to that

00:31:45.940 --> 00:31:57.780
digester. So that's that picture and this one is a little harder to see. This is the

00:31:57.780 --> 00:32:03.480
actually IFS basins. So this is the large concrete basins that are in these pipes

00:32:03.480 --> 00:32:10.020
your air blowers to aerate it and this white bag here is actually dumping little

00:32:10.020 --> 00:32:16.240
pasta wheels where the bacteria will grow and develop into the basin. So they

00:32:16.240 --> 00:32:21.520
have put half the bags in and they will put half the other, the main half in here

00:32:21.520 --> 00:32:26.040
pre-soo. And so this is actually up and running and it is currently being operated

00:32:26.040 --> 00:32:30.960
and we can accept 13 million gallons a day of flow through there today. So I met

00:32:30.960 --> 00:32:34.840
the schedule. There's little minor things that are happening like the hand rails

00:32:34.840 --> 00:32:40.080
here. The supplier of the hand rails didn't really come through for them so

00:32:40.080 --> 00:32:44.320
they made immediate revisions to it. Got to a new supplier but that still takes

00:32:44.320 --> 00:32:47.800
a little bit of time to the guy. In fact today if you went down there I would

00:32:47.800 --> 00:32:52.040
imagine they're all installed today but they work with CH2P, Sean's team down

00:32:52.040 --> 00:32:57.000
there to make sure that the place is safe for them to operate it. It doesn't

00:32:57.000 --> 00:33:01.580
The look is pretty with what hand-routs, but they've since fixed it, so it's operating

00:33:01.580 --> 00:33:04.000
and it's going really good.

00:33:04.000 --> 00:33:19.050
So, there's a little bit about contractor billings of the 18 million, 620,000 currently

00:33:19.050 --> 00:33:20.050
obligated.

00:33:20.050 --> 00:33:27.920
We build 13.2 million with the remainder of 5.3 million left to pay the contractor change

00:33:27.920 --> 00:33:31.080
orders or 657,000.

00:33:31.080 --> 00:33:33.640
There are a large portion of those I came before you before.

00:33:33.640 --> 00:33:40.080
A lot of that was a pipeline that we put in and I think that's really beneficial in that

00:33:40.080 --> 00:33:45.080
it will get us a fire hydrant right near the plant entrance and if we ever have another

00:33:45.080 --> 00:33:49.480
auger falls we're also putting in a kind of a cul-de-sac it should really help with the

00:33:49.480 --> 00:33:53.840
fire support down there and I saw there was kind of one at the golf course on the other

00:33:53.840 --> 00:33:59.680
end today so we can help we get with fires down there the better and then the other portion

00:33:59.680 --> 00:34:04.460
of that large number came from repaving a little bit more than what we originally anticipated

00:34:04.460 --> 00:34:06.480
paving.

00:34:06.480 --> 00:34:12.280
We went, we didn't minimum because we didn't know how large a project was and we wanted

00:34:12.280 --> 00:34:15.120
to make sure we can get this thing built.

00:34:15.120 --> 00:34:19.120
And when we saw we've got such a good deal, we expanded the work a little bit.

00:34:19.120 --> 00:34:21.120
And so that's that other major change order.

00:34:21.120 --> 00:34:30.380
There's some minor ones in there, some safety type stuff that we've done throughout there.

00:34:30.380 --> 00:34:44.100
We have a few changes as far as potential change orders and this graph here kind of shows

00:34:44.100 --> 00:34:46.080
how much we've expended.

00:34:46.080 --> 00:34:52.910
So if you look at the bar side, look to the right for the legend.

00:34:52.910 --> 00:34:55.690
So this one here shows about three and a half million.

00:34:55.690 --> 00:34:57.410
This is your monthly billings.

00:34:57.410 --> 00:35:02.770
So as we've kind of peaked and now we're starting to go down as we've completed the phase one.

00:35:02.770 --> 00:35:07.450
And then the line diagram is the total of all the bars that you look to the left side

00:35:07.450 --> 00:35:09.010
to look at that.

00:35:09.010 --> 00:35:16.730
So the 18.6 million will be at the end of the project and that kind of sums it up.

00:35:16.730 --> 00:35:17.730
Chris talking to?

00:35:17.730 --> 00:35:23.210
What about the reconfiguration of the air blower system or the change order for that?

00:35:23.210 --> 00:35:28.530
Will that have any downstream impact on completion time or budget?

00:35:28.530 --> 00:35:30.730
Of the air blower system?

00:35:30.730 --> 00:35:35.090
Testing of the air blower system didn't meet performance requirements for low flow rates.

00:35:35.090 --> 00:35:38.770
So that's why one train is currently up and running.

00:35:38.770 --> 00:35:41.730
We should have two trains.

00:35:41.730 --> 00:35:45.170
So there's two portions of the IFAS unit left and the right.

00:35:45.170 --> 00:35:46.170
We're on the right side.

00:35:46.170 --> 00:35:50.290
The right side can make the 12, 13 million gallons today.

00:35:50.290 --> 00:35:56.370
What happened was you can pump air into this thing, work great at high flows.

00:35:56.370 --> 00:35:59.730
When you get to the end, it's very, very efficient.

00:35:59.730 --> 00:36:04.650
if you want to turn it down and treat six million gallons a day or seven

00:36:04.650 --> 00:36:07.890
million gallons a day, our average today, you're over aerating.

00:36:08.330 --> 00:36:13.170
When you get down to low volumes there, it doesn't get as quite as natural mixing

00:36:13.330 --> 00:36:19.370
as necessary. So they, they've come up with a process to fix that and they will,

00:36:19.610 --> 00:36:23.570
they will fix it on the left side and the right side. So this won't fix schedule.

00:36:23.930 --> 00:36:26.450
It won't affect our cost. They'll be done.

00:36:26.610 --> 00:36:27.110
Thank you.

00:36:26.970 --> 00:36:40.350
So, these two graphs are RFIs and submittals, the RFIs are requests for information, so

00:36:40.350 --> 00:36:44.150
if the contractor is going along, see something, he asks a question about it, he wants to be

00:36:44.150 --> 00:36:46.150
sure he's doing it right.

00:36:46.150 --> 00:36:52.630
You can look here, you're the hundreds of RFIs that they've, and then the submittals,

00:36:52.630 --> 00:36:57.750
every, every, every bowl, every piece of metal concrete out there, they have to submit

00:36:57.750 --> 00:37:00.510
on and say, this is what we plan to do, this is right.

00:37:00.510 --> 00:37:04.230
And that's what the submittal portion is, and you see that's up over 400.

00:37:04.230 --> 00:37:06.910
So I wanted to give a lot of credit to CH2 Family.

00:37:06.910 --> 00:37:10.790
They've done a really good job of being a construction manager on this, and this is a large time

00:37:10.790 --> 00:37:14.190
consuming project, which is why it's such a large value.

00:37:14.190 --> 00:37:17.990
If you guys have any other questions, I'd be happy to answer them.

00:37:17.990 --> 00:37:22.630
So when you say CH is the construction manager, did they hire someone and bring a man, or is

00:37:22.630 --> 00:37:25.470
it part of their regular staff that they have, you know?

00:37:25.470 --> 00:37:26.470
They have two different sides.

00:37:26.470 --> 00:37:30.150
They have the engineering site, which did the design of it, and then they have the construction

00:37:30.150 --> 00:37:34.350
management site so it's a different division within the same company. They have

00:37:34.350 --> 00:37:39.030
construction managers that go from site to site to site out there. Our original one

00:37:39.030 --> 00:37:42.870
got a different job. The one that started the project I should say got a different

00:37:42.870 --> 00:37:46.310
job with the college out of working to move back home and be really kind of

00:37:46.310 --> 00:37:50.630
local but the project manager out there right now is doing a fantastic job so

00:37:50.630 --> 00:37:55.810
we do something updated daily. Do we have any other questions for Troy? Suzanne

00:37:55.810 --> 00:38:01.330
Hawkins. So we missed our opportunity to go down and have our tour are we going to reschedule?

00:38:03.250 --> 00:38:08.290
We are. We wanted to make sure that all members of the council were present and then also we also

00:38:08.850 --> 00:38:12.850
when we were thinking about the tour we are a little bit premature. One of the things we didn't

00:38:12.850 --> 00:38:18.690
want to do is have a lot of individuals walking through an active construction site and so we are

00:38:18.690 --> 00:38:25.910
looking, I believe, at the 21st of September, as the date that we will go down and have

00:38:25.910 --> 00:38:32.510
that penciled. We believe it's going to be a good opportunity. Most of the work will be

00:38:32.510 --> 00:38:37.990
at a state where we can really kind of walk around and see as opposed to being in an active

00:38:37.990 --> 00:38:38.990
construction zone.

00:38:38.990 --> 00:38:43.510
Thank you, trans. Thank you, Suzanne. Anything further?

00:38:43.510 --> 00:38:49.910
I would like to add one-on portion to it. So I came before you guys a while back and asked

00:38:49.910 --> 00:38:54.450
for your permission to go ahead with the headworks design.

00:38:54.450 --> 00:38:55.490
So they've done that.

00:38:55.490 --> 00:38:59.590
And we are now at 90% designed, 60% cost estimate.

00:39:01.670 --> 00:39:03.210
It's looking pretty good.

00:39:03.210 --> 00:39:05.170
I'm really thinking that we're gonna be able

00:39:05.170 --> 00:39:06.610
to go forward with that.

00:39:06.610 --> 00:39:10.130
And that is the next remaining factor

00:39:10.130 --> 00:39:11.410
of the wastewater treatment plant.

00:39:11.410 --> 00:39:15.170
So after that, we can increase the yet again.

00:39:15.170 --> 00:39:20.320
I think it goes up to 18 million gallons.

00:39:20.320 --> 00:39:21.800
20 million gallons, if that was correct.

00:39:21.800 --> 00:39:24.020
I mean, it's head of ours, it's like that.

00:39:24.020 --> 00:39:25.160
He's a numbers guy.

00:39:25.160 --> 00:39:26.120
Yes, he is.

00:39:26.120 --> 00:39:28.460
I don't argue with numbers.

00:39:28.460 --> 00:39:30.360
So it is looking good.

00:39:30.360 --> 00:39:31.880
If we proceed that direction, of course,

00:39:31.880 --> 00:39:34.360
it will come before you and recommend

00:39:34.360 --> 00:39:35.600
that we proceed with that.

00:39:35.600 --> 00:39:38.800
Once we get to the actual final cost estimate,

00:39:38.800 --> 00:39:41.280
I believe the plan is to work with RSCI

00:39:41.280 --> 00:39:44.840
and continue that development with them.

00:39:44.840 --> 00:39:47.240
And I would highly recommend that we go forward

00:39:47.240 --> 00:39:48.800
with them as a possibility.

00:39:48.800 --> 00:39:50.760
Just for folks in the audience at home,

00:39:50.760 --> 00:39:52.920
Tell us about headworks, what does that mean?

00:39:52.920 --> 00:39:55.240
So the headworks is where the first wastewater

00:39:55.240 --> 00:39:57.200
energy treatment plant, it takes out

00:39:58.280 --> 00:40:00.960
essentially the recognizables that get flushed down the toilet.

00:40:00.960 --> 00:40:03.680
It's really a lot of its gravels and grids

00:40:03.680 --> 00:40:05.360
that come in through the sewer.

00:40:05.360 --> 00:40:08.200
It gets a malo system because you can't treat gravel.

00:40:08.200 --> 00:40:10.960
Just get them out right away, take it to the landfill site.

00:40:10.960 --> 00:40:14.920
The rest of the mostly liquids go through the system

00:40:14.920 --> 00:40:17.200
and get degraded and taken care of.

00:40:17.200 --> 00:40:20.760
So it is our next limiting factor that we had works.

00:40:20.760 --> 00:40:23.120
So again, it's a large project.

00:40:24.160 --> 00:40:27.760
After that, you just add an immediate to the IFAS units.

00:40:27.760 --> 00:40:30.920
So a lot of bang for the buck that you're thinking,

00:40:30.920 --> 00:40:32.560
but that'll be coming to us later.

00:40:32.560 --> 00:40:33.400
Yep.

00:40:33.400 --> 00:40:35.840
Thanks for being actually solidified those numbers.

00:40:35.840 --> 00:40:37.120
You just want to give your heads up.

00:40:37.120 --> 00:40:39.420
That's looking pretty good right now.

00:40:39.420 --> 00:40:40.420
Well, this is great news.

00:40:40.420 --> 00:40:42.420
Try, thank you for your presentation.

00:40:42.420 --> 00:40:44.820
And you know, engineers get excited

00:40:44.820 --> 00:40:46.780
about some kind of stuff.

00:40:46.780 --> 00:40:47.620
Not hard.

00:40:47.620 --> 00:40:54.540
That's awesome. Thank you, sir, Troy. Just one and celery question. You mentioned 90% design 60% cost

00:40:54.540 --> 00:40:57.340
There's no relationship to the two really

00:40:58.020 --> 00:41:03.300
You know they kind of they're moving so fast on the design because they want to get it in before the contractor

00:41:03.820 --> 00:41:07.820
Devoves goes home and then they have to get a new one in and do the obitying process over

00:41:07.820 --> 00:41:15.700
So they do design fast and once they have the design out there then they send it to the estimators and then estimators look in the count number of bolts

00:41:15.700 --> 00:41:19.140
And so it's usually always lags with

00:41:19.700 --> 00:41:22.500
You'd want the design to lead the cost I would hope

00:41:26.580 --> 00:41:28.580
Thank you

00:41:29.610 --> 00:41:36.010
Item number seven presentation of the city managers recommended budget for fiscal year 2016

00:41:36.410 --> 00:41:41.850
Followed by as always citizen input our city manager Travis Roth whether welcome Travis

00:42:11.560 --> 00:42:13.450
So good evening

00:42:13.450 --> 00:42:19.410
Mr. Mayor, members of the council, so tonight really is the last of the dissection of the

00:42:19.410 --> 00:42:22.810
budget that we've really had that conversation about.

00:42:22.810 --> 00:42:29.410
And over the course of the last several months, we started with a presentation from our long-term

00:42:29.410 --> 00:42:30.410
planning group.

00:42:30.410 --> 00:42:35.610
And the presentation from the long-term planning group then caused a whole series of collections

00:42:35.610 --> 00:42:39.130
and recommendations and overall strategies for the budget.

00:42:39.130 --> 00:42:46.090
And then from that piece we considered opportunities and blended those together, had a series

00:42:46.090 --> 00:42:52.010
of check back in sessions and then since the beginning of July we've been having conversations

00:42:52.010 --> 00:42:56.770
about the budget where we started very globally and now we've connected down into our strategic

00:42:56.770 --> 00:43:01.290
plan and tonight is the last of the strategic plan connections tonight we're going to focus

00:43:01.290 --> 00:43:05.290
on prosperous community.

00:43:05.290 --> 00:43:09.770
Like we started all of our conversations we wanted to do a side by side comparison because

00:43:09.770 --> 00:43:15.690
Obviously, how this budget impacts individuals, personal financial situations is important.

00:43:15.690 --> 00:43:18.090
And so we want to have that conversation.

00:43:18.090 --> 00:43:26.610
And as we continue to refine and move forward with the budget, there are some additional numbers that I wanted to share with you.

00:43:26.610 --> 00:43:32.570
One of the things you'll notice is that there is a difference, and especially for those who have been following along,

00:43:32.570 --> 00:43:38.810
There's a difference in the overall sanitation and recycling bill from PSI that's presented

00:43:38.810 --> 00:43:40.050
in this budget.

00:43:40.050 --> 00:43:45.770
When we started this process, we started with a 2% increase, recognizing that that would

00:43:45.770 --> 00:43:50.730
be probably about as high as we thought that it would come in.

00:43:50.730 --> 00:43:55.370
Over the course of the last several weeks and conversations with PSI, that rate, proposed

00:43:55.370 --> 00:43:59.610
rate increase is 8-10th of 1%, less than the 2%.

00:43:59.610 --> 00:44:05.050
So that caused an additional reduction in the sanitation rate that is being passed on.

00:44:05.050 --> 00:44:10.890
And so you'll notice that the sanitation recycling rate pay for by our residents will

00:44:10.890 --> 00:44:16.770
decrease by 66 cents in comparison to the rate that they're currently paying.

00:44:16.770 --> 00:44:21.770
In addition to that, and as we've communicated, there are no increases for water or sewer

00:44:21.770 --> 00:44:24.930
recommended in this budget.

00:44:24.930 --> 00:44:29.530
And then when it comes to taxes, obviously, what we're looking here is the average in

00:44:29.530 --> 00:44:34.250
individual and the average household and based upon the best information that we have right

00:44:34.250 --> 00:44:43.690
now, we believe that the tax rate is going to be in a range of $7.67, the $7.72 per $1,000

00:44:43.690 --> 00:44:53.170
of taxable value, which would cause either a $0.77 decrease or a $2.83 annual increase

00:44:53.170 --> 00:44:56.330
in the total property taxes paid by that individual.

00:44:56.330 --> 00:45:02.290
So in total, we estimate that the average citizen in Flint Falls would see a overall reduction

00:45:02.290 --> 00:45:10.410
in their taxes and utility bills paid, ranging from 72 cents per month to 42 cents per month.

00:45:10.410 --> 00:45:15.450
And so when we look at that comparison and we compare that to the municipal cost index

00:45:15.450 --> 00:45:24.260
of 1.28% that we've used this year, we are very comfortable with this budget moving forward.

00:45:24.260 --> 00:45:30.700
The seven primary focus areas that I talked about earlier are listed up above and the one

00:45:30.700 --> 00:45:37.940
that we really spent that time on is implementing the 2013 strategic plans, goals, and objectives.

00:45:37.940 --> 00:45:44.740
Obviously, we wanted to make sure that we are limiting and being very sensitive and sustainable

00:45:44.740 --> 00:45:47.060
when it came to tax rate increases.

00:45:47.060 --> 00:45:51.820
We wanted to make sure that we are appropriating all of the new gas tax money directly into

00:45:51.820 --> 00:45:54.020
the street fund and we've done that.

00:45:54.020 --> 00:45:57.540
We want to continue to invest in our employees.

00:45:57.540 --> 00:46:02.340
This budget provides a 3% performance increase, moves the table half a percent, and provides

00:46:02.340 --> 00:46:05.740
funding for health insurance adjustments.

00:46:05.740 --> 00:46:10.820
It continues to invest in our infrastructure, and we've spent talking about what that looks

00:46:10.820 --> 00:46:13.060
like over the last several weeks.

00:46:13.060 --> 00:46:18.300
We want to continue to pursue innovative strategies and more effective outcomes, and really part

00:46:18.300 --> 00:46:22.180
of that one city that we've been talking about, we've been showcasing and highlighting

00:46:22.180 --> 00:46:24.880
some of those as we've gone out throughout the year.

00:46:24.880 --> 00:46:28.040
And in the upcoming weeks, we're going to have a presentation

00:46:28.040 --> 00:46:31.400
about City Works, which is another one of those blending all

00:46:31.400 --> 00:46:34.640
the department togethers that's going to be really exciting.

00:46:34.640 --> 00:46:39.160
We're looking at having that the first week in September.

00:46:39.160 --> 00:46:42.040
And then we want to continue to evaluate our service delivery

00:46:42.040 --> 00:46:44.280
methods, and we're continuing to do that.

00:46:44.280 --> 00:46:46.800
So those were the seven drivers of the budget.

00:46:46.800 --> 00:46:48.920
And when we're looking, we want to make sure

00:46:48.920 --> 00:46:51.920
that we talk about property taxes, because that's really

00:46:51.920 --> 00:47:01.640
Itahoe code allows each local tax entity to collect an additional 3% revenue every year than it did in the prior year.

00:47:02.840 --> 00:47:12.000
The City of Twin Falls this year is not taking the 3%, and by not taking the 3%, we will add to the city's foregone balance.

00:47:12.000 --> 00:47:17.880
We expect the city's foregone balance to grow to nearly $2.15 million.

00:47:17.880 --> 00:47:24.120
That translates into a real savings of property taxes to our citizens.

00:47:24.120 --> 00:47:29.800
Had we taken the 3% each and every single year, that would be additional monies that would come

00:47:29.800 --> 00:47:34.040
into the system and then that would be paid more by our residents.

00:47:34.040 --> 00:47:39.800
You're looking at somewhere between about a 12.5% increase in city property taxes on an

00:47:39.800 --> 00:47:44.770
annual basis had that foregone balance been incorporated.

00:47:44.770 --> 00:47:49.730
By taking the one and a half percent plus the growth, we believe that this budget is very

00:47:49.730 --> 00:47:53.320
sustainable moving forward.

00:47:53.320 --> 00:47:57.360
This is the side-by-side comparison that we've kind of been going through, and again, we're

00:47:57.360 --> 00:48:02.440
estimating that tax rate to be slightly lower than or equal to this year.

00:48:02.440 --> 00:48:08.840
So when you look at implementing the strategic plan, one of the foundations of what we want

00:48:08.840 --> 00:48:13.800
to move forward with, we've said since the creation of the strategic plan that we wanted this

00:48:13.800 --> 00:48:19.400
to be the cornerstone and the guiding document of things that we move forward with.

00:48:19.400 --> 00:48:22.920
And over the course of the last few weeks, we really wanted to illustrate how we're moving

00:48:22.920 --> 00:48:23.920
that forward.

00:48:23.920 --> 00:48:30.760
And again, tonight, the conversation that we wanted to focus on is the prosperous community

00:48:30.760 --> 00:48:31.760
section.

00:48:31.760 --> 00:48:34.480
This slide kind of outlines its connection.

00:48:34.480 --> 00:48:39.080
But really most important thing about this is maybe two points.

00:48:39.080 --> 00:48:46.160
The first is this strategic plan was crafted in concert with our citizens.

00:48:46.160 --> 00:48:51.280
The voices of the citizens really helped move this forward and really created the goals and

00:48:51.280 --> 00:48:54.600
objectives that we're considering and funding and moving forward.

00:48:54.600 --> 00:48:59.880
The second piece is this is a plan that continues to evolve and grow over time.

00:48:59.880 --> 00:49:05.920
And there's funding in this budget to continue and support an adjustment and an update to

00:49:05.920 --> 00:49:12.360
the plan to again get additional citizen engagement, encourage them to participate, and we anticipate

00:49:12.360 --> 00:49:17.360
doing that in February of next year starting that process.

00:49:17.360 --> 00:49:23.560
In conjunction, we will also be doing a citizen survey, and we will start the strategic planning

00:49:23.560 --> 00:49:28.460
process after we have the result of those surveys available.

00:49:28.460 --> 00:49:38.450
Those are the eight primary focus areas, and that is a combination of what that looks like.

00:49:38.450 --> 00:49:46.240
trying to achieve the overall vision, and tonight is Focus Area 6. Focus Area 6 talks

00:49:46.240 --> 00:49:52.040
about what it takes to be a prosperous community, and it does have a strong focus on the areas

00:49:52.040 --> 00:49:59.840
of economic development. What was also important is the thought of placemaking and the continued

00:49:59.840 --> 00:50:06.040
investment in infrastructure. As we experience throughout most of the recruitment that you

00:50:06.040 --> 00:50:13.000
You have to have a very strong business package, but at the end of the day, it's quality of

00:50:13.000 --> 00:50:16.360
place that individuals are really looking at moving forward.

00:50:16.360 --> 00:50:21.040
And what's interesting is, and I think Brian shared last week when he did his presentation

00:50:21.040 --> 00:50:26.440
on secure community and the part of how it's all intertwined, a prosperous community is really

00:50:26.440 --> 00:50:29.880
intertwined to all of those same areas as well.

00:50:29.880 --> 00:50:35.040
Because you're not going to be prosperous unless you are safe, unless you're secure, unless you're

00:50:35.040 --> 00:50:40.560
And that's why on that previous slide, it really illustrated all of those strategic planning

00:50:40.560 --> 00:50:48.240
goals, objectives, flundling and creating one overall vision.

00:50:48.240 --> 00:50:52.540
So in the prosperous community section, we've talked about the planter being an important

00:50:52.540 --> 00:50:56.940
part of this, and we really spent that time in that area number one.

00:50:56.940 --> 00:51:02.700
But part of the connection of the planter is making sure that we have the best updated

00:51:02.700 --> 00:51:08.540
land use practices, policies to be able to assist and advance our local economy.

00:51:08.540 --> 00:51:13.400
And then we also have some capital projects whether that be aerial mapping, airport utility

00:51:13.400 --> 00:51:19.540
planning projects as well as strategic planning projects out of the airport.

00:51:19.540 --> 00:51:23.640
In combination they really do help set the stage for planning and it also does help us

00:51:23.640 --> 00:51:29.780
kind of move the organization forward to create new opportunities and new lands and maybe even

00:51:29.780 --> 00:51:35.780
take advantage of the airport as an economic development site, and this plan is part of that

00:51:35.780 --> 00:51:37.390
process.

00:51:37.390 --> 00:51:43.510
The other factor in creating a prosperous community is really having those other critical infrastructure

00:51:43.510 --> 00:51:47.150
components and also creating those cool places.

00:51:47.150 --> 00:51:52.310
Because one of the things that we are finding is as individuals in the past would move to

00:51:52.310 --> 00:51:59.310
communities for jobs, which is still partly true, we're finding that young entrepreneurs

00:51:59.310 --> 00:52:03.750
and business folks are moving to communities, they're bringing their collection of dreams

00:52:03.750 --> 00:52:09.070
and skill sets with them, they are opening up shops and communities that can support their

00:52:09.070 --> 00:52:10.970
way of life.

00:52:10.970 --> 00:52:18.590
So they're actually moving and choosing place over quality place, over geographic location.

00:52:18.590 --> 00:52:22.790
And in order for us to continue to build our workforce, to continue to ensure that we have

00:52:22.790 --> 00:52:28.790
the workers to be able to support and advance the economic successes that we've had, the

00:52:28.790 --> 00:52:37.510
investment is really important. Also in that works is the development of a City Hall complex.

00:52:38.630 --> 00:52:46.870
And it's tied to this because the downtown City Hall is going to be one of the primary anchors

00:52:46.870 --> 00:52:51.750
in the downtown core. And we're really, really excited about that project and over the course

00:52:51.750 --> 00:52:56.950
of the last two city fairs. We've had lots of great community engagement about what that

00:52:56.950 --> 00:53:02.470
project is going to be and what that looks like. In addition, being a safe and secure community

00:53:02.470 --> 00:53:07.150
is renovating the current city hall as well as police station to ensure that they have the

00:53:07.150 --> 00:53:13.260
operation space to be able to move forward. And then certainly, part of that is the main

00:53:13.260 --> 00:53:18.540
street downtown project that is being funded in partnership with the urban renewal agency

00:53:18.540 --> 00:53:23.700
and we're anticipating as Melinda and Mandy from OTEC shared construction to begin on that

00:53:23.700 --> 00:53:26.080
in 2016.

00:53:26.080 --> 00:53:29.920
Travis, do you remember the 8 million for the City Hall

00:53:29.920 --> 00:53:33.640
and the police department about what the breakdown is for each?

00:53:33.640 --> 00:53:36.840
It's, so there's three components.

00:53:36.840 --> 00:53:45.040
It's about $4.6 million for the City Hall remodel project.

00:53:45.040 --> 00:53:50.880
There's about $700,000, $710,000 for the remodel of the existing City Hall

00:53:50.880 --> 00:53:57.600
to be turned into a command center and then about 2.4 million I believe is the balance to

00:53:57.600 --> 00:54:03.240
be used to renovate the police department into an operation center and secure the lot.

00:54:03.240 --> 00:54:08.600
Okay.

00:54:08.600 --> 00:54:13.640
And then here's the final slide, again, the slide that we shared in the very beginning.

00:54:13.640 --> 00:54:19.200
What I do want to talk about in the area of economic development is we're about to go under

00:54:19.200 --> 00:54:27.400
a time of change in the area of economic development and as it has been announced, Jan Rogers is

00:54:27.400 --> 00:54:33.520
going to be leaving her current position with CEDU and she has accepted another role and

00:54:33.520 --> 00:54:39.020
it's important to recognize that economic development and prosperous community is really

00:54:39.020 --> 00:54:45.020
not only driven by the city of Twin Falls but it's also it's advanced by its partners.

00:54:45.020 --> 00:54:50.180
advanced by the chamber, it's advanced by CDU, it's advanced by business plus, it's advanced

00:54:50.180 --> 00:54:54.780
by the county, it's advanced by all the members who really take a great interest in promoting

00:54:54.780 --> 00:54:56.940
our local economy.

00:54:56.940 --> 00:55:01.580
And so what is going to be important as we continue to move forward as CDU continues

00:55:01.580 --> 00:55:07.180
to look for its next director and as that program continues to evolve that we do take

00:55:07.180 --> 00:55:13.140
the opportunities and the steps in this upcoming year to really take a look at economic development

00:55:13.140 --> 00:55:19.820
inside the city of Twin Falls and ask how we can advance in moving our own organization

00:55:19.820 --> 00:55:20.820
forward.

00:55:20.820 --> 00:55:25.460
So look at that as part of that internal workings really to move forward.

00:55:25.460 --> 00:55:30.540
Melinda during the budget and long term planning process had requested an additional staff

00:55:30.540 --> 00:55:35.760
person and in those conversations we really felt that there was more work that needed to

00:55:35.760 --> 00:55:39.780
be done in defining what that position looked like.

00:55:39.780 --> 00:55:43.820
whether that be through marketing, through business retention, and so we did hear it.

00:55:43.820 --> 00:55:48.460
We recognize that some members of the council did request that position to be included or

00:55:48.460 --> 00:55:50.420
to look at that.

00:55:50.420 --> 00:55:55.980
We just felt that it would be better for us to kind of work and see what economic development

00:55:55.980 --> 00:56:01.260
looks like in the long term for us and build a sustainable platform to advance and move

00:56:01.260 --> 00:56:02.610
forward.

00:56:02.610 --> 00:56:06.850
So, again, we're looking that this budget is actually going to decrease the cost of the

00:56:06.850 --> 00:56:13.490
average resident by 72 cents to 42 cents a month and with that we'll stand for any

00:56:13.490 --> 00:56:18.330
questions. Chris talking. Looking at the big picture concerning the internal

00:56:18.330 --> 00:56:24.050
organization component what is the latest on our change in hospitalization

00:56:24.050 --> 00:56:30.930
medical to a different organization in the anticipated cost increase. So as we've

00:56:30.930 --> 00:56:34.130
continued to look at health insurance we've had the conversation about what

00:56:34.130 --> 00:56:38.810
does that look like? In Focus Area 8, we wanted to make sure that we're providing the health

00:56:38.810 --> 00:56:43.350
insurance for our employees. We talked about that and thanks for the question. We're looking

00:56:43.350 --> 00:56:50.750
right now at probably moving to a different carrier. We're still in those negotiations,

00:56:50.750 --> 00:56:55.950
but it's looking likely and we will continue to dot our eyes and cross our T's. The increase

00:56:55.950 --> 00:57:02.190
would be about 9. I think it's under just under 10%. I want to say 9.6, but it would

00:57:02.190 --> 00:57:09.190
to be 9.8, but it's just under 10% where the other potential increases were significantly

00:57:10.710 --> 00:57:15.390
more than that. And so we want to make sure that the insurance is sustainable for the long

00:57:15.390 --> 00:57:21.190
term as we continue to investigate that. And prior to making a decision, we'll communicate

00:57:21.190 --> 00:57:22.190
that with you.

00:57:22.190 --> 00:57:25.630
Thank you. Thank you. We're back in Melsoica.

00:57:25.630 --> 00:57:30.310
Thank you, Mayor. Thank you, Travis. I've been following along at home with a newborn on

00:57:30.310 --> 00:57:35.950
my lap so that's been fun but I appreciate the opportunity to rejoin you guys on the budget

00:57:35.950 --> 00:57:43.070
discussion. Two questions that I had that I mentioned at the beginning of the process was

00:57:43.070 --> 00:57:47.790
one how do we move forward concerning our sidewalk improvements. We've heard a lot of feedback

00:57:47.790 --> 00:57:54.390
from the community on that and I believe it's our desire to create a resident incentive

00:57:54.390 --> 00:58:00.270
program or some sort of program to help encourage people to take responsibility and do those

00:58:00.270 --> 00:58:08.390
improvements that per city code are their responsibility, but of course we'll need some funding for that.

00:58:08.390 --> 00:58:12.710
And then the second question I had was regarding a disc golf course.

00:58:12.710 --> 00:58:21.550
We had a group come speak to the council and they also were involved in the Parks and Rec plan update.

00:58:21.550 --> 00:58:27.990
And they're looking for potential location for an additional disc golf course.

00:58:27.990 --> 00:58:31.790
So, I was wondering if we could have some funding available,

00:58:31.790 --> 00:58:34.110
should that opportunity arise?

00:58:34.110 --> 00:58:38.310
I just didn't want funding to be a stumbling block

00:58:38.310 --> 00:58:41.070
in order to move forward for that disc golf course,

00:58:41.070 --> 00:58:44.030
because of course, you know, with the dog park

00:58:44.030 --> 00:58:47.310
and our other opportunities that we've been increasing

00:58:47.310 --> 00:58:52.310
for recreation, it's a objective HC1.1F

00:58:54.030 --> 00:58:56.510
that encourages us to respond to public interest

00:58:56.510 --> 00:59:00.030
in emerging healthy lifestyle activities.

00:59:00.030 --> 00:59:03.550
And so those are just the two questions that I had.

00:59:03.550 --> 00:59:05.270
Great, and so when it comes to the sidewalks,

00:59:05.270 --> 00:59:07.590
I'll answer that one first.

00:59:07.590 --> 00:59:12.590
Inside the budget, we have $50,000 in total funds allocated

00:59:12.590 --> 00:59:14.110
towards ADA improvements.

00:59:14.110 --> 00:59:16.310
Often times we'll think of that as being curbs

00:59:16.310 --> 00:59:20.190
and gutters and sidewalks, but it's all ADA improvements.

00:59:20.190 --> 00:59:23.310
Inside the street fund, and we have an additional $25,000

00:59:23.310 --> 00:59:27.190
for ADA improvements in the water fund.

00:59:27.190 --> 00:59:30.230
And so as we make those improvements in streets

00:59:30.230 --> 00:59:32.030
and as they cross, we want to make sure

00:59:32.030 --> 00:59:34.350
that we're making those necessary improvements.

00:59:34.350 --> 00:59:37.710
In addition to that, we believe that a portion

00:59:37.710 --> 00:59:42.550
of the $305,000 that we received from the state of Idaho

00:59:42.550 --> 00:59:44.910
can also be used for an incentive-based program.

00:59:44.910 --> 00:59:47.470
And like I shared with you in an email earlier today,

00:59:47.470 --> 00:59:49.190
we really want to proceed cautiously.

00:59:49.190 --> 00:59:51.510
We really want to make sure that we have a program

00:59:51.510 --> 00:59:58.770
that really fits the needs and is something that is going to be take advantage of by our

00:59:58.770 --> 00:59:59.770
residents.

00:59:59.770 --> 01:00:06.690
And so John and Dean are going to be focusing on building the mechanics of a program that

01:00:06.690 --> 01:00:09.890
can be user friendly.

01:00:09.890 --> 01:00:16.530
And we wanted to make sure that the incentive-based portion has a city share as we can develop

01:00:16.530 --> 01:00:17.530
that.

01:00:17.530 --> 01:00:18.530
We'll kind of look at that.

01:00:18.530 --> 01:00:25.970
I believe that there's a residential responsibility and a residential requirement to also help maintain their own individual properties.

01:00:25.970 --> 01:00:31.850
One of the quick solutions that we've looked at, but really needs to be fleshed out, is some version of an LID.

01:00:31.850 --> 01:00:39.930
And in that version of an LID, you would have large blocks or tracks that would have some portion of their fee,

01:00:39.930 --> 01:00:46.130
to be able to be paid for over a period of time, and the city would be able to contribute its amount right up front.

01:00:46.130 --> 01:00:52.790
So say the city did a portion of the labor or did a portion of the materials and vice versa.

01:00:52.790 --> 01:00:57.290
We would be able to cover our expenses with the available funds and then the citizens would

01:00:57.290 --> 01:01:04.170
be able to have theirs in an LID format, which is really a mechanism that allows them to extend

01:01:04.170 --> 01:01:06.170
that over a period of time.

01:01:06.170 --> 01:01:10.710
But one of the things that John has asked is that let us get through this construction season

01:01:10.710 --> 01:01:14.010
and then we'll be able to hammer out what that details look like.

01:01:14.010 --> 01:01:15.010
we'll be able to move forward.

01:01:15.010 --> 01:01:18.930
The other thing is we want to try to tie it to our zone maintenance program so that we're

01:01:18.930 --> 01:01:25.010
working again in concentrated specific areas as we kind of roll through the community in

01:01:25.010 --> 01:01:26.010
different areas.

01:01:26.010 --> 01:01:33.610
The second when it comes, so there is funding and we believe funding to assist with advancing

01:01:33.610 --> 01:01:37.610
the EDE accessibility issues within our community.

01:01:37.610 --> 01:01:42.330
The second when it comes to the disc golf place, it got to be a little bit more complicated

01:01:42.330 --> 01:01:50.010
for us and we've looked at a series of different locations and one of the things that we've

01:01:50.010 --> 01:01:56.570
learned from our own experience is that having a Frisbee and Disc Golf place in an area that

01:01:56.570 --> 01:02:03.130
is surrounded in residential, by residential houses is maybe not necessarily a good mix.

01:02:03.130 --> 01:02:09.890
As in the past and it was shared to us, we had individuals, you know, have the wind catch

01:02:09.890 --> 01:02:14.850
their desk or more inexperienced players and they would land on top of roofs or in backyards.

01:02:14.850 --> 01:02:16.250
And so we received complaints.

01:02:16.250 --> 01:02:24.210
We actually ended up, as I understand it, moving a disc golf course from Thompson Park and actually

01:02:24.210 --> 01:02:29.210
moving it to the middle school because it was a lot more open.

01:02:29.210 --> 01:02:35.890
So part of the issue is more than cages and it's trying to find that appropriate location

01:02:35.890 --> 01:02:37.370
and where is that location.

01:02:37.370 --> 01:02:42.070
And as Dennis was working on that project, there were different possibilities that were

01:02:42.070 --> 01:02:46.010
thrown out that I think that all need to be married and explored.

01:02:46.010 --> 01:02:49.310
They range from agar falls to the airport.

01:02:49.310 --> 01:02:54.110
But what I think is important is wherever you go, whether it's agar falls, I think that

01:02:54.110 --> 01:02:58.650
we need to have a conversation with the folks who helped create the agar falls master plan

01:02:58.650 --> 01:03:01.770
to see where those compatible uses are.

01:03:01.770 --> 01:03:05.570
And if it's out of the airport, I think that we need to make sure that that's a compatible

01:03:05.570 --> 01:03:07.010
use as well.

01:03:07.010 --> 01:03:10.490
But most importantly, I think that we need to really sit down.

01:03:10.490 --> 01:03:16.650
And I know that the disc golf folks were very active in the process.

01:03:16.650 --> 01:03:20.810
But in the Parks Master Plan, as it rated as a higher priority,

01:03:20.810 --> 01:03:23.490
it was never defined as to where.

01:03:23.490 --> 01:03:28.450
And so I really think that the where is one of the most important questions

01:03:28.450 --> 01:03:37.330
that we ask so that the disc golfers have a place that is really

01:03:37.330 --> 01:03:42.030
able to support and grow their sport.

01:03:42.030 --> 01:03:49.070
And so I think that over the course of this next year, we should take the time and work

01:03:49.070 --> 01:03:55.470
collectively to investigate spots, to incorporate it into our long-term planning process.

01:03:55.470 --> 01:04:00.270
Have that role through our long-term planning process, prioritize it, and determine where

01:04:00.270 --> 01:04:07.310
that rolls out, whether and because it's going to compete, disc golf feel facilities

01:04:07.310 --> 01:04:12.390
will compete with trails, will compete with swimming improvements, will compete with all

01:04:12.390 --> 01:04:14.550
other tax-recorded things.

01:04:14.550 --> 01:04:17.910
And at this point in time, place was the biggest stumbling block for us.

01:04:17.910 --> 01:04:23.950
And so, unfortunately, I don't have, I did not recommend any funding at this time, it's

01:04:23.950 --> 01:04:27.230
hard funding for the advancement of that.

01:04:27.230 --> 01:04:28.230
Okay.

01:04:28.230 --> 01:04:33.310
So, how soon do you think we might be able to get started in that process of finding

01:04:33.310 --> 01:04:34.310
that location?

01:04:34.310 --> 01:04:42.650
So this is where I get to turn to Windy who's going to be responsible for helping find that location

01:04:43.250 --> 01:04:45.250
Thank you. Good delegation

01:04:51.600 --> 01:04:57.480
Right before Dennis left we did meet with a couple of representatives from the disc golf community and unfortunately, I don't remember

01:04:58.080 --> 01:05:02.440
the names of the gentleman that came and they presented their

01:05:02.440 --> 01:05:07.840
or plug their case to me to make sure I understood it was still needed to be a priority.

01:05:07.840 --> 01:05:13.400
So I think at this point, we discussed some of the pros and cons of some of the different

01:05:13.400 --> 01:05:14.400
locations.

01:05:14.400 --> 01:05:18.600
And I think at this point, it's just a matter of, we kind of left it on the table that as

01:05:18.600 --> 01:05:22.600
soon as I kind of got situated, I would get back in touch with them.

01:05:22.600 --> 01:05:25.360
We could sit down and talk about some more options.

01:05:25.360 --> 01:05:30.360
We talked about down by Durkys Lake, we talked about our refalls, we talked about the airport.

01:05:30.360 --> 01:05:34.920
So it's certainly on my radar screen and it's probably time as we head into fall to start

01:05:34.920 --> 01:05:39.200
looking for location options to see what we can do.

01:05:39.200 --> 01:05:43.800
I worked with the group at CSI in the past to try to put one in over there.

01:05:43.800 --> 01:05:45.880
So I've worked with them.

01:05:45.880 --> 01:05:50.360
I understand kind of the needs of a location and now we just need to find a good spot for

01:05:50.360 --> 01:05:51.360
one here.

01:05:51.360 --> 01:05:52.360
Well, that's wonderful.

01:05:52.360 --> 01:05:57.760
Yeah, I remember with the dog park, you know, we just kind of started having a public

01:05:57.760 --> 01:06:02.080
hearing, so to speak, or just a meeting saying public, you know, what do you think of this

01:06:02.080 --> 01:06:07.220
location? And so any time we can start that, I think would be great that way. We can get

01:06:07.220 --> 01:06:14.240
that started. I know that the results from the Parks and Rec survey, a disc golf course,

01:06:14.240 --> 01:06:19.640
was a highly desired amenity. And I think that it really would add to our community and that

01:06:19.640 --> 01:06:24.560
people would get a lot of use out of it as they do the current two courses that we have.

01:06:24.560 --> 01:06:30.970
Absolutely. Sean Berrer. I would just add as the liaison for Parks and Recreation I think certainly

01:06:31.850 --> 01:06:36.170
as we continue to move through the process of the master planning for Parks and Recreation which

01:06:36.730 --> 01:06:41.930
you know we have some survey results, we have some preliminary reports but that's not really

01:06:41.930 --> 01:06:47.930
robust yet. I do think it's important that we keep in mind what we heard from all the residents

01:06:47.930 --> 01:06:52.970
about all the various programs because as Travis said these do become competitive with each other

01:06:52.970 --> 01:06:55.770
And so you have to make sure you're prioritizing.

01:06:55.770 --> 01:06:59.890
And I think there's still a little time to get through that process.

01:06:59.890 --> 01:07:05.570
I would certainly support taking the next year to look at those possibilities and certainly

01:07:05.570 --> 01:07:10.410
building those partnerships to see what makes sense in the coming months.

01:07:10.410 --> 01:07:15.750
I think I want to just piggyback on something that Rebecca said about sidewalks just really

01:07:15.750 --> 01:07:16.750
quickly.

01:07:16.750 --> 01:07:20.750
I know I've talked about this before, but I think your comment about where when it comes

01:07:20.750 --> 01:07:27.390
to the disc golf is absolutely appropriate, but I think also where when it comes to sidewalk

01:07:27.390 --> 01:07:33.590
and mobility issues, Chris said something last week or week before when we were talking about

01:07:33.590 --> 01:07:40.270
this, struck me later especially as I'm walking down Hayburn with my dog and my wife and my

01:07:40.270 --> 01:07:45.830
youngest and we were walking on people's lawns because that's the only place you could walk

01:07:45.830 --> 01:07:52.150
without giving in the way of traffic, but Chris said something about it's not only just for

01:07:52.150 --> 01:07:58.310
you and your mobility getting around your neighborhood, but it's for those that have limited mobility.

01:07:58.310 --> 01:08:03.870
Some of these folks are frankly landlocked to their homes and they can't get out because

01:08:03.870 --> 01:08:09.150
there's no sidewalk on either side if they even wanted to get out in their different ways.

01:08:09.150 --> 01:08:13.430
So I think where is a really big question there too and I would encourage us.

01:08:13.430 --> 01:08:15.430
I'll be part of that conversation in the future.

01:08:15.430 --> 01:08:17.070
I know we're not going to do anything right now,

01:08:17.070 --> 01:08:19.550
but to really look at where Travis,

01:08:19.550 --> 01:08:23.030
where really makes sense for pedestrian,

01:08:23.030 --> 01:08:26.470
for no better term arterials as well,

01:08:26.470 --> 01:08:28.190
because I think that's very important

01:08:28.190 --> 01:08:31.510
for the mobility of folks in our community.

01:08:31.510 --> 01:08:36.850
So anything further for Travis on the presentation

01:08:36.850 --> 01:08:38.730
of the city manager's recommended budget

01:08:38.730 --> 01:08:41.920
for fiscal year 2016?

01:08:41.920 --> 01:08:43.920
I guess next week's kind of important to show up.

01:08:43.920 --> 01:08:46.240
So next week's kind of a big week.

01:08:46.240 --> 01:08:47.360
All of the weeks have been kind of big,

01:08:47.360 --> 01:08:51.600
but next week's kind of the last conversation

01:08:51.600 --> 01:08:56.080
that we'll have for this budget moving forward.

01:08:56.080 --> 01:08:57.720
Next week we have the public hearing,

01:08:57.720 --> 01:09:00.200
it is scheduled for six o'clock.

01:09:00.200 --> 01:09:04.040
And prior to that we'll do a quick overall synopsis

01:09:04.040 --> 01:09:08.000
of the budget, it'll be a similar in presentation

01:09:08.000 --> 01:09:11.680
to the very first budget, kind of like global overall view.

01:09:11.680 --> 01:09:15.280
We will ask you to also adopt the utility rate resolution

01:09:15.280 --> 01:09:20.280
in the budget as well as the overall ordinance

01:09:21.500 --> 01:09:24.820
and acting the budget asking your directing staff

01:09:24.820 --> 01:09:26.540
to complete the LT form.

01:09:27.780 --> 01:09:28.620
Thank you Travis.

01:09:28.620 --> 01:09:31.300
Now's the time we always open it up to the public

01:09:31.300 --> 01:09:35.620
for public input anytime that we talk about the budget.

01:09:35.620 --> 01:09:37.020
And I think it's a great segue

01:09:37.020 --> 01:09:39.740
because the next item on the agenda is public input.

01:09:39.740 --> 01:09:42.220
So I'm just opening it up for public input

01:09:42.220 --> 01:09:44.860
for anything that's not on the agenda

01:09:44.860 --> 01:09:49.420
or specifically about the budget that was just presented

01:09:49.420 --> 01:09:51.000
to the city council.

01:09:51.000 --> 01:09:52.860
So now's your time to come forward

01:09:52.860 --> 01:09:59.020
if anyone in the community would like to do that.

01:09:59.020 --> 01:10:00.540
Either item.

01:10:00.540 --> 01:10:04.420
Okay, moving on to any other items from our city manager,

01:10:04.420 --> 01:10:06.820
keeping in mind that the executive session

01:10:06.820 --> 01:10:11.820
that was on the calendar has been canceled for this evening.

01:10:12.580 --> 01:10:15.460
City manager, Travis Rathweiler.

01:10:15.460 --> 01:10:18.260
We spent a little bit of time talking about next week

01:10:18.260 --> 01:10:25.260
in the budget. Just important reminder, the following week, the 31st, at this point in

01:10:25.260 --> 01:10:32.260
time, we're going to ask the council to cancel the meeting as a result of a lack of business.

01:10:32.260 --> 01:10:38.260
And then also, as we continue to our investigation, it appears that we will have a skeleton crew

01:10:38.260 --> 01:10:46.260
of not only staff, but council folks on September 28th. So we'd be looking at the possibility of

01:10:46.260 --> 01:10:49.200
of counseling that meeting as well.

01:10:49.200 --> 01:10:53.840
So just again, to put that out there for your review.

01:10:53.840 --> 01:10:56.710
Thank you, Travis.

01:10:56.710 --> 01:11:00.040
Anything from City Council?

01:11:00.040 --> 01:11:01.560
Council, I just wanted to report back.

01:11:01.560 --> 01:11:06.160
I had the opportunity to attend the first,

01:11:06.160 --> 01:11:10.200
as far as we know, street dinner in the state of Idaho.

01:11:11.120 --> 01:11:15.480
Leah Bobion, did I say that wrong?

01:11:15.480 --> 01:11:16.320
Bobion.

01:11:16.320 --> 01:11:17.880
Bobion, yeah, she can be mad at me,

01:11:17.880 --> 01:11:20.920
Leah is one of my dear students staying.

01:11:20.920 --> 01:11:27.880
Leah put this event on, and it was eloquent, it was elegant.

01:11:27.880 --> 01:11:32.560
It was something outside the norm for me.

01:11:32.560 --> 01:11:35.520
We joked to my wife and I did that we ate like that every night.

01:11:35.520 --> 01:11:37.440
It was about a five course meal.

01:11:37.440 --> 01:11:41.920
And of course, the money was raised for school supplies

01:11:41.920 --> 01:11:43.560
for our area students.

01:11:43.560 --> 01:11:45.760
And again, she did a fantastic job.

01:11:45.760 --> 01:11:51.040
thank you to the city for allowing us to or allowing her to block off the streets.

01:11:51.040 --> 01:11:58.560
She did a fantastic job just so you know, Chief, that she walked through the emergency procedure

01:11:58.560 --> 01:12:02.920
if a fire truck had to come through.

01:12:02.920 --> 01:12:09.160
Very well we knew exactly what we were supposed to do and so you were well represented by Leah,

01:12:09.160 --> 01:12:14.760
but it was a great event and I just took a lot of work and I've got pictures and it was just

01:12:14.760 --> 01:12:21.120
And just to add to that, Mr. Mayor, the treats that have been provided are by her this evening.

01:12:21.120 --> 01:12:26.320
She wanted to make sure that all the members of the Council have the opportunity to partake in those to see.

01:12:26.320 --> 01:12:29.720
And folks in the audience, we have some more up here.

01:12:29.720 --> 01:12:31.880
I don't think it's good for us to eat them also.

01:12:31.880 --> 01:12:37.040
Please come on up here and you can have my, it's not your dinner shot.

01:12:37.040 --> 01:12:39.200
Please come up if you would.

01:12:39.200 --> 01:12:42.880
So with that, anything further from Council?

01:12:42.880 --> 01:12:44.360
All right, we are adjourned.

01:12:44.360 --> 01:12:45.360
Thank you.