00:00:00.000 --> 00:00:08.000
Fourth, 2015, it's 5 p.m. And the first item on the agenda is always our Pledge of Allegiance.

00:00:08.000 --> 00:00:14.000
And I know that we have Caitlin Morris of our Youth Council. Did she leave?

00:00:14.000 --> 00:00:20.000
I'm sorry. Do we have any former Boy Scouts in the unknown? Never mind.

00:00:20.000 --> 00:00:24.000
For all of you wishing to please rise and join me in the Pledge of Allegiance.

00:00:24.000 --> 00:00:44.110
I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.

00:00:44.110 --> 00:00:47.470
Again welcome to everyone to our meeting this evening.

00:00:47.470 --> 00:00:50.510
We do have a quorum of the city council.

00:00:50.510 --> 00:00:54.910
Six members are here and Sharon did you say that Sean was going to be calling in or is

00:00:54.910 --> 00:00:55.910
he on?

00:00:55.910 --> 00:00:56.910
Sean are you out there?

00:00:56.910 --> 00:01:03.610
I am excellent. So all in one way or the other all seven members of the council are here this evening

00:01:04.510 --> 00:01:08.270
Travis Rothweiler our city manager. Do we have any amendments to our agenda?

00:01:08.830 --> 00:01:10.990
There are no amendments this evening very good

00:01:11.230 --> 00:01:13.870
We do have a very stacked agenda this evening

00:01:13.870 --> 00:01:20.110
So I'm going to try to keep us moving as rapidly as possible. So the first item on the agenda that I have the privilege of

00:01:20.110 --> 00:01:24.990
of participating in is reading a couple of proclamations.

00:01:24.990 --> 00:01:29.950
So we will start with Youth Appreciation Week,

00:01:29.950 --> 00:01:33.790
and this is a proclamation from the mayor,

00:01:33.790 --> 00:01:37.030
whereas the vast majority of youth are concerned,

00:01:37.030 --> 00:01:39.670
knowledgeable, and responsible citizens,

00:01:39.670 --> 00:01:41.990
and whereas Optimus International

00:01:41.990 --> 00:01:44.070
and the Twin Falls Optimus Club

00:01:44.070 --> 00:01:46.710
have developed and promoted a program entitled

00:01:46.710 --> 00:01:49.150
Youth Appreciation Week.

00:01:49.150 --> 00:01:51.590
and whereas the citizens of Twin Falls

00:01:51.590 --> 00:01:55.190
have indicated a desire to join the optimists

00:01:55.190 --> 00:01:58.190
in expressing appreciation and approval

00:01:58.190 --> 00:02:01.150
for the contributions of our youth.

00:02:01.150 --> 00:02:04.090
I, Don Hall, therefore proclaim the first week

00:02:04.090 --> 00:02:08.030
of May as Youth Appreciation Week in Twin Falls, Idaho

00:02:08.030 --> 00:02:09.790
by this action, let it be known

00:02:09.790 --> 00:02:13.590
that we have faith in the ability of today's youth

00:02:13.590 --> 00:02:17.030
as they assume responsible roles

00:02:17.030 --> 00:02:20.750
in the future of mankind, and we have Anna Scholes

00:02:20.750 --> 00:02:29.970
to accept this, and I hope you'll say a few words, huh?

00:02:29.970 --> 00:02:31.490
Yeah, if you need to go here and then

00:02:31.490 --> 00:02:34.050
fix this way because of the cameras and all that stuff.

00:02:34.050 --> 00:02:35.050
Thank you.

00:02:35.050 --> 00:02:36.970
Thank you, Mayor, Council members.

00:02:36.970 --> 00:02:39.330
And yeah, I'm Anna Scholes.

00:02:39.330 --> 00:02:41.450
I'm a member of the Twin Falls Optimus Club,

00:02:41.450 --> 00:02:44.250
and I'm delighted that you are participating

00:02:44.250 --> 00:02:46.450
in our youth appreciation week.

00:02:46.450 --> 00:02:49.650
We included all of the high schools in Twin Falls,

00:02:49.650 --> 00:02:51.330
both the Twin Falls School District

00:02:51.330 --> 00:02:55.450
in the private schools, and each school

00:02:55.450 --> 00:02:58.810
nominated two students, and the only criteria was,

00:02:58.810 --> 00:03:01.650
we sent them our Optimus Creed, and we said,

00:03:01.650 --> 00:03:04.210
pick the two kids who come to your mind first.

00:03:04.210 --> 00:03:06.450
So there wasn't a long application process.

00:03:06.450 --> 00:03:08.010
It was just a way to recognize people

00:03:08.010 --> 00:03:10.770
who lived their life in a great way.

00:03:10.770 --> 00:03:15.450
And so we appreciate this, and Mayor Hall will be

00:03:15.450 --> 00:03:17.930
at a luncheon later on this week to present them

00:03:17.930 --> 00:03:19.650
each individually with their certificates.

00:03:19.650 --> 00:03:21.410
So thank you very much.

00:03:21.410 --> 00:03:28.190
Let's give our youth a hand.

00:03:28.190 --> 00:03:30.070
Next, we have National Music Week.

00:03:30.070 --> 00:03:33.940
And as Bonnie here, Bonnie, I will be calling you up

00:03:33.940 --> 00:03:34.980
in just a moment.

00:03:34.980 --> 00:03:37.900
So I have the privilege of reading this proclamation.

00:03:37.900 --> 00:03:43.620
National Music Week, whereas music plays an increasingly

00:03:43.620 --> 00:03:45.780
important role in our world today.

00:03:45.780 --> 00:03:48.020
And whereas music is one of the most

00:03:48.020 --> 00:03:52.940
sublime of human pursuits and is subscribed to, too,

00:03:52.940 --> 00:03:59.080
by all races and creeds, and whereas music is the language of all peoples, and one of

00:03:59.080 --> 00:04:05.140
the greatest forces in creating peace and harmony, whereas the National Federation of

00:04:05.140 --> 00:04:11.820
Music Clubs, dedicated to encouraging young musicians, to increasing music knowledge, and

00:04:11.820 --> 00:04:19.020
to advancing American music and its cooperating organizations, join forces to direct attention

00:04:19.020 --> 00:04:23.140
to the dynamic influence of music in everyday living.

00:04:23.140 --> 00:04:25.900
Now, therefore, I, Don Hall, mayor of the city of Twin Falls

00:04:25.900 --> 00:04:30.600
do hereby proclaim the week of May 3rd through the 10th, 2015,

00:04:30.600 --> 00:04:34.040
to be National Music Week in Twin Falls, Idaho.

00:04:34.040 --> 00:04:36.940
And ask that all citizens of this community

00:04:36.940 --> 00:04:39.340
observe and take part in activities,

00:04:39.340 --> 00:04:42.820
recognizing the importance of music, musicians,

00:04:42.820 --> 00:04:46.860
and musical organizations to the cultural life of our city,

00:04:46.860 --> 00:04:55.340
state and nation and the world. I was able to sign this as mayor and Lee Ayla Sanchez

00:04:55.340 --> 00:05:08.900
attested to this. So if we could have Bonnie come up.

00:05:08.900 --> 00:05:16.900
I'll introduce myself on Bonnie Landborn, president of the Twin Falls Music Club.

00:05:16.900 --> 00:05:21.820
Mr. Mayor and council members, we thank you for taking the time to acknowledge National

00:05:21.820 --> 00:05:27.260
Music Week in Twin Falls with the mayor's proclamation. There has been a national music

00:05:27.260 --> 00:05:34.620
week since 1923. The theme this year, Music, Heartbeat as a Soul, encourages us to explore

00:05:34.620 --> 00:05:38.420
the far-reaching effects of music in our lives and to discover the added dimension that

00:05:38.420 --> 00:05:44.440
it can bring to our world today. The National Federation of Music Clubs is a prominent organization

00:05:44.440 --> 00:05:51.040
composed of musicians and music lovers and its sponsors, National Music Week. The National

00:05:51.040 --> 00:05:58.080
Federation was chartered by the United States Congress in 1898, as a philanthropic, educational,

00:05:58.080 --> 00:06:01.630
and volunteer organization, so we've been around for a while.

00:06:01.630 --> 00:06:07.510
Today as one of the world's largest music organizations, with club and individual members of all ages,

00:06:07.510 --> 00:06:14.910
there are over 146,000 members and over 6,000 related organizations and music clubs in 45

00:06:14.910 --> 00:06:15.910
states.

00:06:15.910 --> 00:06:22.910
Twin Falls Music Club has been a member of the National Federation since 1950 and we are one of nine clubs in Idaho.

00:06:22.910 --> 00:06:30.800
The mission of music clubs is to promote musical education and awareness in schools and communities.

00:06:30.800 --> 00:06:37.800
We work to ensure that music continues to be an integral part of the American education system.

00:06:37.800 --> 00:06:43.800
We accomplished this by aiding and encouraging music education by promoting musical excellence.

00:06:43.800 --> 00:06:51.800
to include vocalists, composers, dancers, performing artists, art, and music educators,

00:06:51.800 --> 00:06:55.800
professional and amateur musicians, and music students.

00:06:55.800 --> 00:07:03.220
To give you an idea of what we do in the Magic Valley area, music students in February and March,

00:07:03.220 --> 00:07:11.220
about 500 of them from Twin Falls, Jerome and Haley, took part in judge performances for piano,

00:07:11.220 --> 00:07:17.740
winds, strings, and vocal. These students were not competing for scholarships. They

00:07:17.740 --> 00:07:23.100
were just merely eager to improve their musical techniques. We're very proud of

00:07:23.100 --> 00:07:27.940
our Twin Falls Music Club Scholarship Foundation that has provided scholarships

00:07:27.940 --> 00:07:34.070
to our most talented young people for many years. Music is a natural part of

00:07:34.070 --> 00:07:39.030
the Interman, a natural means of communication. Early historical records

00:07:39.030 --> 00:07:44.450
prove that there has always been some form of music, and music has been always important

00:07:44.450 --> 00:07:45.950
throughout history.

00:07:45.950 --> 00:07:54.020
Today it's a powerful means to deepen our worship, express patriotic fervor, add a joyous atmosphere

00:07:54.020 --> 00:08:02.740
to happy occasions, the pursuit of music, whether it be through study, composing, listening,

00:08:02.740 --> 00:08:08.020
performing, or participation gives rich experience to human life.

00:08:08.020 --> 00:08:15.860
much joy and pleasure to be gained from music. Thank you for acknowledging Music Week in 2015.

00:08:15.860 --> 00:08:22.100
Thank you Bonnie and I think we would be remiss to not mention that we have the longest running

00:08:22.100 --> 00:08:28.900
city band this side of Mississippi right here in Twin Falls. And we have the director of that city

00:08:28.900 --> 00:08:35.880
band. He had to run, oh I'm sorry. He was there. His wife is here. Well he's so busy. That's why

00:08:35.880 --> 00:08:38.520
Hi, excellent, if we could give her her hand.

00:08:38.520 --> 00:08:39.360
Thank you.

00:08:39.360 --> 00:08:47.370
Next item on the agenda is general public input.

00:08:47.370 --> 00:08:49.690
This is for anyone in the public

00:08:49.690 --> 00:08:51.970
that would like to address the council this evening.

00:08:51.970 --> 00:08:53.330
That's not on the agenda.

00:08:53.330 --> 00:08:57.030
Is there anyone that would like to do that?

00:08:57.030 --> 00:08:59.550
Moving along, we will now move to the consent calendar

00:08:59.550 --> 00:09:04.590
and I'll turn it over to council for their direction.

00:09:04.590 --> 00:09:05.550
Suzanne Hawkins.

00:09:05.550 --> 00:09:08.350
I move approval of the consent calendar as printed.

00:09:08.350 --> 00:09:11.020
Okay.

00:09:11.020 --> 00:09:12.740
We have motion on the floor by Suzanne Hawkins,

00:09:12.740 --> 00:09:17.380
Seconded by Greg Lanting to approve the consent calendar as posted.

00:09:17.380 --> 00:09:21.110
Anything further on that motion council?

00:09:21.110 --> 00:09:23.900
Sharon, can we have a roll call vote please?

00:09:23.900 --> 00:09:25.060
Suzanne Hawkins?

00:09:25.060 --> 00:09:26.600
Yes.

00:09:26.600 --> 00:09:27.360
Jim Mann?

00:09:27.360 --> 00:09:28.400
Yes.

00:09:28.400 --> 00:09:29.960
Sean Bericher?

00:09:29.960 --> 00:09:31.440
Yes.

00:09:31.440 --> 00:09:32.440
Chris Tockington?

00:09:32.440 --> 00:09:33.700
Yes.

00:09:33.700 --> 00:09:34.640
Greg Lanting?

00:09:34.640 --> 00:09:35.540
Yes.

00:09:35.540 --> 00:09:36.240
Don Hall?

00:09:36.240 --> 00:09:37.240
Yes.

00:09:37.240 --> 00:09:38.960
Rebecca Mills-Soyka?

00:09:38.960 --> 00:09:39.680
Yes.

00:09:39.680 --> 00:09:42.160
Motion passes 7-0, thank you.

00:09:42.160 --> 00:09:44.920
Now moving to items for consideration.

00:09:44.920 --> 00:09:50.060
Our first item on the agenda is discussion and possible action on a petition from Xavier

00:09:50.060 --> 00:09:53.920
Charter School for a bike lane, and we have John Capillares.

00:09:53.920 --> 00:09:55.400
Did I say that wrong?

00:09:55.400 --> 00:09:56.400
Yes, very good.

00:09:56.400 --> 00:09:57.400
Thank you.

00:09:57.400 --> 00:09:58.400
You're welcome.

00:09:58.400 --> 00:10:04.120
Mayor and Council, John Capillares, and most of you know me from either CSI or from the

00:10:04.120 --> 00:10:08.080
Twin Falls County Historical Preservation Commission or from the Senior Center.

00:10:08.080 --> 00:10:12.520
I'm also on the Xavier Charter School Board, and that's what brings me here tonight.

00:10:12.520 --> 00:10:15.400
we need a bike lane on North College.

00:10:15.400 --> 00:10:18.800
The nature of the case is that the Xavier Charter School

00:10:18.800 --> 00:10:21.280
and the surrounding community needs a bike lane

00:10:21.280 --> 00:10:23.140
to increase safety.

00:10:23.140 --> 00:10:25.640
We would like the council to consider phase two

00:10:25.640 --> 00:10:28.240
of the proposed bike lane to be the Western portion

00:10:28.240 --> 00:10:30.000
of North College.

00:10:30.000 --> 00:10:33.200
So I'm gonna discuss development in the area,

00:10:33.200 --> 00:11:07.280
phases of the proposed bike lane and the petition.

00:11:07.280 --> 00:11:11.360
Okay, so if you see on the map here, this is North College,

00:11:11.360 --> 00:11:12.920
This is Canyon Ridge High School.

00:11:12.920 --> 00:11:15.960
This is Xavier Charter School, just to orient you.

00:11:15.960 --> 00:11:21.500
So they're going to build a park here on Wendell in North

00:11:21.500 --> 00:11:22.000
College.

00:11:22.000 --> 00:11:25.280
They're going to build more houses right here.

00:11:25.280 --> 00:11:30.400
Up here at Grandview and North College, they, you see,

00:11:30.400 --> 00:11:34.320
this is very important because this is our only access

00:11:34.320 --> 00:11:36.200
to these buildings up here.

00:11:36.200 --> 00:11:39.680
This is an LDS church, and this is the school.

00:11:39.680 --> 00:11:44.920
So the neighborhood, the church and the school all share this route and go in and out both

00:11:44.920 --> 00:11:45.920
ways.

00:11:45.920 --> 00:11:51.100
It is pretty wide right here to the church.

00:11:51.100 --> 00:11:58.540
Students use this route when going to seminary every day early in the morning and parents

00:11:58.540 --> 00:12:04.140
use it going to dropping off their children at school buses come through here and also

00:12:04.140 --> 00:12:08.220
some children go this way to Keneridge High School.

00:12:08.220 --> 00:12:14.560
They're going to build more houses over here and here and this is the Sunway Soccer

00:12:14.560 --> 00:12:15.560
Plex.

00:12:15.560 --> 00:12:20.880
It also has the first federal bank park.

00:12:20.880 --> 00:12:22.840
They're going to build a splash pad.

00:12:22.840 --> 00:12:26.600
And eventually right over here they're going to put an elementary school.

00:12:26.600 --> 00:12:30.520
The district still owns that land and plans to put an elementary school there someday.

00:12:30.520 --> 00:12:34.320
So you see there's going to be a lot of traffic throughout there.

00:12:34.320 --> 00:12:41.510
And eventually the road will be opened to further development now this way.

00:12:41.510 --> 00:12:51.070
The road is used by children and families and going to parks, schools, and to church.

00:12:51.070 --> 00:12:56.510
Can we get to phase two further to the phases on that?

00:12:56.510 --> 00:13:06.220
There's a phase one for the proposed by Kline.

00:13:06.220 --> 00:13:12.580
And phase one, so eventually it's going to go from the Sunway Soccerplex to, let's see,

00:13:12.580 --> 00:13:14.420
to reorient you here.

00:13:14.420 --> 00:13:17.580
Yeah, here's the, the Soccerplex.

00:13:17.580 --> 00:13:22.700
It goes all the way to, it'll, it'll end up at CSI right around the Expo Center.

00:13:22.700 --> 00:13:24.500
Here's, can you reach high school?

00:13:24.500 --> 00:13:25.500
Here's Xavier.

00:13:25.500 --> 00:13:29.090
Phase one is just right here.

00:13:29.090 --> 00:13:31.530
That's from Washington to Sparks.

00:13:31.530 --> 00:13:35.860
And you see there's already one on Sparks.

00:13:35.860 --> 00:13:42.160
So what we are asking is to step in line because there is no phase 2 and we want to be that

00:13:42.160 --> 00:13:43.920
phase 2 over here.

00:13:43.920 --> 00:13:50.120
It could go this way or it could go this way and we feel it's much more needed in this

00:13:50.120 --> 00:13:52.690
area.

00:13:52.690 --> 00:13:57.170
So we have priorities because there are certain places where maybe you don't think there

00:13:57.170 --> 00:14:03.690
could be a bike lane but ideally we would like a bike lane to go all the way through.

00:14:03.690 --> 00:14:10.650
There is a portion from Wendell, it's about right here to Grandview, that is going to be

00:14:10.650 --> 00:14:11.850
developed in the next year.

00:14:11.850 --> 00:14:15.170
They're selling lots already on the farmers' field.

00:14:15.170 --> 00:14:18.210
That's going to be developed in Wyden.

00:14:18.210 --> 00:14:23.650
If it's developed next year, it'll widen the road.

00:14:23.650 --> 00:14:30.850
We could fit it already, right here from Grandview to the church, and then also from

00:14:30.850 --> 00:14:37.690
sparks to wendle. There's already enough room. So if you, there's also the option of making

00:14:37.690 --> 00:14:43.690
it, you know, two different phases, possibly, or making them one phase and then eventually

00:14:43.690 --> 00:14:49.530
coming back to a phase three or four right there. Or you could extend phase one out as

00:14:49.530 --> 00:14:55.850
far as you can right here. This is the will of Xavier Charter School Board, but it is also

00:14:55.850 --> 00:15:03.170
the will of the people. We talked to neighbors, developers and users and I have over 360 signatures

00:15:03.170 --> 00:15:13.860
here. I'd like to present that to the city. It says the following signers petitioned the

00:15:13.860 --> 00:15:17.940
city of Twin Falls for a bike lane on the western portion of north college to be designated

00:15:17.940 --> 00:15:27.500
as phase two of the proposed bike lane. So the residents were all in favor of the bike

00:15:27.500 --> 00:15:33.060
lane. Talking with them, I learned that they were also interested in lines on the street

00:15:33.060 --> 00:15:41.300
to have lanes and then also possibly a lower speed limit and also it seemed to make more

00:15:41.300 --> 00:15:47.420
sense to have the gap, you know, like on sparks they have a gap from the curve to the bike

00:15:47.420 --> 00:15:53.540
lane and we could have it on the south side because that would provide, and there's enough

00:15:53.540 --> 00:15:58.740
room for that. They provide enough room for people to park up against driveways. The north

00:15:58.740 --> 00:16:06.780
side doesn't need that because there aren't any driveways to go into. So what are the cons

00:16:06.780 --> 00:16:12.860
of having a bike lane on North College? Well, number one is the cost. You're going to have

00:16:12.860 --> 00:16:21.980
to provide paint, the workers to paint it, set up signs and to maintain it. Also, if we

00:16:21.980 --> 00:16:29.860
go through now and don't wait for the street to be widened. We might have more phases.

00:16:29.860 --> 00:16:37.950
So those are the only cons that I can think of to having a bike lane right now. So people

00:16:37.950 --> 00:16:45.230
will be safer with these measures, we believe. We're not asking for a traffic signal, though

00:16:45.230 --> 00:16:52.590
So that would be nice, ideally we could have enough money, but I'm here today because I

00:16:52.590 --> 00:16:58.550
don't want anybody in the future to be here asking for a traffic signal, and we know how

00:16:58.550 --> 00:17:00.470
you get a traffic signal.

00:17:00.470 --> 00:17:06.550
My wife grew up here in this community and was here when Twin Falls High School got a

00:17:06.550 --> 00:17:12.950
traffic light and I worked at Shabani for a year and at that time we also suffered a

00:17:12.950 --> 00:17:21.430
of fatality and a light was put up and the speed limit was lowered and I know that this

00:17:21.430 --> 00:17:29.110
council on April 20th voted to keep the lowered speed limit on Kimberly over by the Chavani

00:17:29.110 --> 00:17:34.230
plant and Mayor Hall said we should air on the side of caution and I would ask you all

00:17:34.230 --> 00:17:39.750
to do it again to air on the side of caution and safety and provide a bike lane on North

00:17:39.750 --> 00:17:41.750
college. I will stand for questions.

00:17:41.750 --> 00:17:57.270
Maybe what we could do is turn it over to staff just for a minute, John, for them to give us some dynamics, some road widths, what this looks like, so that gives us an opportunity to have more educated questions.

00:17:57.270 --> 00:18:09.270
So I'm going to answer, you know, maybe some of the other questions that John had posed as opposed to the kind of clear those in whether it be lower speed limits traffic signals.

00:18:09.270 --> 00:18:14.470
The Council has a Traffic Safety Commission, and the purpose of the Traffic Safety Commission

00:18:14.470 --> 00:18:21.750
is to investigate the possibilities of speed limits in areas in conjunction and also with

00:18:21.750 --> 00:18:27.430
the expertise of our Police Department as well as our engineering team when they do the traffic

00:18:27.430 --> 00:18:32.150
studies, the traffic analysis and move in those type of things.

00:18:32.150 --> 00:18:38.270
Warrant analysis are obviously a different place when we start looking at traffic signals,

00:18:38.270 --> 00:18:43.150
We can talk to our engineering department to see if we even believe that this area right

00:18:43.150 --> 00:18:49.310
now would warrant a traffic signal moving forward.

00:18:49.310 --> 00:18:52.510
The first thing I would say is thank you to John for the effort.

00:18:52.510 --> 00:18:58.190
I mean, he's been in contact with staff and he's obviously very dedicated to moving forward

00:18:58.190 --> 00:19:04.630
and creating a series of bike lanes throughout the community and extending that.

00:19:04.630 --> 00:19:09.670
to go back, the first phase was created in conjunction

00:19:09.670 --> 00:19:12.230
with lots of community input.

00:19:12.230 --> 00:19:17.390
And the first phase was created by asking individuals

00:19:17.390 --> 00:19:19.910
who participated a series of questions.

00:19:19.910 --> 00:19:22.350
Where are you located?

00:19:22.350 --> 00:19:24.790
Where are you trying to go?

00:19:24.790 --> 00:19:29.110
And what type of bicyclist are you?

00:19:29.110 --> 00:19:30.950
Are you a recreationalist?

00:19:30.950 --> 00:19:32.750
Are you a commuter?

00:19:32.750 --> 00:19:34.470
Do you do it for sport?

00:19:34.470 --> 00:19:41.470
And we tried to break it into different categories and different locations, and that's how that first phase was constructed.

00:19:41.470 --> 00:19:52.470
In those subsequent phases, as you can see, and as Mr. Capular said pointed out, there is a subsequent phase

00:19:52.470 --> 00:19:58.470
that contemplates a bike lane moving along North College.

00:19:58.470 --> 00:20:03.470
The challenge that we have is, and as it was described,

00:20:03.550 --> 00:20:05.470
there are some places of that roadway

00:20:05.470 --> 00:20:08.470
that are not fully expanded and fully built out

00:20:08.470 --> 00:20:09.610
at this point in time.

00:20:11.390 --> 00:20:14.630
And so what we would like to do is maybe receive

00:20:14.630 --> 00:20:18.310
the information tonight and then work directly with John

00:20:18.310 --> 00:20:20.550
and other members of our biking community

00:20:20.550 --> 00:20:23.630
to really develop a comprehensive phase two.

00:20:23.630 --> 00:20:26.830
The first phase of the biking plan was comprehensive.

00:20:26.830 --> 00:20:30.230
It was involved numerous roads.

00:20:30.230 --> 00:20:32.230
And what we'd like to do is not only look at this,

00:20:32.230 --> 00:20:36.470
but see what other sections may also be included moving forward.

00:20:36.470 --> 00:20:42.150
I think that John very aptly pointed out that the costs,

00:20:42.150 --> 00:20:44.830
there is a cost, but I think that the costs associated

00:20:44.830 --> 00:20:50.110
with the striping and the labor are not certainly

00:20:50.110 --> 00:20:51.750
as a cost, but it's not as significant

00:20:51.750 --> 00:20:54.190
as the construction of a roadway that

00:20:54.190 --> 00:20:56.790
may be required in some of these areas.

00:20:56.790 --> 00:20:59.790
But John's idea of partially extending in some places

00:20:59.790 --> 00:21:04.390
may have absolute merit now to be able to move that forward.

00:21:04.390 --> 00:21:07.350
We just like the opportunity to work with the engineering team,

00:21:07.350 --> 00:21:11.310
work closely with John and members of his team

00:21:11.310 --> 00:21:13.550
to really develop a comprehensive strategy

00:21:13.550 --> 00:21:15.470
that we could either move forward with,

00:21:15.470 --> 00:21:16.950
or we could present back to the Council

00:21:16.950 --> 00:21:20.200
for ratification at your choice.

00:21:20.200 --> 00:21:21.360
Thank you, Travis.

00:21:21.360 --> 00:21:23.000
We're back in Millsoink.

00:21:23.000 --> 00:21:23.920
Thank you, Mayor.

00:21:23.920 --> 00:21:27.240
Thank you, John, for bringing this to our attention.

00:21:27.240 --> 00:21:29.800
I just have a follow-up question on Phase 2.

00:21:29.800 --> 00:21:33.800
I think that's a great idea to execute Phase 2

00:21:33.800 --> 00:21:35.520
like we did Phase 1.

00:21:35.520 --> 00:21:38.160
We had a lot of response from the community,

00:21:38.160 --> 00:21:40.440
and it was a really robust process.

00:21:40.440 --> 00:21:42.520
So what is the status of Phase 2?

00:21:42.520 --> 00:21:44.880
Is it moving forward this year?

00:21:44.880 --> 00:21:48.400
Will there be funding in this year's budget for it?

00:21:48.400 --> 00:21:51.020
Or is there a timeline yet?

00:21:51.020 --> 00:21:53.540
Yes, so we're working still through the Phase 1 piece,

00:21:53.540 --> 00:21:59.060
We've had a conversation and I don't know if John Caton is in a position tonight to talk about phase one.

00:21:59.060 --> 00:22:01.020
Dennis is also here.

00:22:01.020 --> 00:22:09.020
The idea would be to begin a phase two process conversation as part of the construction of the fiscal year 2016 budget.

00:22:09.020 --> 00:22:15.340
With funding at that point in time to see if that rose to the level of priority to move forward with the

00:22:15.340 --> 00:22:21.100
the share rows and the other types of paint that may be required for the different types of

00:22:21.100 --> 00:22:28.830
either bike lanes or shared processes. John, Jake? Thank you, Mayor. Yes, so phase one, we did have

00:22:28.830 --> 00:22:34.590
on our our plans to construct this year. In fact, we're kind of going over the the verbiage of all

00:22:34.590 --> 00:22:40.570
the signage that's going to go out there. So we do have that scheduled for this year. Okay,

00:22:40.570 --> 00:22:53.570
Thank you. And one follow-up question for, I guess, Travis or whoever. John mentioned there's a section of road there that will be developed possibly soon.

00:22:53.570 --> 00:23:05.570
When that is developed, is it required currently for there to be with enough for a bike lane? Not necessarily the striping of it, but would the width of the road be there?

00:23:05.570 --> 00:23:12.930
be there and how might we make sure that if that area is developed in the

00:23:12.930 --> 00:23:21.130
recent future or the near future, how would we make sure that that's accounted for?

00:23:21.130 --> 00:23:25.330
I believe the triage record you used yourself for folks at home.

00:23:25.330 --> 00:23:29.690
Trivitek Assistacy and I believe the person we was talking about was the

00:23:29.690 --> 00:23:36.930
Broadmoor parcel, which is bounded by Wendell, Grandview, and North College on the north.

00:23:36.930 --> 00:23:41.810
That parcel is actually in our office for review, is going through a plating and construction

00:23:41.810 --> 00:23:43.450
design.

00:23:43.450 --> 00:23:46.650
It currently can't be sold as individualized as it's not platted.

00:23:46.650 --> 00:23:49.610
The whole project could be sold, but not the individual ones.

00:23:49.610 --> 00:23:52.610
And you'd probably be seeing that later this year.

00:23:52.610 --> 00:23:56.890
As far as the plat portion of it, they would be required to develop that roadway and pawn

00:23:56.890 --> 00:23:59.840
construction of it.

00:23:59.840 --> 00:24:11.060
This was a design, so Bronmore has been in for a few years and when they submit the preliminary

00:24:11.060 --> 00:24:16.780
class kind of when they lock them in, this portion wasn't indicated on it, so we would

00:24:16.780 --> 00:24:22.980
have to talk with the developers about including that in their design and we can do that as part

00:24:22.980 --> 00:24:28.260
of this because we have a finalizer approved anything, but I'll bring it up to them.

00:24:28.260 --> 00:24:32.700
Great, yeah, let's be proactive there and make sure we don't miss an opportunity to provide

00:24:32.700 --> 00:24:37.500
for a bike lane if in fact after it goes through the process it's needed it'd be

00:24:37.500 --> 00:24:43.740
better to plan for it now. Thank you. Thank you Troy. Great landing. First of

00:24:43.740 --> 00:24:49.080
question Troy and you might be able to answer this so don't get too far away. At

00:24:49.080 --> 00:24:53.540
some point I was the road I've ever go is the road going to go through at some

00:24:53.540 --> 00:24:58.100
point past the Sunday summer soccer complex all the way to grab you. Yes at

00:24:58.100 --> 00:25:01.180
At some point the road will go through, but down the road, okay.

00:25:01.180 --> 00:25:03.020
Oh, by us, I believe that's.

00:25:03.020 --> 00:25:04.960
Part of it is and then parts of the developer,

00:25:04.960 --> 00:25:05.800
part of it's okay.

00:25:05.800 --> 00:25:07.220
So, there's a large cost there.

00:25:07.220 --> 00:25:09.380
And the second was an exclamation process,

00:25:09.380 --> 00:25:10.740
we did the Xavier people,

00:25:10.740 --> 00:25:13.260
but we aren't just kind of kicking this down the road.

00:25:13.260 --> 00:25:15.460
We realized that as these roads get,

00:25:15.460 --> 00:25:18.140
we don't actually widen the roads.

00:25:18.140 --> 00:25:20.900
The developers are responsible for widening the roads

00:25:20.900 --> 00:25:22.900
as they develop them for building lots

00:25:22.900 --> 00:25:26.700
or for the church or the school or whatever the case may be.

00:25:26.700 --> 00:25:31.020
And so, it slows the process down because we really don't have the funds to go in and

00:25:31.020 --> 00:25:36.260
build a half mile road, just so we can get a bike lane that's part of it, does that make

00:25:36.260 --> 00:25:37.260
sense?

00:25:37.260 --> 00:25:42.900
So the developers will be responsible for that ground to the south of North College,

00:25:42.900 --> 00:25:47.740
there's a cross from the school as well as even that lot between your lot and the church

00:25:47.740 --> 00:25:53.460
will, somebody will widen that at not our expense, but their expense and so, until it

00:25:53.460 --> 00:25:59.380
gets widened and as Rebecca talked about and as Travis talked about phase one went

00:25:59.380 --> 00:26:03.940
through a lengthy process to get approved to be phase one and so we really I don't

00:26:03.940 --> 00:26:08.100
I don't see myself jumping in and saying well this is part of phase two until it

00:26:08.100 --> 00:26:13.540
went through that same process but we do appreciate the I at least appreciate the

00:26:13.540 --> 00:26:18.380
the acknowledgement of we got a lot of stuff going on out there and Xavier is

00:26:18.380 --> 00:26:22.340
part of that and someone's talking about part of it and at some future point yes

00:26:22.340 --> 00:26:29.660
I think Mike Lane is an appropriate use there and will certainly hopefully get it there sooner

00:26:29.660 --> 00:26:30.660
than later.

00:26:30.660 --> 00:26:32.940
I don't think it's just great.

00:26:32.940 --> 00:26:34.860
I think we all appreciate it.

00:26:34.860 --> 00:26:36.860
Travis, you wanted to weigh in?

00:26:36.860 --> 00:26:45.220
Just to talk about the effort that John has made and kind of validate, he has 366 signatures

00:26:45.220 --> 00:26:51.220
from the area which is roughly four and a half times the number of people that we had

00:26:51.220 --> 00:26:56.140
participate in the construction of phase one. So clearly there's a segment of this

00:26:56.140 --> 00:27:00.940
community that really wants to see it and I don't want John to leave here feeling

00:27:00.940 --> 00:27:04.540
that this has fallen into some bureaucratic process but really that we're

00:27:04.540 --> 00:27:09.680
going to take this and we'll move as expeditiously as we can. Maybe parts of

00:27:09.680 --> 00:27:15.540
this can be included in the first phase just because of where that first phase

00:27:15.540 --> 00:27:18.820
stands and we'll certainly work with our engineering team as we move that forward.

00:27:18.820 --> 00:27:25.680
a part of this we actually may be able to construct as part of what we're doing this year as well.

00:27:25.680 --> 00:27:28.360
Thank you, Travis, well said. Chris, talking to me.

00:27:28.360 --> 00:27:34.980
Yeah, and I'd like to just key offer what Travis indicated, Council's safe citizen input

00:27:34.980 --> 00:27:42.380
and here we have it in a fine-fashioned consistent with advancing our long-range planning for

00:27:42.380 --> 00:27:48.100
bike usage in Twin Falls. I don't want this to become a bureaucratic black hole where it

00:27:48.100 --> 00:27:54.620
goes in and nothing comes out. I would like the Council to establish a time where we might

00:27:54.620 --> 00:28:02.140
have a report back on what can be done to expedite this portion of Phase 2, like 90 days or 60

00:28:02.140 --> 00:28:10.060
days, so we can encourage more citizen groups such as this that are helping get our community

00:28:10.060 --> 00:28:13.380
a little bit greener, see some end to their work.

00:28:13.380 --> 00:28:19.340
But, John, I would like to caution you that in engineering parlance, the whiter the road

00:28:19.340 --> 00:28:23.780
is, the faster the natural speed travel on it.

00:28:23.780 --> 00:28:29.980
And we hardly ever get requests for people wanting a higher speed limit, but usually

00:28:29.980 --> 00:28:36.220
a lower, but a widened road on North College would probably make it almost impossible to

00:28:36.220 --> 00:28:38.900
slow down the traffic over what it is now.

00:28:38.900 --> 00:28:43.780
So I just want to make you aware that in a traffic like we're talking about a hundred

00:28:43.780 --> 00:28:48.680
thousand dollars and that's why we have warrants for the things and they don't put them in

00:28:48.680 --> 00:28:49.680
will they nilly.

00:28:49.680 --> 00:29:03.060
I may say the issues with the speed limit the speed limit was really from the residents

00:29:03.060 --> 00:29:04.940
and I said I would bring it up.

00:29:04.940 --> 00:29:06.580
It's not a part of the petition.

00:29:06.580 --> 00:29:10.060
It's you know, I just you know in good faith. I just wanted to show that you know, I

00:29:10.540 --> 00:29:16.880
You know, this is what the community wants. I'm not saying I'm here for that, but as far as the

00:29:18.040 --> 00:29:20.380
petition goes, it's just you know pays to

00:29:20.800 --> 00:29:26.800
We want it off to the West, but I think we should self-empose some sort of a time for feedback. I was gonna ask Travis. Do you have a?

00:29:27.520 --> 00:29:30.400
Realistic view what we could get some feedback from

00:29:31.650 --> 00:29:34.570
You know, I think councilman talked in suggested 90 days

00:29:34.570 --> 00:29:39.290
I think that's a pretty low hurdle for us to be able to clear to come back and report back to the council 90 hours

00:29:41.130 --> 00:29:43.130
That might be a little high I

00:29:44.230 --> 00:29:49.190
Think that's appropriate. Thank you Chris and John. I don't see any further lights again

00:29:49.670 --> 00:29:54.030
Many of the council members expressed their appreciation for bringing this forward to us

00:29:54.030 --> 00:29:58.550
We really do appreciate all the lake work that you did as well. Thank you. Thank you

00:29:59.430 --> 00:30:01.190
Moving on to the next item

00:30:01.190 --> 00:30:12.190
It's presentation of Rhodes Scholar Level 1 award to Tom Billman and Road Master Level 2 awards to Cody Brown, Victor Cabello, Cabello.

00:30:12.190 --> 00:30:14.190
I've been practicing that name.

00:30:14.190 --> 00:30:27.190
Dale Eldridge, Aaron Hintrup, Dean Littler, Dave McCreary, Bud Stradley, Mark Thompson, Dan Vienstra, Chris Westbrook, and Terry Williamson.

00:30:27.190 --> 00:30:33.070
And we have John Caten here as well as Layla Kral going to be making the presentation so

00:30:33.070 --> 00:30:34.070
welcome John.

00:30:34.070 --> 00:30:35.230
Thank you Mayor Council.

00:30:35.230 --> 00:30:40.150
The names you just listed are 12 of the 14 members of our street department and so I'm

00:30:40.150 --> 00:30:41.950
real proud of this group.

00:30:41.950 --> 00:30:47.830
They've made an effort to achieve this certification from the state and tonight we have a guest

00:30:47.830 --> 00:30:48.830
from the state.

00:30:48.830 --> 00:30:54.390
Her name is Layla Kral and she is the TT manager and I'm going to let her talk about the training

00:30:54.390 --> 00:30:55.390
that they've been through.

00:30:55.390 --> 00:30:56.390
Welcome, Leah.

00:30:56.390 --> 00:30:57.390
Thank you.

00:30:57.390 --> 00:31:04.750
Thank you guys for letting me come today with a very packed agenda and a lot of citizens

00:31:04.750 --> 00:31:05.750
here.

00:31:05.750 --> 00:31:10.910
So I will cover the program and the awards as briefly as possible, but please, if you

00:31:10.910 --> 00:31:12.070
have questions, let me know.

00:31:12.070 --> 00:31:14.110
I'm happy to cover any of them.

00:31:14.110 --> 00:31:19.150
I'm here as a member of LTCH, an employee of LTCH, and I manage the T2 program.

00:31:19.150 --> 00:31:23.590
The T2 program provides training and technical assistance to all local highway jurisdictions

00:31:23.590 --> 00:31:24.590
in Idaho.

00:31:24.590 --> 00:31:29.390
counties, counties, and highway districts. All of the road employees are, the classes

00:31:29.390 --> 00:31:34.190
are tailored for them and they're all welcome to attend the classes. We strive to make the

00:31:34.190 --> 00:31:40.150
classes affordable. Most of our classes are 60, 65 dollars for a full day of training so

00:31:40.150 --> 00:31:43.670
I challenge all of you to try to find some more affordable training and then let me know

00:31:43.670 --> 00:31:50.710
about it. So the classes we provide really cover a number of topics. We have safety courses,

00:31:50.710 --> 00:31:53.250
professional development, maintenance techniques,

00:31:53.250 --> 00:31:56.410
and new technologies, and we try to keep that diverse

00:31:56.410 --> 00:31:59.690
so that it applies to all the road employees.

00:31:59.690 --> 00:32:03.830
We believe that regardless of your position and your job,

00:32:03.830 --> 00:32:06.610
when you start that job, you shouldn't quit learning,

00:32:06.610 --> 00:32:09.530
or training, or becoming more aware of what's going on.

00:32:09.530 --> 00:32:12.490
So that's the role we're playing in the road system

00:32:12.490 --> 00:32:15.730
is providing that training for the local road employees.

00:32:15.730 --> 00:32:17.770
We have two levels of programs.

00:32:17.770 --> 00:32:20.330
So I'll first cover the road scholar program.

00:32:20.330 --> 00:32:23.210
The Rhodes Scholar is the first step in our program.

00:32:23.210 --> 00:32:28.170
It's approximately 80 hours of instruction that, again, the classes cover those topics

00:32:28.170 --> 00:32:29.570
we covered earlier.

00:32:29.570 --> 00:32:35.050
So we have the flagging courses, roadway maintenance courses, and then communications type courses

00:32:35.050 --> 00:32:37.370
for the professional development.

00:32:37.370 --> 00:32:42.810
The employee has four years to complete the course, and most of the classes have an exam,

00:32:42.810 --> 00:32:48.010
and it's an 80% to pass rather than a 70% to pass.

00:32:48.010 --> 00:32:51.170
We want to make sure when they're there, they're actually getting some of that instruction and

00:32:51.170 --> 00:32:54.570
taking it back to the shop rather than just being a body in a class.

00:32:54.570 --> 00:33:01.580
So four years to complete the course, if they do that, then they become a Rhodes Scholar.

00:33:01.580 --> 00:33:05.220
And so with that, if it's all right with you, Mayor, I'd like to welcome our Rhodes Scholar

00:33:05.220 --> 00:33:06.220
up.

00:33:06.220 --> 00:33:12.730
Please do.

00:33:12.730 --> 00:33:17.730
So Tom Billman has completed his Rhodes Scholar, again, 80 hours of instruction over a four-year

00:33:17.730 --> 00:33:18.730
period.

00:33:18.730 --> 00:33:22.810
It takes a lot of dedication on the employees and to keep up with that, know where they are,

00:33:22.810 --> 00:33:27.650
in their transcript process and not let those classes fall off the back end.

00:33:27.650 --> 00:33:34.040
So I'd like to congratulate Tom with the certificate and then we also present two awards.

00:33:34.040 --> 00:33:37.040
One is a hat that says a Rhodes Scholar and it is true.

00:33:37.040 --> 00:33:39.680
There's nobody in the state that has one of these hats that didn't earn it.

00:33:39.680 --> 00:33:41.840
So I don't even have one at my house.

00:33:41.840 --> 00:33:46.880
So Rhodes Scholar hat and the one the guys normally like the most is a Leatherman tool

00:33:46.880 --> 00:33:49.800
engraved with T2 Rhodes Scholar on it.

00:33:49.800 --> 00:34:04.540
Let's give Tom a hand. Tom, Tom, could you stay up here? I think what we're going to do is take a group picture when everyone's up here, and besides we're going to make you stand up there a little longer then.

00:34:04.540 --> 00:34:06.540
Thank you, Tom.

00:34:06.540 --> 00:34:18.540
I just wanted to clarify one comment. I mean, there's 12 individuals receiving certificates tonight, but tonight now every person in the streets will have at least the Rhodes Scholar program finished, and most of them have the Roadmaster.

00:34:18.540 --> 00:34:21.220
Thank you, John.

00:34:21.220 --> 00:34:23.820
So after an employee completes the Road Scholar program,

00:34:23.820 --> 00:34:26.380
we encourage them to move to the Road Master program.

00:34:26.380 --> 00:34:28.980
The next step, as the name implies,

00:34:28.980 --> 00:34:31.020
many of the courses in the Road Master program

00:34:31.020 --> 00:34:32.780
have prerequisites that they've completed

00:34:32.780 --> 00:34:33.980
in the Road Scholar program.

00:34:33.980 --> 00:34:35.940
So it's building on that knowledge they've learned

00:34:35.940 --> 00:34:38.060
from that first step in the program.

00:34:38.060 --> 00:34:40.500
It's about another 80 hours of instruction.

00:34:40.500 --> 00:34:42.780
So all in all, when you get to become a Road Master,

00:34:42.780 --> 00:34:46.380
you've had a minimum of 160 hours of instruction

00:34:46.380 --> 00:34:47.620
to get to that point.

00:34:47.620 --> 00:34:52.640
Again, we give the employees four years to complete the program and to have the same requirements

00:34:52.640 --> 00:34:55.100
of that passing percentage as well.

00:34:55.100 --> 00:35:02.560
So with that, I guess I'd like to welcome all of the roadmasters up.

00:35:02.560 --> 00:35:12.200
Cody Brown, Victor Caballo, Dale Eldridge, Erin Hintra, Dean Littler, Dave McCreary, Bud Stradley,

00:35:12.200 --> 00:35:17.160
Mark Thompson, Dan Vienstra, Chris Westberg, and Terry Williamson.

00:35:17.160 --> 00:35:24.220
Come on up.

00:35:24.220 --> 00:35:29.560
As they're getting their certificates, I've never presented this many roadmasters at one time.

00:35:29.560 --> 00:35:35.220
So kudos to the City of Twin Falls for a real stellar road crew.

00:35:35.220 --> 00:35:38.020
That's a big study group.

00:35:38.020 --> 00:35:41.150
Yeah, I think it speaks to our own.

00:35:41.150 --> 00:35:43.310
I guess I normally cover it this time.

00:35:43.310 --> 00:35:52.670
Also, the goal of this, of the program, besides providing that training and that technical assistance, is for the efficiency purpose back to the city.

00:35:52.670 --> 00:35:58.350
You guys are seeing some value out of all of your employees being trained the same way with the same techniques coming back

00:35:58.470 --> 00:36:03.430
Then when they are operating sometimes I know there's individual crews sometimes individual employees are out doing work

00:36:03.430 --> 00:36:08.690
The goal is for everyone to be doing the right thing the right way all the time and getting more bang for your buck

00:36:08.690 --> 00:36:11.210
When you guys are investing in your streets in the city of Twin Falls

00:36:12.580 --> 00:36:17.700
Layla if you could come over here gentlemen, could you come time in for can you get us where you need us Josh?

00:36:17.700 --> 00:36:19.700
I

00:36:21.730 --> 00:36:26.830
The line up talk guys the back. I can't believe Dean took his hat off

00:36:31.240 --> 00:36:33.240
That's about it

00:36:41.880 --> 00:37:02.460
Get getting complicated guys complicated snuggle up boys

00:37:03.600 --> 00:37:16.710
I stood on Dean for a second.

00:37:16.710 --> 00:37:20.180
Everybody met him being traded in his horse for a best

00:37:20.180 --> 00:37:21.180
prosecutor.

00:37:21.180 --> 00:37:33.280
We could give them an opportunity.

00:37:33.280 --> 00:37:35.600
Josh, it's hard to tell whether he's smiling with the

00:37:35.600 --> 00:37:36.440
handlebar mustaches.

00:37:36.440 --> 00:37:37.920
He's sorry.

00:37:37.920 --> 00:37:40.480
I think that same smiling joke when I get pictures.

00:37:40.480 --> 00:37:41.760
So you'll be surprised.

00:37:41.760 --> 00:37:43.800
None of the road guys and any of the jurisdictions

00:37:43.800 --> 00:37:44.560
tonight have a smile.

00:37:44.560 --> 00:37:48.160
So with their roadmasters, they also get presented a

00:37:48.160 --> 00:37:50.760
Carhartt jacket, which I'll be doing out in the hallway,

00:37:50.760 --> 00:37:52.160
making sure everyone gets their jackets.

00:37:52.160 --> 00:37:57.220
And we also will take some pictures to be included in the LTCH newsletter that is e-mailed out

00:37:57.220 --> 00:37:59.500
and mailed out to all the local highway jurisdictions in the state.

00:37:59.500 --> 00:38:01.540
So any questions for me?

00:38:01.540 --> 00:38:02.540
Any questions for me?

00:38:02.540 --> 00:38:05.050
I see no lights.

00:38:05.050 --> 00:38:06.410
Thank you for presentation.

00:38:06.410 --> 00:38:10.110
Thank you so much for your time and for your support of the program and for your guys.

00:38:10.110 --> 00:38:10.930
Thanks.

00:38:10.930 --> 00:38:13.490
Very appreciative of you gentlemen and your professionalism.

00:38:13.490 --> 00:38:14.690
Thank you very much.

00:38:14.690 --> 00:38:16.690
Good job.

00:38:16.690 --> 00:38:21.390
Moving on to the next item on the agenda and swearing in ceremony for the Twin Falls Police

00:38:21.390 --> 00:38:29.300
Department's newest police employee. Officer Matthew Jelter? Well your dad told me how to say it.

00:38:29.300 --> 00:38:36.100
I will be administering the oath of office here in just a moment but first of all we have a chief

00:38:36.100 --> 00:38:44.690
Brian Creer. Chief? Well thank you Mayor and Council. Tonight we have the privilege of swearing in our

00:38:44.690 --> 00:38:57.390
newest police officer. If I could ask Matthew Jelter please come forward. Over this way a little bit

00:38:57.390 --> 00:39:02.080
There we go, there we go.

00:39:02.080 --> 00:39:05.440
Police officers must secure the safety of the citizens.

00:39:05.440 --> 00:39:11.520
In doing so, they must take risks and accept inconveniences on the behalf of strangers.

00:39:11.520 --> 00:39:17.980
They must protect life, defend civil liberties, all in order to make a difference in the quality

00:39:17.980 --> 00:39:20.500
of life for their community.

00:39:20.500 --> 00:39:25.020
And policing, you will be faced with life and death decisions.

00:39:25.020 --> 00:39:30.890
You will be called to assist others in need, and at times, possibly at the lowest point in

00:39:30.890 --> 00:39:33.760
that person's life.

00:39:33.760 --> 00:39:38.440
You must have compassion and sympathy, while at the same time, possess the ability to remain

00:39:38.440 --> 00:39:45.120
calm, disciplined, and professional during critical life and death situations.

00:39:45.120 --> 00:39:49.800
So, Council, let me introduce you to Matthew Jelter.

00:39:49.800 --> 00:39:56.240
He was hired by the Twin Falls Police Department on April 13, 2015 as a full-time police officer.

00:39:56.240 --> 00:40:04.880
He was born in Glendora, California, September of 1991.

00:40:04.880 --> 00:40:10.600
He was raised in San Dimas, California, and attended high school in both San Dimas and Glendora.

00:40:10.600 --> 00:40:15.760
Upon graduating from high school, he attended Citrus Community College in Glendora and earned

00:40:15.760 --> 00:40:19.760
an associate's degree in business administration.

00:40:19.760 --> 00:40:25.160
He served a two-year mission in the countries of El Salvador and Belize, where he became fluent

00:40:25.160 --> 00:40:26.160
in Spanish.

00:40:26.160 --> 00:40:31.480
When he returned from his mission, Matt went on to further his education at Brigham Young

00:40:31.480 --> 00:40:33.920
University, Idaho.

00:40:33.920 --> 00:40:38.760
He's pursuing his bachelor's degree in business management, and he's scheduled to graduate

00:40:38.760 --> 00:40:42.580
in January of 2016.

00:40:42.580 --> 00:40:48.540
Prior to his employment with Twin Falls Police, he worked as a deputy sheriff with the Los Angeles

00:40:48.540 --> 00:40:56.220
County Sheriff's Department from July of 2013 until coming to our agency in April of 2015.

00:40:56.220 --> 00:41:03.220
Matt was awarded his California Post Basic Certificate in December of 2014.

00:41:03.220 --> 00:41:11.890
Matt and his wife, Alexa, are looking forward to not only having but raising a family here in Twin Falls.

00:41:11.890 --> 00:41:16.890
He's an avid outdoorsman. He enjoys hunting, shooting, fishing.

00:41:16.890 --> 00:41:23.820
And this is the part I'm concerned about, riding motocross.

00:41:23.820 --> 00:41:29.670
He's grateful for the opportunity to serve the Twin Falls community.

00:41:29.670 --> 00:41:34.830
So tonight the ceremony consists of pinning of the police badge and the oath administered

00:41:34.830 --> 00:41:36.890
by Mayor Hall.

00:41:36.890 --> 00:41:42.900
So Matthew, pinning of the police badge is more than a metallic object that I will place

00:41:42.900 --> 00:41:45.540
on your uniform.

00:41:45.540 --> 00:41:54.090
The badge is a symbol of your office that represents honor, integrity, service and dedication

00:41:54.090 --> 00:41:57.460
to the people you are sworn to protect.

00:41:57.460 --> 00:42:03.720
The badge is your constant reminder of the high standards in the police profession and

00:42:03.720 --> 00:42:08.510
our expectation of service to this community.

00:42:08.510 --> 00:42:17.150
You are to always demonstrate bravery, compassion, wisdom, accountability, and you are to always

00:42:17.150 --> 00:42:22.840
keep the badge shining as an example of our profession.

00:42:22.840 --> 00:42:28.680
The oath, by raising your right hand, you are affirming your commitment.

00:42:28.680 --> 00:42:34.640
You are making the solemn pledge to uphold the ethical values of our profession, to uphold

00:42:34.640 --> 00:42:37.690
all of what the badge represents.

00:42:37.690 --> 00:42:43.570
And you affirm your commitment to providing public safety to our community while maintaining

00:42:43.570 --> 00:42:46.160
the public's trust.

00:42:46.160 --> 00:42:55.150
So Matthew, my charge to you tonight always remain committed in your duties and never slip

00:42:55.150 --> 00:43:00.590
in your honor, in your integrity, in your service, or in the public's trust.

00:43:00.590 --> 00:43:53.000
I state your name up to Solomonley Swear.

00:43:53.000 --> 00:43:56.000
Do you solemnly swear that I will support the Constitution,

00:43:56.000 --> 00:43:59.000
as well as the Constitution of the United States of America,

00:43:59.000 --> 00:44:02.000
the United States of America, and the Constitution,

00:44:02.000 --> 00:44:05.000
and the Constitution, and the laws of the state of Iowa,

00:44:05.000 --> 00:44:09.000
and laws of the state of Iowa, and the laws of the ordinance of the laws and ordinances

00:44:09.000 --> 00:44:13.000
of the city of Twin Falls, the city of Twin Falls, and the rules and regulations

00:44:13.000 --> 00:44:16.000
and rules and regulations of the Twin Falls Police Department

00:44:16.000 --> 00:44:18.000
of Twin Falls Police Department.

00:44:18.000 --> 00:44:26.220
that I will and that I will well and faithfully discharge the duties of the office of police

00:44:26.220 --> 00:44:30.180
office the duties of the office of police office the Twin Falls Police Department

00:44:30.180 --> 00:44:37.280
to which I have been appointed according to law according to the best of mine good

00:44:37.280 --> 00:45:25.280
and the best of my ability to get you by the speech

00:45:25.280 --> 00:45:38.410
Well, I just want to say on behalf of the City Council, welcome, Matthew, welcome to his

00:45:38.410 --> 00:45:39.410
family.

00:45:39.410 --> 00:45:43.210
I got to meet a few of you just earlier and I want to get caught up.

00:45:43.210 --> 00:45:45.290
I used to live in Sandemas years ago.

00:45:45.290 --> 00:45:49.810
I worked for the Forest Service there in Glendora and up in Sandemas Canyon on an injured crew

00:45:49.810 --> 00:45:50.810
up there.

00:45:50.810 --> 00:45:54.340
So it would be fun to talk to you about that.

00:45:54.340 --> 00:45:55.340
Congratulations.

00:45:55.340 --> 00:46:08.040
Next item on the agenda is consideration of a request to approve a special events application

00:46:08.040 --> 00:46:10.040
for La Fiesta.

00:46:10.040 --> 00:46:17.260
Front Cinco de Mayo event to be held at 1288 Blue Lakes Boulevard North on Tuesday, May 5th,

00:46:17.260 --> 00:46:21.360
2015. We have Dennis Bullen, Staff Sergeant.

00:46:21.360 --> 00:46:23.320
Thank you, Mayor Hall, City Council.

00:46:23.320 --> 00:46:29.000
We received a request to hold the Cinco de Mayo celebration on May 5th, which is tomorrow.

00:46:29.000 --> 00:46:34.200
We've been working diligently on this, trying to get this in in time.

00:46:34.200 --> 00:46:42.720
And several city's relevant staff members in the police administration have met on this.

00:46:42.720 --> 00:46:52.360
Realizing that Lafayette's to celebrate Cinco de Mayo every year, however this year it's a little bit different because they are hoping to hold part of their celebration outdoors.

00:46:52.360 --> 00:47:01.560
Serving alcohol would be on the west side of the building, the small parking area between their building and the lawn and blue legs basically.

00:47:01.560 --> 00:47:07.680
They also wish to hold or have a bucking bowl or an electric bowl ride in the area.

00:47:07.680 --> 00:47:11.320
It might be kind of interesting to watch.

00:47:11.320 --> 00:47:17.160
As well as they're going to only allow 21 years of age and oh and up in that area they

00:47:17.160 --> 00:47:23.100
will provide people checking IDs and make sure everybody follows the rules in that area.

00:47:23.100 --> 00:47:29.460
They will also have a DJ playing live music recorded music in that area as well.

00:47:29.460 --> 00:47:34.700
They are going to close the music down approximately at a clock in the evening due to the hotel

00:47:34.700 --> 00:47:35.700
being next door.

00:47:35.700 --> 00:47:37.060
They don't want to disturb people's peace.

00:47:37.060 --> 00:47:42.080
However, the bucking bull and the alcohol continue to be served until nine o'clock an

00:47:42.080 --> 00:47:43.080
hour later.

00:47:43.080 --> 00:47:49.380
After everyone has met on this, they have all the required permits needed.

00:47:49.380 --> 00:47:55.270
We are simply bringing this to you for your blessing on this as well as I would like to

00:47:55.270 --> 00:47:57.290
know that we've approved this.

00:47:57.290 --> 00:47:58.290
Thank you, Staff Sergeant.

00:47:58.290 --> 00:48:01.810
I have any questions or direction for this evening.

00:48:01.810 --> 00:48:03.170
Greg Lanny.

00:48:03.170 --> 00:48:06.170
Mayor Hall, I move that we approve the Cinco de Mayo

00:48:06.170 --> 00:48:08.690
celebration for La Fiesta with the hours

00:48:08.690 --> 00:48:14.340
and things as stated by Staff Sergeant Pollum.

00:48:14.340 --> 00:48:15.180
Second.

00:48:15.180 --> 00:48:16.660
I have a motion on floor by Greg Lanting

00:48:16.660 --> 00:48:19.420
seconded by Suzanne Hopkins as stated.

00:48:19.420 --> 00:48:23.800
Do we have anything further on that motion council?

00:48:23.800 --> 00:48:26.080
Sharon, roll call vote please.

00:48:26.080 --> 00:48:26.920
Jim Mann.

00:48:26.920 --> 00:48:28.240
Yes.

00:48:28.240 --> 00:48:29.720
Sean Verigar.

00:48:29.720 --> 00:48:53.720
Yes, Chris talking to yes, Greg landing yes, Don Hall. Yes, Rebecca Mills, so I can yes, Suzanne Hocken. Yes, motion passes seven to zero. Thank you, Staff Sergeant. Appreciate it. Next item on the agenda is consideration of your request to hire a combination building inspector slash plans examiner and we have Jared Boardy.

00:48:53.720 --> 00:48:55.720
Welcome, Chair.

00:48:55.720 --> 00:48:58.320
Maybe my members of the council.

00:48:58.320 --> 00:49:00.920
So we tried to ride a pretty in-depth staff report,

00:49:00.920 --> 00:49:02.720
so I'd just like to try to hit some of the high points

00:49:02.720 --> 00:49:06.320
and then stand for any questions.

00:49:06.320 --> 00:49:09.360
In 2006, we had three full-time building inspectors

00:49:09.360 --> 00:49:11.300
who were fully dedicated to building inspections

00:49:11.300 --> 00:49:14.490
and only currently we only have one.

00:49:14.490 --> 00:49:16.970
So our permit activity has a significant increase

00:49:16.970 --> 00:49:19.290
and a workload demands are drawn up.

00:49:19.290 --> 00:49:22.330
We believe the increase in workload fully justifies

00:49:22.330 --> 00:49:24.290
to support for a new building inspector

00:49:24.290 --> 00:49:26.210
slash plans examiner position.

00:49:27.890 --> 00:49:30.170
This new position has already received support

00:49:30.170 --> 00:49:32.850
from long-term planning and senior staff.

00:49:32.850 --> 00:49:35.930
And basically tonight we're asking for authorization

00:49:35.930 --> 00:49:41.000
to do a major hire for this position.

00:49:41.000 --> 00:49:42.240
Maybe I'll turn it over to Travis.

00:49:42.240 --> 00:49:43.720
Could you maybe talk us through

00:49:43.720 --> 00:49:46.480
where the Howard Run Fundness and all those pin items?

00:49:48.040 --> 00:49:49.680
Absolutely.

00:49:49.680 --> 00:49:53.320
So I think that maybe to kind of back up a little bit

00:49:53.320 --> 00:49:57.920
and add some of the detail, because I think it's important.

00:49:57.920 --> 00:50:00.720
The first is, why are we here tonight?

00:50:00.720 --> 00:50:03.320
During an annual budget process, we

00:50:03.320 --> 00:50:05.240
assigned the total number of employees

00:50:05.240 --> 00:50:07.680
that we're going to have inside of our organization

00:50:07.680 --> 00:50:11.760
by allocation of funding for salaries.

00:50:11.760 --> 00:50:16.440
In order to move forward and create additional positions

00:50:16.440 --> 00:50:19.600
mid-year, what we're asking for is the council

00:50:19.600 --> 00:50:22.480
to be able to spend additional monies.

00:50:22.480 --> 00:50:27.680
And in this case, it would be revenues that were not contemplated during the budget process.

00:50:27.680 --> 00:50:31.120
When we take a look at the revenue that is coming in from the building department,

00:50:31.120 --> 00:50:35.320
it is exceeding where we were at last year.

00:50:35.320 --> 00:50:40.120
And if that trend continues, which we believe that will,

00:50:40.120 --> 00:50:48.320
you're going to have about $70,000 in the building department alone that would be able to cover these costs.

00:50:48.320 --> 00:50:55.180
We're also seeing increases in the electrical, mechanical, and plumbing permits in those categories

00:50:55.180 --> 00:50:58.560
as a whole that also create additional revenue opportunities.

00:50:58.560 --> 00:51:03.560
So in total, we believe that there is clearly enough money to absorb this position this

00:51:03.560 --> 00:51:09.610
year and into the subsequent years with the increased building activity that we're seeing.

00:51:09.610 --> 00:51:16.810
I think an important point that Jared didn't share is we have, and I think these are very,

00:51:16.810 --> 00:51:22.810
very good decisions would have more money in our coffers to move forward.

00:51:22.810 --> 00:51:28.450
But we have made the decision to help and not only our partners, but also to advance and

00:51:28.450 --> 00:51:32.050
do economic development inside of our community.

00:51:32.050 --> 00:51:38.130
We have made the decision to waive the Cliff Bar Building Permit Fees associated with this

00:51:38.130 --> 00:51:44.290
project based upon the decision that a single year of permit fees pales in comparison to

00:51:44.290 --> 00:51:49.510
the ongoing property tax benefit as part of an overall incentive package.

00:51:49.510 --> 00:51:54.670
The second is the school district in exchange for land and other opportunities, namely the

00:51:54.670 --> 00:52:00.310
Sunway Soccer Fields, exchanged that for building permit fees.

00:52:00.310 --> 00:52:05.350
And that's really a testament to the partnership that we have moving forward.

00:52:05.350 --> 00:52:09.110
Lori race is here, she could also talk about the finances, but when we spent time looking

00:52:09.110 --> 00:52:13.950
at the finances we believe that we should be well covered.

00:52:13.950 --> 00:52:17.110
I think Jared also mentioned that this is a position

00:52:17.110 --> 00:52:20.270
that was fully vetted on many, many different levels.

00:52:20.270 --> 00:52:22.610
Later tonight, you're going to see the presentation

00:52:22.610 --> 00:52:24.910
from the long-term planning commission.

00:52:24.910 --> 00:52:28.190
And as I understand it, if a position makes it

00:52:28.190 --> 00:52:32.550
through that battleground, it has had serious conversation.

00:52:32.550 --> 00:52:35.590
We have representatives of every single department sitting

00:52:35.590 --> 00:52:40.870
at the table prioritizing departments based upon true need.

00:52:40.870 --> 00:52:47.510
And this position was one of one that would be presented in moving forward and is contemplated

00:52:47.510 --> 00:52:52.430
in next year's overall budget based upon the efforts of the long-term planning position.

00:52:52.430 --> 00:52:54.990
Thank you, Travis.

00:52:54.990 --> 00:52:55.990
Chris Daugherty.

00:52:55.990 --> 00:53:03.290
And, Jared, if we bring this building inspector on early, he has partially in reflection to

00:53:03.290 --> 00:53:10.770
are 41% bump and think single-family permits over the same time a year ago, surely seems

00:53:10.770 --> 00:53:18.130
justified. As a consequence, we must have quite a backlog of inspections. Would you walk the

00:53:18.130 --> 00:53:24.390
council and the public through the metrics of what internally you try to do on building

00:53:24.390 --> 00:53:30.370
inspection approval time, how long, and with the new person coming on, are going to shorten

00:53:30.370 --> 00:53:33.370
that hopefully you get the drift of the question.

00:53:33.370 --> 00:53:34.370
Yes sir.

00:53:34.370 --> 00:53:40.370
So residential plan reviews we try to do a 3-5 turnaround, 3-5-8 turnaround on plan reviews.

00:53:40.370 --> 00:53:42.450
So the builder can get started.

00:53:42.450 --> 00:53:45.370
Our current workload we're up to almost two weeks or longer.

00:53:45.370 --> 00:53:50.970
In commercial we try to do four to six weeks and it's eight plus weeks.

00:53:50.970 --> 00:53:55.570
So it's really backlogging the plan review process and then once the plans are approved

00:53:55.570 --> 00:53:58.610
We try to commit to the same day inspection service,

00:53:58.610 --> 00:54:00.610
and we're getting to the point

00:54:00.610 --> 00:54:02.370
where we're not gonna build on or that anymore as well.

00:54:02.370 --> 00:54:06.330
So this position will allow us to continue

00:54:06.330 --> 00:54:07.570
the three to five day turnaround

00:54:07.570 --> 00:54:09.090
four to six week on commercial

00:54:09.090 --> 00:54:11.050
and do same day inspections.

00:54:11.050 --> 00:54:12.690
That's the intent of this position.

00:54:12.690 --> 00:54:13.650
And it's a combination.

00:54:13.650 --> 00:54:15.730
So the person can do plans, examiner,

00:54:15.730 --> 00:54:17.410
and building inspections both.

00:54:17.410 --> 00:54:20.290
Where are the needs to work to get the need.

00:54:20.290 --> 00:54:22.090
And if we brought that person on that,

00:54:22.090 --> 00:54:25.250
still only takes us up to two building inspectors

00:54:25.250 --> 00:54:27.690
versus three that we've had before.

00:54:27.690 --> 00:54:29.090
So what we've really tried to do

00:54:29.090 --> 00:54:32.290
is tailor our department to a combination type department

00:54:32.290 --> 00:54:35.090
to where we have multiple scopes

00:54:35.090 --> 00:54:37.330
with one individual doing multiple different trades

00:54:37.330 --> 00:54:38.170
of inspection.

00:54:38.170 --> 00:54:41.170
So the combination thing is improving our efficiency,

00:54:41.170 --> 00:54:44.070
but we're at that brink to where we can no longer

00:54:44.070 --> 00:54:46.410
do it with the combination folks we have.

00:54:46.410 --> 00:54:47.730
Thank you.

00:54:47.730 --> 00:54:48.570
Thank you.

00:54:48.570 --> 00:54:49.570
We're back in Melsoika.

00:54:49.570 --> 00:54:50.410
Thank you, Mayor.

00:54:50.410 --> 00:54:52.510
Thank you, Jared.

00:54:52.510 --> 00:54:54.730
Remind us, this is a different position,

00:54:54.730 --> 00:55:01.090
But we recently added a position for, I can't remember if it was a planned examiner.

00:55:01.090 --> 00:55:05.690
But associated with a fee that we created or increased recently.

00:55:05.690 --> 00:55:08.450
Can you remind us of that position?

00:55:08.450 --> 00:55:11.230
Ms. Roth, why don't you?

00:55:11.230 --> 00:55:20.870
So what happened, I'm going to even roll back the clock to the time in which we had the make of the decision to lay off individuals inside of our building department based upon workload.

00:55:20.870 --> 00:55:28.870
When we had that workload issue, it also caused us to take a look at where we were at, and we ran very thin.

00:55:28.870 --> 00:55:36.870
We had one individual that was serving as a building inspector, a building official, and then we had one individual over each of the three areas.

00:55:36.870 --> 00:55:39.870
One in mechanical, one in plumbing, and one in electrical.

00:55:39.870 --> 00:55:44.870
We made the decision to eliminate the plan's examiner based upon workload and revenues coming in.

00:55:44.870 --> 00:55:54.870
And in hindsight, and as we shared at the creation of the resolution, that was one of those positions that I aired in providing that guidance and that judgment,

00:55:54.870 --> 00:55:59.870
because the workload wasn't really indicative of the permits that were being issued.

00:55:59.870 --> 00:56:08.870
And we were asking our building official to be and wear more hats than what was physically capable to honor those timelines and moving forward.

00:56:08.870 --> 00:56:16.030
Fast forward to last year, what we did was we had a conversation with the Building Advisory Committee.

00:56:16.030 --> 00:56:20.950
And in the conversation with the Building Advisory Committee, we approached them and

00:56:20.950 --> 00:56:26.110
the Building Advisory Committee is composed of representatives of the industry.

00:56:26.110 --> 00:56:36.390
And said that we would be able to turn around to be more expedient in the plan review side of the equation.

00:56:36.390 --> 00:56:44.310
If we were able to assess a plan review fee on residential properties, we had provided and

00:56:44.310 --> 00:56:49.150
requested a plan review fee on commercial properties and industrial properties in the past,

00:56:49.150 --> 00:56:53.830
but it was the first time that we ever did it for residential properties.

00:56:53.830 --> 00:56:59.350
And part of that justification was we would be able to hire our planned examiner back with

00:56:59.350 --> 00:57:05.870
the partial of with those but it would also free up our building official to serve and

00:57:05.870 --> 00:57:11.550
be the building official and really monitor the operations of the department and remove

00:57:11.550 --> 00:57:13.670
some of those duties.

00:57:13.670 --> 00:57:21.790
This position that we would be looking at hiring mid-year is actually re-establishing and putting

00:57:21.790 --> 00:57:29.530
in a position that we also had removed during that time in which we are eliminating positions.

00:57:29.530 --> 00:57:34.390
Because we also not only eliminate the plans examined at that time, we also eliminated a

00:57:34.390 --> 00:57:35.390
building inspector.

00:57:35.390 --> 00:57:39.020
Okay, thank you.

00:57:39.020 --> 00:57:46.300
Well, it makes sense to me to have the funding and there's a need for the position.

00:57:46.300 --> 00:57:50.620
But as a follow-up question, I appreciate you pointing that out, Travis.

00:57:50.620 --> 00:57:58.160
So if the workload or the activity, the revenues drop, I mean is this a permanent position that

00:57:58.160 --> 00:58:04.040
will be able to fund, should it not fund itself in the future?

00:58:04.040 --> 00:58:06.280
How do you see this position going forward?

00:58:06.280 --> 00:58:12.280
So I believe that all positions need to be reviewed on an annual basis.

00:58:12.280 --> 00:58:16.840
We have every intention of making sure that the positions, when we add them, we are doing

00:58:16.840 --> 00:58:23.300
So when we've analyzed every single effort, including improvements of internal processes.

00:58:23.300 --> 00:58:29.620
And the workload right now illustrates that we are going to significantly fail if we are

00:58:29.620 --> 00:58:35.020
not able to add this additional body.

00:58:35.020 --> 00:58:40.660
Should we, knock on wood, right, ever have to experience those same types of downturns,

00:58:40.660 --> 00:58:44.500
we would continue to go forward and have those same types of conversations.

00:58:44.500 --> 00:58:48.220
But I think the council needs to recognize prior to having this conversation.

00:58:48.220 --> 00:58:53.380
We also have conversations with members of our building community and

00:58:53.380 --> 00:58:58.060
tried to get an understanding of what they're projecting for the future.

00:58:58.060 --> 00:59:05.930
And they are projecting that this trend is going to continue into the foreseeable future.

00:59:05.930 --> 00:59:10.210
Travis, that's actually for my guy, I think that you know I've gone, so

00:59:10.210 --> 00:59:12.010
you can find some more of that stuff.

00:59:12.010 --> 00:59:30.010
So I understand the need for the position and I'm totally supportive. My question is, we've also done a space needs push. We know we're out of physical space for another body and I'm assuming this person will need to go in the Hanson Street building.

00:59:30.010 --> 00:59:35.010
And where are you going to squeeze another body and until we get things moving.

00:59:35.010 --> 00:59:39.010
There's a room in the basement that I mark storage.

00:59:39.010 --> 00:59:56.560
I think that Councilwoman Hawkins brings up a point just for increased clarification.

00:59:56.560 --> 01:00:00.360
The amount of money that we're asking for in this budget not only includes the balance

01:00:00.360 --> 01:00:04.840
of this fiscal year but the immediate tools that the person is going to need to be able

01:00:04.840 --> 01:00:09.480
to move forward and then in the subsequent years it will be just the salary and complete

01:00:09.480 --> 01:00:11.480
benefits.

01:00:11.480 --> 01:00:16.200
Jared, I just wanted to say that I guess this is a good problem to have where we need to hire more

01:00:16.760 --> 01:00:21.800
employees so that we can keep up with the demand because our economy is fairly robust right now.

01:00:22.360 --> 01:00:26.920
And with that, I just want to say thank you to you and your staff because we know that

01:00:27.560 --> 01:00:31.400
this hasn't been instantaneous, that we're going to get this other position. You're going to have to

01:00:31.400 --> 01:00:35.480
pick up the load and keep running with it. So thank you for that and please share that with

01:00:35.480 --> 01:00:37.740
with your staff and council.

01:00:37.740 --> 01:00:38.740
Chris, talking.

01:00:38.740 --> 01:00:41.020
I'd like to make a motion based upon the fact

01:00:41.020 --> 01:00:43.580
that we have a significant slowdown

01:00:43.580 --> 01:00:47.460
on the building inspector turnaround time

01:00:47.460 --> 01:00:49.380
that inconveniences all parties

01:00:49.380 --> 01:00:52.220
and the fact that we're exceeding our revenues

01:00:52.220 --> 01:00:56.300
by virtue of everything from the residential,

01:00:56.300 --> 01:00:59.580
the commercial building activity in the community.

01:00:59.580 --> 01:01:04.680
I would therefore approve the or authorize,

01:01:04.680 --> 01:01:12.440
I would ask the council, I mean, to offer the combination building inspector plan examiner

01:01:12.440 --> 01:01:16.640
paid for with the unanticipated building permit excess revenues.

01:01:16.640 --> 01:01:17.640
Second.

01:01:17.640 --> 01:01:23.360
We have a motion on floor by Chris Toggington, seconded by Rebecca Milsoyka, Rebecca Milsoyka.

01:01:23.360 --> 01:01:24.360
Thank you.

01:01:24.360 --> 01:01:29.400
Mayor, just before we vote, I did want to ask a question on your staff report talked about

01:01:29.400 --> 01:01:33.120
the proposed downtown permit assistance program.

01:01:33.120 --> 01:01:36.320
So since we hadn't heard about that, I was wondering,

01:01:36.320 --> 01:01:38.820
you said that this position is going to help implement

01:01:38.820 --> 01:01:40.820
this proposed program.

01:01:40.820 --> 01:01:44.020
So just for the public's benefit and our benefit,

01:01:44.020 --> 01:01:46.760
what type of program is that proposed to be

01:01:46.760 --> 01:01:50.120
and how will that assist in the downtown allocation?

01:01:50.120 --> 01:01:52.620
Yeah, so that program I plan to bring to council

01:01:53.520 --> 01:01:55.220
is still in the conceptual stages right now.

01:01:55.220 --> 01:01:58.120
We did meet with New Lakes Rotary,

01:01:58.120 --> 01:02:00.220
our building advisory board and got some good feedback.

01:02:00.220 --> 01:02:02.620
And we have kind of a pilot program going,

01:02:02.620 --> 01:02:07.320
But Melinda got excited and got the word out, so it's kind of been holding the whole program.

01:02:07.320 --> 01:02:14.560
So once this position's here, I can fully implement that and bring it back to Council to explain what that program's all about, definitely.

01:02:14.560 --> 01:02:22.760
But it's about getting old buildings occupied again and thriving with businesses or tenants, because the old buildings are so challenging.

01:02:22.760 --> 01:02:24.520
It takes more time.

01:02:24.520 --> 01:02:25.920
Okay.

01:02:25.920 --> 01:02:32.780
How long of a turnaround do you think will be for hiring this position with the economy being good and unemployment rate being low?

01:02:32.780 --> 01:02:38.590
I don't know, I'm hoping soon, but I'm going to talk to Susan, maybe I can post it tonight.

01:02:38.590 --> 01:02:42.110
I like it, thank you.

01:02:42.110 --> 01:02:43.890
We have a motion on force, seconded.

01:02:43.890 --> 01:02:46.150
Anything further on the motion council?

01:02:46.150 --> 01:02:48.320
Sharon, roll call, vote please.

01:02:48.320 --> 01:02:49.800
Sean Bericher.

01:02:49.800 --> 01:02:51.470
Yeah.

01:02:51.470 --> 01:02:52.470
Chris Tockington.

01:02:52.470 --> 01:02:53.910
Yes.

01:02:53.910 --> 01:02:54.810
Greg Lanting.

01:02:54.810 --> 01:02:55.510
Yes.

01:02:55.510 --> 01:02:56.150
Don Hall.

01:02:56.150 --> 01:02:57.070
Yes.

01:02:57.070 --> 01:02:58.550
Rebecca Mills-Soyka.

01:02:58.550 --> 01:03:00.040
Yes.

01:03:00.040 --> 01:03:01.320
Suzanne Hawkins.

01:03:01.320 --> 01:03:02.280
Yes.

01:03:02.280 --> 01:03:03.040
Jim Mun.

01:03:03.040 --> 01:03:03.600
Yes.

01:03:03.600 --> 01:03:05.240
Motion passes seven to zero.

01:03:05.240 --> 01:03:11.160
Sean, I'd fail to remind myself to ask you if you have any questions, be in remote.

01:03:11.160 --> 01:03:14.360
So please don't be shy and let us know if you do have a question, sir.

01:03:14.360 --> 01:03:17.560
You will never know me to be shy, may I?

01:03:17.560 --> 01:03:20.120
I have not.

01:03:20.120 --> 01:03:28.620
Next item is presentation of an update on the Canyon Springs Grade Project.

01:03:28.620 --> 01:03:32.580
And we have Troy Vitek, Assistant City Engineer.

01:03:32.580 --> 01:03:34.800
Welcome back, Troy.

01:03:34.800 --> 01:03:36.320
Thank you, Council.

01:03:36.320 --> 01:03:37.720
Tonight, I am coming forward,

01:03:37.720 --> 01:03:39.680
just kind of give you a brief update

01:03:39.680 --> 01:03:43.960
on what is happening with the Canyon Rim Trail discussion.

01:03:43.960 --> 01:03:48.600
So Travis, Mitch, Jackie, and myself all met

01:03:48.600 --> 01:03:52.120
and started discussing this Canyon Springs grade.

01:03:52.120 --> 01:03:55.040
And out of four of us, we have four separate opinions

01:03:55.040 --> 01:03:57.040
of what should be designed out there.

01:03:57.040 --> 01:03:59.880
So we kind of went back to the drawing board

01:03:59.880 --> 01:04:01.560
and we said, how can we help with this?

01:04:01.560 --> 01:04:03.000
Well, four different opinions means

01:04:03.000 --> 01:04:05.520
There's probably a lot of others out there in the community

01:04:05.520 --> 01:04:08.000
that have an interest in this.

01:04:08.000 --> 01:04:10.320
I don't know, I'm starting to talk into one of those

01:04:10.320 --> 01:04:11.640
that has a great opinion on this.

01:04:11.640 --> 01:04:15.600
And what we proposed, I guess, or what we came up with,

01:04:15.600 --> 01:04:17.920
is we would like to go forward with hiring

01:04:17.920 --> 01:04:20.360
a kind of a public liaison.

01:04:20.360 --> 01:04:22.120
And before I tell you who we have in mind,

01:04:22.120 --> 01:04:24.120
I'll kind of tell you a little background about what

01:04:24.120 --> 01:04:26.880
we think this person would do.

01:04:26.880 --> 01:04:29.480
So this public liaison would gather

01:04:29.480 --> 01:04:31.400
all the opinions of the stakeholders.

01:04:31.400 --> 01:04:36.360
So we believe that this being very public will have several open houses where the community

01:04:36.360 --> 01:04:40.200
comes in and gives their opinion about what they want to see and the reasons they want

01:04:40.200 --> 01:04:43.040
to see it.

01:04:43.040 --> 01:04:48.720
In order to take that input and actually develop it with the consultant engineer, that's quite

01:04:48.720 --> 01:04:49.720
a process.

01:04:49.720 --> 01:04:54.640
You want to hear the people, but some ideas are better than others and we can't afford

01:04:54.640 --> 01:04:56.560
all ideas.

01:04:56.560 --> 01:05:03.840
So this liaison would help us come up with a stakeholders list, I guess, of people who

01:05:03.840 --> 01:05:04.840
are interested in this.

01:05:04.840 --> 01:05:07.880
I think we'll work with them very closely on this.

01:05:07.880 --> 01:05:13.120
So this person would develop a stakeholders list and then he'd probably help what we would

01:05:13.120 --> 01:05:18.920
propose is develop a task force or a project advisory committee.

01:05:18.920 --> 01:05:24.640
Essentially something appointed by the Council of a member between 10 and 12 people that can

01:05:24.640 --> 01:05:30.200
give input that are very closely related to the project and we would come up with a list

01:05:30.200 --> 01:05:37.160
with this gentleman and present that to you for your opinion and or approval.

01:05:37.160 --> 01:05:42.520
The council would have to present or propose a liaison and council member to be part of this

01:05:42.520 --> 01:05:46.800
advisory committee but that would be their general task in that.

01:05:46.800 --> 01:05:51.760
You could also help scope the project objectives for the design consultant.

01:05:51.760 --> 01:05:56.640
So we have an RFQ in our office that has simple designers on it.

01:05:56.640 --> 01:06:01.580
We can go out and hire a civil engineer, and we can go out and hire a geotechnical engineer.

01:06:01.580 --> 01:06:05.440
This project is more than it is said, it's a combination of both, and they work pretty

01:06:05.440 --> 01:06:06.440
well together.

01:06:06.440 --> 01:06:10.880
But this is our opportunity to sit down and say, all right, this is a very specific project.

01:06:10.880 --> 01:06:11.880
We want to get more input.

01:06:11.880 --> 01:06:20.390
We want to know more about who is working with us as part of which guy is actually going

01:06:20.390 --> 01:06:25.550
be standing up there and present in front of the community and the council and help with

01:06:25.550 --> 01:06:26.550
that.

01:06:26.550 --> 01:06:33.470
And so he can come up with that, Liz, he can also lead the community scoping meetings, which

01:06:33.470 --> 01:06:39.670
means he's standing up in front of the community and saying these are all our alternatives.

01:06:39.670 --> 01:06:44.710
We have one of three or three four different alternatives and they aren't these locations

01:06:44.710 --> 01:06:49.350
or these types of facilities, something like that, so he can get up there and discuss that

01:06:49.350 --> 01:06:53.510
in detail with all of them, and kind of get their opinions on it.

01:06:53.510 --> 01:06:56.470
And then also help us develop other project alternatives.

01:06:56.470 --> 01:07:01.330
So we will actually propose that I go out and hire Phil

01:07:01.330 --> 01:07:03.590
Krishnan, who is a member.

01:07:03.590 --> 01:07:04.950
I think you guys are aware of him.

01:07:04.950 --> 01:07:08.710
He helped us develop the strategic plan for the city.

01:07:08.710 --> 01:07:10.790
And hire him as an individual.

01:07:10.790 --> 01:07:11.510
I'd bring his.

01:07:11.510 --> 01:07:14.390
I'd work with a scope with him to say,

01:07:14.390 --> 01:07:17.550
this is what you are lined up to do

01:07:17.550 --> 01:07:20.230
and how many meetings are associated with that,

01:07:20.230 --> 01:07:22.870
and then he can help facilitate the rest of this.

01:07:22.870 --> 01:07:24.230
So we would start there,

01:07:24.230 --> 01:07:25.510
and as he's brought on board,

01:07:25.510 --> 01:07:27.990
and we actually start giving community input,

01:07:27.990 --> 01:07:32.970
we'll continue with the development of the design engineer.

01:07:32.970 --> 01:07:35.730
So I'll stand for any other questions you may have.

01:07:35.730 --> 01:07:36.570
Very good.

01:07:36.570 --> 01:07:37.410
Chris, talk.

01:07:37.410 --> 01:07:39.130
Troy, I think you're on to a good idea,

01:07:39.130 --> 01:07:41.850
but let me play devil's advocate for just a minute.

01:07:41.850 --> 01:07:46.490
If we're to democratize this project

01:07:46.490 --> 01:07:52.010
to the extent of people bringing in all sorts of ideas

01:07:52.010 --> 01:07:56.570
that may have varying ranges of practicality.

01:07:56.570 --> 01:08:01.730
Might we not lose sight of the safety and the transportation

01:08:01.730 --> 01:08:04.890
and the concepts that are really driving

01:08:04.890 --> 01:08:10.170
the need for the change in the current structure down there?

01:08:10.170 --> 01:08:14.250
I'm worried that we'll have 500 bicyclists

01:08:14.250 --> 01:08:21.330
and may drive the decision that puts the transportation needs of our wastewater plant

01:08:21.330 --> 01:08:25.050
and access to Canyon Springs as a secondary concern.

01:08:25.490 --> 01:08:31.850
It may also run contrary to the private property owners of the Brecken Regents.

01:08:31.850 --> 01:08:41.610
I'm wondering should we not have some sort of a focused value or what our intent has to be

01:08:41.610 --> 01:08:45.410
so that everything doesn't have equal value and waiting in it.

01:08:45.410 --> 01:08:47.970
Troy, I think I'm going to ask our city, Andrew,

01:08:47.970 --> 01:08:49.770
to weigh in on this, Travis.

01:08:49.770 --> 01:08:52.210
So clearly, there are some fundamental goals

01:08:52.210 --> 01:08:53.330
that have to be achieved.

01:08:53.330 --> 01:08:56.570
Canyon rim stabilization and public safety

01:08:56.570 --> 01:09:00.450
are going to be certainly at the top of that.

01:09:00.450 --> 01:09:03.330
But accomplishing those two objectives,

01:09:03.330 --> 01:09:05.970
you still have an entire palette of options

01:09:05.970 --> 01:09:07.890
that are available to you.

01:09:07.890 --> 01:09:13.510
Some of those include widening it to allow for bicyclists,

01:09:13.510 --> 01:09:17.410
or reducing it and having one lane travel with a light,

01:09:17.410 --> 01:09:23.090
or having a separated walking path for just walkers

01:09:23.090 --> 01:09:25.810
and different types of options.

01:09:25.810 --> 01:09:30.090
And because there is that differencing of opinion,

01:09:30.090 --> 01:09:33.290
after you get to the place of the importance of safety

01:09:33.290 --> 01:09:36.250
and the importance of ensuring public health,

01:09:36.250 --> 01:09:41.450
what this looks like and what the ultimate project is going to be is going to drive the

01:09:41.450 --> 01:09:42.450
cost.

01:09:42.450 --> 01:09:46.810
And what we want to do is we want to make sure that we're getting the public input on the front

01:09:46.810 --> 01:09:53.290
end to help design that project as opposed to being reactive and on the bike end.

01:09:53.290 --> 01:10:01.090
And then the idea of having some number of individuals is to lessen one particular group

01:10:01.090 --> 01:10:04.410
and keep all groups at an equal or level playing field.

01:10:04.410 --> 01:10:09.510
So the idea would be you would have the council would appoint a person who would represent

01:10:09.510 --> 01:10:14.710
the bicycling community and you'd have a person that would appoint to represent the running

01:10:14.710 --> 01:10:20.550
community and the walking community and the golfer or whatever that looked like and private

01:10:20.550 --> 01:10:22.630
property interests as well.

01:10:22.630 --> 01:10:29.830
And so that you brought a equal representation, if you will, of individuals to vet and have

01:10:29.830 --> 01:10:35.190
that conversation so that the process isn't on necessarily hijacked by one particular group

01:10:35.190 --> 01:10:39.270
that shows up with the loudest voice at that meeting. I think it's important for the Council

01:10:40.230 --> 01:10:47.030
to go through that process and appoint that committee as well as its chairperson, and that is the

01:10:47.030 --> 01:10:51.990
committee, and I say that because I think that creates real legitimacy with that committee,

01:10:51.990 --> 01:10:58.150
and then point one if not two Council liaisons to help move that process and the information

01:10:58.150 --> 01:11:06.030
to and from the community to the council, and then let them engage in a series of conversations.

01:11:06.030 --> 01:11:10.230
Like Troy said, when we sat down and had conversations just trying to understand what

01:11:10.230 --> 01:11:15.270
this scope could be, we had four very, very different opinions.

01:11:15.270 --> 01:11:22.030
And if you were to go with my plan, my plan, I guarantee, was not like by 75% of the people

01:11:22.030 --> 01:11:24.270
that I shared my plan with.

01:11:24.270 --> 01:11:30.130
The idea is to get everything on the table, and then to try to find the plan that may not

01:11:30.130 --> 01:11:36.520
be perfect for all, but it is understood and accepted by most.

01:11:36.520 --> 01:11:42.280
We could also include, essentially, an advisory committee task force charter or something like

01:11:42.280 --> 01:11:43.760
that as part of that.

01:11:43.760 --> 01:11:48.160
Here's your roles and responsibilities, and this liaison, Phil, would be responsible for

01:11:48.160 --> 01:11:51.960
heading up that meeting to make sure they stay on that charter, and we can share that with

01:11:51.960 --> 01:11:53.840
the council before we got into it.

01:11:53.840 --> 01:11:55.290
Thank you.

01:11:55.290 --> 01:11:59.580
Thank you, Mayor.

01:11:59.580 --> 01:12:06.340
Maybe I'm coming at it from a different perspective, but I'm not sure I'm on board with the consultant

01:12:06.340 --> 01:12:08.340
and committee concept.

01:12:08.340 --> 01:12:14.860
It just seems like it's not that complicated and that might add a lot more bureaucracy and

01:12:14.860 --> 01:12:15.860
time that we need.

01:12:15.860 --> 01:12:21.820
I mean, like you said, I agree with the concepts of we can only present ideas that we can afford.

01:12:21.820 --> 01:12:24.540
we can only present ideas that are best practices,

01:12:24.540 --> 01:12:28.140
that are engineering best practices,

01:12:28.140 --> 01:12:31.900
and I feel like we know those options,

01:12:31.900 --> 01:12:34.460
and we can know those options in-house.

01:12:36.620 --> 01:12:40.180
Maybe that's incorrect, but I feel like,

01:12:40.180 --> 01:12:43.100
for example, the options that Travis just stated,

01:12:43.100 --> 01:12:44.900
I think are the options we've all discussed,

01:12:44.900 --> 01:12:49.580
that we all know, I'm concerned about how much it would cost

01:12:49.580 --> 01:12:55.740
to have this consultant and go through all these committee meetings when I think we kind

01:12:55.740 --> 01:12:57.640
of know where we're at.

01:12:57.640 --> 01:13:02.260
And if you have four different opinions, let's present those to the community and have people

01:13:02.260 --> 01:13:03.260
vote on it.

01:13:03.260 --> 01:13:11.340
I hesitate to exclude certain people and appoint other people to a committee.

01:13:11.340 --> 01:13:19.180
That might be problematic if one representative doesn't always represent an entire group.

01:13:19.180 --> 01:13:23.180
Like you said, there's a lot of different opinions.

01:13:23.180 --> 01:13:24.180
I don't know.

01:13:24.180 --> 01:13:31.340
I hope we can really settle this in maybe more of a simpler manner and not go through the

01:13:31.340 --> 01:13:38.100
whole kind of city hall committee consultant sort of a thing.

01:13:38.100 --> 01:13:39.660
We have a lot of consultants out there right now.

01:13:39.660 --> 01:13:44.900
We're working on our parks, updating our parks master plan.

01:13:44.900 --> 01:13:47.340
We've got the downtown consultants.

01:13:47.340 --> 01:13:52.850
And I just feel like we might tire out the community a little bit.

01:13:52.850 --> 01:13:54.850
She's at Hopkins.

01:13:54.850 --> 01:14:01.850
Thank you. So if we decide to go with Phil, do you have an estimate on what you think it's going to cost and where we're going to pull that from our budget?

01:14:01.850 --> 01:14:06.850
Actually in discussions with Phil, he's kind of got a draft scope. We haven't finalized that yet.

01:14:06.850 --> 01:14:16.850
So before I would present that as a separate item at that time and make a recommendation, I just want to kind of give you guys a heads up, which way I'm starting to progress.

01:14:16.850 --> 01:14:20.750
progress before I get too far along if this is not something that you want to

01:14:20.750 --> 01:14:25.030
need to proceed with and I need to pull back and do a different route but

01:14:25.030 --> 01:14:29.990
I will break that number to you. That would be helpful. Thank you. Right now this is

01:14:29.990 --> 01:14:32.830
just presentation. There is no action here. There's no action. I'm just going to give

01:14:32.830 --> 01:14:37.790
our getting our reaction back. Travis? So we have $600,000 that have been placed

01:14:37.790 --> 01:14:41.230
in the budget just for the engineering and the consulting site. We

01:14:41.230 --> 01:14:48.450
envisioned a robust community process, part of our fear was that oftentimes we will bring

01:14:48.450 --> 01:14:53.310
our own biases to that process and to that meeting.

01:14:53.310 --> 01:15:00.630
And Troy has been really trying to craft a scope, I mean he has been trying to fully

01:15:00.630 --> 01:15:05.870
understand what he is going to have built in the project.

01:15:05.870 --> 01:15:11.910
And I would speculate that if we pulled the members of the council, you may have the exact

01:15:11.910 --> 01:15:18.350
same experience that us seven had in terms of what needs to be included.

01:15:18.350 --> 01:15:25.310
The other side is we're looking at cash and revenues and resources that we have.

01:15:25.310 --> 01:15:31.030
It may be the case that this becomes a project that the community wants to champion.

01:15:31.030 --> 01:15:35.610
And through that community involvement, maybe they're willing to ask some other questions

01:15:35.610 --> 01:15:40.730
that we as a group may not be in a position or feel like is appropriate to ask, which is

01:15:40.730 --> 01:15:45.570
a very similar process that we did on the wastewater treatment plant when we enhanced the amount

01:15:45.570 --> 01:15:48.330
of money that went forward with collections.

01:15:48.330 --> 01:15:54.510
If we were to limit this to the amount of resources that we have to move forward, we probably

01:15:54.510 --> 01:15:59.290
may not accomplish any of the goals that were previously described by the members of the

01:15:59.290 --> 01:16:05.210
Council when we first started talking about this, such as separated trails and pedestrian

01:16:05.210 --> 01:16:11.730
type access. There are some costs and what we want to do is we want to balance the opportunities

01:16:11.730 --> 01:16:18.490
of the project with the potential costs and have that conversation really kind of rain

01:16:18.490 --> 01:16:24.290
the day of what needs to be done again, safety being the first and foremost of what that looks

01:16:24.290 --> 01:16:32.800
I think I'm ready to have to take a look at what it's all my

01:16:32.800 --> 01:16:35.960
cosplay film, my cost is at least move forward from this

01:16:35.960 --> 01:16:42.290
meeting to at least you to advance your process there.

01:16:42.290 --> 01:16:46.090
You know, obviously found I was married to time when we did

01:16:46.090 --> 01:16:48.650
the wastewater treatment plan and we are a cheaper group

01:16:48.650 --> 01:16:50.930
than the citizens were going off with you.

01:16:50.930 --> 01:16:55.370
They came up with things that were needed that I don't think

01:16:55.370 --> 01:17:00.070
I think we would have been willing to include if they hadn't told us what needed to be included.

01:17:00.070 --> 01:17:09.670
I think we may find, just like Travis said, we may find that on this, maybe they're willing to look at other options to really make this a grand project forever.

01:17:09.670 --> 01:17:15.370
You know, for not just to fix a problem, but enhance the whole situation.

01:17:15.370 --> 01:17:23.970
And so I'm willing to take a look at your process of using fill and see where it leads us.

01:17:23.970 --> 01:17:28.330
to be honest with you, because if I could play Travis,

01:17:28.330 --> 01:17:31.770
I think if we probably pulled the seven of us

01:17:31.770 --> 01:17:34.370
on what we think had ought to be fixed,

01:17:34.370 --> 01:17:38.570
we'd have a whole range of, we'd probably have eight ideas

01:17:38.570 --> 01:17:39.970
out of seven of us.

01:17:39.970 --> 01:17:43.490
So as Chris says, and a whole range

01:17:43.490 --> 01:17:45.410
of how much money we'd be willing to spend on it.

01:17:45.410 --> 01:17:48.850
So I would like to at least go forward

01:17:48.850 --> 01:17:51.610
and see what it was gonna cost us

01:17:51.610 --> 01:17:54.650
of what Phil, and maybe you have Phil present to us

01:17:54.650 --> 01:17:57.050
of how he was planning on handling it,

01:17:57.050 --> 01:18:02.050
and if we have the other part I like about a facilitator,

01:18:02.050 --> 01:18:04.650
they know what we have to get done.

01:18:04.650 --> 01:18:06.970
I mean, we have to stay wise the rim,

01:18:06.970 --> 01:18:08.090
and those different things,

01:18:08.090 --> 01:18:10.010
and then what can we do beyond that?

01:18:10.010 --> 01:18:12.210
And so he can lead the discussion,

01:18:12.210 --> 01:18:14.230
at least knowing this has to be done.

01:18:15.130 --> 01:18:15.970
Thank you, man.

01:18:15.970 --> 01:18:17.090
You betcha.

01:18:17.090 --> 01:18:19.250
Shawn, did you want to weigh in on this?

01:18:19.250 --> 01:18:30.660
I would agree that having a facilitator help to shepherd the process can get us to a really

01:18:30.660 --> 01:18:41.880
robust options, would agree with some of the hesitancy that Rebecca stated, I think if we

01:18:41.880 --> 01:18:48.320
go into this with the goal of having a facilitator get the ideas on the table and have a process

01:18:48.320 --> 01:18:53.080
to go through that, we may come to a point where we don't necessarily need a

01:18:53.080 --> 01:18:57.060
citizens committee per se to help drive that.

01:18:57.060 --> 01:19:01.160
I think that's certainly an option and can be really effective.

01:19:01.160 --> 01:19:07.320
But maybe if we're focused on the goal of safety and rim stabilization and making this

01:19:07.320 --> 01:19:15.880
a functional multi-use transportation corridor sort of as phase one and then think about phase

01:19:15.880 --> 01:19:20.880
to how we go about engaging people.

01:19:21.160 --> 01:19:22.920
I'd be supportive of that.

01:19:22.920 --> 01:19:28.370
So I would encourage that we ask for it to bring back

01:19:29.010 --> 01:19:31.890
kind of a defined scope and maybe Phil

01:19:31.890 --> 01:19:34.290
comes and presents that as well

01:19:34.290 --> 01:19:40.820
to put our approval on that before it moves forward.

01:19:40.820 --> 01:19:42.220
I think I'll go ahead and weigh in.

01:19:42.220 --> 01:19:47.010
Now, Rebecca talked about the City Hall Committee

01:19:47.010 --> 01:19:48.370
and where that went.

01:19:48.370 --> 01:19:54.050
It was somewhat of a messy process, but the majority spoke and gave us direction.

01:19:54.050 --> 01:19:59.850
There was certainly a vocal minority, but the majority voted and gave us direction, and

01:19:59.850 --> 01:20:07.170
I felt very confident with that direction, and so I can see the benefit to having that

01:20:07.170 --> 01:20:09.410
type of a committee potentially.

01:20:09.410 --> 01:20:14.370
It doesn't mean that other people can't come and go during these sessions.

01:20:14.370 --> 01:20:19.330
The facilitator could be able to put on and give their input, but I really do like to have

01:20:19.330 --> 01:20:26.250
a well-defined committee with a chairperson and direction, and a facilitator could certainly

01:20:26.250 --> 01:20:29.450
help with all those dynamics.

01:20:29.450 --> 01:20:36.770
Thinking about Phil, I've been involved in the city for about 25, 30 years now with being

01:20:36.770 --> 01:20:42.010
an employee before, and then on council as of recently, and the strategic plan that we

01:20:42.010 --> 01:20:44.850
we have today, for example, is the best one that we've ever had.

01:20:44.850 --> 01:20:50.650
It's evolved, but I give a lot of credit to Phil Cushman to help direct that and guide

01:20:50.650 --> 01:20:51.650
that.

01:20:51.650 --> 01:20:57.610
And it's really a working document, and so I trust his ability in that respect.

01:20:57.610 --> 01:21:01.250
Now if he comes back, for me it's going to be back around cost.

01:21:01.250 --> 01:21:06.250
If he comes back and says, yeah, it's going to cost about $600,000, your complete budget.

01:21:06.250 --> 01:21:10.890
I might have some reservations about bringing a consultant.

01:21:10.890 --> 01:21:16.570
I'm not a big fan of just consultants for a consultant's sake, but in this situation that

01:21:16.570 --> 01:21:21.270
Canyon Road is so important to so many people in our community.

01:21:21.270 --> 01:21:25.050
Just go down there on a nice day and go down there right now and see how many people are

01:21:25.050 --> 01:21:26.050
utilizing that.

01:21:26.050 --> 01:21:33.720
Not only driving, walking, exercising, recreating, checking out the VISTAs.

01:21:33.720 --> 01:21:40.040
It's really an important area and there's tremendous concern about the safety of that area as well.

01:21:40.040 --> 01:21:46.840
I would really like to see us move forward and I think what I've heard from council is that at least get us back some

01:21:47.240 --> 01:21:51.720
Information from Phil and we'll go from there appreciate it. Yeah, the last two bits

01:21:51.720 --> 01:21:58.160
I've had a appreciate the impact near the input of everyone, but if you take your car to a car repair

01:21:59.040 --> 01:22:03.640
Outfit and say fix it they'll fix it, but you are giving carte blanche and

01:22:04.360 --> 01:22:06.360
you the bill will

01:22:06.360 --> 01:22:09.860
make your family destitute at times, okay?

01:22:09.860 --> 01:22:14.060
I think that the council and the four people

01:22:14.060 --> 01:22:17.340
in the committee that Travis has alluded to,

01:22:17.340 --> 01:22:21.780
we have to be focused enough to say the top three priorities

01:22:21.780 --> 01:22:27.780
or this or that, to go in with a cart-launched shotgun approach

01:22:27.780 --> 01:22:33.380
is gonna be timely, it's gonna be expensive as can be,

01:22:33.380 --> 01:22:39.700
And I think we're going to get some sort of a quilt blanket out that doesn't really give us a direction.

01:22:39.700 --> 01:22:42.300
You know, I really think that we owe it to ourselves.

01:22:42.300 --> 01:22:48.580
And I would be surprised if the four of you haven't been able to identify some priorities.

01:22:48.580 --> 01:22:50.660
I don't know, not even that.

01:22:50.660 --> 01:22:52.980
That's worse.

01:22:52.980 --> 01:22:59.460
I don't like giving an open slate without the council providing some direction,

01:22:59.460 --> 01:23:04.460
then of what our priorities are, so that if a zip line

01:23:04.460 --> 01:23:06.500
catches the attention of 500 people,

01:23:06.500 --> 01:23:10.050
we're not held hostage to that.

01:23:10.050 --> 01:23:12.810
So I really think that we have to have our imprint

01:23:12.810 --> 01:23:16.890
on a little bit more before turning it over.

01:23:16.890 --> 01:23:18.890
I think there's still time for that, obviously.

01:23:18.890 --> 01:23:19.970
I think that's my impression.

01:23:19.970 --> 01:23:21.890
I really think the charter is something

01:23:21.890 --> 01:23:23.570
we would work with, whoever we hired,

01:23:23.570 --> 01:23:26.090
or if we choose not to hire them, we as staff,

01:23:26.090 --> 01:23:29.530
which develop a charter and say, this is our priorities.

01:23:29.530 --> 01:23:33.850
one, two, three, and we would go forward with that, really try to keep them

01:23:33.850 --> 01:23:40.090
honed in on this. So, not all of those extra ideas, because those take time and money.

01:23:40.090 --> 01:23:46.650
So, Jim on has just a wrap this thing up. I, where we are, this is a bit of an

01:23:46.650 --> 01:23:50.890
academic discussion here. You bring us back a proposal. We can have a debate and a

01:23:50.890 --> 01:23:55.530
discussion about what that entails along with costs near future, correct?

01:23:55.530 --> 01:24:01.110
Yes. Okay. Great idea. I think that was fairly

01:24:01.110 --> 01:24:04.300
Thank you, Jim.

01:24:04.300 --> 01:24:06.300
Let me ask this question.

01:24:06.300 --> 01:24:08.300
Jackie, how long?

01:24:08.300 --> 01:24:10.780
Jackie Fields?

01:24:10.780 --> 01:24:11.780
Jackie.

01:24:11.780 --> 01:24:12.780
Jackie, what are you doing?

01:24:12.780 --> 01:24:13.780
I can't find you.

01:24:13.780 --> 01:24:14.780
How long is your presentation?

01:24:14.780 --> 01:24:18.780
Because I'm trying to figure out if I'm going to give us a break right now.

01:24:18.780 --> 01:24:20.780
Or if we should forge on with yours.

01:24:20.780 --> 01:24:25.780
Because I know that we have the long term planning committee and that's fairly lengthy.

01:24:25.780 --> 01:24:30.060
I would like my presentation to be ten minutes or less.

01:24:30.060 --> 01:24:31.060
Go.

01:24:31.060 --> 01:24:35.820
Wait a second. That is entirely dependent on us. I know I get

01:24:37.580 --> 01:24:39.580
Jackie you want to take break

01:24:40.240 --> 01:24:43.560
Okay, we were gonna take a five-minute break

01:24:47.820 --> 01:24:51.060
Like to reconvene the meeting of the Twin Falls City Council

01:24:52.600 --> 01:24:56.240
Shauna you still out there? I am very good, sir

01:24:56.240 --> 01:25:02.300
We are moving on to the next item which is a presentation of an update on the Southeast Twin Falls

01:25:02.300 --> 01:25:07.460
alternative alternate study. We have Jackie Fields, our city engineer. Welcome, Jackie.

01:25:07.460 --> 01:25:12.660
Thank you. Good evening. So as you know, or most of you know, the city is a member of the

01:25:12.660 --> 01:25:20.580
Greater Twin Falls Area Transportation Committee, G-Fatsy. This committee is a group of regional

01:25:20.580 --> 01:25:26.460
transportation entities like ITB, various highway districts, and some cities. And we're

01:25:26.460 --> 01:25:37.780
member of that. The G-FACI develops priority lists that we use to ITD uses to gain support

01:25:37.780 --> 01:25:45.340
for funding and that's on local roads as well as the state highway system. So ITD, through

01:25:45.340 --> 01:25:49.680
somewhat of a process, secured some funding to update an older study called the Southeast

01:25:49.680 --> 01:25:56.060
One Falls Algernet Study and selected a steering committee which is the chairman of the committee,

01:25:56.060 --> 01:26:03.420
young, a Twin Falls Highway District representative, so her master camp chose to allow Dave Burgess

01:26:03.420 --> 01:26:08.820
to participate and the City of Twin and I appointed myself.

01:26:08.820 --> 01:26:15.780
So the Student Committee worked with ITD on data and so this is all the technical components

01:26:15.780 --> 01:26:17.700
of the project.

01:26:17.700 --> 01:26:25.040
And the result of this work is going to be proposals for a future study, okay?

01:26:25.040 --> 01:26:31.420
So nothing in here has been designed to a place where you can actually build it, but projects

01:26:31.420 --> 01:26:36.100
have been estimated so that we can all kind of have an understanding of what order of magnitude

01:26:36.100 --> 01:26:37.940
we're looking for.

01:26:37.940 --> 01:26:46.500
So the consultant has Keller and Associates and they worked on, first on safety projects,

01:26:46.500 --> 01:26:51.060
And then a list of capacity projects, and then ultimately on an alternate route.

01:26:51.060 --> 01:26:57.300
And my primary purpose for being here tonight is to make you aware of the information and

01:26:57.300 --> 01:27:02.780
to ask some input on this alternate route concept, ask for some input on the alternate

01:27:02.780 --> 01:27:03.780
route concept.

01:27:03.780 --> 01:27:15.080
Okay, so the safety projects, there are three that apply to us.

01:27:15.080 --> 01:27:19.320
And none of them are huge dollar projects, they are all, you're going to see all of these

01:27:19.320 --> 01:27:24.160
projects exist on the state highway and how it interfaces with the city. So, Washington

01:27:24.160 --> 01:27:30.760
and Orchard, there's a suggestion that we do support nation with the signal, advanced warning

01:27:30.760 --> 01:27:36.280
beacon, that type of thing, kind of like what we have out on highway 30 and also out on US

01:27:36.280 --> 01:27:46.820
93 as you head for the bridge. Then there's Kimberly Road and Locust. That project is improving

01:27:46.820 --> 01:27:53.820
signal heads and phasing to provide more left turn time and then out on US 30 at Champlain

01:27:53.820 --> 01:28:02.430
3300 East the recommendation is to place turn lanes on the state highway portion of the roadway

01:28:02.430 --> 01:28:05.170
and those are the estimates for the work.

01:28:05.170 --> 01:28:11.190
So the safety projects are developed based on accident history and remarkably and happily

01:28:11.190 --> 01:28:16.150
We don't have a phenomenally bad accident history.

01:28:16.150 --> 01:28:21.350
And so some of these projects, when you look at the fatalities,

01:28:21.350 --> 01:28:24.350
there are a large number of them occurring on Highway 93

01:28:24.350 --> 01:28:27.030
and the Hollerster-Roderson area, people are driving

01:28:27.030 --> 01:28:30.470
off the road, that type of thing, falling asleep.

01:28:30.470 --> 01:28:35.070
Our projects are safety improvements that are not necessarily

01:28:35.070 --> 01:28:39.470
related to death, but will still minimize property damage

01:28:39.470 --> 01:28:45.690
and injury. Does anyone want to ask any questions on these projects?

01:28:45.690 --> 01:29:00.390
I see no lights, Jay. The capacity projects, not shockingly, are almost entirely associated

01:29:00.390 --> 01:29:07.230
with the City of Twin Falls. It's impossible to see on what I've shown you, but I'll point

01:29:07.230 --> 01:29:12.710
it out, that there's one project that we tend to believe is associated with the city and

01:29:12.710 --> 01:29:18.560
It's actually a highway district project, and that is.

01:29:18.560 --> 01:29:23.040
So in very feet, I parenthetical around that.

01:29:23.040 --> 01:29:26.880
Blue Lakes and Orchard is actually a highway district jurisdiction location.

01:29:26.880 --> 01:29:34.120
At some point in time, we believe a traffic signal may be necessary to deal with delay.

01:29:34.120 --> 01:29:38.960
And that is a project that we've looked at continuously.

01:29:38.960 --> 01:29:43.000
We've done more analysis on that intersection continuously to keep track of it.

01:29:43.000 --> 01:29:51.280
And that's perceived as a short-term project that will be necessary.

01:29:51.280 --> 01:29:54.800
Shoshone and Six adds double left turn lanes on Shoshone Street,

01:29:54.800 --> 01:29:57.160
which is the state highway.

01:29:57.160 --> 01:30:07.290
Blue Lakes and Kimberly Road, the long-term solution is to add an additional westbound

01:30:07.290 --> 01:30:10.160
left turn lane.

01:30:10.160 --> 01:30:16.520
Mertile on second suggests there's a suggestion that we might need a signal there that of course

01:30:16.520 --> 01:30:19.600
has to go through a warrant analysis.

01:30:19.600 --> 01:30:26.140
Blue Lakes, this is a significant project.

01:30:26.140 --> 01:30:35.800
The suggestion is to widen blue lakes to five lanes and to address the railroad overpass

01:30:35.800 --> 01:30:42.930
on Eastland and finally to widen Washington Street from Highland to Orchard, which should

01:30:42.930 --> 01:30:50.410
be a substantial improvement to those roadways. You can see that they are substantial projects

01:30:50.410 --> 01:30:54.890
and they are in the state highway. Chris talking in answer question.

01:30:54.890 --> 01:31:00.990
Jackie, I don't see any project mentioned here of, unless I'm misunderstanding at the

01:31:00.990 --> 01:31:09.330
East Five Points and we talked one time about bringing truck traffic westbound on Kimberley

01:31:09.330 --> 01:31:14.250
the road straight through that intersection onto what is it not Merta,

01:31:14.250 --> 01:31:21.120
menidoka. Am I misconstruing that or that's not part of any of the concept here?

01:31:21.120 --> 01:31:33.440
Not you have not misunderstood what you're seeing so the I-9B suggests some

01:31:33.440 --> 01:31:41.400
improvements to the turning movements. The work on Merta II is also associated

01:31:41.400 --> 01:31:51.760
with not making 6-Minidoka and Washington into a state highway.

01:31:51.760 --> 01:31:57.350
Making 6-Minidoka and Washington into a state highway is not a capacity project.

01:31:57.350 --> 01:32:00.430
It doesn't increase capacity on the state highway.

01:32:00.430 --> 01:32:11.190
So we are working together on seeking a local urban project to improve Washington, Minidoka

01:32:11.190 --> 01:32:19.070
six to a place where we could have a conversation about modifying the intersection of Blue Lakes

01:32:19.070 --> 01:32:27.140
and U.S. 30 to facilitate the bypass of the downtown area.

01:32:27.140 --> 01:32:31.780
With or without the removal of the state highway from the sections.

01:32:31.780 --> 01:32:33.360
Yeah.

01:32:33.360 --> 01:32:34.360
Greg Lenny.

01:32:34.360 --> 01:32:35.360
This is Sean.

01:32:35.360 --> 01:32:36.360
Can I chime in?

01:32:36.360 --> 01:32:37.360
Yes.

01:32:37.360 --> 01:32:45.730
So, Jackie, some of these improvements, it has been known that there is the possibility

01:32:45.730 --> 01:32:55.700
of a 56 minute Oak and Washington Street, that some of these improvements may blend

01:32:55.700 --> 01:33:01.650
into that, but was not part of it.

01:33:01.650 --> 01:33:04.890
That scope was not directly part of the corridor study.

01:33:04.890 --> 01:33:11.170
The corridor study looked at safety, immediate safety problems, and suggested solutions to

01:33:11.170 --> 01:33:15.930
those immediate safety problems, and it looked at immediate capacity problems and looked

01:33:15.930 --> 01:33:17.890
for solutions to those.

01:33:17.890 --> 01:33:24.210
There is some interface between the community's desire to relocate the state highway and these

01:33:24.210 --> 01:33:27.490
safety and capacity projects, but it's not linear, Sean.

01:33:27.490 --> 01:33:33.840
And I'm going to talk a little bit more about the bypass later in the presentation, correct?

01:33:33.840 --> 01:33:34.840
Yes.

01:33:34.840 --> 01:33:40.520
That comes up next, and that actually doesn't include the sixth and minidocle route at all.

01:33:40.520 --> 01:33:46.520
That includes a global bypass of the city of Twin for truck traffic around town.

01:33:46.520 --> 01:33:50.840
but the internal circulation of truck traffic in town.

01:33:50.840 --> 01:33:52.760
I will save my two cents on that

01:33:52.760 --> 01:33:54.600
when you get to that point in the presentation.

01:33:54.600 --> 01:33:56.400
Okay, thank you, Manny.

01:33:56.400 --> 01:33:58.880
Exactly, that may not be something you can answer,

01:33:58.880 --> 01:34:01.560
but it also kind of goes on as saying,

01:34:05.900 --> 01:34:07.740
it seemed like I had noticed in the past

01:34:07.740 --> 01:34:09.260
that we were getting a lot of truck traffic

01:34:09.260 --> 01:34:11.300
that was coming down through these five points

01:34:11.300 --> 01:34:14.260
on the main street coming down to voter restraint

01:34:14.260 --> 01:34:16.380
that was making a left and going by Gerties

01:34:16.380 --> 01:34:22.620
picking up Minidoka. Again this is not certainly not a scientific study in my

01:34:22.620 --> 01:34:26.860
work. It seems like more of them are now, and I'm not sure this is an improvement.

01:34:26.860 --> 01:34:31.500
More of them are actually making the right on the blue lakes turning on to

01:34:31.500 --> 01:34:36.780
second which is Highway 30 and going on down and then making a left-hand turn on

01:34:36.780 --> 01:34:44.790
Shoshone Street. Neither option is very good to be honest with you. So do we have

01:34:44.790 --> 01:34:50.870
a preferred route we would rather them take if they are trying to come from the

01:34:50.870 --> 01:34:55.910
interstate across Hanson Bridge down and Kimberly Road and then they want to get

01:34:55.910 --> 01:35:00.150
to Columbia what's saying or would we rather them just come around by Highway

01:35:00.150 --> 01:35:05.110
93 and use our new Washington and all that kind of stuff I'm just I'm just

01:35:05.110 --> 01:35:08.830
asking if we have a preferred route or we just haven't studied that at this point

01:35:08.830 --> 01:35:15.400
I love what Jackie I always ask questions and Jackie has to think I

01:35:15.400 --> 01:35:23.160
appreciate that. You know so this is this is another this is another situation

01:35:23.160 --> 01:35:30.680
where we all have various goals so if your goal is to retain the integrity of

01:35:30.680 --> 01:35:34.600
the pavement within the city system then you want trucks to stay on the state

01:35:34.600 --> 01:35:39.840
highway as long as this humanly possible. If you want to achieve some other goal

01:35:39.840 --> 01:35:44.320
like I don't want to have any trucks downtown or I don't want to have any

01:35:44.320 --> 01:35:49.440
trucks on Blue Lakes Boulevard, then you work diligently to create a road that can actually

01:35:49.440 --> 01:35:55.000
handle that truck volume and encourage them either by resolution or designation of a city

01:35:55.000 --> 01:36:02.310
truck route onto that roadway. Or you just get the word out and make it easy. So as

01:36:02.310 --> 01:36:08.030
Dean has said once or twice you make the right thing easy and the wrong thing hard.

01:36:08.030 --> 01:36:13.070
So we can do that at some point in time.

01:36:13.070 --> 01:36:18.950
So our goal is to try to get local urban funding to try to make Washington, Minnadocan

01:36:18.950 --> 01:36:26.350
sixth easy and as time goes on, State Highway will become more difficult for those people

01:36:26.350 --> 01:36:28.510
who are trying to come in through downtown.

01:36:28.510 --> 01:36:35.950
There's discussions about putting in arches and having increased congestion downtown because

01:36:35.950 --> 01:36:40.810
you know that's a vibrant downtown and truck drivers don't naturally go into

01:36:40.810 --> 01:36:48.460
places where there's congestion if they don't have to so did I tackle your

01:36:48.460 --> 01:36:52.260
question you know right now it's legal to travel on any road where you can get

01:36:52.260 --> 01:36:58.620
a permit and and state highways have an ability to get permits on them so that

01:36:58.620 --> 01:37:02.460
what would attribute that last time the right choice is easy and the wrong choice

01:37:02.460 --> 01:37:05.460
It's hard to call it a deenism.

01:37:05.460 --> 01:37:06.460
You can.

01:37:06.460 --> 01:37:07.460
Yeah, I think he'll wear that.

01:37:07.460 --> 01:37:08.460
He'd be happy to wear it.

01:37:08.460 --> 01:37:10.460
I don't know if he created it.

01:37:10.460 --> 01:37:12.460
That's where I heard it from.

01:37:12.460 --> 01:37:15.770
We've tried that in law enforcement.

01:37:15.770 --> 01:37:17.770
Sometimes it doesn't work.

01:37:17.770 --> 01:37:18.770
It's accurate.

01:37:18.770 --> 01:37:21.770
It doesn't always work with children either.

01:37:21.770 --> 01:37:22.770
So, let's see.

01:37:22.770 --> 01:37:28.770
The last component is up for discussion with the Greater Tone Falls Area Transportation Committee

01:37:28.770 --> 01:37:30.770
and the near future next week.

01:37:30.770 --> 01:37:33.410
The consultant will make this proposal to the committee,

01:37:33.410 --> 01:37:35.370
to the body of the committee for the first time.

01:37:35.370 --> 01:37:41.510
And I felt like it was prudent and important for me

01:37:41.510 --> 01:37:45.410
to talk to you before I represented what our opinion would be

01:37:45.410 --> 01:37:56.110
with regard to these alternates.

01:37:56.110 --> 01:38:06.730
Okay, so this line is yellow,

01:38:06.730 --> 01:38:09.650
and that road is tortured in part.

01:38:09.650 --> 01:38:16.400
It's partured right here.

01:38:16.400 --> 01:38:19.840
We get out in Shampham 3300, okay?

01:38:19.840 --> 01:38:28.860
So the consultant looked for a route considering what

01:38:28.860 --> 01:38:31.380
Twin Falls is going to be.

01:38:31.380 --> 01:38:34.180
If you want to belt route around town,

01:38:34.180 --> 01:38:36.020
they were looking for something that's

01:38:36.020 --> 01:38:41.900
going to be around town not today and not 20 years from now,

01:38:41.900 --> 01:38:45.460
but in our longer term reality.

01:38:45.460 --> 01:38:52.530
They had to combine that judgment with where people are

01:38:52.530 --> 01:38:55.130
going now and what the needs are now.

01:38:55.130 --> 01:39:02.480
So for that reason, they believed,

01:39:02.480 --> 01:39:07.560
and I believe that something closer to Highway 74,

01:39:07.560 --> 01:39:12.520
the water tanks, and potentially out to Blue Lakes

01:39:12.520 --> 01:39:16.940
or Champlain Road, is closer to out of town

01:39:16.940 --> 01:39:20.760
in our 20-year reality than Orchard.

01:39:20.760 --> 01:39:32.440
Okay, so at Orchard, we have a right at Harrison, we have a church, we have several subdivisions

01:39:32.440 --> 01:39:38.800
coming in, we have schools that are a school that's quarter mile south, that's a developing

01:39:38.800 --> 01:39:41.080
neighborhood.

01:39:41.080 --> 01:39:47.140
Even beyond blue lakes, could with relative ease become a developing neighborhood and

01:39:47.140 --> 01:39:57.520
west of Washington Street south over in here can also be a developing neighborhood.

01:39:57.520 --> 01:40:07.630
So that's why the blue and the red route were considered.

01:40:07.630 --> 01:40:12.960
So the consultant tried to address issues like this.

01:40:12.960 --> 01:40:20.690
You make a little matrix and you say, how are people connected?

01:40:20.690 --> 01:40:23.290
Is this road safe?

01:40:23.290 --> 01:40:29.010
What kind of prime farm ground and other environmental issues am I going to come up against?

01:40:29.010 --> 01:40:33.130
What's the long-range planning for the community or the area that I'm going through?

01:40:33.130 --> 01:40:38.010
What kind of public support are people actually going to use the road, are they going to insist

01:40:38.010 --> 01:40:41.330
on doing something different?

01:40:41.330 --> 01:40:46.250
What kind of agriculture is in the neighborhood that's an absolutely real consideration if

01:40:46.250 --> 01:40:47.890
you're doing an I2D project?

01:40:47.890 --> 01:40:53.010
Because prime farm ground was a significant factor in the development of the Twin Falls

01:40:53.010 --> 01:41:00.090
alternate, okay, and how that is removed or bisected by a roadway. So the most

01:41:00.090 --> 01:41:04.710
efficient slickest roadway route was absolutely in opposition to a prime

01:41:04.710 --> 01:41:09.490
farm ground concept and the route changed to deal with it environmentally. So we

01:41:09.490 --> 01:41:14.450
will, if the state goes through a construction of a southeast Twin Falls

01:41:14.450 --> 01:41:20.310
alternate, they will have to address environmental issues, which include

01:41:20.310 --> 01:41:27.040
There was also a need to look at industrial development, obviously, because this is a truck

01:41:27.040 --> 01:41:36.470
route and consideration of our natural resources and existing and future residential development.

01:41:36.470 --> 01:41:42.230
Then the team, which included the three of us, Gary Young, Dave Burgess, the old highway

01:41:42.230 --> 01:41:50.110
district director and currently commissioner, and myself sat down and tried to attach numbers

01:41:50.110 --> 01:42:00.430
and values to some of these factors and then the consultant also ran through cost scenario.

01:42:00.430 --> 01:42:05.950
So the blue line.

01:42:05.950 --> 01:42:06.950
It does.

01:42:06.950 --> 01:42:14.200
It's a $32 million project as an estimate.

01:42:14.200 --> 01:42:23.080
The red line is a $33 million project and the yellow line is a $30.8 million project.

01:42:23.080 --> 01:42:30.520
So the 30 point, the yellow line, is that orchard modified root that runs out champlain.

01:42:30.520 --> 01:42:35.840
The red line caused us a little bit of concern because you have a long run of prying farm

01:42:35.840 --> 01:42:37.410
ground.

01:42:37.410 --> 01:42:43.490
You know, Highway 74 and up champlain is existing roadway.

01:42:43.490 --> 01:42:46.900
They all need a bridge.

01:42:46.900 --> 01:42:50.420
They all have their advantages and disadvantages.

01:42:50.420 --> 01:42:59.300
So I want to go ahead and seek input from you based on, so no, here's the other thing.

01:42:59.300 --> 01:43:02.940
Just because this root is preferred doesn't mean it's the one that's selected and it doesn't

01:43:02.940 --> 01:43:07.300
mean that anything, anybody does anything with it, you know, if we don't want to have

01:43:07.300 --> 01:43:12.100
any root or we don't like any of these roots, we can say so.

01:43:12.100 --> 01:43:16.460
And we probably want to provide some input on why we don't like them.

01:43:16.460 --> 01:43:21.420
So the blue route ended up being the chosen group by the steering committee because it is

01:43:21.420 --> 01:43:22.420
on existing roadway.

01:43:22.420 --> 01:43:24.980
It has less damage to prime farm ground.

01:43:24.980 --> 01:43:30.260
The environmental considerations are less the number of houses that are impacted or less.

01:43:30.260 --> 01:43:34.180
The cost of the road was less.

01:43:34.180 --> 01:43:40.940
But that's three engineering types looking at a roadway and saying what's our world

01:43:40.940 --> 01:43:44.500
going to look like 50 years from now.

01:43:44.500 --> 01:43:50.340
And I recognize there's more than just engineering types that make these decisions, so here I am.

01:43:50.340 --> 01:43:52.330
Greg Lanning.

01:43:52.330 --> 01:44:02.210
Jackie, the one I guess I didn't every, I didn't believe that I would be still on council when we were considering a belt route.

01:44:02.210 --> 01:44:15.730
I don't think we're quite that big yet, but we're here and so we need to move forward. It was a consideration to the part that I guess I'm struggling with on both the yellow and blue

01:44:15.730 --> 01:44:24.830
is that we just close off with bar from the road and they're going to go to

01:44:24.830 --> 01:44:29.870
30 second 3200 so which was obviously they would be a use of a belt road for

01:44:29.870 --> 01:44:34.840
their trucks going south or coming in from the south that's what I just

01:44:34.840 --> 01:44:38.120
confused aren't that isn't that closed off they're gonna send all their trucks

01:44:38.120 --> 01:44:45.240
to 3200 is not going to remember that your your memory is correct cliff shows

01:44:45.240 --> 01:44:49.620
to have their employees come in on 3300 and to have their trucks come in on

01:44:49.620 --> 01:45:00.010
3200. Their truck load isn't huge. They'll have people, it will be a

01:45:00.010 --> 01:45:04.990
sizable number of people on 3300. The truck route doesn't eliminate car traffic.

01:45:04.990 --> 01:45:15.010
And we did not necessarily drive Cliff to that decision. We were talking about

01:45:15.010 --> 01:45:20.210
resources and the potential to signalize and things like that and quality of the roadway.

01:45:20.210 --> 01:45:27.480
And just as a statement, I don't think I want to be at the public hearing where we're discussing

01:45:27.480 --> 01:45:33.640
going south of Orchard with a bell route for the people that are pretty up fired up about

01:45:33.640 --> 01:45:39.730
what we're already doing at that general direction. So, Chris Dockington.

01:45:39.730 --> 01:45:44.090
This is throwing a lot at the council. I don't know if I can give you any feedback. I'd

01:45:44.090 --> 01:45:49.010
whether you ask us questions, you will like A, B, or C.

01:45:49.010 --> 01:45:50.930
Maybe that's what you're trying to do here.

01:45:50.930 --> 01:46:00.170
But the blue line would involve less capturing of farmland.

01:46:00.170 --> 01:46:02.930
Would that in any way expedite a process

01:46:02.930 --> 01:46:08.210
or assure a process of approval by all the regulatory agencies

01:46:08.210 --> 01:46:13.010
or is it merely the economics and the capture of private land

01:46:13.010 --> 01:46:16.850
to do this, but I don't really understand

01:46:16.850 --> 01:46:20.250
that we're inconveniencing private property owners

01:46:20.250 --> 01:46:23.450
in all three of those variables, are we not?

01:46:23.450 --> 01:46:26.970
We are inconveniencing private property owners in all three,

01:46:26.970 --> 01:46:29.450
but part of the environmental considerations

01:46:30.490 --> 01:46:34.810
that a federal aid project has to the US is there's,

01:46:34.810 --> 01:46:37.130
there's two different types of people related issues,

01:46:37.130 --> 01:46:39.650
specifically people related issues they're dealt with.

01:46:39.650 --> 01:46:41.970
Environmental justice, which is,

01:46:41.970 --> 01:46:45.010
are you blowing your big roadway through an impoverished

01:46:45.010 --> 01:46:47.530
neighborhood because the right-of-way is cheap,

01:46:47.530 --> 01:46:50.970
and those guys aren't going to comment for some reason.

01:46:50.970 --> 01:46:55.170
And then the other one is prime farm ground.

01:46:55.170 --> 01:46:58.330
Prime farm ground is a value in the United States,

01:46:58.330 --> 01:47:02.360
or at least in District 4.

01:47:02.360 --> 01:47:04.400
I don't feel called for any of you.

01:47:04.400 --> 01:47:09.520
So I thought that I'd attempt to answer questions.

01:47:09.520 --> 01:47:12.360
If you would like me to lead you down a process

01:47:12.360 --> 01:47:16.700
that first selection, I'll do that.

01:47:16.700 --> 01:47:18.300
Back in Millsoy.

01:47:18.300 --> 01:47:19.460
Thank you, Mayor.

01:47:19.460 --> 01:47:21.380
Well, I appreciate all the information

01:47:21.380 --> 01:47:23.220
that you gave us, Jackie.

01:47:23.220 --> 01:47:24.740
And I'm certainly not an expert on it.

01:47:24.740 --> 01:47:27.980
And I appreciate your engineering expertise.

01:47:27.980 --> 01:47:32.660
And so as a sociologist, which is probably the furthest thing

01:47:32.660 --> 01:47:35.340
from an engineer, I am surprised, though,

01:47:35.340 --> 01:47:39.180
because I completely agree with the recommendation

01:47:39.180 --> 01:47:40.180
of the committee.

01:47:40.180 --> 01:47:43.180
I mean, I don't see any red flags or any concerns.

01:47:43.180 --> 01:47:45.460
Why is that surprising?

01:47:45.460 --> 01:47:49.140
I don't usually, you know, we have different perspectives,

01:47:49.140 --> 01:47:54.220
but I think that your points are well put.

01:47:54.220 --> 01:47:57.780
I think that you need to consider farm ground, impact

01:47:57.780 --> 01:48:01.380
to residences, and environmental considerations.

01:48:01.380 --> 01:48:06.420
I think that the blue line, your recommended route,

01:48:06.420 --> 01:48:15.780
makes the most sense, probably be the easiest as far as logistically to work out, because

01:48:15.780 --> 01:48:24.620
the yellow line just looks kind of daunting as it kind of curves everywhere.

01:48:24.620 --> 01:48:31.100
And so anyway, I guess if you're asking the council, you know, do we concur with the committee's

01:48:31.100 --> 01:48:34.780
recommendation, and I am the liaison to that committee.

01:48:34.780 --> 01:48:36.940
So if the council has any input,

01:48:36.940 --> 01:48:41.940
I'd be happy to take it to that group.

01:48:42.260 --> 01:48:47.260
But I personally don't see any concerns for your recommendation.

01:48:47.260 --> 01:48:49.020
Suzanne Hollins.

01:48:49.020 --> 01:48:49.860
Thank you.

01:48:49.860 --> 01:48:54.260
I appreciate the farmland and what that means.

01:48:54.260 --> 01:48:57.540
But I look at a beltway route that goes around

01:48:57.540 --> 01:49:00.100
where you're coming to a dead stop to make a left hand turn

01:49:00.100 --> 01:49:04.940
is a deterrent to some people on that blue line.

01:49:04.940 --> 01:49:09.380
So there's no way to make the blue line a curved corner

01:49:09.380 --> 01:49:11.020
like the red line out there.

01:49:11.020 --> 01:49:13.540
And so traffic can keep flowing.

01:49:13.540 --> 01:49:19.670
OK, so yes, there is a way the scale of this drawing

01:49:19.670 --> 01:49:20.870
is several miles.

01:49:20.870 --> 01:49:26.750
So what looks like those curves are massive.

01:49:26.750 --> 01:49:29.670
Those are really huge curves that you're looking at right there.

01:49:29.670 --> 01:49:32.750
So that little tiny thing that looks like a hard right,

01:49:32.750 --> 01:49:35.970
it could be a hard or left, yeah, it's still left.

01:49:35.970 --> 01:49:38.790
It could be a hard left or it could be something

01:49:38.790 --> 01:49:42.150
that is significantly faster than pole line and easily.

01:49:42.150 --> 01:49:47.520
Now it can be 50 or 60 mile an hour,

01:49:47.520 --> 01:49:49.120
whatever the design speed route is.

01:49:49.120 --> 01:49:52.640
That's the way that that would be designed

01:49:52.640 --> 01:49:57.640
and or that's what we would try to design as a ask for.

01:49:57.920 --> 01:49:59.720
When I look at pole line and how well done

01:49:59.720 --> 01:50:05.000
And that was to keep traffic moving and I mean that's what I envision for a.

01:50:05.000 --> 01:50:12.720
Okay so where when 93 came into Poland when it was at this stage it looked like a hard

01:50:12.720 --> 01:50:14.760
right or left depending on what direction it came from.

01:50:14.760 --> 01:50:15.760
That makes me feel better.

01:50:15.760 --> 01:50:18.920
But when you get into it you can actually drive it in a manner that doesn't make it put

01:50:18.920 --> 01:50:20.200
on your compression brakes.

01:50:20.200 --> 01:50:27.600
And you know that's a choice that we would make as a community.

01:50:27.600 --> 01:50:32.880
So there would be a possible then for the ramping on to Kimberly Road, the highway to

01:50:32.880 --> 01:50:42.650
also be a access without maybe having to stop and having a merge lane there or no.

01:50:42.650 --> 01:50:45.650
That is possible although it has not been considered.

01:50:45.650 --> 01:50:46.650
Okay.

01:50:46.650 --> 01:50:47.650
At this point in time.

01:50:47.650 --> 01:50:51.770
I would think if there's a way to keep traffic going without having to come to a dead

01:50:51.770 --> 01:50:56.650
stop that would be an advantage but that's just my two cents worth.

01:50:56.650 --> 01:51:04.650
So our goal was to limit, to make it as few stops as possible, but we weren't necessarily

01:51:04.650 --> 01:51:07.000
trying to make none.

01:51:07.000 --> 01:51:08.000
Okay.

01:51:08.000 --> 01:51:14.000
If it's the goal of the community to have none, then I'm sure we could work with the state

01:51:14.000 --> 01:51:16.000
to accommodate that.

01:51:16.000 --> 01:51:17.000
Thank you.

01:51:17.000 --> 01:51:18.420
Great learning.

01:51:18.420 --> 01:51:25.420
Jackie, being a farm boy, you know, obviously the yellow one is scary because, well, I guess

01:51:25.420 --> 01:51:29.820
I guess red as well, or some pieces, take farmland,

01:51:29.820 --> 01:51:32.080
and I'm very conscious of that.

01:51:32.980 --> 01:51:34.540
I'm a little concerned though,

01:51:34.540 --> 01:51:39.100
and maybe I'm asking a question of the purpose of this,

01:51:39.100 --> 01:51:43.180
is if our other discussion that Chris and I just had

01:51:43.180 --> 01:51:45.140
with the trucks coming into downtown

01:51:45.140 --> 01:51:46.540
and trying to get to Lambian,

01:51:46.540 --> 01:51:49.900
trying to get into Lamb Weston and all those places

01:51:49.900 --> 01:51:51.060
right over there, and that's the ones

01:51:51.060 --> 01:51:53.620
who end up going to onto Main Street and things.

01:51:53.620 --> 01:51:57.780
If the purpose of this bypass is for them to use that,

01:51:57.780 --> 01:52:01.180
I see the yellow being much more likely used for that

01:52:01.180 --> 01:52:02.740
than I do the blue.

01:52:02.740 --> 01:52:04.300
Is that a fair assessment?

01:52:04.300 --> 01:52:06.900
Because it's another mile south, and so trucks

01:52:06.900 --> 01:52:09.460
have to come all the way around and come back to Glamby,

01:52:09.460 --> 01:52:10.380
back to Lamb West.

01:52:10.380 --> 01:52:12.620
And is that the thought process by this beltway?

01:52:12.620 --> 01:52:16.860
Or is the beltway just so they completely skip good faults?

01:52:16.860 --> 01:52:19.660
The roots don't eliminate truck traffic anywhere else

01:52:19.660 --> 01:52:20.620
in town.

01:52:20.620 --> 01:52:25.380
So that's not the purpose.

01:52:25.380 --> 01:52:31.460
So trucks coming from the south could enter on to Highway 74.

01:52:31.460 --> 01:52:38.260
And if they were headed for Kimberly or the east side of town

01:52:38.260 --> 01:52:42.620
or Berkeley, they could choose to use any one of these three

01:52:42.620 --> 01:52:43.980
routes.

01:52:43.980 --> 01:52:48.060
If they were coming into Columbia or Conagra or any of our folks

01:52:48.060 --> 01:52:52.020
that are due south on Washington Street, South.

01:52:52.020 --> 01:52:54.060
The capacity project that's recommended

01:52:54.060 --> 01:52:56.140
to improve Washington Street, South,

01:52:56.140 --> 01:53:02.980
for a multi-lane section, will eventually progress

01:53:02.980 --> 01:53:04.740
and come farther south.

01:53:04.740 --> 01:53:06.820
So the vision is that if you're coming in

01:53:06.820 --> 01:53:09.140
and you need to make a delivery to Columbia,

01:53:09.140 --> 01:53:11.460
you could come in on Highway 74,

01:53:11.460 --> 01:53:17.620
and you would still head south on Washington Street, South.

01:53:17.620 --> 01:53:21.500
We wouldn't have to come all the way around.

01:53:21.500 --> 01:53:26.300
There were discussions about how trucking comes in

01:53:26.300 --> 01:53:31.300
from Castle Ford on Archer and that it's there.

01:53:31.300 --> 01:53:35.540
We were looking for that traffic in fall

01:53:35.540 --> 01:53:41.940
and the consultants couldn't see a measurable difference.

01:53:41.940 --> 01:53:45.940
They're favoring that particular route over the other,

01:53:45.940 --> 01:53:50.140
which is why they had the discussion.

01:53:50.140 --> 01:53:54.080
Also, there's no way that the middle of town isn't going

01:53:54.080 --> 01:53:58.340
to continue to intensify its residential and commercial uses.

01:53:58.340 --> 01:54:00.300
Orchard is going to have the mammoth amounts

01:54:00.300 --> 01:54:03.300
of residential and commercial use in that area.

01:54:03.300 --> 01:54:05.940
Okay. And then my second question on this.

01:54:05.940 --> 01:54:09.660
Is it envisioned that this will eventually go north

01:54:09.660 --> 01:54:15.100
and come around to the bridge and on Po'wine at some point?

01:54:15.100 --> 01:54:17.220
It may be someone's vision.

01:54:17.220 --> 01:54:29.260
It wasn't the vision of this portion of the project, but it just kind of feels funny for it to stop the Kimberley Road there. Yes, this year. Well, it succeeds as a southeast.

01:54:31.340 --> 01:54:33.500
Sean, did you want to have any comments?

01:54:35.470 --> 01:54:42.310
I do. I do. Thank you. I appreciate your perspective that you started this conversation off with by saying, you know, this is that

01:54:42.310 --> 01:54:50.630
25, 30, 40 year kind of visioning thing, understanding that road felt overnight it takes

01:54:50.630 --> 01:54:51.630
some planning.

01:54:51.630 --> 01:54:56.550
So I would agree with Rebecca's assessment I think, but the recommendations that the steering

01:54:56.550 --> 01:55:02.170
committee has laid out here are good start.

01:55:02.170 --> 01:55:12.120
Knowing that this will move at the speed of molasses, I'm all for moving it forward.

01:55:12.120 --> 01:55:18.130
I'll weigh in a completely unqualified way in about where we're going to put roads other

01:55:18.130 --> 01:55:24.490
than I do not like the idea of taking up good farm ground and turning it into roadways.

01:55:24.490 --> 01:55:28.290
You're not going to make any everyone happy no matter what happens in roadways.

01:55:28.290 --> 01:55:29.770
You're going to affect neighborhoods.

01:55:29.770 --> 01:55:34.130
There's neighborhoods all along that blue route as well because I used to live out there

01:55:34.130 --> 01:55:38.010
so I know there are neighborhoods out there.

01:55:38.010 --> 01:55:42.850
But to me, just layman's terms, it looks the most logical to me, the blue, because there's

01:55:42.850 --> 01:55:46.930
already existing roads, connectivity over to 74.

01:55:46.930 --> 01:55:51.850
I'm assuming you're going to have to build a pretty substantial bridge on all three routes.

01:55:51.850 --> 01:55:56.690
Bridge cost is functionally insane in the order of magnitude.

01:55:56.690 --> 01:56:06.100
So the least amount of impact that I can see from my limited perspective is probably blue.

01:56:06.100 --> 01:56:10.800
And I would like to look at limited impact on what's really important to us.

01:56:10.800 --> 01:56:15.440
Although if I lived along blue right now, I probably would say something different, to be honest with you.

01:56:15.440 --> 01:56:19.440
So that being said, do you have enough?

01:56:19.440 --> 01:56:21.120
We've heard from all council members.

01:56:21.120 --> 01:56:21.980
I think so.

01:56:21.980 --> 01:56:28.880
So I think you have consensus that there isn't any one route that is so appalling,

01:56:28.880 --> 01:56:33.240
that you wouldn't want to consider not under any circumstances.

01:56:33.240 --> 01:56:38.800
And there's general direction that if selection of a blue route is debated, that we should

01:56:38.800 --> 01:56:39.800
probably support that.

01:56:39.800 --> 01:56:42.360
I should probably support that on behalf of the city.

01:56:42.360 --> 01:56:43.360
I think so.

01:56:43.360 --> 01:56:44.360
Thanks everybody.

01:56:44.360 --> 01:56:45.360
Thank you.

01:56:45.360 --> 01:56:46.360
Thank you, Jackie.

01:56:46.360 --> 01:56:50.600
We have an item coming up and all of you have been incredibly patient.

01:56:50.600 --> 01:56:53.160
I appreciate and I'm looking at all of you.

01:56:53.160 --> 01:56:54.160
You look a little tired.

01:56:54.160 --> 01:56:59.200
I don't think you look quite as tired as I am, but I really appreciate your patience.

01:56:59.200 --> 01:57:02.320
So what I'm going to do is I'm going to jump ahead just to give an opportunity because

01:57:02.320 --> 01:57:07.000
We're so late in the evening for any public input because this next item is going to be

01:57:07.900 --> 01:57:15.720
In the staff report at least an hour. Is there anyone here from the public that would like to make a comment or approach the council at this time?

01:57:16.520 --> 01:57:23.740
See no one coming forward. So I will now move to presentation by the long-term planning committee on

01:57:24.220 --> 01:57:26.300
personnel and capital needs to accomplish

01:57:26.300 --> 01:57:30.500
identified goals and objectives of the City of Twin Falls Community

01:57:30.500 --> 01:57:36.740
Strategic Plan 2030 and we will have the long-term planning committee headed up

01:57:36.740 --> 01:57:43.820
by the esteemed Mr. Gary apparently. Before that Council is it still about 80

01:57:43.820 --> 01:57:48.740
degrees up here or just me? Is there any way while while they're making that that

01:57:48.740 --> 01:57:52.580
we could play with their conditioner a little bit? That'd be greatly appreciated.

01:57:52.580 --> 01:57:57.340
So with that, Mr. Gary, they're closed.

01:57:57.340 --> 01:57:59.340
You have our attention, sir.

01:57:59.340 --> 01:58:01.340
So my name's Veronica.

01:58:01.340 --> 01:58:11.340
I'm here to kind of set the stage for the long term planning committee presentation that we have for you.

01:58:11.340 --> 01:58:20.630
So with that, you'll see in the crowd, we've got a lot of members from a lot of different departments in the city who put in a ton of work on this thing.

01:58:20.630 --> 01:58:24.630
And so with that, we're just going to kind of kick it up.

01:58:24.630 --> 01:58:25.630
Okay.

01:58:25.630 --> 01:58:36.870
So when I first had the opportunity to get on to the long-term planning committee group,

01:58:36.870 --> 01:58:41.870
I thought we were going to discuss a laundry list of capital needs,

01:58:41.870 --> 01:58:47.870
personnel needs from each one of the departments, sort of on an Excel spreadsheet,

01:58:47.870 --> 01:58:51.870
you know, go through and then just buy money or whatever, just throw them out.

01:58:51.870 --> 01:58:56.270
Well, Laurie and Gretchen kind of facilitated this whole thing, and what they brought to

01:58:56.270 --> 01:59:04.350
us was the idea that we approach the capital and personnel needs of each department using

01:59:04.350 --> 01:59:07.310
the updated community strategic plan.

01:59:07.310 --> 01:59:12.920
So when they first said that, I think my first question was, huh?

01:59:12.920 --> 01:59:18.360
So I knew exactly what the long-term strategic plan was, but I didn't know how we were

01:59:18.360 --> 01:59:21.520
going to tie it all together, how we were going to make this all work.

01:59:21.520 --> 01:59:27.520
So we had to ask, what is the updated community strategic plan?

01:59:27.520 --> 01:59:33.440
So the plan identifies eight focus areas that were put together from input from the City

01:59:33.440 --> 01:59:38.520
Council, recommendations of members of the community, and city staff.

01:59:38.520 --> 01:59:44.200
The eight focus areas consist of a healthy community, a learning community, a secure community,

01:59:44.200 --> 01:59:50.200
accessible community, environmental community, prosperous community, responsible community,

01:59:50.200 --> 01:59:55.820
And last but not least, take a look at the internal organization.

01:59:55.820 --> 01:59:59.380
So then we kind of had to ask, so what goal do we have?

01:59:59.380 --> 02:00:01.220
What challenges do we face?

02:00:01.220 --> 02:00:06.130
So the committee is comprised of representatives from each department in the city, all very

02:00:06.130 --> 02:00:07.810
professional I might add.

02:00:07.810 --> 02:00:15.370
So over the next few months, we would have to identify and prioritize the personnel and

02:00:15.370 --> 02:00:18.290
capital needs of each department.

02:00:18.290 --> 02:00:21.810
And then we were tasked with doing this over a five-year period.

02:00:21.810 --> 02:00:27.080
So again, I think my first question was, huh?

02:00:27.080 --> 02:00:31.640
So what we did to get started was each one of the committee members went back to our respective

02:00:31.640 --> 02:00:32.640
departments.

02:00:32.640 --> 02:00:35.880
And we started talking to the folks that are out there working with the public every single

02:00:35.880 --> 02:00:36.880
day.

02:00:36.880 --> 02:00:42.160
You know, these are the folks that have that public contact and what their needs.

02:00:42.160 --> 02:00:46.520
So we asked them four questions when we went back to talk to them.

02:00:46.520 --> 02:00:50.900
One of them was what are the strengths as they apply to the department and the city in

02:00:50.900 --> 02:00:52.500
terms of the strategic plan?

02:00:52.500 --> 02:00:53.500
So pretty easy.

02:00:53.500 --> 02:00:54.500
What are the strengths?

02:00:54.500 --> 02:00:59.180
So we got a laundry list of strengths that the city has and each department has.

02:00:59.180 --> 02:01:02.300
Then we asked what are the weaknesses and how do we address those weaknesses?

02:01:02.300 --> 02:01:07.420
A little bit tougher question, but we again got some pretty good feedback.

02:01:07.420 --> 02:01:13.580
Then we asked what are the opportunities that the city faces and what are the threats

02:01:13.580 --> 02:01:16.740
they each department faces over the next five years.

02:01:16.740 --> 02:01:18.780
So what we got was a detailed understanding

02:01:18.780 --> 02:01:21.060
of some of the needs and challenges

02:01:21.060 --> 02:01:23.780
that each department faces each and every day

02:01:23.780 --> 02:01:26.900
and what we believe the community expectations are.

02:01:26.900 --> 02:01:29.380
So the next time we met, we realized

02:01:29.380 --> 02:01:31.180
that we had a little bit of a problem.

02:01:31.180 --> 02:01:34.300
So we had a $2.5 million shortfall

02:01:34.300 --> 02:01:36.700
with all of the needs that come back,

02:01:36.700 --> 02:01:38.140
personnel needs, capital needs.

02:01:38.140 --> 02:01:39.740
This is what we need for the next,

02:01:39.740 --> 02:01:42.630
and that was just in 2016.

02:01:42.630 --> 02:01:47.510
So, at that point, we knew that we were going to have to start really betting this stuff

02:01:47.510 --> 02:01:52.890
out, making some cuts, you know, and discussing this, and I felt a little bit uncomfortable

02:01:52.890 --> 02:01:58.470
with that because I'm sitting in front of a, you know, in a round table setting, and I'm

02:01:58.470 --> 02:02:02.850
looking at professionals from all over the city.

02:02:02.850 --> 02:02:08.410
And I thought to myself, who am I to make recommendations for your department?

02:02:08.410 --> 02:02:16.690
who might say that a dump truck may not be as important as some needs that the Rec Department

02:02:16.690 --> 02:02:18.770
needs.

02:02:18.770 --> 02:02:28.090
So what we ended up doing was we looked at the challenge and we identified and worked

02:02:28.090 --> 02:02:33.770
to address was to reduce the gap between community expectations for service with the reality

02:02:33.770 --> 02:02:36.250
of sustainable service capabilities.

02:02:36.250 --> 02:02:40.250
That being said, we continually challenged each other with looking at individual department

02:02:40.250 --> 02:02:45.930
processes and structures to ensure that we as one city are utilizing our current resources

02:02:45.930 --> 02:02:49.330
as effectively and efficiently as possible.

02:02:49.330 --> 02:02:54.290
Now we recognize that additional personnel and equipment are not always the most efficient

02:02:54.290 --> 02:02:58.850
and effective way to solve growing workload demands.

02:02:58.850 --> 02:03:04.690
So we focused on maximizing our current resources available through process and structure review

02:03:04.690 --> 02:03:08.850
and through technology improvement before simply throwing personnel and capital at our

02:03:08.850 --> 02:03:10.650
growing demands.

02:03:10.650 --> 02:03:15.090
So to accomplish this review, we focused questions around three driving ideals.

02:03:15.090 --> 02:03:20.210
One was how we enhance services with our current resources.

02:03:20.210 --> 02:03:24.050
And probably the thing that come out of this for me is we've always kind of, in the fire

02:03:24.050 --> 02:03:28.450
department, we've always had a direction of thought on the next five years on how we're

02:03:28.450 --> 02:03:32.330
going to tackle the needs of equipment and things like that.

02:03:32.330 --> 02:03:41.250
And there were some suggestions made during this, some by Mandy, as it applies to grants,

02:03:41.250 --> 02:03:45.970
and then some by Jonathan as it applies to impact fees.

02:03:45.970 --> 02:03:50.450
And I think that we actually have kind of curved the way that we're looking at the way we're

02:03:50.450 --> 02:03:51.450
buying apparatus.

02:03:51.450 --> 02:03:58.050
And we're going to focus on that in the future and maybe come up with some really good ideas

02:03:58.050 --> 02:03:59.050
on how to do that.

02:03:59.050 --> 02:04:04.810
The second question was, what is needed to maintain the ongoing operations?

02:04:04.810 --> 02:04:10.970
So how will we continue to provide the outstanding service as a city that we do with the challenges

02:04:10.970 --> 02:04:12.210
that we face?

02:04:12.210 --> 02:04:17.850
And then the third one was what opportunities exist to build or enhance partnerships?

02:04:17.850 --> 02:04:23.090
So we discussed a lot in there with partnerships, internal partnerships as it applies to the

02:04:23.090 --> 02:04:25.170
city and then external partnerships.

02:04:25.170 --> 02:04:30.380
And you'll hear some of those partnerships discussed throughout the presentation.

02:04:30.380 --> 02:04:34.940
So what we wanted you to know is that this presentation is simply an overview of a very

02:04:34.940 --> 02:04:37.860
large, robust document.

02:04:37.860 --> 02:04:42.220
We will highlight some of the projects and personnel requests and touch on some of our

02:04:42.220 --> 02:04:48.170
recommendations and outline years.

02:04:48.170 --> 02:04:54.690
So even with that, you'll see that we had, after we went through this whole process, we

02:04:54.690 --> 02:04:58.290
still had about a $421,000 shortfall.

02:04:58.290 --> 02:05:02.930
While doing the process review and information gathering, it was decided that we may not have

02:05:02.930 --> 02:05:06.890
all the information we need to predict the needs for a full five years.

02:05:06.890 --> 02:05:13.450
We will gather more information using documents like the 30-year comprehensive plan, the Fire

02:05:13.450 --> 02:05:19.890
Department location, station location study, the Master Transportation Plan, and some of

02:05:19.890 --> 02:05:25.370
the other documents that will be made available in the future.

02:05:25.370 --> 02:05:29.050
With these documents, we will better be able to understand the future needs of the city.

02:05:29.050 --> 02:05:36.020
believe this process is dynamic and can change on any given day based on updated information.

02:05:36.020 --> 02:05:44.030
So if you'll bear with us we're going to go through each one of the eight strategic focus

02:05:44.030 --> 02:05:49.150
areas and then at the end of each focus area we'll open it up for questions.

02:05:49.150 --> 02:05:58.160
So with that we're going to call on Jonathan to start with Healthy Community.

02:05:58.160 --> 02:06:01.880
Focus Area 1 was the Healthy Community and the main goal that we identified was to improve

02:06:01.880 --> 02:06:05.000
health of the community. We identified a few key items to highlight in our

02:06:05.000 --> 02:06:08.800
pursuit of providing facilities, programs, and services that support healthy lifestyles.

02:06:08.800 --> 02:06:13.800
Our public trail system is one of the best, the community's best assets. We

02:06:13.800 --> 02:06:17.600
have spectacular views and top-notch trail sections. The committee has put

02:06:17.600 --> 02:06:21.760
forth a recommendation of $275,000 for trailhead improvements to take place at

02:06:21.760 --> 02:06:26.040
the jump site in fiscal year 2018. These improvements will enhance the area and

02:06:26.040 --> 02:06:30.450
provide greater access to the trail section. During our process reviewing

02:06:30.450 --> 02:06:31.450
new improvements.

02:06:31.450 --> 02:06:35.410
At our facilities, it was repeatedly emphasized that we have an obligation to maintain current

02:06:35.410 --> 02:06:37.250
facilities and working order.

02:06:37.250 --> 02:06:41.650
The key trails properly maintained, the Parks Department has a sand slurry schedule that

02:06:41.650 --> 02:06:44.490
they rotate, different trail sections.

02:06:44.490 --> 02:06:49.490
We recommend 25,000 to be set aside this next year for sand slurry on four trail sections.

02:06:49.490 --> 02:06:54.190
Valsa recommended 140,000 to be used toward the replacement of the tennis courts up front

02:06:54.190 --> 02:06:57.130
to your field, which is the picture you see up there on the top right.

02:06:57.130 --> 02:07:02.820
On the course of developed large cracks in the foundation and then become a hazard and unusable

02:07:02.820 --> 02:07:04.840
for the designed activity.

02:07:04.840 --> 02:07:09.480
This particular project was discussed at length as we tried to find solutions to lower the

02:07:09.480 --> 02:07:16.120
cost of the project by allocating current assets and employees to perform parts of the construction.

02:07:16.120 --> 02:07:19.360
Shifting from internal partnerships to external partnerships, the committee recognizes the

02:07:19.360 --> 02:07:24.640
opportunities to support the donation by First Federal and the Summit Complex.

02:07:24.640 --> 02:07:28.760
We recommend allocating $100,000 over the next two years for various field improvements

02:07:28.760 --> 02:07:33.240
and a pavilion to be constructed in order to provide much-needed shade and a group gathering

02:07:33.240 --> 02:07:37.000
facility to provide a sense of place within the park.

02:07:37.000 --> 02:07:42.560
Other projects recommended in Outline years include replacement of restrooms in multiple

02:07:42.560 --> 02:07:43.560
parks.

02:07:43.560 --> 02:07:46.840
We recommend staggering these projects over the course of the next five years, the first

02:07:46.840 --> 02:07:53.160
few parks to see the update starting in fiscal year 2017 will be City Park and Harmon Park

02:07:53.160 --> 02:07:58.560
with Cascade or Candy Cane Park, whichever you prefer to call it, in fiscal year 2018.

02:07:58.560 --> 02:08:04.700
These updates will cost 150, 180, and 120,000 dollars respectively.

02:08:04.700 --> 02:08:09.060
Creating a sense of place is a concept that could be applied to the city as a whole as well.

02:08:09.060 --> 02:08:12.860
The mechanism to do so is through the development and zoning codes.

02:08:12.860 --> 02:08:15.740
Currently the city is operating with outdated zoning codes.

02:08:15.740 --> 02:08:19.380
Within the strategic plan the community development department is responsible for updating and

02:08:19.380 --> 02:08:21.340
maintaining those codes.

02:08:21.340 --> 02:08:31.340
Due to current workloads and increased development activities, the committee is recommending additional personnel to address the outdated codes and focus on supporting healthy lifestyles through best zoning practices.

02:08:31.340 --> 02:08:40.630
Providing programs and services to help to support healthy lifestyles centers on personnel needed to implement and run the programs offered by the city.

02:08:40.630 --> 02:08:49.460
Our community has seen increased participation in the recreation programs due to the large influx of residents and popularity in the programs we offer.

02:08:49.460 --> 02:08:53.510
through all of the developments we've happened with Chibani Future Clip Bar.

02:08:53.510 --> 02:08:57.510
The committee is recommending an additional recreation coordinator to address the staffing

02:08:57.510 --> 02:09:01.430
shortfall created by the success and demand of the programs by residents.

02:09:01.430 --> 02:09:08.080
This position would have some offset dollars due to a decrease in an overtime budget.

02:09:08.080 --> 02:09:11.200
Recognizing our partnership with the school district and the success of our

02:09:11.200 --> 02:09:15.270
police department has had a conjunction with them

02:09:15.270 --> 02:09:18.150
in creating a safe environment for our children. We recommend an additional

02:09:18.150 --> 02:09:23.770
school resource officer in fiscal year 2017. This will coincide with the opening of the

02:09:23.770 --> 02:09:28.570
new South Middle School. Half of the cost for this position is paid by the school district.

02:09:28.570 --> 02:09:33.490
SROs play a key role in addressing issues that arise specifically with school children.

02:09:33.490 --> 02:09:37.690
In order to address these special cases, the long term planning committee has recommended

02:09:37.690 --> 02:09:42.570
additional personnel in the form of a dedicated health and welfare investigator in fiscal year

02:09:42.570 --> 02:09:47.730
2018. Lieutenant Thusen is going to talk more about this position and the timing of the health

02:09:47.730 --> 02:09:49.730
Thank you, Jonathan.

02:09:49.730 --> 02:09:52.180
Welcome, Lieutenant.

02:09:52.180 --> 02:09:56.180
Just real quick on the health and welfare investigator,

02:09:56.180 --> 02:10:00.180
we are looking at the police department at the volume of

02:10:00.180 --> 02:10:04.180
calls for service pertaining to priority 1, 2, and 3 health and

02:10:04.180 --> 02:10:06.180
welfare calls.

02:10:06.180 --> 02:10:10.180
This service is currently being provided by on duty patrol officers.

02:10:10.180 --> 02:10:13.180
We're looking at that call volume to determine if the more

02:10:13.180 --> 02:10:17.180
appropriate place to house this position would be as a school

02:10:17.180 --> 02:10:22.940
school resource officer or a potential additional investigator specifically dedicated to health

02:10:22.940 --> 02:10:25.100
and welfare priority calls.

02:10:25.100 --> 02:10:28.660
And that's why we've pushed this out a couple of years.

02:10:28.660 --> 02:10:33.500
Currently, we are handling those calls for service, but we'd like to look at maybe some

02:10:33.500 --> 02:10:36.950
more effective ways of providing those services.

02:10:36.950 --> 02:10:40.550
Thank you.

02:10:40.550 --> 02:10:42.110
That concludes Focus Area 1.

02:10:42.110 --> 02:10:43.110
There's any questions?

02:10:43.110 --> 02:10:46.710
Are there any questions for Jonathan or you kind of do us?

02:10:46.710 --> 02:10:47.710
Back in Milsoy.

02:10:47.710 --> 02:10:48.710
Thank you, Mayor.

02:10:48.710 --> 02:10:54.510
I'm not really a question, just maybe a comment, just on the recommendation of the recreation

02:10:54.510 --> 02:11:01.530
coordinator, you know, I know that we fund other recreation programs, just looking at our

02:11:01.530 --> 02:11:05.630
community, there's actually a lot of great opportunities for recreation through Boys

02:11:05.630 --> 02:11:12.230
and Girls Club and through Salvation Army and the YMCA and those are places that we do

02:11:12.230 --> 02:11:14.230
fund a lot of those programs.

02:11:14.230 --> 02:11:22.190
And so I guess my only hesitation, maybe in adding that expensive of a personnel position

02:11:22.190 --> 02:11:32.690
that is going to be needed to be funded into perpetuity would be maybe to look at maybe

02:11:32.690 --> 02:11:40.190
some capital improvements that would serve a greater portion of the community.

02:11:40.190 --> 02:11:47.350
And looking at the strategic plan as you've highlighted, I appreciate the trail system highlights that you made and

02:11:48.350 --> 02:11:55.710
the the plan for funding at the City Park, which is a heavily utilized facility that we really need to

02:11:56.550 --> 02:12:02.150
keep up to date, especially with its utilities and you know people complain about the

02:12:02.550 --> 02:12:04.190
the power

02:12:04.190 --> 02:12:09.870
situation at City Park every year, so you know, definitely want to want to add that in there, but I mean

02:12:09.870 --> 02:12:13.770
But I understand the importance of our recreation programs, but there's actually an abundance

02:12:13.770 --> 02:12:22.210
of them and in our community that are offered for free or low cost to our community.

02:12:22.210 --> 02:12:29.150
So in our strategic plan, I just see more of a need to create capital improvements that will

02:12:29.150 --> 02:12:32.030
serve a greater portion of the community.

02:12:32.030 --> 02:12:36.510
I mean, some people have young families, some people use the recreation programs, some people

02:12:36.510 --> 02:12:41.470
don't and so just looking at kind of representing a larger portion of the

02:12:41.470 --> 02:12:47.270
community. I would kind of shy away from that recreation position but that's just

02:12:47.270 --> 02:12:53.950
my my initial concern. Thank you for the comment. Suzanne Hawkins. Thank you. I just

02:12:53.950 --> 02:12:57.990
want to counter that I support the position. For example this year we lost

02:12:57.990 --> 02:13:01.350
our Hershey track meet because we don't have the staff to put it together. I

02:13:01.350 --> 02:13:06.030
know there's a lot of things that the Rec Department offers for a wide variety

02:13:06.030 --> 02:13:12.150
of community members, I think it's well utilized from the adult sports leagues down to the children.

02:13:12.150 --> 02:13:15.550
And I think it touches almost every family in this community.

02:13:15.550 --> 02:13:20.470
And I would highly support you keep after that position and let's get our office staff where it needs to be.

02:13:20.470 --> 02:13:23.040
Thank you.

02:13:23.040 --> 02:13:30.040
I guess I'll just add that I certainly respect Rebecca's opinion and position on that.

02:13:30.040 --> 02:13:34.800
But I'm fairly familiar with some of those nonprofit organizations and

02:13:34.800 --> 02:13:41.600
They are all bursting at the seams on their own, much less what's happening with our Parks and Rec department.

02:13:41.600 --> 02:13:49.080
So I am in support if this long term planning committee reviewed this, looked at it closely, beat it up.

02:13:49.080 --> 02:13:57.480
I know what you guys do. You really do, you get into the weeds and you make sure that when you're going to make a recommendation that it's appropriate.

02:13:57.480 --> 02:14:02.760
trust you and and knowing that about those nonprofits and I know how how much

02:14:02.760 --> 02:14:07.860
this our parks and rec department is utilized and knowing how our community is

02:14:07.860 --> 02:14:13.640
growing I'm just going to a certain that it's the correct way to move so Greg

02:14:13.640 --> 02:14:17.160
Lanning I'm gonna agree with Suzanne and Don just on the growth factor if

02:14:17.160 --> 02:14:22.280
nothing else we're we're gonna we're exploding and then we've got to get ahead

02:14:22.280 --> 02:14:29.960
of it that we're going to provide a quality recreation program and I will be

02:14:29.960 --> 02:14:32.880
honest with you that's one of the things that the most people talk to me they talk

02:14:32.880 --> 02:14:36.720
to me about roads and I talk to people about rec. That's the people that you made

02:14:36.720 --> 02:14:43.240
your are important to them. Chris talking to just a little background then the

02:14:43.240 --> 02:14:49.080
recommendations are predicated upon future growth of the community going up

02:14:49.080 --> 02:14:52.760
for our long-range plan, the 70,000.

02:14:52.760 --> 02:14:55.360
We didn't talk about specific population numbers,

02:14:55.360 --> 02:14:57.800
but we didn't talk about the next five years.

02:14:57.800 --> 02:14:59.480
Well, let me ask you a different way.

02:14:59.480 --> 02:15:02.920
The anticipated personnel improvements

02:15:02.920 --> 02:15:08.840
are only based upon current needs then.

02:15:08.840 --> 02:15:10.000
I don't know if all of them are,

02:15:10.000 --> 02:15:12.720
but I think that's fairly accuracy.

02:15:12.720 --> 02:15:14.820
And anticipated need.

02:15:14.820 --> 02:15:17.320
Travis, did you weigh in more?

02:15:17.320 --> 02:15:19.520
So I'm not going to weigh in on the positions,

02:15:19.520 --> 02:15:27.720
But I want to maybe kind of rewind just a minute and talk about long-term planning and what this purpose is.

02:15:27.720 --> 02:15:34.040
So really long-term planning is designed to provoke the initial thought.

02:15:34.040 --> 02:15:39.280
One of the examples is the committee was not charged with balancing.

02:15:39.280 --> 02:15:46.580
There is a $421,000 deficit right now based upon anticipated revenues and

02:15:46.580 --> 02:15:50.580
and anticipated expenditures if this plan were to move forward.

02:15:50.580 --> 02:15:56.580
I have a statutory obligation to provide you with a balanced, sustainable budget.

02:15:56.580 --> 02:16:04.580
So from this conversation tonight, through a whole series of conversations, 12, in fact,

02:16:04.580 --> 02:16:11.580
we are going to be having the opportunity to really weigh in on each individual position,

02:16:11.580 --> 02:16:16.580
each individual capital item as we move forward through our budget process.

02:16:16.580 --> 02:16:22.580
Next week is your opportunity to share what your priorities are for this budget

02:16:22.580 --> 02:16:26.580
and open it up to the community, and I will also begin to share mine as well,

02:16:26.580 --> 02:16:30.580
and then we'll present a balanced budget to you on July 6th.

02:16:30.580 --> 02:16:34.580
So I really encourage the questions.

02:16:34.580 --> 02:16:40.580
I encourage you to ask questions in terms of how did you come up with this,

02:16:40.580 --> 02:16:48.580
But it may be the case, and I'm not saying anything to the team because I got a lot of people like we're glaring at me now,

02:16:48.580 --> 02:16:52.580
I may not support one or any of the positions in the budget.

02:16:52.580 --> 02:16:58.580
And when I present that budget to you, hopefully you'll take my thoughts,

02:16:58.580 --> 02:17:04.580
but also the long-term planning committee members' thoughts in terms of what is that balance

02:17:04.580 --> 02:17:10.340
and what is that state and what do we need to do to be able to achieve the different

02:17:10.340 --> 02:17:12.700
priorities that are described in the strategic plan.

02:17:12.700 --> 02:17:18.340
So you just want to kind of get us to a place that really, I'm not trying to stifle conversation

02:17:18.340 --> 02:17:24.420
and debate, but really maybe recognize that this is that first bite at the apple and we

02:17:24.420 --> 02:17:26.860
have 13 more conversations after this one.

02:17:26.860 --> 02:17:32.260
I think it's important that as statements are made that we try to balance those because

02:17:32.260 --> 02:17:38.120
As I know what you take back to this long-term planning committee is what you hear from us.

02:17:38.120 --> 02:17:46.100
So, and so I want to make sure that we balance it, but certainly I appreciate what you say, Travis, that this is the first bite I get it.

02:17:46.100 --> 02:17:53.600
The long-term planning committee is done after tonight for this year.

02:17:53.600 --> 02:18:00.760
This is the final exercise in their processes, the presentation of their results.

02:18:00.760 --> 02:18:04.660
All of the members are here that are participating in the long-term planning committee, so they're

02:18:04.660 --> 02:18:11.180
hearing you right now as we have this conversation.

02:18:11.180 --> 02:18:12.620
I see no further likes.

02:18:12.620 --> 02:18:16.900
With that, turn over to Mandy for focus area number two.

02:18:16.900 --> 02:18:19.260
Welcome Mandy.

02:18:19.260 --> 02:18:23.060
Thank you, Jonathan.

02:18:23.060 --> 02:18:24.700
Mayor, Council.

02:18:24.700 --> 02:18:29.340
Focus area two, strategic plan is centered around the importance of being a learning community.

02:18:29.340 --> 02:18:33.900
While one of the smaller focus areas of our strategic plan, it wasn't given any less consideration

02:18:33.900 --> 02:18:37.120
during the strategic planning process.

02:18:37.120 --> 02:18:39.180
The goal of this focus area is centered on increasing

02:18:39.180 --> 02:18:40.920
the knowledge base of our city government

02:18:40.920 --> 02:18:42.980
by supporting the efforts of others

02:18:42.980 --> 02:18:46.180
in creating a well-educated and well-trained community.

02:18:46.180 --> 02:18:48.180
This involves strong partnerships

02:18:48.180 --> 02:18:50.040
between the public and private institutions

02:18:50.040 --> 02:18:52.480
to promote an environment of personal

02:18:52.480 --> 02:18:54.440
and professional growth.

02:18:54.440 --> 02:18:56.520
The recommendations of the long-term plan group

02:18:56.520 --> 02:18:59.600
tied directly to this focus area all focus on training

02:18:59.600 --> 02:19:01.700
and the increasing the knowledge base of the community

02:19:01.700 --> 02:19:05.510
through strategic community partnerships.

02:19:05.510 --> 02:19:07.470
It is a recommendation of the long-term planning committee

02:19:07.470 --> 02:19:09.270
that an internship program be established

02:19:09.270 --> 02:19:11.990
to assist in training students seeking careers

02:19:11.990 --> 02:19:14.190
that align with programs and services

02:19:14.190 --> 02:19:15.550
that are offered by the city.

02:19:15.550 --> 02:19:17.150
The initial recommendation will provide

02:19:17.150 --> 02:19:19.750
for a part-time salaries in the city shop

02:19:19.750 --> 02:19:22.390
to bring in and help train mechanics.

02:19:22.390 --> 02:19:24.470
Additionally, other departments were interested

02:19:24.470 --> 02:19:26.590
as we went through this discussion

02:19:26.590 --> 02:19:29.790
in pursuing unpaid internship programs,

02:19:29.790 --> 02:19:31.870
similar to what the Parks and Recreation Department

02:19:31.870 --> 02:19:33.990
has been doing for several years.

02:19:33.990 --> 02:19:37.390
These internships allow for hands-on training for students

02:19:37.390 --> 02:19:40.390
while providing valuable assistance to various departments.

02:19:40.390 --> 02:19:41.830
And the success of this program will

02:19:41.830 --> 02:19:44.010
be dependent upon our already strong partnerships

02:19:44.010 --> 02:19:49.320
with both CSI and with the Twin Falls School District.

02:19:49.320 --> 02:19:51.640
Because the city's not directly involved in education,

02:19:51.640 --> 02:19:53.280
community partnerships are very key

02:19:53.280 --> 02:19:55.160
to achieving these goals.

02:19:55.160 --> 02:19:57.040
Beyond the internship program, the city

02:19:57.040 --> 02:19:59.880
relies on its partnerships with the Twin Falls School District

02:19:59.880 --> 02:20:02.320
to ensure a safe learning community and an environment

02:20:02.320 --> 02:20:06.500
of drugs and bullying for our children. The city shares the cost of the student resource

02:20:06.500 --> 02:20:15.770
officers in the schools. And one of these officers, Officer Stephen Gassert, has received

02:20:15.770 --> 02:20:20.550
statewide recognition for its effectiveness at the middle school level. The top picture

02:20:20.550 --> 02:20:27.350
here is Officer Gassert along with Officer Simone Rodriguez and the Governor. They were

02:20:27.350 --> 02:20:32.630
at the Capitol that day when an anti-bullying bill was signed into law and then below is

02:20:32.630 --> 02:20:36.030
as one of the sponsors of the bill with Officer Gassert.

02:20:36.030 --> 02:20:40.470
City staff also participates in, or excuse me,

02:20:41.830 --> 02:20:43.950
city staff also participates in career fairs

02:20:43.950 --> 02:20:47.030
and speaks at schools on the business of local governments,

02:20:47.030 --> 02:20:48.470
the issues that we're facing in our work

02:20:48.470 --> 02:20:50.410
and how students can become more engaged

02:20:50.410 --> 02:20:51.630
in the local government.

02:20:52.550 --> 02:20:57.550
That includes participating in a fair called careers on wills

02:20:58.150 --> 02:21:00.630
and then multiple staff members throughout the city

02:21:00.630 --> 02:21:06.850
attend, take advantage of various opportunities to speak to both middle school and high school

02:21:06.850 --> 02:21:11.330
students about the programs through the city.

02:21:11.330 --> 02:21:15.570
CSI also plays an impactful role in moving this focus area forward.

02:21:15.570 --> 02:21:19.650
The police department has hired graduates of the law enforcement program in the past, but

02:21:19.650 --> 02:21:23.050
recently began utilizing this program in a different way.

02:21:23.050 --> 02:21:27.290
Newly hired officers can now complete their law enforcement training and coursework at CSI.

02:21:27.290 --> 02:21:34.210
Not only does this allow for more flexibility and scheduling, but it allows newly hired officers

02:21:34.210 --> 02:21:40.570
to engage with and interact with their fellow officers during their training period because

02:21:40.570 --> 02:21:43.410
they're in Twin Falls instead of at post and Meridian.

02:21:43.410 --> 02:21:48.970
This enhances the training that our new officers are receiving and better prepares them for

02:21:48.970 --> 02:21:52.610
their job when they are deployed on their own.

02:21:52.610 --> 02:21:56.410
The city will continue to rely on the strength of the Workforce Development Training Program

02:21:56.410 --> 02:22:01.410
to ensure quality employees are available to fill all of the jobs that are available in the community,

02:22:01.410 --> 02:22:07.410
as well as those that we've been working diligently with our economic development efforts to bring to the City of Twin Falls.

02:22:07.410 --> 02:22:13.410
And then lastly, the City has been working with various community partners, including all that I've mentioned previously,

02:22:13.410 --> 02:22:18.410
as well as St. Luke's and the Twin Falls YMCA on a new initiative called Activate Magic Valley.

02:22:18.410 --> 02:22:24.410
The goal of this initiative is to educate our residents on the options to live a healthy and active lifestyle

02:22:24.410 --> 02:22:31.460
and to offer activities and programs and resources to do so.

02:22:31.460 --> 02:22:34.410
Do we have any questions for Mandy?

02:22:34.410 --> 02:22:37.130
You did such a stellar job, no questions.

02:22:37.130 --> 02:22:37.970
Thank you, Mandy.

02:22:37.970 --> 02:22:39.250
She did it quickly too.

02:22:39.250 --> 02:22:45.010
She did.

02:22:45.010 --> 02:22:47.130
Lieutenant Thuyasen back with us.

02:22:47.130 --> 02:22:49.730
We're going to talk about Book of Cerea 3.

02:22:49.730 --> 02:22:53.170
Next, one of the primary responsibilities of government

02:22:53.170 --> 02:22:55.050
is to provide for the safety and security

02:22:55.050 --> 02:22:56.970
of the community it serves, while providing

02:22:56.970 --> 02:23:00.770
for a secure community involves the continued investment

02:23:00.770 --> 02:23:03.570
and buyer and police services.

02:23:03.570 --> 02:23:06.370
Other departments also contribute to this focus area.

02:23:06.370 --> 02:23:08.490
For example, one of the objectives identified

02:23:08.490 --> 02:23:11.050
in this focus area is to prevent crime

02:23:11.050 --> 02:23:13.090
through improved environmental design.

02:23:13.090 --> 02:23:16.130
The Planning and Zoning Department addresses crime prevention

02:23:16.130 --> 02:23:18.890
through environmental design as building plans

02:23:18.890 --> 02:23:21.090
are submitted and reviewed.

02:23:21.090 --> 02:23:22.690
They do this by evaluating things

02:23:22.690 --> 02:23:27.380
such as landscaping, lighting, and building design.

02:23:27.380 --> 02:23:29.180
In order to be more effective in this endeavor,

02:23:29.180 --> 02:23:31.380
the Long-Term Planning Committee recommends funding

02:23:31.380 --> 02:23:34.020
to hire an additional intermediate Planner 2

02:23:34.020 --> 02:23:36.220
and an additional building inspector,

02:23:36.220 --> 02:23:41.770
which was just approved prior to our presentation.

02:23:41.890 --> 02:23:43.970
The Planner 2 position will ensure building codes

02:23:43.970 --> 02:23:45.970
are up to date and applied to building plans

02:23:45.970 --> 02:23:48.810
during the review process and the building inspector position

02:23:48.810 --> 02:23:50.450
will ensure those codes are being followed

02:23:50.450 --> 02:23:53.230
during the construction phase.

02:23:53.230 --> 02:23:55.210
Additionally, the long-term planning committee looked

02:23:55.210 --> 02:23:57.530
at how we're spending current resources

02:23:57.530 --> 02:24:00.610
to determine if there are better ways of doing business

02:24:00.610 --> 02:24:04.370
that will improve coverage and enhance service capabilities.

02:24:04.370 --> 02:24:06.330
For instance, the airport has recognized

02:24:06.330 --> 02:24:09.130
that they can reallocate funding in their contract services

02:24:09.130 --> 02:24:12.250
line to significantly reduce the cost of hiring

02:24:12.250 --> 02:24:15.170
two part-time custodial personnel.

02:24:15.170 --> 02:24:17.970
The additional staffing will improve coverage at the airport

02:24:17.970 --> 02:24:20.170
and improve service delivery capabilities

02:24:20.170 --> 02:24:22.290
on a consistent basis.

02:24:22.290 --> 02:24:24.290
The streets department has also reviewed

02:24:24.290 --> 02:24:26.570
its current funding structure and identified a way

02:24:26.570 --> 02:24:30.810
to reduce the cost of outsourcing traffic light maintenance.

02:24:30.810 --> 02:24:33.170
Shifting this funding from contract services

02:24:33.170 --> 02:24:37.050
will offset the full cost of an additional streets operator.

02:24:37.050 --> 02:24:40.090
We believe this change will improve the street department's

02:24:40.090 --> 02:24:42.810
sustainable service capabilities overall

02:24:42.810 --> 02:24:45.930
at a reduced cost to the city.

02:24:45.930 --> 02:24:47.730
While the airport custodial positions

02:24:47.730 --> 02:24:50.170
and the street operator may be new positions,

02:24:50.170 --> 02:24:52.410
they do not require new funding.

02:24:52.410 --> 02:24:54.490
The costs associated with these positions

02:24:54.490 --> 02:25:00.870
are covered by moving current funding from one, from operation lines into personnel.

02:25:00.870 --> 02:25:05.410
If these positions are not supported in the final budget, the funding will still be required

02:25:05.410 --> 02:25:10.050
by these departments and remain in their operation lines.

02:25:10.050 --> 02:25:15.890
The fire, the fire department is evaluating their response times to calls and recognizes

02:25:15.890 --> 02:25:20.870
the potential need for an additional fire station in the foreseeable future.

02:25:20.870 --> 02:25:25.330
Their initial plan to staff this new station called for three additional firemen every year

02:25:25.330 --> 02:25:27.590
for the next four years.

02:25:27.590 --> 02:25:32.070
This would build a complete company available for deployment by the time the new station is

02:25:32.070 --> 02:25:33.070
ready for operation.

02:25:33.070 --> 02:25:38.630
But as the long-term planning committee progressed through our discussions, the Fire Department

02:25:38.630 --> 02:25:44.150
recognized the opportunity to conduct fire safety service research as part of the comprehensive

02:25:44.150 --> 02:25:45.630
plan.

02:25:45.630 --> 02:25:50.630
This research will help identify the best location for the new station as well as projected date

02:25:50.630 --> 02:25:56.590
as to when the new facility will be vital to support continued fire safety services.

02:25:56.590 --> 02:26:02.070
As a result, the Fire Department moved these positions to a priority, too, in the upcoming

02:26:02.070 --> 02:26:03.870
year.

02:26:03.870 --> 02:26:07.770
The long-term planning committee may recommend consideration of additional firefighters as

02:26:07.770 --> 02:26:11.910
priority one in outlined years, based on the results of this study.

02:26:11.910 --> 02:26:18.780
Further, the Police Department is progressing efforts focused on data-driven deployment initiatives.

02:26:18.780 --> 02:26:24.180
A common practice for police organizations across the country to determine staffing needs

02:26:24.180 --> 02:26:28.980
is to measure officer to 1,000 citizen population ratio.

02:26:28.980 --> 02:26:32.980
We're challenging this mindset at police department.

02:26:32.980 --> 02:26:39.400
We're looking at more objective measures to assess our staffing needs rather than simply

02:26:39.400 --> 02:26:45.080
throwing new officers at growing service demands driven by population increases.

02:26:45.080 --> 02:26:50.040
We're looking at workload studies and analysis compared to current shift structures and deployment

02:26:50.040 --> 02:26:51.800
strategies.

02:26:51.800 --> 02:26:56.040
As a result of these efforts to work smarter with current resources and technology, the

02:26:56.040 --> 02:27:01.580
long-term planning committee recommends that we continue to increase sworn police staffing

02:27:01.580 --> 02:27:08.120
on an average of two officers every other year as opposed to the four officers every year

02:27:08.120 --> 02:27:15.900
that would be required to meet the Idaho average of officer 1,000 population ratio.

02:27:15.900 --> 02:27:20.700
As mentioned, we're analyzing workload trends to determine if and when additional officers

02:27:20.700 --> 02:27:25.560
will be needed to maintain service levels and support ongoing operations.

02:27:25.560 --> 02:27:31.140
Two additional officers will balance the service capabilities and coverage of each platoon and

02:27:31.140 --> 02:27:36.580
police department, providing one additional officer available for deployment to a 12-hour

02:27:36.580 --> 02:27:43.500
shift rotation strategically aligned to peak call load hours and BDAX initiatives.

02:27:43.500 --> 02:27:48.060
The police departments also working with both the city and county prosecutors to decrease

02:27:48.060 --> 02:27:53.140
time-consuming service demands on evidence technicians, and the shop has started discussions

02:27:53.140 --> 02:27:58.060
with the police department to potentially take over all responsibilities associated with

02:27:58.060 --> 02:28:00.060
fleet management.

02:28:00.060 --> 02:28:05.780
These process changes may help the police department recapture time of current staff allowing those

02:28:05.780 --> 02:28:12.540
individuals to pick up increasing service demands and other support service functions.

02:28:12.540 --> 02:28:18.300
The Long-Term Planning Committee recognizes that additional personnel also require additional

02:28:18.300 --> 02:28:22.860
equipment to support their services and work output.

02:28:22.860 --> 02:28:26.980
The Long-Term Planning Committee recommends that additional marked police car be added

02:28:26.980 --> 02:28:31.500
to the fleet to support the new patrol officer being recommended.

02:28:31.500 --> 02:28:36.620
In addition to the new capital expenses necessary to support new staffing, the Long-Term Planning

02:28:36.620 --> 02:28:42.140
Committee found that continuing to fill the objective in this focus area will require

02:28:42.140 --> 02:28:47.100
investment in current equipment to maintain ongoing operations.

02:28:47.100 --> 02:28:52.140
The Long-Term Planning Committee examined how we can more effectively utilize resources

02:28:52.140 --> 02:28:57.620
to maximize value and prolong the life of our current assets.

02:28:57.620 --> 02:29:01.500
Most of the Long-Term Planning Committee recommendations for capital improvements associated

02:29:01.500 --> 02:29:06.380
with the focus area center on equipment, management, and rotation.

02:29:06.380 --> 02:29:11.500
Long-Term Planning Committee worked to extend the life of current assets to maximize value

02:29:11.500 --> 02:29:16.820
by rotating older equipment from high-use departments to departments that do not require

02:29:16.820 --> 02:29:21.560
the equipment on a daily basis.

02:29:21.560 --> 02:29:26.440
This allows for the most dated and costly equipment to be rotated out of service and provides

02:29:26.440 --> 02:29:31.440
the flexibility to assign new assets to the most appropriate locations within the city as

02:29:31.440 --> 02:29:32.440
a whole.

02:29:32.440 --> 02:29:37.080
The long-term planning committee looked at internal partnerships to better identify which

02:29:37.080 --> 02:29:41.580
pieces of equipment should rotate out in order to maximize the return on the

02:29:41.580 --> 02:29:48.870
city's investment in this equipment. The recommendations moving forward from the

02:29:48.870 --> 02:29:52.390
long-term planning committee are based on evaluations of the cost of maintenance

02:29:52.390 --> 02:29:55.990
and repairs for each identified piece of equipment compared to the cost of

02:29:55.990 --> 02:30:00.750
replacing that item. Additionally, the shop is working with each department on a

02:30:00.750 --> 02:30:06.270
continual basis to create, maintain, and update individualized department fleet

02:30:06.270 --> 02:30:11.730
management plans. For example, the Police Department's Fleet Management Plan, which was

02:30:11.730 --> 02:30:16.610
created from the significant input by the shop regarding maintenance and repair costs

02:30:16.610 --> 02:30:23.010
for each piece of equipment, calls for the rotation of four patrol cars, one staff car,

02:30:23.010 --> 02:30:28.210
and the animal control truck. The staff car will be replaced by a marked patrol car to

02:30:28.210 --> 02:30:33.670
provide the two patrol lieutenants with a marked vehicle capable of emergency response.

02:30:33.670 --> 02:30:39.230
The animal control truck will rotate to a low use department at the golf course to capture

02:30:39.230 --> 02:30:44.390
the maximum value of the asset while rotating out a cost-consuming piece of equipment currently

02:30:44.390 --> 02:30:46.390
used at the golf course.

02:30:46.390 --> 02:30:50.030
The new truck purchase will be assigned to the police department to replace the animal

02:30:50.030 --> 02:30:51.030
control truck.

02:30:51.030 --> 02:30:56.520
The long-term planning committee also looked at technology and the potential it creates

02:30:56.520 --> 02:30:59.560
for working smarter with current resources.

02:30:59.560 --> 02:31:04.480
For example, the streets department intends to implement a data-driven assessment of asphalt

02:31:04.480 --> 02:31:09.320
conditions that will improve their planning and rotation of street maintenance and upkeep

02:31:09.320 --> 02:31:11.880
for improved traffic safety.

02:31:11.880 --> 02:31:16.920
The long-term planning committee also had discussions regarding capital needs to support

02:31:16.920 --> 02:31:21.480
ongoing operations centered on safety equipment for employees.

02:31:21.480 --> 02:31:26.320
The long-term planning committee is recommending the purchase of three rapid intervention packs

02:31:26.320 --> 02:31:30.520
as well as the funding to replace outdated bomb technician suits.

02:31:30.520 --> 02:31:34.560
The hazardous device unit currently has five blast suits

02:31:34.560 --> 02:31:37.160
that were all purchased with grant funding.

02:31:37.160 --> 02:31:39.440
The certification for each suit has expired

02:31:39.440 --> 02:31:41.720
and the suits all need replaced.

02:31:41.720 --> 02:31:45.600
Each suit costs approximately $25,000.

02:31:45.600 --> 02:31:47.680
The long-term planning committee has worked closely

02:31:47.680 --> 02:31:49.800
with each department and Mandy Thompson

02:31:49.800 --> 02:31:52.680
to identify potential grant funding that may be available

02:31:52.680 --> 02:31:57.200
to offset or reduce the cost associated with safety equipment.

02:31:57.200 --> 02:32:00.080
Ultimately, the long-term planning committee recognizes the need

02:32:00.080 --> 02:32:04.600
for continued evaluation on internal processes and structures.

02:32:04.600 --> 02:32:08.000
Each department continues to evaluate current practices,

02:32:08.000 --> 02:32:11.320
services provided, and ways of doing business.

02:32:11.320 --> 02:32:14.760
As we do so, new processes and additional changes are sure

02:32:14.760 --> 02:32:17.760
to drive some adjustments to the long-term planning committee's

02:32:17.760 --> 02:32:21.000
recommendations in outlying years.

02:32:21.000 --> 02:32:23.600
However, we believe the practice of continued process

02:32:23.600 --> 02:32:26.800
and structure review is a critical component

02:32:26.800 --> 02:32:30.720
to providing sustainable safety and security services

02:32:30.720 --> 02:32:35.610
and should be our standard as we move forward.

02:32:35.610 --> 02:32:37.810
Questions for Focus Area 3?

02:32:37.810 --> 02:32:40.730
Do we have any questions for Focus Area 3?

02:32:40.730 --> 02:32:42.090
It wouldn't dare.

02:32:42.090 --> 02:32:46.090
That's pretty thorough.

02:32:46.090 --> 02:32:48.250
I mean, there's a compliment.

02:32:48.250 --> 02:32:49.530
I concur.

02:32:49.530 --> 02:32:54.520
Thank you, Lieutenant.

02:32:54.520 --> 02:32:59.080
and take a shot of it, it's for the next.

02:32:59.080 --> 02:33:01.680
Good evening, Mayor and Council.

02:33:01.680 --> 02:33:04.960
My name's Mitchell with the Fire Department.

02:33:04.960 --> 02:33:08.880
I get a focus area for which covers

02:33:08.880 --> 02:33:12.360
multimodal choices, improved connectivity,

02:33:12.360 --> 02:33:16.040
maintain and improve the airport.

02:33:16.040 --> 02:33:17.620
The Street Department will continue to support

02:33:17.620 --> 02:33:19.780
their current and future reconstruction plans.

02:33:19.780 --> 02:33:25.440
For example, we have recommended that $840,000 be added

02:33:25.440 --> 02:33:27.960
for the Eastland Drive South Project

02:33:27.960 --> 02:33:35.510
and another 430,000 for other miscellaneous reconstruction projects in 2016.

02:33:35.510 --> 02:33:39.750
We discussed the Canyon Springs Great project, but did not include it into the five-year plan

02:33:39.750 --> 02:33:44.750
until there was more discussion, and it has gone through a more public process, and I think

02:33:44.750 --> 02:33:48.660
Troy explained that pretty well today.

02:33:48.660 --> 02:33:53.340
We anticipate that this project will require a large capital investment and are not sure

02:33:53.340 --> 02:33:56.780
how the project will be funded.

02:33:56.780 --> 02:34:01.500
The street department has allocated $900,000 other budget to continue with their ongoing zone

02:34:01.500 --> 02:34:04.740
maintenance seal code program.

02:34:04.740 --> 02:34:10.580
$150,000 has been recommended in 2017 to match the state's funding for signalization improvements

02:34:10.580 --> 02:34:16.060
and upgrades as identified in the five-year plan by engineering.

02:34:16.060 --> 02:34:21.500
We recommend budgeting $250,000 to have our master transportation plan updated, which will

02:34:21.500 --> 02:34:27.140
allow us to identify congestion and capacity problems, update street development standards,

02:34:27.140 --> 02:34:33.350
prioritize future projects. There's been a lot of discussion lately regarding

02:34:33.350 --> 02:34:39.710
ADA ramps and their conditions. The long-term planning committee understands that

02:34:39.710 --> 02:34:44.710
there are several ramps in the community that either need or in need of repair or

02:34:44.710 --> 02:34:49.210
need to be constructed. The plan moving forward is to install or repair them in

02:34:49.210 --> 02:34:54.350
conjunction with roadway reconstruction projects in other appropriate locations

02:34:54.350 --> 02:34:58.840
determined by community requests for service.

02:34:58.840 --> 02:35:04.080
We recommend allocating $25,000 a year towards this effort and hope to receive additional grant

02:35:04.080 --> 02:35:07.190
funding.

02:35:07.190 --> 02:35:11.870
We recognize the cycling community is growing and will strive to make our city as biker-friendly

02:35:11.870 --> 02:35:16.990
as possible by improving our signing, striping and other pavement markings for bike lanes to

02:35:16.990 --> 02:35:21.650
meet the community's expectations.

02:35:21.650 --> 02:35:26.410
Both the parks and street departments have developed a maintenance schedule for the trail

02:35:26.410 --> 02:35:30.410
systems which include continued sweeping, making repairs, and applying a

02:35:30.410 --> 02:35:35.730
sand slurry application to four trails per year. Partnerships have been made

02:35:35.730 --> 02:35:40.050
between the biking community, Magic Valley Trail Enhancement Committee, and the

02:35:40.050 --> 02:35:44.760
Parks Department to improve and enhance our trail systems. We understand that

02:35:44.760 --> 02:35:49.000
several trails are segmented and will work to connect as many as possible

02:35:49.000 --> 02:35:54.840
through future construction and development projects. We had several

02:35:54.840 --> 02:36:00.820
discussions on public transportation and anticipate the need to provide the service

02:36:00.820 --> 02:36:05.560
after the 2020 Census. We felt there will need to be a lot more discussion beyond

02:36:05.560 --> 02:36:09.340
the long-term planning group and after getting the results of the master

02:36:09.340 --> 02:36:19.080
transportation and transit development plans. We are in the beginning stages of

02:36:19.080 --> 02:36:23.480
comprehensive plan update that will progress through 2016. This update will

02:36:23.480 --> 02:36:28.400
be a guiding document for future land use patterns and policies. The long-term

02:36:28.400 --> 02:36:38.400
Planning Committee feels that if a plan or two position is added, it will allow them to address workload issues and further implement the goals and objectives of the strategic and comprehensive plan.

02:36:38.400 --> 02:36:45.190
The airport staff is continually working with the FAA to develop a five-year utility plan.

02:36:45.190 --> 02:36:52.450
This plan will help them determine where to put utilities that will work best for any future development and tenant needs.

02:36:52.450 --> 02:36:58.760
Terminal modifications will be made to provide better pasture comfort and security with most

02:36:58.760 --> 02:37:03.020
of the funding coming from FAA.

02:37:03.020 --> 02:37:08.680
The FAA has also approved the purchase of a new crash rescue fire apparatus at the airport

02:37:08.680 --> 02:37:14.680
in 2017 and will provide approximately 93% of that funding.

02:37:14.680 --> 02:37:22.100
That replaces our 1996 vehicle that's out there now.

02:37:22.100 --> 02:37:25.880
Recent state legislation requires a more thorough review of future development plans

02:37:25.880 --> 02:37:27.720
around airport facilities.

02:37:27.720 --> 02:37:30.040
The city is addressing this legislative requirement

02:37:30.040 --> 02:37:32.600
through the comprehensive plan update.

02:37:32.600 --> 02:37:35.880
This update will adequately address the airport

02:37:35.880 --> 02:37:38.920
as an asset to be protected and direct developments

02:37:38.920 --> 02:37:42.080
in the area to more airport-friendly land use pattern.

02:37:44.490 --> 02:37:47.090
That completes Focus Area Forum.

02:37:47.090 --> 02:37:48.890
We have any questions?

02:37:48.890 --> 02:37:50.210
Rebecca Milsek.

02:37:50.210 --> 02:37:51.370
Thank you, Mayor.

02:37:51.370 --> 02:37:54.490
Thank you for your report on accessible community.

02:37:54.490 --> 02:37:56.730
Something that we've heard a lot from the community,

02:37:56.730 --> 02:38:01.170
I think here in person on the radio are the sidewalks.

02:38:01.170 --> 02:38:04.810
And we all recognize that the city code

02:38:04.810 --> 02:38:07.470
requires the property owner to make improvements

02:38:07.470 --> 02:38:08.170
on the sidewalks.

02:38:08.170 --> 02:38:12.330
And I mean, I feel like it probably fits really well

02:38:12.330 --> 02:38:15.570
under accessible community, because whether people can

02:38:15.570 --> 02:38:18.130
maneuver big cracks in the sidewalks,

02:38:18.130 --> 02:38:23.090
whether they have ADA accessible kind of issues or not,

02:38:23.090 --> 02:38:24.370
it's really a safety hazard.

02:38:24.370 --> 02:38:28.970
So I was wondering if the group talked about that at all

02:38:28.970 --> 02:38:31.850
about how to address or implement,

02:38:31.850 --> 02:38:35.530
and I don't have the answer because our historical answer

02:38:35.530 --> 02:38:38.290
has been well to the property owners' responsibility.

02:38:38.290 --> 02:38:40.410
And so really it just doesn't get done.

02:38:40.410 --> 02:38:42.250
And our sidewalks are falling apart

02:38:42.250 --> 02:38:44.370
and our community isn't accessible.

02:38:44.370 --> 02:38:47.050
So I mean really I think the city is gonna have to step up

02:38:47.050 --> 02:38:50.890
and do something to start the process

02:38:50.890 --> 02:38:54.210
or encourage people to take on that responsibility.

02:38:54.210 --> 02:39:00.210
But anyway, did the group talk about sidewalks at all?

02:39:00.210 --> 02:39:02.210
There was definitely discussion.

02:39:02.210 --> 02:39:04.210
Funding that some way.

02:39:04.210 --> 02:39:13.210
I'm not sure we have a solution for it, but I know the street department was acutely aware of the problems that we're having.

02:39:13.210 --> 02:39:18.210
I believe they're going to be addressing it as they can as time permits.

02:39:18.210 --> 02:39:21.210
But nothing specific in this budget recommendation.

02:39:21.210 --> 02:39:23.690
Unless there's more to add.

02:39:23.690 --> 02:39:27.580
Yeah, Troy looks like he's...

02:39:27.580 --> 02:39:30.580
We talked about the ADA Rams.

02:39:30.580 --> 02:39:32.580
Yeah, other than the state or federal funding.

02:39:32.580 --> 02:39:34.580
Yeah, just kind of what our own mission is.

02:39:34.580 --> 02:39:36.580
Well, $25,000 we were going to put in.

02:39:36.580 --> 02:39:38.580
Right, so there's a portion of that.

02:39:38.580 --> 02:39:40.580
There was a lot of discussion about this.

02:39:40.580 --> 02:39:51.580
And our life expectancy for ADA Rams is something about a 1,000-year cycle or something right now at the $25,000.

02:39:51.580 --> 02:39:57.940
So we are required to update the ramps by state requirements or federal requirements right

02:39:57.940 --> 02:40:00.180
now as you do a project there.

02:40:00.180 --> 02:40:03.220
So we decided we're going to fund something that we're required to do.

02:40:03.220 --> 02:40:08.520
We all agreed that the sidewalks that join in those ramps don't meet standards but we're

02:40:08.520 --> 02:40:10.300
having difficulty funding those as well.

02:40:10.300 --> 02:40:15.900
So we want to put our money where we had to at this point and we will continue to plan and

02:40:15.900 --> 02:40:18.540
try to increase those funds as we progress.

02:40:18.540 --> 02:40:19.540
Thank you.

02:40:19.540 --> 02:40:21.730
Good.

02:40:21.730 --> 02:40:24.570
I don't see any further questions, so.

02:40:24.570 --> 02:40:26.530
Well, the good news is I get to present

02:40:26.530 --> 02:40:29.050
Folksery 5 as well.

02:40:29.050 --> 02:40:29.970
Go.

02:40:29.970 --> 02:40:31.570
It is good news.

02:40:31.570 --> 02:40:35.250
General Roll, go.

02:40:35.250 --> 02:40:38.970
Folksery 5 talks about environmental community,

02:40:38.970 --> 02:40:41.330
improve the environmental standards of the community,

02:40:41.330 --> 02:40:44.980
and support environmental stewardship.

02:40:44.980 --> 02:40:46.860
The Community Development Planning Department

02:40:46.860 --> 02:40:48.940
have been utilizing development codes and policies

02:40:48.940 --> 02:40:50.100
that need updating.

02:40:50.100 --> 02:40:52.800
Again, we feel that adding a person in the Planning Department

02:40:52.800 --> 02:40:56.120
will help address the time constraints of current personnel

02:40:56.120 --> 02:41:00.840
in updating and enforcing those codes.

02:41:00.840 --> 02:41:03.440
The Parks and Rec Master Plan should be finalized

02:41:03.440 --> 02:41:04.960
by early summer.

02:41:04.960 --> 02:41:06.400
This plan will guide future efforts

02:41:06.400 --> 02:41:08.160
to update the long-term plan for park

02:41:08.160 --> 02:41:10.800
and open space development and maintenance,

02:41:10.800 --> 02:41:13.800
as well as the development of continuation

02:41:13.800 --> 02:41:16.760
of recreational opportunities within the community.

02:41:16.760 --> 02:41:18.920
The Parks Department will work to educate the public

02:41:18.920 --> 02:41:21.880
on planning drought tolerant trees

02:41:21.880 --> 02:41:24.000
and utilizing pressurized irrigation

02:41:24.000 --> 02:41:29.190
instead of potable water for irrigation as much as possible.

02:41:29.190 --> 02:41:33.190
We have recommended $40,000 for ongoing auger falls

02:41:33.190 --> 02:41:35.230
seeding irrigation and weed control.

02:41:36.390 --> 02:41:37.710
Just a quick story.

02:41:37.710 --> 02:41:41.710
I'm the big fan of this, especially as a member

02:41:41.710 --> 02:41:42.750
of the fire department.

02:41:44.670 --> 02:41:46.270
There's that picture up on the right there

02:41:46.270 --> 02:41:48.830
as part of the burns that we've done in the spring,

02:41:48.830 --> 02:41:51.190
trying to get rid of some of the tumbleweeds,

02:41:51.190 --> 02:41:53.390
but they were getting stacked up pretty high.

02:41:55.670 --> 02:42:00.670
There was a few occasions where I thought we were going to melt the paint on the apparatus as hot as it was getting.

02:42:00.670 --> 02:42:06.600
And I knew it. I have to talk to Chief Clark about that.

02:42:06.600 --> 02:42:11.600
But anyway, we're in support of this effort.

02:42:11.600 --> 02:42:17.080
The benefit of this effort will also reduce the fire load from wheat growth,

02:42:17.080 --> 02:42:22.390
as well as keeping the ponds that we have down there cleaner.

02:42:22.390 --> 02:42:27.390
Sediment and wetland ponds have been constructed in the agar falls and the gun range.

02:42:27.390 --> 02:42:32.030
Part of the water, the wastewater permitting process required the city to remove a significant

02:42:32.030 --> 02:42:35.190
amount of total solids going back into the river.

02:42:35.190 --> 02:42:40.550
Instead of building the expensive infrastructure to do this, we partnered with EPA, DEQ and

02:42:40.550 --> 02:42:45.310
Twin Falls Canal Company to engineer and build sediment ponds at the end of selected canal

02:42:45.310 --> 02:42:46.310
lateral.

02:42:46.310 --> 02:42:52.360
The wetland ponds have been constructed at Auger Falls, allow us to utilize treated wastewater

02:42:52.360 --> 02:42:56.080
from the treatment facility to create habitat and wetlands.

02:42:56.080 --> 02:43:02.200
There is one drawback to the system in order to regulate the current water levels and

02:43:02.200 --> 02:43:06.960
the employee has to visit the site on a daily basis and manually open and close valves to

02:43:06.960 --> 02:43:10.350
control the water levels.

02:43:10.350 --> 02:43:19.110
We recommend allocating $50,000 in each of the next five years to insult telemetry equipment

02:43:19.110 --> 02:43:24.290
that will allow us to perform those tasks remotely.

02:43:24.290 --> 02:43:28.850
The street department is committed to recycling roadway materials to limit solid waste as well

02:43:28.850 --> 02:43:34.370
is limited use of sand and salt and deicing operations to improve air and stormwater quality.

02:43:34.370 --> 02:43:38.610
They will also continue to explore green options for pavement, maintenance products similar to

02:43:38.610 --> 02:43:46.500
last year's fog seal project that won the city an environmental green award.

02:43:46.500 --> 02:43:47.500
That's all I have.

02:43:47.500 --> 02:43:49.500
That's two quick focus areas.

02:43:49.500 --> 02:43:52.880
Do we have any further questions for Mitchell?

02:43:52.880 --> 02:43:55.240
See no lights?

02:43:55.240 --> 02:43:56.810
Oh, Sean.

02:43:56.810 --> 02:43:58.810
You're looking up in the air.

02:43:58.810 --> 02:43:59.810
You got it?

02:43:59.810 --> 02:44:02.490
Sean, did you have any questions?

02:44:02.490 --> 02:44:04.490
I haven't been asking you.

02:44:04.490 --> 02:44:07.210
Sean sent me a text and his battery was dying.

02:44:07.210 --> 02:44:12.440
So hardly he's that's what he's saying about.

02:44:12.440 --> 02:44:18.030
He had no batteries and a text.

02:44:18.030 --> 02:44:19.030
We have no further questions.

02:44:19.030 --> 02:44:27.780
Thank you very much.

02:44:27.780 --> 02:44:31.620
You have Mandy back.

02:44:31.620 --> 02:44:35.380
Focus area six focuses on a prosperous community.

02:44:35.380 --> 02:44:37.620
A prosperous community has to find balance between its

02:44:37.620 --> 02:44:42.340
traditional economic base, which for us has always been agriculture, and also new growth.

02:44:42.340 --> 02:44:46.460
And it requires, again, strong partnerships to ensure that qualified labor force exists,

02:44:46.460 --> 02:44:51.420
that we have access to quality employment, and that we have an ongoing investment in our

02:44:51.420 --> 02:44:55.740
infrastructure to allow for the expansion that we're all working so hard for.

02:44:55.740 --> 02:44:59.580
The goals of this focus area are to revitalize downtown and support economic prosperity.

02:44:59.580 --> 02:45:04.380
As you're all aware, the Urban Renewal Agency is working on the main avenue redesign project,

02:45:04.380 --> 02:45:07.780
which will really go a long way to fulfill the goals and needs of this focus area.

02:45:07.780 --> 02:45:12.660
The project will replace the aging infrastructure along Main Street, as well as in Selnew streets,

02:45:12.660 --> 02:45:17.100
sidewalks, curbs, gutters, and landscaping along that five block area.

02:45:17.100 --> 02:45:20.580
Economic development is working with other city staff, city staff, including myself, to

02:45:20.580 --> 02:45:24.240
secure additional funding to enhance this project.

02:45:24.240 --> 02:45:27.840
As Main Avenue and the downtown area continue to thrive, the long term planning committee

02:45:27.840 --> 02:45:32.960
is recommending two new positions, which we've actually already mentioned to you tonight,

02:45:32.960 --> 02:45:42.440
but wanted to illustrate to you that many of these positions that we are bringing forth to you as recommendations tied directly to more than one focus area.

02:45:42.440 --> 02:45:48.080
The first is the building inspector plan reviewer that you have already approved tonight.

02:45:48.080 --> 02:45:55.580
But this position will operate the newly created downtown permit assistance program to assist potential businesses in the building permit and

02:45:55.580 --> 02:46:00.280
certificate occupancy process on buildings within the original town site.

02:46:00.280 --> 02:46:05.020
As Jared said, old buildings are hard and they're tough and it's an opportunity for people

02:46:05.020 --> 02:46:09.280
to understand what they're getting into and kind of help them along in the process.

02:46:09.280 --> 02:46:14.040
The purpose of this program is to promote the revitalization and make it easier for those

02:46:14.040 --> 02:46:19.270
relocation or businesses to relocate to the downtown area.

02:46:19.270 --> 02:46:22.910
Additionally, a plan or two position has been recommended and spoken about previously tonight

02:46:22.910 --> 02:46:23.910
as well.

02:46:23.910 --> 02:46:28.110
This position will support this focus area by addressing significant zoning deficiencies that

02:46:28.110 --> 02:46:30.520
exist in the downtown area.

02:46:30.520 --> 02:46:35.440
The second goal of this focus area relates to infrastructure and facilities to support economic

02:46:35.440 --> 02:46:36.640
prosperity and growth.

02:46:36.640 --> 02:46:48.400
The long-term planning committee recommends the commission of an airport utility plan to

02:46:48.400 --> 02:46:53.460
address the infrastructure for new or for the revenue-producing areas of the airport in order

02:46:53.460 --> 02:47:00.460
to bring the utilities along with future expansion plans such as taxiways, roadways and new hangers.

02:47:00.460 --> 02:47:04.100
This will ensure that the city will be able to accommodate and take advantage of any future

02:47:04.100 --> 02:47:06.340
growth opportunities.

02:47:06.340 --> 02:47:10.220
Channel mapping is also recommended by the committee as an important tool used by almost

02:47:10.220 --> 02:47:14.300
every single department within the city as well as many private businesses.

02:47:14.300 --> 02:47:19.340
The current mapping in use was completed in August of 2012 and these pictures are rather

02:47:19.340 --> 02:47:25.340
hard to see but they show three areas of Twin Falls down here.

02:47:25.340 --> 02:47:32.750
The outdated area map number one is showing that area in and around Settlers Ridge that

02:47:32.750 --> 02:47:37.250
is looks vacant, but I just moved into a rental house out there and I guarantee their

02:47:37.250 --> 02:47:39.810
house is there.

02:47:39.810 --> 02:47:46.010
The second area is out on Canyon Park West and the Canyon Rim Development and then up

02:47:46.010 --> 02:47:48.410
towards the top is the Cliff Bar Development.

02:47:48.410 --> 02:47:51.690
So you can see how quickly these maps get outdated.

02:47:51.690 --> 02:47:56.010
And so what the long-term planning committee is recommending is that we budget for new

02:47:56.010 --> 02:48:05.370
mapping in 2016, and then starting in 2019, get on a rotation schedule so that we don't

02:48:05.370 --> 02:48:09.010
find ourselves in a situation where we're completely out of date.

02:48:09.010 --> 02:48:13.570
Finally, in outline years, the committee is also recommending both a stormwater plan and

02:48:13.570 --> 02:48:18.330
a pressurized irrigation master plan in order to identify, allow staff to identify services

02:48:18.330 --> 02:48:23.210
and systems that need to be updated, not only to keep up with our growth, but also to assist

02:48:23.210 --> 02:48:28.930
city and complying with upcoming federal mandates and changes in rules and regulations and again

02:48:28.930 --> 02:48:31.850
better allow us to do our jobs.

02:48:31.850 --> 02:48:36.490
The last goal of the focus area is expanding opportunities for business and tourism.

02:48:36.490 --> 02:48:40.730
This is an area where the city is forced to weigh the needs and expectations of our current

02:48:40.730 --> 02:48:45.170
citizens and businesses community against our ability to fund all requests.

02:48:45.170 --> 02:48:49.210
A position was proposed to the long term planning for an economic development assistant.

02:48:49.210 --> 02:48:53.110
This individual would have been responsible for operating a business expansion and retention

02:48:53.110 --> 02:49:00.350
program at the city of currently all of our economic development efforts are reactionary

02:49:00.350 --> 02:49:06.110
and there are no expansion retention or entrepreneurial programs available to existing businesses

02:49:06.110 --> 02:49:07.850
within Twin Falls.

02:49:07.850 --> 02:49:14.170
Although everyone on the committee recognized the need, this was probably one of the best

02:49:14.170 --> 02:49:19.690
examples of not being able to recommend all positions based on our limited

02:49:19.690 --> 02:49:28.570
resources and that concludes Focus Area 6. Any questions? All right. Great. Thank you.

02:49:28.570 --> 02:49:36.790
Focus Area 7 is not near as complex for long as Focus Area 3 but still no less

02:49:36.790 --> 02:49:44.950
important. So Focus Area 7 talks about a responsible community and this the

02:49:44.950 --> 02:49:49.470
The driving thing behind this is to engage the community in a manner that seeks involvement

02:49:49.470 --> 02:49:54.310
in input regarding what services should be a priority, as well as the most effective and

02:49:54.310 --> 02:49:56.390
efficient ways of delivering service.

02:49:56.390 --> 02:49:58.230
I'm going to move this up.

02:49:58.230 --> 02:50:02.700
There we go.

02:50:02.700 --> 02:50:07.500
Long-term planning committee identified a number of opportunities to create collaborative advisory

02:50:07.500 --> 02:50:09.100
groups and partnerships.

02:50:09.100 --> 02:50:16.180
For example, we recommend that a GIS advisory group be developed internally to identify how

02:50:16.180 --> 02:50:20.500
How to maximize the value of GIS within each individual department.

02:50:20.500 --> 02:50:25.300
We also recommend that a technology advisory group be developed to coordinate the purchase

02:50:25.300 --> 02:50:28.100
of technology throughout the city.

02:50:28.100 --> 02:50:33.340
This will help eliminate one department operating off of systems that are incompatible with systems

02:50:33.340 --> 02:50:35.460
used in other departments.

02:50:35.460 --> 02:50:42.020
This should reduce workload or roadblocks and costs associated with multiple types of software

02:50:42.020 --> 02:50:46.140
and programs being requested by each individual department.

02:50:46.140 --> 02:50:50.780
The long-term planning committee also recommends some funding be set aside to develop collaborative

02:50:50.780 --> 02:50:56.480
advisory groups to identify solutions for future maintenance and replacement needs of the city's

02:50:56.480 --> 02:51:02.980
swimming pool bubble and the potential development of a community recreation center. Additionally,

02:51:02.980 --> 02:51:07.740
the long-term planning committee recommends that the city continue to set aside funding

02:51:07.740 --> 02:51:12.260
to participate in the National Citizen Survey every other year to help drive our focus

02:51:12.260 --> 02:51:16.000
on service priorities is viewed by the community.

02:51:16.000 --> 02:51:18.060
That's folks area seven.

02:51:18.060 --> 02:51:20.860
Terry, I have a question when we, the internal work groups,

02:51:20.860 --> 02:51:25.180
the advisory groups for GIS and technology, that's internal.

02:51:25.180 --> 02:51:29.800
And then we start talking about the pull bubble recreation.

02:51:29.800 --> 02:51:33.100
You're saying that we get some external advisory groups.

02:51:33.100 --> 02:51:35.100
Is that a advisory group to the council?

02:51:35.100 --> 02:51:37.180
Is it separate to just staff?

02:51:37.180 --> 02:51:38.300
What are your thoughts?

02:51:38.300 --> 02:51:40.780
Our thoughts are an advisory group to the council.

02:51:40.780 --> 02:51:43.780
to really identify what options are available

02:51:43.780 --> 02:51:46.500
and how best to go about providing funding

02:51:46.500 --> 02:51:48.300
for those major costs.

02:51:48.300 --> 02:51:51.060
And these would probably be more like a task force

02:51:51.060 --> 02:51:53.900
advisory group because they have a season to them, right?

02:51:53.900 --> 02:51:55.900
They come and then they go.

02:51:55.900 --> 02:51:58.860
That is the idea behind those two particular ones, yes.

02:51:58.860 --> 02:52:00.820
OK, very good.

02:52:00.820 --> 02:52:06.080
Do we have any other questions for Lieutenant Lewis?

02:52:06.080 --> 02:52:07.000
No, sir.

02:52:07.000 --> 02:52:13.100
Thank you.

02:52:13.100 --> 02:52:16.900
I conclude with focus area number eight, internal organization

02:52:16.900 --> 02:52:22.780
and talks about providing effective professional high quality services to city, residents, businesses,

02:52:22.780 --> 02:52:24.140
industries, and visitors.

02:52:24.140 --> 02:52:29.420
Training was one of the key areas our committee focused on during our recommendation process.

02:52:29.420 --> 02:52:34.020
One opportunity we discussed at length involved the lead training through the University of Virginia.

02:52:34.020 --> 02:52:42.220
The LTP committee took a significant amount of time discussing the one day and four day training sessions.

02:52:42.220 --> 02:52:45.980
Some pointed out that the one day training was not nearly as beneficial as the four day,

02:52:45.980 --> 02:52:50.220
while others pointed out that the one-day training had made an impact on their day-to-day interactions

02:52:50.220 --> 02:52:52.620
with customers and coworkers.

02:52:52.620 --> 02:52:55.940
Our unanimous recommendation is to continue to pursue this training in the future with

02:52:55.940 --> 02:53:01.460
both the one-day and four-day trainings available to those who have not yet received them.

02:53:01.460 --> 02:53:06.460
Other training opportunities included web-based supervisory training is discussed that gathering

02:53:06.460 --> 02:53:09.700
all the supervisors throughout the city into one place can be difficult with the varying

02:53:09.700 --> 02:53:13.020
work schedules and the demand for their time.

02:53:13.020 --> 02:53:17.740
Our recommendation is to pursue web-based training for this specific group and topic,

02:53:17.740 --> 02:53:23.180
which will allow flexibility and optimize effective work times with those specific work

02:53:23.180 --> 02:53:24.530
groups.

02:53:24.530 --> 02:53:30.530
We also recommend the continuation of renewing important certifications for emergency services

02:53:30.530 --> 02:53:33.010
and public works departments.

02:53:33.010 --> 02:53:37.330
Maintaining these certifications is vital to satisfying state and federal requirements,

02:53:37.330 --> 02:53:42.690
while giving refresher courses to individuals who play a pivotal role in maintaining our

02:53:42.690 --> 02:53:48.340
systems and keeping our community safe. Through these recommended training opportunities we wish to convey

02:53:48.340 --> 02:53:54.260
the importance in maintaining the professionalism and competency of our workforce. Continuing education

02:53:54.260 --> 02:53:59.380
allows for increased efficiency and capable decision making on all levels of the organization.

02:54:00.350 --> 02:54:04.910
The second area of internal organization deals with treating our employees fairly. This piece was

02:54:04.910 --> 02:54:09.230
also debated at length within our group. At the terminus of our discussion on these topics,

02:54:09.230 --> 02:54:15.330
We came to the conclusion that we truly do not have a solid number on the anticipated

02:54:15.330 --> 02:54:17.410
insurance increase.

02:54:17.410 --> 02:54:21.010
We had not started negotiations with our insurance provider and were forced to come up with the

02:54:21.010 --> 02:54:23.410
best guest scenario.

02:54:23.410 --> 02:54:28.610
We used 15 percent as the increase to bring some reality to the conversation as we balance

02:54:28.610 --> 02:54:31.090
future needs with future reality.

02:54:31.090 --> 02:54:35.410
We understand this number may change and we recognize negotiations will be vigorous.

02:54:35.410 --> 02:54:39.050
It was the best information we had at the time of this recommendation.

02:54:39.050 --> 02:54:42.890
We believe employees are the best asset we have in the city.

02:54:42.890 --> 02:54:46.410
Keeping well trained, competent employees that offer an unparalleled service to the community

02:54:46.410 --> 02:54:51.770
are going to be difficult to keep in our job market.

02:54:51.770 --> 02:54:56.570
In order to address this, the committee recommends a compensation increase of 3%.

02:54:56.570 --> 02:55:01.050
This number closely resembles the cumulative increase of the consumer price index for the

02:55:01.050 --> 02:55:05.100
year 2014, the end year.

02:55:05.100 --> 02:55:10.260
Thank you for your service and your guidance as we strive to offer the most informed five-year

02:55:10.260 --> 02:55:14.860
plan to help this budgeting process continue throughout this next year.

02:55:14.860 --> 02:55:16.860
Ron is going to conclude us.

02:55:16.860 --> 02:55:18.900
Unless you have any questions for me.

02:55:18.900 --> 02:55:21.700
Any questions for Jonathan?

02:55:21.700 --> 02:55:22.700
You're on Ron.

02:55:22.700 --> 02:55:23.700
Thank you Jonathan.

02:55:23.700 --> 02:55:24.700
Thank you Jonathan.

02:55:24.700 --> 02:55:29.100
That I can finish this up in about 25 minutes I practice this a few times right away.

02:55:29.100 --> 02:55:30.100
Rock and roll.

02:55:30.100 --> 02:55:35.580
So in conclusion the one city philosophy dictates that we put decision making where the information

02:55:35.580 --> 02:55:40.580
All the decisions that were made for the recommendations are based on the information

02:55:40.580 --> 02:55:42.580
that we had available to us today.

02:55:42.580 --> 02:55:48.320
As you can see, we fully understand that by continuing to evaluate our processes, our structure,

02:55:48.320 --> 02:55:53.320
and the way that we do business, we will be able to move forward in a very positive way.

02:55:53.320 --> 02:56:01.410
We believe that these recommendations can be used as a building block for your further budget process.

02:56:01.410 --> 02:56:08.210
So with that we thank you for your time and we'll open it up to any questions that you have for the group.

02:56:08.210 --> 02:56:15.810
Before we have any questions I think the whole council really want to tell you how much we appreciate all the effort that you put into this.

02:56:15.810 --> 02:56:17.810
It really does give us a high.

02:56:17.810 --> 02:56:26.590
And for being here until 8.05 as well so we really do appreciate that.

02:56:26.590 --> 02:56:28.990
So do we have any questions Council?

02:56:28.990 --> 02:56:35.180
I think it was so well informed that seriously thank you very much.

02:56:35.180 --> 02:56:46.860
So I want to put their effort into perspective, because clearly you see just a snapshot of what they did.

02:56:46.860 --> 02:57:00.270
But all the men and women in here worked at least somewhere between 14 to 16 hours a week for a period of four months on this project.

02:57:00.270 --> 02:57:03.590
And they still did their day job.

02:57:03.590 --> 02:57:11.220
So they had to go forward, they had to respond to those critical things that we do as public servants.

02:57:11.220 --> 02:57:16.300
We look up here and we see that there's a $2.5 million shortfall, that's where they started.

02:57:16.300 --> 02:57:21.060
And they've really been able to neck this down to about $421,000.

02:57:21.060 --> 02:57:25.280
$421,000 is a lot of money.

02:57:25.280 --> 02:57:33.200
But I will also tell you that prior to the advent of the long term planning process, before you saw the budget,

02:57:33.200 --> 02:57:36.720
We started at a $2.5 million deficit.

02:57:36.720 --> 02:57:43.800
So the work that they do really accelerates our budget process from a place that we can

02:57:43.800 --> 02:57:47.920
really dive down and fund what is truly important.

02:57:47.920 --> 02:57:53.440
But most importantly, this budget is much more complete than anything that I would generate

02:57:53.440 --> 02:57:54.440
from my desk.

02:57:54.440 --> 02:58:01.870
And although we may not, my budget that comes forward may not look 100 percent like this.

02:58:01.870 --> 02:58:11.550
They've taken probably 90% of the work through their process away from just by the conversations,

02:58:11.550 --> 02:58:14.610
the figures, the debates that they had.

02:58:14.610 --> 02:58:20.010
And most importantly, what this illustrates is the one-city concept that we've been talking

02:58:20.010 --> 02:58:26.090
about, where we've created a parallel team, you have groups and individuals that are not

02:58:26.090 --> 02:58:31.930
necessarily at the top of our organization, and they're not necessarily at the bottom,

02:58:31.930 --> 02:58:34.500
but they're in all places in between,

02:58:34.500 --> 02:58:36.180
coming together to guide the future

02:58:36.180 --> 02:58:38.260
of the organization for the next five years.

02:58:38.260 --> 02:58:41.100
They bring their talents, they bring their tools,

02:58:41.100 --> 02:58:44.380
and they apply it to fix a problem.

02:58:44.380 --> 02:58:47.140
That's what we're striving to do across the organization.

02:58:47.140 --> 02:58:49.940
So I'm sitting over here, I hear things like charter,

02:58:49.940 --> 02:58:52.100
I hear things like committee,

02:58:52.100 --> 02:58:54.020
hear things like one city,

02:58:54.020 --> 02:58:56.260
and it can see that it's really beginning to take hold.

02:58:56.260 --> 02:58:58.060
So my congratulations to them,

02:58:58.060 --> 02:59:00.300
but I also wanted you to understand,

02:59:00.300 --> 02:59:02.940
really the level of detail and effort that they put into this

02:59:02.940 --> 02:59:05.000
over the course of the last four months.

02:59:05.000 --> 02:59:05.840
Thank you, Travis.

02:59:05.840 --> 02:59:07.860
Thank you.

02:59:07.860 --> 02:59:10.140
All right, we have a couple other things on the agenda.

02:59:10.140 --> 02:59:12.500
And ladies and gentlemen, you're not going to hurt our feelings

02:59:12.500 --> 02:59:14.860
a bit if you start drifting out, because we're going to be

02:59:14.860 --> 02:59:17.700
going into an executive session potentially as well.

02:59:17.700 --> 02:59:21.300
So get up, get out of here, go see your families.

02:59:21.300 --> 02:59:23.260
Thank you.

02:59:23.260 --> 02:59:26.020
Next item, I'm going to go ahead and open it up again

02:59:26.020 --> 02:59:28.660
for public input if there's anyone here from the public

02:59:28.660 --> 02:59:31.620
that would like to address the council.

02:59:31.620 --> 02:59:34.620
I can't imagine either.

02:59:34.620 --> 02:59:38.540
Items from city manager.

02:59:38.540 --> 02:59:47.540
Okay, so I have a few, but I'll also tell you that we will send this out in an email, and we've also already discussed this, but I just wanted to get this for the public.

02:59:47.540 --> 03:00:01.540
One of the things that was requested as part of the downtown improvement project was the council going through and having a thorough discussion and public review of their own of the downtown project and including parking.

03:00:01.540 --> 03:00:05.540
On the week, next week, the 11th,

03:00:05.540 --> 03:00:08.540
Melinda and Mandy with OTEC are going to be in our community,

03:00:08.540 --> 03:00:14.540
and they're going to share some of the thoughts and the concepts driving the current plan.

03:00:14.540 --> 03:00:20.540
On the week, and we're going to ask you on the 11th not to take any action on that plan,

03:00:20.540 --> 03:00:24.540
because on the week of the 18th, we would like to do a field demonstration project

03:00:24.540 --> 03:00:27.540
to really look at what back-end parking looks like.

03:00:27.540 --> 03:00:33.380
We recognize that there are some groups in our community that are very supportive.

03:00:33.380 --> 03:00:38.100
We recognize that there are some groups that are very much in opposition.

03:00:38.100 --> 03:00:42.660
And then you have the center group that really is trying to figure out what that all means.

03:00:42.660 --> 03:00:46.660
And so with the field demonstration, we want to be a part of this process.

03:00:46.660 --> 03:00:50.500
Then on Tuesday, March 26th, we are going to have a public hearing.

03:00:50.500 --> 03:00:51.020
May.

03:00:51.020 --> 03:00:52.100
Yeah, that may.

03:00:52.100 --> 03:00:56.540
May 26th, which is a Tuesday.

03:00:56.540 --> 03:01:00.540
because Memorial Day is the 25th this year.

03:01:00.540 --> 03:01:12.540
We will have our meeting and we will have a public hearing in which we will continue to have members of our community come and share their thoughts about that, not only the downtown project, but also the parking.

03:01:12.540 --> 03:01:19.540
And after those processes, should you choose to make and take a decision that would totally be acceptable?

03:01:19.540 --> 03:01:25.540
But staff is just asking that you wait until after Tuesday of the 26th to have most of the information available.

03:01:25.540 --> 03:01:27.820
Travis, I know you're going to do this, but just reiterate it.

03:01:27.820 --> 03:01:34.340
Maybe you're going to really advertise that demonstration piece because I've been hit by

03:01:34.340 --> 03:01:40.420
numerous folks regarding that in support and definitely not in support of it as well.

03:01:40.420 --> 03:01:44.780
So I think it's really important to get as many folks out there as possible.

03:01:44.780 --> 03:01:45.780
Right.

03:01:45.780 --> 03:01:49.420
And then we'll have public input at all of those sessions along the way.

03:01:49.420 --> 03:01:55.700
Just a quick, again, clarification from the comments that I made last week, AMPOC.

03:01:55.700 --> 03:02:03.200
Next week is just a conversation with the council if you'd want to determine a consistent scoring

03:02:03.200 --> 03:02:05.460
method between the group.

03:02:05.460 --> 03:02:13.650
The hearings on MPOG applications do not take place until the 18th at 4 o'clock.

03:02:13.650 --> 03:02:17.370
Then the budget conversations, this is really the beginning of that process.

03:02:17.370 --> 03:02:21.690
Next week we're going to ask the council to begin having a conversation about their goals

03:02:21.690 --> 03:02:25.690
and we would encourage the council to have again continuing those open mic sessions

03:02:25.690 --> 03:02:30.690
where community partners and interested individuals would come and also share their thoughts.

03:02:30.690 --> 03:02:36.690
We would do that again on the 26th of May.

03:02:36.690 --> 03:02:45.690
All of that information will be compiled and we will then present the budget to the City Council on July 6th.

03:02:45.690 --> 03:02:54.690
Between all of these conversations again, we have 12 total conversations prior to the adoption on 824.

03:02:54.690 --> 03:03:00.510
The last thing I have is on next Thursday, we either sent out a message, but also the

03:03:00.510 --> 03:03:05.130
community is invited from noon to four o'clock, it is Public Works Appreciation Week and in

03:03:05.130 --> 03:03:11.530
honor of Public Works Appreciation Week we have a series of tours on that day on the 21st

03:03:11.530 --> 03:03:18.090
which is a Thursday from 12 o'clock to four o'clock and we would invite you to come down

03:03:18.090 --> 03:03:23.380
and also have members of the community.

03:03:23.380 --> 03:03:24.380
Very good.

03:03:24.380 --> 03:03:26.820
Council, anything from you?

03:03:26.820 --> 03:03:28.300
Chris talking.

03:03:28.300 --> 03:03:32.540
Because of national events and even some in the state, Travis,

03:03:32.540 --> 03:03:35.020
I wonder if you and Fritz and the chief

03:03:35.020 --> 03:03:41.980
could provide an update of the policy and the legality

03:03:41.980 --> 03:03:44.260
around body cameras and vehicle cameras

03:03:44.260 --> 03:03:47.470
that are law enforcement.

03:03:47.470 --> 03:03:49.550
I've had a couple inquiries and I thought

03:03:49.550 --> 03:03:52.270
I didn't have any information I'd like to.

03:03:52.270 --> 03:03:55.950
It could be an email or a public presentation.

03:03:55.950 --> 03:03:58.670
So what we're going to do is we're actually

03:03:58.670 --> 03:04:00.670
having a meeting again tomorrow.

03:04:00.670 --> 03:04:03.910
We recognize that a news article on KTVB over the course

03:04:03.910 --> 03:04:06.590
of the weekend has sparked some renewed interest

03:04:06.590 --> 03:04:08.990
in terms of body cameras.

03:04:08.990 --> 03:04:10.670
We are looking at body cameras.

03:04:10.670 --> 03:04:14.750
We want to make sure that the actions that we take

03:04:14.750 --> 03:04:15.750
are sustainable.

03:04:15.750 --> 03:04:18.550
And we look at making a recommendation to you

03:04:18.550 --> 03:04:22.550
in terms of funding over the course of this next budget.

03:04:22.550 --> 03:04:28.130
Just to take care of that, except for the legal ramifications.

03:04:28.130 --> 03:04:30.130
Rebecca Milsoyka.

03:04:30.130 --> 03:04:31.130
Thank you, Mayor.

03:04:31.130 --> 03:04:39.130
And just to clarify, sir, our first public input or public hearing on the budget will be May 11th next week.

03:04:39.130 --> 03:04:40.130
Is that correct?

03:04:40.130 --> 03:04:48.130
Yes, so I want to, yes, we want to make sure that so statutorily we are required

03:04:48.130 --> 03:04:50.870
required to do a public hearing.

03:04:50.870 --> 03:04:57.090
What we're asking the Council to do is to allow public input through all of these conversations.

03:04:57.090 --> 03:05:03.690
We will do what we can with different types of media notification, but we won't necessarily

03:05:03.690 --> 03:05:08.370
take the legal steps for the established public hearing until we have to go through that public

03:05:08.370 --> 03:05:11.010
hearing process.

03:05:11.010 --> 03:05:15.810
There has been a suggestion to maybe do advertising that would be slightly different and that

03:05:15.810 --> 03:05:19.170
That would be really a direction from the council.

03:05:19.170 --> 03:05:26.460
The advertising that's talked about is more of a purchased add type advertisement as opposed

03:05:26.460 --> 03:05:30.540
to something that would appear in the legal announcements.

03:05:30.540 --> 03:05:33.490
Yeah, that brings up my comment.

03:05:33.490 --> 03:05:38.410
I wanted to just bring the conversation to the council because I think we've all decided

03:05:38.410 --> 03:05:43.010
that really the front end is the best time for the public to participate.

03:05:43.010 --> 03:05:46.930
So we have our state required public hearing in August,

03:05:46.930 --> 03:05:50.730
and that is required that we publish that in the paper,

03:05:50.730 --> 03:05:53.770
and so of course we publish that in the legal section.

03:05:53.770 --> 03:05:56.530
So I'm wondering, how do we get the word out?

03:05:56.530 --> 03:06:00.090
Do we wanna advertise this front end public hearing?

03:06:00.090 --> 03:06:04.730
I think it would be more effective for the public

03:06:04.730 --> 03:06:08.410
to kinda do something outside of the legal section

03:06:08.410 --> 03:06:12.530
since not a lot of people look at that area.

03:06:12.530 --> 03:06:15.210
something similar, I don't know if you all have seen,

03:06:15.210 --> 03:06:19.330
when ITD calls for public input, it's very simple.

03:06:19.330 --> 03:06:22.210
In the main section of the paper, it's black and white.

03:06:22.210 --> 03:06:26.250
It says basically, what kind of input they're looking for,

03:06:26.250 --> 03:06:31.890
where, when, and how people can participate.

03:06:31.890 --> 03:06:35.610
What I'm thinking of is, how do we spread the word

03:06:35.610 --> 03:06:39.050
and get the word out to the public that really,

03:06:39.050 --> 03:06:41.930
this is the best time to give input?

03:06:41.930 --> 03:06:43.850
I mean, I think it's kind of conflicting

03:06:43.850 --> 03:06:46.210
to say, well, this front end public hearing

03:06:46.210 --> 03:06:48.650
is really the best time, but we're not

03:06:48.650 --> 03:06:50.650
going to advertise it at all.

03:06:50.650 --> 03:06:52.530
And then in August, we advertise for people

03:06:52.530 --> 03:06:55.850
to come and give input.

03:06:55.850 --> 03:06:58.570
So I just wondered if that would be OK with the council,

03:06:58.570 --> 03:07:02.850
if they think that that's a justified expense, something

03:07:02.850 --> 03:07:07.530
small, simple, maybe three inches by five inches.

03:07:07.530 --> 03:07:09.610
I apologize, I don't have an example of ITDs.

03:07:09.610 --> 03:07:11.170
But many of you might have seen it.

03:07:11.170 --> 03:07:15.170
It just catches your eye, it gets your attention and says,

03:07:15.170 --> 03:07:19.410
hey, this is your opportunity to provide input.

03:07:19.410 --> 03:07:25.070
And I think with the end goal of readjusting the public's

03:07:25.070 --> 03:07:27.890
expectation of when they give input,

03:07:27.890 --> 03:07:33.530
I think we need to help them shift from August to May.

03:07:33.530 --> 03:07:35.930
And if anyone has any other suggestions

03:07:35.930 --> 03:07:38.170
on how to better do that, I think

03:07:38.170 --> 03:07:40.490
that'd be a great conversation to have.

03:07:40.490 --> 03:07:44.730
great line. Well, I was actually had my line for a different issue, but I won't

03:07:44.730 --> 03:07:50.210
answer that one as well. I'd like to see what response we get from the ads because

03:07:50.210 --> 03:07:54.750
I really don't want to put 12 of them in if they're not getting anybody here. One,

03:07:54.750 --> 03:08:00.130
and two, shifted from August to that. We don't need by in August. So,

03:08:00.130 --> 03:08:06.130
anybody we get earlier is going to be improving over August. So, that would

03:08:06.130 --> 03:08:17.130
And then also Josh and social media Twitter and Facebook and all those things probably reach as many people as the newspaper does at this point because the readership just keeps plummeting in the newspaper.

03:08:17.130 --> 03:08:23.130
So, before you change it to the subject, can I jump in on this real quick?

03:08:23.130 --> 03:08:30.130
You know, we have a professional public information officer with the idea that you had, you got it, right? You can figure this stuff out pretty quick.

03:08:30.130 --> 03:08:33.580
Okay, thanks.

03:08:33.580 --> 03:08:41.140
I just want to give a shout out without skipping a publicized meeting and thanks to the two

03:08:41.140 --> 03:08:47.220
events we had last Thursday, the additions to our community, the first federal park is

03:08:47.220 --> 03:08:48.220
unbelievable.

03:08:48.220 --> 03:08:53.860
I mean, I was astonished, I had a conceptual, I've been to the meetings, I've watched what

03:08:53.860 --> 03:08:59.460
they were talking about, I've talked to Manny, and I had no idea how nice that was going

03:08:59.460 --> 03:09:03.680
to be and how beautiful and an asset or an addition to our community that is.

03:09:03.680 --> 03:09:10.160
I'd just like to publicly thank First Federal for their gift to our community and then also

03:09:10.160 --> 03:09:15.240
the new Visitor Center, Publicly Thank Rainios, and I think he was part of the major sponsor

03:09:15.240 --> 03:09:16.240
of it.

03:09:16.240 --> 03:09:21.000
That is such a beautiful entrance to our city now that if you think about the two little

03:09:21.000 --> 03:09:26.000
wood buildings we had before and you think about what's there now and the things that are involved

03:09:26.000 --> 03:09:30.880
that I certainly think that highlights our community and can't do anything but help

03:09:30.880 --> 03:09:41.510
our promoting of Twin Falls. Okay. Anyone else from Council? All right moving on

03:09:41.510 --> 03:09:49.290
to potentially adjournment into executive session Idaho Code section 672345. One

03:09:49.290 --> 03:09:53.570
be to consider the evaluation dismissal or disciplining up or to hear a

03:09:53.570 --> 03:09:58.130
complaint or charges brought against a public officer, employee, staff member or

03:09:58.130 --> 03:10:05.890
individual agent or public school student and one C to conduct deliberations concerning

03:10:05.890 --> 03:10:12.370
labor negotiations or to require an interest in real property which is not owned by a public

03:10:12.370 --> 03:10:17.450
agency, stand for direction from council. Suzanne Hawkins.

03:10:17.450 --> 03:10:18.450
So moved.

03:10:18.450 --> 03:10:19.450
Second.

03:10:19.450 --> 03:10:24.230
Motion on the floor by Suzanne Hawkins, seconded by Greg Lanting. Anything further on that

03:10:24.230 --> 03:10:25.230
motion council?

03:10:25.230 --> 03:10:28.540
We'll call vote please, Sharon.

03:10:28.540 --> 03:10:30.740
Chris talking to you bet

03:10:32.060 --> 03:10:37.040
Yes, Don Hall. Yes, Rebecca Mills, soica. Yes

03:10:38.000 --> 03:10:40.000
Suzanne Hawkins. Yes

03:10:40.120 --> 03:10:46.020
Jim man. Yes, motion passes six to zero. We will not be reconvening after this meeting to see me

03:10:46.840 --> 03:10:49.240
We are going into executive session